HOUSE BILL REPORT
SSB 5881
This analysis was prepared by non-partisan legislative staff for the use of legislative members in
their deliberations. This analysis is not a part of the legislation nor does it constitute a
statement of legislative intent.
As Reported by House Committee On:
Agriculture & Natural Resources
Appropriations
Title: An act relating to water power license fees.
Brief Description: Modifying water power license fees.
Sponsors: Senate Committee on Water, Energy & Telecommunications (originally sponsored by Senators Poulsen, Delvin, Regala and Fraser; by request of Department of Ecology).
Brief History:
Agriculture & Natural Resources: 3/22/07, 3/29/07 [DPA];
Appropriations: 3/31/07 [DPA(APP w/o AGNR)s].
Brief Summary of Substitute Bill (As Amended by House Committee) |
|
|
|
|
HOUSE COMMITTEE ON AGRICULTURE & NATURAL RESOURCES
Majority Report: Do pass as amended. Signed by 10 members: Representatives B. Sullivan, Chair; Blake, Vice Chair; Dickerson, Eickmeyer, Grant, Kagi, Lantz, McCoy, Orcutt and VanDeWege.
Minority Report: Do not pass. Signed by 4 members: Representatives Kretz, Ranking Minority Member; Warnick, Assistant Ranking Minority Member; Hailey and Newhouse.
Staff: Jaclyn Ford (786-7339).
Background:
According to the Department of Ecology (DOE), there are approximately 100 hydroelectric
projects in Washington, of which 56 projects have licenses from the Federal Energy
Regulatory Commission (FERC). Owners of projects pay an annual hydropower fee which
the state uses to pay for investigations and surveys of natural resources, including stream
gaging, hydrographic, topographic, river, underground water, mineral, and geological
surveys.
The annual power license fee is based upon the theoretical water power claimed under each
and every separate claim to water. The fees have not been updated since 1929.
Every 35 to 50 years, the Federal Power Act requires that owners of hydropower projects get
a new FERC license. Many of the hydropower projects were first licensed before adoption of
the Clean Water Act, and are now up for re-licensing. A major part of licensing involves
addressing environmental concerns not considered in previous licensing proceedings. The
licensing process takes a minimum of five years, and FERC now requires that hydropower
owners respond to new information throughout the life of the license, and manage the project
accordingly. This approach requires oversight of license conditions, not only by FERC, but
by the DOE and the Department of Fish and Wildlife (WDFW). As part of the FERC license,
states must certify that hydropower projects meet state water quality standards. Each FERC
license contains conditions to meet state water quality standards.
Summary of Amended Bill:
The DOE will collect an annual fee on water power projects in operation and FERC projects
in operation.
Capacity (theoretical
horsepower) Current Annual Fee
(per theoretical
horsepower) Proposed Annual Fee
in SSB 5881
(per theoretical
horsepower)Proposed Annual fee
for FERC Projects
(in addition to
proposed fees)0-1,000 $0.10 $0.18 $0.32 1,000-10,000 excess $0.02 $0.036 $0.064 10,000 + excess $0.01 $0.018 $0.032
The rate for each and every theoretical horsepower of capacity claimed up to and including
1,000 horsepower is raised from 10 cents per horsepower to the new rate of 18 cents per
horsepower. For each and every theoretical horsepower in excess of 1,000 horsepower, up to
and including 10,000 horsepower, the rate is increased from 2 cents to the new rate of 3.6
cents per horsepower. For each and every theoretical horsepower in excess of 10,000
horsepower, the fee is increased from 1 cent to the new rate of 1.8 cents per horsepower.
In addition to the annual fee, FERC projects in operation will pay an extra fee. The rate for
each and every theoretical horsepower of capacity claimed up to and including 1,000
horsepower is 32 cents per horsepower. Each and every theoretical horsepower in excess of
1,000 horsepower, up to and including 10,000 horsepower is 6.4 cents per horsepower. For
each and every theoretical horsepower in excess of 10,000 horsepower, the fee is 3.2 cents
per horsepower. The fees imposed on FERC projects will expire on June 30, 2017.
