BILL REQ. #:  Z-0988.1 



_____________________________________________ 

SENATE BILL 6384
_____________________________________________
State of Washington59th Legislature2006 Regular Session

By Senators Fraser, Prentice, Doumit, Zarelli and Brandland; by request of Governor Gregoire

Read first time 01/11/2006.   Referred to Committee on Ways & Means.



     AN ACT Relating to the capital budget; making appropriations and authorizing expenditures for capital improvements; amending 2005 c 488 ss 109, 131, 138, 142, 143, 152, 206, 212, 239, 255, 264, 323, 324, 325, 327, 329, 332, 340, 341, 342, 360, 365, 368, 369, 370, 372, 376, 382, 385, 386, 387, 390, 391, 392, 395, 443, 451, 453, 601, 632, 714, 905, and 909 (uncodified); adding new sections to 2005 c 488 (uncodified); creating new sections; and declaring an emergency.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

NEW SECTION.  Sec. 1   A supplemental capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period beginning with the effective date of this act and ending June 30, 2007, out of the several funds specified in this act.

SUPPLEMENTAL APPROPRIATIONS

Sec. 101   2005 c 488 s 109 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water Assistance Program (06-4-003)

Appropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $8,100,000
     Drinking Water Assistance Repayment
          Account--State . . . . . . . . . . . . (($11,500,000))
       $21,780,000
          Subtotal Appropriation . . . . . . . . . . . . (($19,600,000))
       $29,880,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $78,400,000
          TOTAL . . . . . . . . . . . . (($98,000,000))
       $108,280,000

Sec. 102   2005 c 488 s 131 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local/Community Projects (06-4-008)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The projects must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
     (2) Funding for the Inland Northwest Science and Technology Center shall be held in reserve until the balance of phase I funding has been secured or committed from local government and community sources.
     (3) The Washington state arts commission shall design a plaque that shall be affixed to buildings or displayed as part of a project receiving any appropriation from this section. The plaque shall provide information to the public that the building or project has been made possible by the tax dollars of Washington citizens. The commission may contact the secretary of state to obtain approval for use of the Washington seal in the design of the plaque. The final design shall be approved by the chairs and ranking members of the house of representatives capital budget committee and the senate ways and means committee.
     (4) The appropriation is provided solely for the following list of projects:


ProjectsRecommendation
7th street theatre$600,000
Alder creek pioneer association carousel museum$450,000
Asian counseling and referral service$2,000,000
Bailey Gatzert children's play area$75,000
Bridge for kids$850,000
Brookside school ADA playground equipment$25,000
Buena library$50,000
Cannon house$250,000
Central area motivation program (CAMP)$250,000
Cesar Chavez park$150,000
Childhaven$150,000
Clark Lake park and retreat center$500,000
Colman school$500,000
Columbia breaks fire interpretive center$150,000
Covington aquatics center phase 1$350,000
Crossroads community center and park$250,000
Cutter theater$71,000
Des Moines beach park historic buildings$300,000
Discovery park$1,000,000
East Whatcom regional resource center$1,750,000
Eatonville family park$50,000
El Centro de la Raza$900,000
Filipino community center$200,000
Foster creek$150,000
Fox theater$2,398,000
GC health clinic$12,000
Grand Army of the Republic cemetery$5,000
Granite Falls museum expansion$50,000
Gray's Harbor substation$1,500,000
Greenbridge plaza in White Center$200,000
Habitat park south hill$400,000
Hidden river environmental education center$50,000
ICL education center$200,000
Japanese cultural and community center$200,000
Joel Pritchard park$2,500,000
Joe's creek project$856,000
Juanita creek channel and riparian restoration$500,000
Julia Butler Hansen home restoration$10,000
LeRoi smelter smokestack monument$3,000
Lewis and Clark confluence project(($1,500,000))
$2,000,000
McCaw hall$2,000,000
MOBIUS/Inland Northwest science and technology center
$1,500,000
Mt. Baker theater$200,000
Mt. Vernon Jasper Gates statue$12,000
Multicultural center of Kitsap county$250,000
Nathaniel Orr home site museum interpretive center$29,000
New Lakewood clinic$350,000
Northeast community center expansion$250,000
Northshore performing arts center$1,000,000
Northwest communities education center$1,000,000
Oak Harbor multi-purpose community and sports facility
$50,000
Omak grandstand$250,000
Pacific Northwest salmon center$1,000,000
Pacific science center$900,000
Performing arts center (PACE)$500,000
Puget Sound freight building warehouse--Thea Foss waterway
$2,000,000
Relocation of Sieke Japanese gardens$250,000
River walk and Sammamish river restoration$200,000
Roslyn city hall$150,000
Ruth Dykeman children's center$27,000
Sandman historical tug restoration$10,000
Seattle Art Museum$200,000
Seattle Aquarium$2,000,000
Seattle community center (1115 E. Pike street)$13,000
Seward park environmental and audubon center$400,000
Snohomish senior center$150,000
Sno-Valley senior activity center kitchen$50,000
Sound way property preservation$500,000
Spokane river whitewater course$400,000
Sumas ballpark$250,000
Synthetic sportsfield partnership at Robinswood park$400,000
Tall ships moorage$300,000
Tukwila kayak and canoe launching facility$20,000
Undeveloped woodlands linked to interurban nature trail
$150,000
Vancouver museum$125,000
Vancouver national historical reserve west barracks$1,000,000
Veterans memorial museum$100,000
West Seattle community resource center$500,000
West central community center$500,000
West Hylebos wetlands boardwalk$100,000
Wilson playfield land acquisition$200,000
Wing Luke Asian art museum$2,000,000
Youth housing/drop-in center$400,000
Total(($39,391,000))
$43,591,000


Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($39,391,000))
       $43,591,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($39,391,000))
       $43,591,000

NEW SECTION.  Sec. 103   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Public Works Assistance Account (06-4-014)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the implementation of chapter . . . ([House] [Senate] Bill No. . . . (Z-0776.1/06)), Laws of 2006 adopting the second recommended public works loan list. If this bill is not enacted by June 30, 2006, the amount provided in this subsection shall lapse.

Appropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $55,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $55,000,000

Sec. 104   2005 c 488 s 138 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Job/Economic Development Grants (06-4-950)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is provided solely for the following list of projects:

ProjectsRecommendation
Belfair sewer improvements$8,000,000
Bellingham waterfront restoration$2,000,000
Bremerton Harborside$4,000,000
Burien town square$2,000,000
Carnation sewer$2,000,000
City of Covington$1,000,000
Infrastructure for Renton Boeing property$5,000,000
Military communities infrastructure projects$5,000,000
Pacific Northwest national labs campus infrastructure project
$6,000,000
Rainier court$1,500,000
Redevelop Snohomish riverfront$1,500,000
Ridgefield employment center project$2,000,000
Tukwila Southcenter parkway infrastructure$6,000,000
Yakima town center restoration$4,000,000
Total$50,000,000

     (2) $1,000,000 of the appropriation for the Pacific Northwest national labs campus infrastructure project is provided solely for giga-pop infrastructure.
     (3) $5,000,000 of the appropriation is provided solely for military communities infrastructure projects ((is provided solely for grants to support projects in Island county, Kitsap county, Pierce county, Snohomish county, and Spokane county when a military base in that county is identified for potential closure in the federal base realignment and closure process. The grants will be used to address infrastructure improvements that will aid in the removal of the base from the closure list. The office of financial management shall establish a process for selecting projects for funding based on criteria used to determine the federal base realignment and closure list and recommendations by the department of community, trade, and economic development and the military department)). The uses of grants, authorized in this subsection, shall include infrastructure improvements to a military department site on Fairchild air force base, improvements to community infrastructure that will aid in preventing future military base closures, and purchase of accident potential zones and clear zones. These funds may be used to match federal grants for infrastructure projects. Final allocation of ((the)) these grants shall be at the discretion and with the approval of the director of the office of financial management.

Appropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $50,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 105   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Washington Bio-Energy Loan Fund (06-1-001)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the implementation of chapter ... ([House] [Senate] Bill No. ....), Laws of 2006 setting up the Washington bio-energy loan fund. If this bill is not enacted by June 30, 2006, the amount provided in this subsection shall lapse.

Appropriation:
     Washington Bio-Energy Loan Account--State . . . . . . . . . . . . $17,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,500,000

NEW SECTION.  Sec. 106   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Energy Match Maker Grant Program (06-2-001)

Appropriation:
     Washington Housing Trust Account--State . . . . . . . . . . . . $4,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,500,000

Sec. 107   2005 c 488 s 142 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Legislative Building: Rehabilitation and Capital Addition (01-1-008)

Reappropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . (($100,000))
       $214,063

     Prior Biennia (Expenditures) . . . . . . . . . . . . $106,280,442
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($106,380,442))
       $106,494,505

Sec. 108   2005 c 488 s 143 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Cherberg Building: Rehabilitation (02-1-005)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is for the purpose of furthering the John A. Cherberg building rehabilitation project, including but not limited to the following: Project final design and initial phase of reconstruction; purchase and remodel of the two modular buildings currently owned by the Legislative building rehabilitation project; and remodel of a portion of the Joel M. Pritchard building for use as swing space during reconstruction.
     (2) The appropriations in this section are subject to the following conditions and limitations:
     (a) Funding is provided solely for design, construction, and other costs related to the relocation efforts associated with this project.
     (((d))) (b) The department may negotiate agreements with the senate for additional fees to manage the John A. Cherberg building rehabilitation project.
     (((e))) (c) Upon completion of the project, the temporary modular buildings shall be sold and removed, and the parking lot shall be restored and landscaped.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,253,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $1,439,000
          Subtotal Appropriation . . . . . . . . . . . . $13,692,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,292,000

Sec. 109   2005 c 488 s 152 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     ((General Administration Building Rehabilitation)) North Capital Campus Executive Office Building(s) (06-1-002)

     The appropriation in this section is subject to the following conditions and limitations: Funding is provided solely for predesign for replacement or renovation of the general administration building combined with the development of an office building on the block adjoining Capital Way and 11th avenue. The combined development is intended to provide: (1) Executive office space for statewide elected officials; (2) public access space for the state library collection and historically significant documents from the state archives and the state historical museum; and (3) high density general office space that can adapt to changing state needs. The project will maximize interagency sharing of support services such as information technology, printing and mailing, management and storage of supplies, reception areas, and other common functions. The project will also include sufficient parking to provide a significant net increase in parking spaces beyond what is required for the new office space. The project shall also include leasable ground floor retail space on Capital Way. The department shall consult with statewide elected officials and the city of Olympia in developing the predesign. The predesign shall evaluate the use of the Pritchard building as one of the options for use by the state library and historically significant documents from the state archives and state historical museum. Due to the intended replacement of the building adjoining Capital Way and 11th avenue, the department shall not charge the facility depreciation component of lease charges for nonprofit tenants in that facility during the 2005-2007 biennium.

Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . (($750,000))
       $1,650,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($65,500,000))
       $312,017,000
          TOTAL . . . . . . . . . . . . (($66,250,000))
       $313,667,000

NEW SECTION.  Sec. 110   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Capital Campus Master Plan (06-2-001)

Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 111   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE MILITARY DEPARTMENT
     Washington Youth Academy (06-2-005)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $273,000
     State Building Construction Account--State . . . . . . . . . . . . $3,050,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,323,000

Sec. 112   2005 c 488 s 206 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Echo Glen Children's Center - Eleven Cottages: Renovation (00-1-041)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,800,000

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,605,495
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($16,100,000))
       $10,300,000
          TOTAL . . . . . . . . . . . . $22,205,495

Sec. 113   2005 c 488 s 212 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Rainier School - Wastewater Treatment Plant: Construction (Buckley) (04-1-950)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,926,000

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $60,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $190,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($4,350,000))
       $0
          TOTAL . . . . . . . . . . . . (($4,600,000))
       $4,176,000

