HOUSE BILL REPORT
HB 2530
This analysis was prepared by non-partisan legislative staff for the use of legislative members in
their deliberations. This analysis is not a part of the legislation nor does it constitute a
statement of legislative intent.
As Reported by House Committee On:
Agriculture & Natural Resources
Title: An act relating to studying the effectiveness of the existing hydraulic project approval process under chapter 77.55 RCW in protecting fish life.
Brief Description: Studying the effectiveness of the existing hydraulic project approval process under chapter 77.55 RCW in protecting fish life.
Sponsors: Representatives Nelson, Cody and Upthegrove.
Brief History:
Agriculture & Natural Resources: 1/17/08, 1/30/08 [DPS].
Brief Summary of Substitute Bill |
|
HOUSE COMMITTEE ON AGRICULTURE & NATURAL RESOURCES
Majority Report: The substitute bill be substituted therefor and the substitute bill do pass. Signed by 12 members: Representatives Blake, Chair; Van De Wege, Vice Chair; Kretz, Ranking Minority Member; Warnick, Assistant Ranking Minority Member; Eickmeyer, Grant, Lantz, Loomis, McCoy, Nelson, Newhouse and Orcutt.
Staff: Jason Callahan (786-7117).
Background:
Before beginning a construction project, a person must obtain a hydraulic project approval
(HPA) for any project that will use, divert, obstruct, or change the natural flow or bed of any
of the salt or fresh waters of the state. The HPAs are issued by the Washington Department
of Fish and Wildlife (WDFW) to ensure the proper protection of fish life.
The WDFW is statutorily authorized to issue programmatic HPAs for small scale mining and
prospecting, and for activities or projects conducted solely for the removal or control of
certain aquatic weeds. The programmatic approval is in lieu of an applicant obtaining an
individual HPA. Under the programmatic approval process, the WDFW publishes a
pamphlet that states the rules for that activity.
The HPA decisions may be appealed to the Director of the WDFW under the provisions of
the Administrative Procedure Act. Certain appeals related to agriculture or off-site mitigation
are heard by the Hydraulic Appeals Board.
Summary of Substitute Bill:
The WDFW is required to conduct a study regarding the effectiveness of the existing HPA
permitting system. The study must consider the effectiveness of legislative enactments, the
implementation by the WDFW, and the impact that historic funding levels have had on the
program's effectiveness. When reviewing the HPA program, the WDFW must focus on both
the level of compliance as well as the actual fish protection offered in instances of full
compliance.
The study is not required to be completed by a certain date, but must be done as readily as
funds allow. The WDFW may pay for the study using direct appropriations specified for the
study, non-designated funds within the control of the WDFW, or private donations. The
report cannot be deemed final until the Fish and Wildlife Commission has voted to affirm the
study's completeness.
Substitute Bill Compared to Original Bill:
The original bill prohibited the WDFW from approving or renewing any HPAs within the
Maury Island Aquatic Reserve for any commercial, industrial, or barge-loading facilities.
Appropriation: None.
Fiscal Note: Available.
Effective Date of Substitute Bill: The bill takes effect 90 days after adjournment of session in which bill is passed.
Staff Summary of Public Testimony:
(In support) The Puget Sound is in peril, and the Legislature has had to make large
investments in its health in recent years. The Legislative effort has included accountability in
its agencies for the funds that are spent on Puget Sound restoration.
The HPA system is broken, and we do not know why. The appeals process is very
complicated, funding may be too low, staffing resources unavailable, or perhaps the mission
of the program just needs new direction. The HPA is important in protecting both fish life
and the fishing industry. Initial information gathered by the WDFW from just one of its
regions suggests that even when the HPA law is fully complied with, there is still not a lot of
protection being offered to fish life. In light of the one small-scale study, a broader study is
required.
The HPA program does not provide for no net loss of fish, and for one permitted project off
of Maury Island, it allowed for the destruction of a large herring breeding ground that has
resulted in a high mortality of fish life. The approved HPA off of Maury Island impacted an
area with every habitat value necessary for Orcas. In issuing the HPA, the WDFW ignored
the science and even the current regulations in place to protect that delicate habitat.
There is increasing concern that, while HPAs are being issued, there is little funding available
to go back and ensure that permit conditions are being fully complied with. There is pressure
to service applicants on the front end, but little ability to follow up after the project is
completed. Any bill that advances fish protection is to be supported.
(With concerns) Tribal co-managers should have notification of HPA applications in order to
be an effective co-manager.
(Opposed) The Maury Island Aquatic Reserve has 22 authorized uses, but this bill only
singles out one. The HPA for the Maury Island project is already issued, but the bill could
complicate revisions to the permit.
Persons Testifying: (In support) Representative Nelson, prime sponsor; Naki Stevens and
Dave Mann, People for Puget Sound; and Steve Robinson, Northwest Indian Fisheries
Commission.
(With concerns) Greg Hueckel, Washington Department of Fish and Wildlife.
(Opposed) Steve Gano and Pete Stoltz, Glacier Northwest.