Fees are not required from any hydropower project owned by the United States, or for
projects that generate 50 horsepower or less.
Projects developed by an irrigation district in conjunction with the irrigation district's water
conveyance system will have their fees reduced by 50 percent to reflect the portion of the year
when the project is not operating.
Irrigation districts or other municipal subdivisions developing power for pumping water for
irrigation are exempt from all fees to the extent that the power is used for irrigation pumping.
All fees are deposited into the Reclamation Account and may be used by the DOE for
investigations and surveys of natural resources, as well as expenses associated with staff at
the DOE and the WDFW working on FERC relicensing and licensing implementation.
The DOE will submit a progress report to the Legislature prior to December 31, 2009, and
biennially thereafter. The progress report will describe how the license fees were expended,
include recommendations from interested parties, and recognize hydropower operators that
exceed their environmental regulatory requirements.
Amended Bill Compared to Substitute Bill:
This bill removes the requirement that the DOE biennially increase the license fee rates in
accordance with the fiscal growth factor provided by the Office of Financial Management.
Appropriation: None.
Fiscal Note: Available. New fiscal note requested on March 29, 2007.
Effective Date of Amended Bill: The bill takes effect 90 days after adjournment of session in which bill is passed.
Staff Summary of Public Testimony:
(In support) The DOE uses the money generated from the fees to support the gauging
stations. The U.S. Geological Survey funding has been reduced recently and Washington
needs to compensate for that reduction in order to maintain the gauging stations and other
research and investigations. Washington needs more staff to work on FERC relicensing and
licensing projects. Most dams that are up for relicensing were initially licensed before the
Clean Water Act, and thus require more personnel than is currently unavailable. Following
all the FERC relincensing, staff is required for maintenance. The fee structure should be
included to allow for the 20 percent reduction for low-impact hydropower facilities.
(With concerns) Low-impact hydropower facilities should have a reduction in fees. Oregon
has a system where if there is additional staff needed, the dam pays for the staff. The DOE
should be adequately staffed to be sure there are no unintended consequences. Reductions
shouldn't be given to low-impact hydropower facilities; neither should cost shifts occur.
(Opposed) None.
Persons Testifying: (In support) Robert Mack, City of Tacoma; Rose Feliciano, City of
Seattle; Melodie Selby, Washington Department of Ecology; and Dave Arbaugh, Chelan
Public Utility District.
(With concerns) Kathleen Collins, Pacific Corporation.
HOUSE COMMITTEE ON APPROPRIATIONS
Majority Report: Do pass as amended by Committee on Appropriations and without amendment by Committee on Agriculture & Natural Resources. Signed by 22 members: Representatives Sommers, Chair; Dunshee, Vice Chair; Cody, Conway, Darneille, Ericks, Fromhold, Grant, Haigh, Hunt, Hunter, Kagi, Kenney, Kessler, Linville, McDermott, McIntire, Morrell, Pettigrew, Schual-Berke, Seaquist and P. Sullivan.
Minority Report: Do not pass. Signed by 11 members: Representatives Alexander, Ranking Minority Member; Bailey, Assistant Ranking Minority Member; Haler, Assistant Ranking Minority Member; Anderson, Buri, Chandler, Dunn, Hinkle, Kretz, McDonald and Priest.
Staff: Kirk Schmidt (786-7118).
Summary of Recommendation of Committee On Appropriations Compared to
Recommendation of Committee On Agriculture & Natural Resources:
The requirement that the Department of Ecology submit a progress report biennially ends
when the fees expire.
Appropriation: None.
Fiscal Note: Available.
Effective Date of Amended Bill: The bill takes effect 90 days after adjournment of session in which bill is passed.
Staff Summary of Public Testimony:
(In support) This bill raises fees for the first time since 1929. The fee increase is necessary to
fund the increased workload associated with the relicensing of dams and bringing them into
compliance with the federal Clean Water Act.
(Opposed) None.
Persons Testifying: Ted Sturdevant, Department of Ecology.