Sec. 114   2005 c 488 s 239 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Special Commitment Center on McNeil Island: Additional Capacity (06-2-505)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($100,000))
       $922,000
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,028,000


     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($21,500,000))
       $22,950,000
          TOTAL . . . . . . . . . . . . (($21,600,000))
       $24,900,000

NEW SECTION.  Sec. 115   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Green Hill School: New Intensive Management Unit Building, and Health Center and Administration Building (06-2-202)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,500,000
          TOTAL . . . . . . . . . . . . $13,750,000

NEW SECTION.  Sec. 116   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Retsil Building 9 Renovation - Transient Program (06-1-008)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $318,000
     State Building Construction Account--State . . . . . . . . . . . . $171,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $489,000

Sec. 117   2005 c 488 s 255 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: 100-Bed Management and Segregation Unit (00-2-008)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $927,000

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $819,229
     State Building Construction Account--State . . . . . . . . . . . . (($18,674,000))
       $17,747,000
          Subtotal Reappropriation . . . . . . . . . . . . (($19,493,229))
       $18,566,229

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,944,803
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $39,438,032

Sec. 118   2005 c 488 s 264 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: North Close Security Compound (04-2-005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $124,000,000
Appropriation:
     ((General Fund--Federal . . . . . . . . . . . . $927,000))
     State Building Construction Account--State . . . . . . . . . . . . (($5,891,000))
       $6,818,000
          Subtotal Appropriation . . . . . . . . . . . . $6,818,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,940,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $140,758,000

NEW SECTION.  Sec. 119   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Replace Correctional Industry Roof (06-1-023)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,451,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,451,000

Sec. 120   2005 c 488 s 323 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (06-4-007)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) Up to $10,000,000 of the state building construction account--state appropriation is provided for the extended grant payment to Spokane for the Spokane-Rathdrum Prairie aquifer.
     (2) $5,000,000 of the state building construction account--state appropriation is provided solely for water quality grants for hardship communities with a population of less than 5,000. The department shall give priority consideration to: (a) Communities subject to a regulatory order from the department of ecology for noncompliance with water quality rules; (b) projects for which design work has been completed; and (c) projects with a local match from reasonable water quality rates and charges.
     (3) $1,000,000 of the state building construction account--state appropriation is provided solely to design appropriate wastewater treatment facilities to serve the Hoodsport to Skokomish reservation areas of Hood Canal. The exact facilities will be based upon the recommendations from an analysis of wastewater management options for the Hoodsport to Skokomish river currently being undertaken by Mason county.
     (4) $750,000 of the state building construction account--state appropriation is provided solely for assistance in management and clean up activities at Long Lake in Kitsap county and $50,000 of the state building construction account--state appropriation is provided solely for assistance in cleaning up Wapato Lake in Pierce county. The assistance is contingent on the lake communities adopting a lake management plan that meets the department's requirement.
     (5) $320,000 of the water quality account--state appropriation is provided solely to Mason county to develop a septic system data base and identify failing septic systems in Hood Canal.
     (6) $70,000 of the water quality account--state appropriation is provided solely to Kitsap county for surveys of septic systems in Hood Canal.
     (7) $70,000 of the water quality account--state appropriation is provided solely to Jefferson county for surveys of septic systems in Hood Canal.
     (8) Up to $1,500,000 of the water quality account--state appropriation is provided solely for grants for on-site sewage replacement. This appropriation may be used to: (a) Establish new or expand existing on-site sewage repair and replacement loan or grant programs by county governments or tribes; or (b) develop a pilot program to administer an on-site sewage repair and replacement loan program through a qualified private or nonprofit lending institution. This appropriation must be used in conjunction with the water pollution control revolving account--state appropriation in section 124 of this act provided for this purpose. Of this amount, up to $1,000,000 may be used to help financially distressed homeowners repair and replace failing on-site sewage system, and up to $500,000 may be used to help local governments plan, implement, and administer the local loan fund assistance programs. The total overall local government and tribal administration costs may not exceed seven percent of the total statewide grant and loan on-site program. The department must report on the use of these funds to the Puget Sound water quality action team as part of its activities under the 2005-2007 Puget Sound conservation and recovery plan.
     (9) $3,500,000 of the state toxics control account--state appropriation is provided solely for wastewater treatment upgrades at Twanoh, Dosewallips, Fort Casey, Fort Ebey, Birch Bay, and Sequim Bay state parks.
     (10)
The remaining appropriation in this section is provided for statewide water quality implementation and planning grants and loans.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $20,000,000
     Water Quality Account--State . . . . . . . . . . . . (($7,500,000))
       $9,000,000
     State Toxics Control Account--State . . . . . . . . . . . . (($10,500,000))
       $14,000,000
          Subtotal Appropriation . . . . . . . . . . . . (($38,000,000))
       $43,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $211,808,000
          TOTAL . . . . . . . . . . . . (($249,808,000))
       $254,808,000

Sec. 121   2005 c 488 s 324 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     State Drought Preparedness (05-4-009)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation in this section is provided solely for response to the statewide drought that was declared pursuant to chapter 43.83B RCW. The department of ecology may provide funding or compensation for purchase or lease of water rights and to public bodies as defined in RCW 43.83B.050 in connection with projects and measures designed to alleviate drought conditions which may affect: Public health and safety; drinking water supplies; agricultural activities; or fish and wildlife survival.
     (2) Projects or measures for which funding or compensation will be provided must be connected with a water system, water source, or water body which is receiving, or has been projected to receive, less than seventy-five percent of normal water supply, as the result of natural drought conditions. This reduction in water supply must be such that it is causing, or will cause, undue hardship for the entities or fish or wildlife depending on the water supply. General criteria for guidelines to be established by the department of ecology for distribution of funds must include: A balanced and equitable distribution of the funds among the different sectors affected by drought; a funding process that ensures funds are available for drought impacts that arise both early and later during the course of the drought; and preference for projects that leverage other federal and local funds.
     (3) Up to $1,500,000 of the reappropriation in this section is provided to the Roza irrigation district for the purchase or lease of water rights.
     (4) Of the funds provided in this section, $150,000 shall be made available to support the development and demonstration of water management measures in the Walla Walla Basin that improve and protect instream flow and water quality, and which also help sustain agricultural and economic vitality. The director of the department shall report to the legislature by December 31, 2006, with any findings, conclusions, and recommendations regarding such water management measures.

Reappropriation:
     State Drought Preparedness Account--State . . . . . . . . . . . . $8,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,200,000

Sec. 122   2005 c 488 s 325 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Local Toxics Grants for Clean up and Prevention (06-4-008)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $4,000,000 of the appropriation is provided solely for grants to local governments for local projects that implement the state "never waste" plan. Grant funds will emphasize additional organics composting and conversion, green building, and moderate risk waste projects described in the plan. Of this amount, up to $1,600,000 may be used for one-time funding for auto switch recycling consistent with the memorandum of agreement being finalized with the auto recyclers association.
     (2) $2,000,000 of the appropriation is provided for emission reduction projects for local governments to retrofit public sector diesel engines with exhaust emission control devices or to make other modifications or operational changes, including cleaner fuels, to allow public sector fleets to reduce their emissions.
     (3) $3,000,000 of the appropriation is provided solely for grants to local governments needing assistance in complying with the new phase II storm water permit requirements. Of this amount, $300,000 is provided solely for Mason county to prepare storm water management plans for Belfair and Hoodsport consistent with the storm water program in the Puget Sound conservation and recovery plan.
     (4) (($60,000,000)) $70,900,000 of the appropriation is provided solely for remedial action grants. Of this amount, $1,000,000 is provided to the town of Warden to respond to contamination of their existing water system.
     (5) From within this appropriation, the department shall prepare an online guide to help small businesses and homeowners learn what to do if they discover toxic wastes on their property. The guide shall provide information about local resources for clean up and disposal of toxic wastes.
     (6) $8,000,000 of the appropriation is provided solely for coordinated prevention grants provided to local governments for local government solid and hazardous waste planning, household and small business hazardous waste collection and disposal, recycling capital purchases and program development, and local solid waste enforcement.

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . (($80,000,000))
       $98,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $45,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $180,000,000
          TOTAL . . . . . . . . . . . . (($315,000,000))
       $323,900,000

Sec. 123   2005 c 488 s 327 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Safe Soil Remediation and Awareness Projects (06-2-001)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . (($2,000,000))
       $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,000,000))
       $5,000,000

Sec. 124   2005 c 488 s 329 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Account (06-4-002)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) The department shall give priority loan funding consideration to on-site septic system rehabilitation and replacement programs in Mason, Kitsap, and Jefferson counties for at least $1,000,000 from the water pollution control revolving account--state in the second year of the funding cycle.
     (2) Up to $5,000,000 of the water pollution control revolving account--state appropriation is provided solely for loans for on-site sewage replacement. This appropriation may be used to: (a) Establish new or expand existing on-site sewage repair and replacement loan programs by county governments or tribes; or (b) develop a pilot program to administer an on-site sewage repair and replacement loan program through a qualified private or nonprofit lending institution. This appropriation must be used in conjunction with water quality account--state appropriation in section 120 of this act provided for this purpose. The department must work with the department of health, the Puget Sound water quality action team, local governments, and the lending industry in developing and piloting this program. The department shall provide a status report on the loan program to the governor and the appropriate legislative fiscal committees by June 30, 2007, including any recommendations for improving the program. The department must report on the use of these funds to the Puget Sound water quality action team as part of its activities under the 2005-2007 Puget Sound conservation and recovery plan.

Appropriation:
     Water Pollution Control Revolving
          Account--State . . . . . . . . . . . . $162,839,146
     Water Pollution Control Revolving
          Account--Federal . . . . . . . . . . . . $76,777,140
          Subtotal Appropriation . . . . . . . . . . . . $239,616,286

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $912,000,000
          TOTAL . . . . . . . . . . . . $1,151,616,286

NEW SECTION.  Sec. 125   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Early Spill Response Equipment Caching (06-1-003)

     The appropriation in this section is subject to the following conditions and limitations: $1,450,000 of the appropriation is provided solely for grants to local governments to secure and place hazardous material spill response equipment at critical locations around the state. Grant funds will emphasize strategic placement of equipment that will allow for quick access and deployment by state, local, or tribal responders in the event of a spill.

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $1,450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,450,000

Sec. 126   2005 c 488 s 332 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Columbia River ((Initiative)) Program (06-2-010)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) (($6,000,000)) $16,000,000 is provided solely for:
     (a) F
easibility studies related to off-mainstem storage projects ((and impacts of changing operations at the Potholes reservoir, and grant funding for the purchase and installation of water measuring devices.));
     (b) Feasibility studies related to changing operations of the Potholes reservoir or other facilities within the Columbia Basin project;
     (c) Assessing the potential impacts of changing operations at water storage and management facilities on the Columbia river;
     (d) A feasibility analysis related to providing replacement water for ground water users in the Odessa subarea. As a part of a study of solutions to the Odessa problem, the department shall work with the United States bureau of reclamation to expedite a review of the potential for aquifer storage and recharge to shorten the lead time to making new water deliveries to ground water dependent farmers;
     (e) The department to work with water users to develop cost effective conservation projects;
     (f) The department to implement agreements that provide water to the mainstem of the Columbia river during periods of low flow and high out-of-stream demand; and
     (g) Grant funding for the purchase and installation of water measuring devices.

     (2) Of the amount appropriated in this section, $10,000,000 may not be expended prior to enactment of state legislation that establishes the policy requirements for a new water resources and water rights management program for the Columbia river mainstem. If such legislation is not enacted prior to June 30, 2006, this amount shall lapse.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $16,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $52,610,000
          TOTAL . . . . . . . . . . . . $68,610,000

NEW SECTION.  Sec. 127   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Local Innovative Storm Water Grants (06-2-006)

     The appropriation in this section is subject to the following conditions and limitations: This appropriation is provided for grants to local governments in Puget Sound to fund innovative, low-impact development storm water management projects to meet critical storm water management needs and protect or restore water quality. Projects may include use of bioretention, rainwater harvest, permeable pavement, vegetated roofs, and other low-impact development techniques. Projects funded in Puget Sound must meet the design guidelines contained in the low impact development technical guidance manual for Puget Sound, unless the municipality can demonstrate that site conditions warrant a deviation from the design guidelines and the deviations in design shall provide similar performance. All projects must include performance monitoring. The department must report on the use of these funds to the Puget Sound water quality action team as part of its activities under the 2005-2007 Puget Sound conservation and recovery plan.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 128   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Waste Tire Clean Up (06-1-002)

     The appropriation in this section is subject to the following conditions and limitations: Funding is provided for the department to initiate clean up of waste tires at the highest risk sites statewide. This clean up work must include major progress at the Goldendale site in Klickitat county.

Appropriation:
     Waste Tire Removal Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 129   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Clean Up Toxics Sites - Puget Sound (06-4-001)

     The appropriation in this section is subject to the following conditions and limitations: Funding is provided for the clean up of contaminated sites that lie adjacent to and are within one-half mile of Puget Sound. Clean ups must include orphan and abandoned sites that pose a threat to Puget Sound with the highest priority sites being cleaned up first. The department must report on the use of these funds to the Puget Sound water quality action team as part of its activities under the 2005-2007 Puget Sound conservation and recovery plan.

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 130   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Clean Up Toxic Sites - Upland and Aquatics (06-1-005)

     The appropriation in this section is subject to the following conditions and limitations: The department must report on the use of these funds to the Puget Sound water quality action team as part of its activities under the 2005-2007 Puget Sound conservation and recovery plan.

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

Sec. 131   2005 c 488 s 340 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
     Minor Works: Facility Preservation (04-1-001)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations in this section are provided solely to continue minor works projects that reduce the deferred maintenance backlog.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $147,269
     Parks Renewal and Stewardship Account--State . . . . . . . . . . . . (($2,600,000))
       $679,079
          Subtotal Reappropriation . . . . . . . . . . . . (($2,747,269))
       $826,348

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,990,231
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($7,737,500))
       $5,816,579

Sec. 132   2005 c 488 s 341 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
     Parkland Acquisition (04-2-013)

Reappropriation:
     Parkland Acquisition Account--State . . . . . . . . . . . . (($412,690))
       $191,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($412,690))
       $191,000

Sec. 133   2005 c 488 s 342 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
     Recreation Development (04-2-002)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) Up to $100,000 of the reappropriation shall be used to retain a consultant to conduct a predesign study for a headquarters building located in Thurston county. The predesign shall compare a new leased facility against options to build and evaluate appropriate funding strategies.
     (2) (($900,000)) Up to $700,000 of the reappropriation is provided ((solely)) to install fee collection stations at selected parks statewide. Any unused funding of this reappropriation may be expended on other recreation development projects.
     (3) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the commission shall file quarterly project progress reports with the office of financial management.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,900,000

NEW SECTION.  Sec. 134   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
     Sustainable Development and Restoration (06-1-011)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

Sec. 135   2005 c 488 s 360 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
     Parkland Acquisition Account (06-2-020)

     The appropriation in this section is subject to the following conditions and limitations: The state parks and recreation commission will provide lists of potential purchases and sales to the office of financial management and the legislature prior to committing the state parks and recreation commission to any sale or purchase of land or buildings and prior to any allotments made for those purchases. Included in the lists will be any potential operating or capital cost impacts known to the state parks and recreation commission.

Appropriation:
     Parkland Acquisition Account--State . . . . . . . . . . . . (($4,000,000))
       $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . (($20,000,000))
       $22,000,000

Sec. 136   2005 c 488 s 365 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
     Park Development (06-1-950)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $250,000 is provided solely to construct a pedestrian/emergency vehicle access bridge across Connor creek to allow for beach access.
     (2) $500,000 is provided solely to determine long-term park zoning, design park amenities and services, and provide site permit and initial construction development at Nisqually-Mashel. The state parks and recreation commission shall provide a predesign in accordance with the office of financial management's predesign instructions.
     (3) $150,000 is provided solely for initial park development at Sequim Bay-Miller Peninsula. The state parks and recreation commission shall provide a predesign in accordance with the office of financial management's predesign instructions.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $900,000

Sec. 137   2005 c 488 s 368 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Firearms and Archery Range Program (FARP) (98-2-004)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . (($31,478))
       $61,478

     Prior Biennia (Expenditures) . . . . . . . . . . . . $542,191
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($573,669))
       $603,669

Sec. 138   2005 c 488 s 369 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Nonhighway Off-road Vehicle Program (NOVA) (98-2-002)

Reappropriation:
     Nonhighway and Off-Road Vehicle Activities
          Program Account--State . . . . . . . . . . . . (($1,243,986))
       $1,322,986

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,851,937
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($11,095,923))
       $11,174,923

Sec. 139   2005 c 488 s 370 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Washington Wildlife and Recreation Program (WWRP) (98-2-003)

     The reappropriations in this section are subject to the following conditions and limitations: Any amount of the reappropriations that is not obligated to a specific project may be used to fund alternate projects approved by the legislature from the same account in biennia succeeding that in which the moneys were originally appropriated.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $4,547,515
     Habitat Conservation Account--State . . . . . . . . . . . . (($1,170,894))
       $4,382,894
          Subtotal Reappropriation . . . . . . . . . . . . (($5,718,409))
       $8,930,409

     Prior Biennia (Expenditures) . . . . . . . . . . . . $71,883,173
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($77,601,582))
       $80,813,582

Sec. 140   2005 c 488 s 372 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Salmon Recovery Funding Board Programs (SRFB) (00-2-001)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . (($11,227,424))
       $13,320,424
     Salmon Recovery Account--State . . . . . . . . . . . . (($2,366,010))
       $3,597,010
          Subtotal Reappropriation . . . . . . . . . . . . (($13,593,434))
       $16,917,434

     Prior Biennia (Expenditures) . . . . . . . . . . . . $88,031,707
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($101,625,141))
       $104,949,141

Sec. 141   2005 c 488 s 376 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Firearms and Archery Range Program (02-0-001)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . (($44,677))
       $120,677

     Prior Biennia (Expenditures) . . . . . . . . . . . . $355,323
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($400,000))
       $476,000

Sec. 142   2005 c 488 s 382 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Wildlife and Recreation Program (WWRP) (02-4-003)

     The reappropriations in this section are subject to the following conditions and limitations: Any amount of the reappropriations that is not obligated to a specific project may be used to fund projects in the following order: (1) The department of natural resources Cypress Island project; and (2) alternate projects approved by the legislature from the same account in biennia succeeding that in which the funds were originally appropriated.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . (($2,041,864))
       $3,525,864
     Habitat Conservation Account--State . . . . . . . . . . . . $6,928,926
          Subtotal Reappropriation . . . . . . . . . . . . (($8,970,790))
       $10,454,790

     Prior Biennia (Expenditures) . . . . . . . . . . . . $36,029,210
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($45,000,000))
       $46,484,000

Sec. 143   2005 c 488 s 385 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Facilities Program (BFP) (04-4-003)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . (($3,753,480))
       $4,484,480

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,753,479
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($7,506,959))
       $8,237,959

Sec. 144   2005 c 488 s 386 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Firearms and Archery Range Program (04-4-006)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . (($144,997))
       $154,997

     Prior Biennia (Expenditures) . . . . . . . . . . . . $105,003
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($250,000))
       $260,000

Sec. 145   2005 c 488 s 387 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Family Forest Fish Blockages Program (04-4-011)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($780,379))
       $1,191,379

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,219,621
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,000,000))
       $2,411,000

Sec. 146   2005 c 488 s 390 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     National Recreation Trails Program (NRTP) (04-4-008)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . (($1,130,000))
       $1,447,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,130,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,260,000))
       $2,577,000

Sec. 147   2005 c 488 s 391 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Nonhighway and Off-Road Vehicle Activities Program (NOVA) (04-4-004)

Reappropriation:
     NOVA Program Account--State . . . . . . . . . . . . (($5,492,729))
       $5,620,729

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,433,581
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($6,926,310))
       $7,054,310

Sec. 148   2005 c 488 s 392 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Salmon Recovery Funding Board Programs (SRFB) (04-4-001)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . (($32,832,305))
       $35,876,305
     State Building Construction Account--State . . . . . . . . . . . . (($11,500,000))
       $13,885,000
          Subtotal Reappropriation . . . . . . . . . . . . (($44,332,305))
       $49,761,305

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($45,332,305))
       $50,761,305

NEW SECTION.  Sec. 149   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Family Forest Fish Blockages Program (06-4-200)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $217,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $217,000

NEW SECTION.  Sec. 150   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Federal Trails Program (06-4-201)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $450,000

Sec. 151   2005 c 488 s 395 (uncodified) is amended to read as follows:
FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Facilities Program (BFP) (06-4-003)

Appropriation:
     Recreation Resources Account--State . . . . . . . . . . . . (($8,350,000))
       $7,271,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $36,597,535
          TOTAL . . . . . . . . . . . . (($44,947,535))
       $43,868,535

NEW SECTION.  Sec. 152   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Whooten Wildlife Area Fencing Replacement Due to Fire (06-1-020)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,700,000

NEW SECTION.  Sec. 153   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Land Acquisition Pass-Thru Grants (06-4-018)

Appropriation:
     State Wildlife Account--Federal . . . . . . . . . . . . $4,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,200,000

NEW SECTION.  Sec. 154   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Estuary and Salmon Restoration in Puget Sound (06-2-001)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is provided solely for nearshore estuary and shoreline projects supporting salmon recovery in Puget Sound.
     (2) Project selection and funding decisions shall be submitted for approval to the executive committee of the Puget Sound nearshore partnership between the department and the United States army corps of engineers.
     (3) Funded projects require a nonstate match or in-kind contributions. The match requirements must be approved by the executive committee identified in subsection (2) of this section.
     (4) Project selection and funding decisions must be coordinated with the salmon recovery funding board to ensure that project funding and matching requirements are maximized to the greatest extent possible.
     (5) The department shall not utilize any amount of this appropriation to support administration or overhead. Funding to support the administration of the funds and the implementation of selected projects must be obtained from the department's operating budget.
     (6) Eligible projects must be within Puget Sound and identified in a current salmon recovery plan.
     (7) All funds must be obligated to a specific project or projects no later than October 15, 2006.
     (8) The department shall submit a report to the legislature and the office of financial management by November 1, 2006. The report must describe the status of all projects authorized for funding under this appropriation, including project location, implementation timeline, performance measures, funding structure, matching funds, and expected results.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,000,000
          TOTAL . . . . . . . . . . . . $7,500,000

Sec. 155   2005 c 488 s 443 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
     Land Bank (06-2-015)

     The appropriation in this section is subject to the following conditions and limitations: Prior to purchase or disposal of properties, the department shall consult with other natural resource agencies to ensure the properties marked for purchase or disposal are not eligible for trust land transfers.

Appropriation:
     Resources Management Cost Account--State . . . . . . . . . . . . (($5,000,000))
       $43,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,462,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . (($55,462,000))
       $93,462,000

Sec. 156   2005 c 488 s 451 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
     Small Timber Landowner (FREP) (06-2-019)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department shall file quarterly project progress reports with the office of financial management.
     (2) The department may not expend more than (($200,000)) $300,000 of the appropriation for administrative or staff costs.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,750,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $55,750,000

Sec. 157   2005 c 488 s 453 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
     Statewide Aquatic Restoration Projects (06-2-008)

     The appropriations in this section are subject to the following conditions and limitations: $2,000,000 of the state toxics control account--state appropriation is provided solely for costs related to removal of creosote logs and pilings in Puget Sound.

Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $300,000
     State Toxics Control Account--State . . . . . . . . . . . . $2,000,000
     State Building Construction Account--State . . . . . . . . . . . . $150,000
          Subtotal Appropriation . . . . . . . . . . . . (($450,000))
       $2,450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,200,000
          TOTAL . . . . . . . . . . . . (($1,850,000))
       $3,850,000

Sec. 158   2005 c 488 s 601 (uncodified) is amended to read as follows:
FOR THE STATE BOARD OF EDUCATION
     Common School Construction Account Deposits

     The appropriations in this section are subject to the following conditions and limitations:
     (1) (($15,000,000)) $33,765,000 in fiscal year 2006 and (($15,000,000)) $10,000,000 in fiscal year 2007 of the education savings account appropriation shall be deposited in the common school construction account.
     (2) $99,737,000 of the education construction account appropriation shall be deposited in the common school construction account.

Appropriation:
     Education Savings Account--State . . . . . . . . . . . . (($30,000,000))
       $43,765,000
     Education Construction Account--State . . . . . . . . . . . . $99,737,000
          Subtotal Appropriation . . . . . . . . . . . . $129,737,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($129,737,000))
       $143,502,000

NEW SECTION.  Sec. 159   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE STATE SCHOOL FOR THE BLIND
     New Physical Education Center (06-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,130,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,130,000

NEW SECTION.  Sec. 160   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR THE WASHINGTON SCHOOL FOR THE DEAF
     Cafeteria and Maintenance Support Building (06-2-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,994,000
          TOTAL . . . . . . . . . . . . $9,994,000

Sec. 161   2005 c 488 s 632 (uncodified) is amended to read as follows:
FOR THE UNIVERSITY OF WASHINGTON
     Guggenheim Hall Renovation (06-1-006)

     The appropriation in this section is subject to the following conditions and limitations: No money from the appropriation in this section may be expended on surge space.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($24,500,000))
       $15,500,000
     Education Construction Account--State . . . . . . . . . . . . $9,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,812,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $26,312,000

NEW SECTION.  Sec. 162   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR CENTRAL WASHINGTON UNIVERSITY
     Replace Chiller (06-1-025)

Appropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1,880,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,880,000

Sec. 163   2005 c 488 s 714 (uncodified) is amended to read as follows:
FOR WESTERN WASHINGTON UNIVERSITY
     Campus Roadway Development (04-2-073)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The purpose of the reappropriation is to complete a predesign of potential south campus roadway options and general circulation issues that avoids significant impacts on adjacent neighborhoods and conforms to the city of Bellingham traffic plans.
     (2) The predesign shall also investigate options to achieve higher rates of alternative modes of transportation among faculty, staff, and students, minimize surface parking, and make improvements for traffic circulation, including public transit. Safe movement of pedestrians and bicyclists shall be a priority.
     (3) Allotment for predesign is contingent upon the completion of a communication and public involvement plan for this project that is consistent with the significant projects section of the Western Washington University institutional master plan and adjacent neighborhood plans adopted by the city of Bellingham, the city of Bellingham Western Washington University neighborhood plan, and the neighborhood meeting requirements contained in Bellingham municipal code 20.40.060. The communication and public involvement plan shall seek to maximize public input through coordination of the planning effort with established neighborhood advisory groups and boards recognized by the city of Bellingham.

Reappropriation:
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . (($38,826))
       $36,466

     Prior Biennia (Expenditures) . . . . . . . . . . . . (($290,174))
       $292,534
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $329,000

NEW SECTION.  Sec. 164   A new section is added to 2005 c 488 (uncodified) to read as follows:
FOR WESTERN WASHINGTON UNIVERSITY
     Planning for Campus Expansion to Bellingham Waterfront (06-2-001)

Appropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

Sec. 165   2005 c 488 s 905 (uncodified) is amended to read as follows:
     (1) To ensure that minor works appropriations are carried out in accordance with legislative intent, funds appropriated in this act shall not be allotted until project lists are on file at the office of financial management ((and the office of financial management has formally approved the lists. Proposed revisions)), the house of representatives capital budget committee, and the senate ways and means committee. All projects must meet the criteria included in subsection (2)(a) of this section. Revisions to the lists must be filed with ((and approved by)) the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee and include an explanation of variances from the prior list before funds may be expended on the revisions.
     (2)(a) Minor works projects are single line appropriations that shall include multiple projects valued between $25,000 and $1,000,000 each that are of a similar nature and can ((generally)) be completed within two years of the appropriation with the funding provided. These projects cannot be combined with or be a part of an overall project, that if combined over a continuous period of time, would exceed $1,000,000. Minor works categories include (i) health, safety, and code requirements; (ii) facility preservation; (iii) infrastructure preservation; and (iv) program improvement or expansion. Improvements for accessibility in compliance with the Americans with disabilities act may be included in any of the above minor works categories.
     (b) Minor works appropriations shall not be used for, among other things: Studies, except for technical or engineering reviews or designs that lead directly to and support a project on the same minor works list; planning; design outside the scope of work on a minor works list; moveable, temporary, and traditionally funded operating equipment not in compliance with the equipment criteria established by the office of financial management; software not dedicated to control of a specialized system; moving expenses; land or facility acquisition; or to supplement funding for projects with funding shortfalls unless expressly authorized elsewhere in this act. The office of financial management may make an exception to the limitations described in this subsection (2)(b) for exigent circumstances after notifying the legislative fiscal committees and waiting ten days for comments by the legislature regarding the proposed exception.
     (3) The ((office of financial management)) agency shall ((forward)) provide copies of these project lists and revised lists to the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee. No expenditure may be incurred or obligation entered into for minor works appropriations until the office of financial management has approved the allotment of the funds to be expended. The office of financial management shall encourage state agencies to incorporate accessibility planning and improvements into the normal and customary capital program.
     (4) It is generally not intended to make future appropriations for capital expenditures or for maintenance and operating expenses for an acquisition project or a significant expansion project that is initiated through the minor works process and therefore does not receive a policy and fiscal analysis by the legislature. Minor works projects are intended to be one-time expenditures that do not require future state resources to complete.

NEW SECTION.  Sec. 166   A new section is added to 2005 c 488 (uncodified) to read as follows:
     Executive Order No. 05-05, archeological and cultural resources, was issued effective November 10, 2005. Agencies and higher education institutions shall comply with the requirements set forth in this executive order.

Sec. 167   2005 c 488 s 909 (uncodified) is amended to read as follows:
     ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS. The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW. When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation. Expenditures made by an agency for one of the indicated purposes before the issue date of the authorized financial contract and any certificates of participation therein are intended to be reimbursed from proceeds of the financial contract and any certificates of participation therein to the extent provided in the agency's financing plan approved by the state finance committee.
     State agencies may enter into agreements with the department of general administration and the state treasurer's office to develop requests to the legislature for acquisition of properties and facilities through financial contracts. The agreements may include charges for services rendered.
     Those noninstructional facilities of higher education institutions authorized in this section to enter into financial contracts are not eligible for state funded maintenance and operations. Instructional space that is available for regularly scheduled classes for academic transfer, basic skills, and workforce training programs may be eligible for state funded maintenance and operations.
     (1) Department of general administration:
     (a) Enter into a financing contract for up to $12,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct the fifth and final phase of the roof membrane replacement at the east plaza parking structure as well as safety improvements to the parking garage below the plaza.
     (b) Enter into a financing contract for up to $6,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the fourth phase of the office building-2 rehabilitation that will renew failing building systems, correct code deficiencies, and improve access.
     (c) Enter into a financing contract for up to $13,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the rehabilitation of the Cherberg building.
     (2) Liquor control board: Enter into a financing contract for up to $17,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an extension to the liquor control board's distribution center to meet liquor sales growth through 2018.
     (3) Department of corrections:
     (a) Enter into a financing contract for up to $400,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a waste transfer station and purchase a garbage truck at the McNeil Island corrections center.
     (b) Enter into a financing contract for up to $4,588,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a transportation services warehouse and offices for correctional industries.
     (c) Enter into a financing contract for up to $4,536,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct additions to the food factory and warehouses at the Airway Heights corrections center for correctional industries.
     (4) Parks and recreation commission: Enter into a financing contract in an amount not to exceed $4,800,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop Cama Beach state park.
     (5) Community and technical colleges:
     (a) ((Enter into a financing contract on behalf of Bellevue Community College for up to $20,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase the North Center building.
     (b)
)) Enter into a financing contract on behalf of Clark College for up to $9,100,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a ((parking structure)) building for a training center.
     (((c))) (b) Enter into a financing contract on behalf of Clover Park Technical College for up to $14,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a student center.
     (((d))) (c) Enter into a financing contract on behalf of Columbia Basin College for up to $1,500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to renovate the Hawk Union building.
     (d) Enter into a financing contract on behalf of Edmonds Community College for up to $8,500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a bookstore and student center.
     (e) Enter into a financing contract on behalf of Edmonds Community College for up to $4,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a black box theater as a part of the Instructional Lab building.
     (f) Enter into a financing contract on behalf of Green River Community College for up to $7,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase Kent Station higher education center.
     (g) Enter into a financing contract on behalf of Olympic College for up to $3,600,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an addition to the student center bookstore.
     (h) Enter into a financing contract on behalf of Shoreline Community College for up to $15,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a student union building.
     (i) Enter into a financing contract on behalf of Skagit Valley Community College for up to $3,200,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to renovate existing space into a new student center.
     (j) Enter into a financing contract on behalf of Walla Walla Community College for up to $2,175,100 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase land, make site improvements, and construct a building for ((the enology program)) professional-technical instruction.
     (k) Enter into a financing contract on behalf of Walla Walla Community College for up to $640,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an addition to the health sciences building at the Clarkston center.
     (l) Enter into a financing contract on behalf of Seattle Central Community College for up to $3,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a math and science building.
     (m) Enter into a financing contract on behalf of Pierce College/Puyallup for up to $8,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a student gym and fitness center.
     (n) Enter into a financing contract on behalf of Pierce College/Ft. Steilacoom for up to $5,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an addition to the college health and wellness center.
     (((p))) (o) The projects in (((a),)) (f), (((k),)) (j), (l), (m), and (n) of this subsection are reauthorizations of projects originally authorized in the 2003-2005 biennium. If the college enters into a financing contract before the effective date of this section, then the appropriate reauthorization contained in this section is null and void.
     (6) Washington State University: Enter into a financing contract for up to $11,650,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a bioproducts facility in the Tri-Cities.
     (7) Washington State University: Enter into a financing contract for up to $63,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a biotechnology and life sciences research laboratory and instructional facility in Pullman. Repayment of the financing contract shall be made from the Washington State University building account.

NEW SECTION.  Sec. 168   Part headings in this act are not any part of the law.

NEW SECTION.  Sec. 169   If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.

NEW SECTION.  Sec. 170   This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately.


     INDEX       PAGE #


CENTRAL WASHINGTON UNIVERSITY . . . . . . . . . . . . 37
DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT . . . . . . . . . . . . 2
DEPARTMENT OF CORRECTIONS . . . . . . . . . . . . 13
DEPARTMENT OF ECOLOGY . . . . . . . . . . . . 14
DEPARTMENT OF GENERAL ADMINISTRATION . . . . . . . . . . . . 8
DEPARTMENT OF NATURAL RESOURCES . . . . . . . . . . . . 34
DEPARTMENT OF SOCIAL AND HEALTH SERVICES . . . . . . . . . . . . 11
DEPARTMENT OF VETERANS AFFAIRS . . . . . . . . . . . . 13
INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION . . . . . . . . . . . . 27
MILITARY DEPARTMENT . . . . . . . . . . . . 11
STATE BOARD OF EDUCATION . . . . . . . . . . . . 35
STATE PARKS AND RECREATION COMMISSION . . . . . . . . . . . . 24
STATE SCHOOL FOR THE BLIND . . . . . . . . . . . . 36
UNIVERSITY OF WASHINGTON . . . . . . . . . . . . 37
WASHINGTON SCHOOL FOR THE DEAF . . . . . . . . . . . . 36
WESTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . 37

--- END ---