Washington State House of Representatives Office of Program Research |
BILL ANALYSIS |
Local Government Committee | |
HB 1463
This analysis was prepared by non-partisan legislative staff for the use of legislative members in
their deliberations. This analysis is not a part of the legislation nor does it constitute a
statement of legislative intent.
Brief Description: Changing Washington's vesting laws.
Sponsors: Representatives Simpson and Williams.
Brief Summary of Bill |
|
|
Hearing Date: 2/1/07
Staff: Thamas Osborn (786-7129).
Background:
The "Vested Rights Doctrine" in the State of Washington
In the context of land use law, the concept of "vesting" is used to determine the point in time at
which the laws and regulations controlling the division, use, or development of real property
become fixed with respect to the development of a specific property, thus preventing such use or
development from being subject to subsequent regulatory changes. Over the years, the
determination of when a property owner's development rights become vested has been a key
issue for the Washington courts, resulting in the courts' development of what is known as the
"vested rights doctrine."
In the case of Noble Manor v. Pierce County, 133 Wn.2d 269 (1997), the Washington Supreme
Court summarized the "vested rights doctrine" as it had been developed by the courts' under the
common law:
In Washington, "vesting" refers generally to the notion that a land use application, under the proper conditions, will be considered only under the land use statutes and ordinances in effect at the time of the application's submission.
At common law, this state's doctrine of vested rights entitled developers to have a land development proposal processed under the regulations in effect at the time that a complete building permit application was filed.
The Court went on to quote from a legislative report issued in 1987 in order to explain how the
common law vesting doctrine operates in the context of a property owner's application for a
building permit:
The doctrine provides that a party filing a timely and sufficiently complete building permit application obtains a vested right to have that application processed according to zoning, land use and building ordinances in effect at the time of the application. The doctrine is applicable if the permit application is sufficiently complete, complies with existing zoning ordinances, and building codes, and filed during the period the zoning ordinances under which the developer seeks to develop are in effect. If a developer complies with these requirements, a project cannot be obstructed by enacting new zoning ordinances or building codes.
This common law vesting doctrine has been codified by the legislature, various forms, in several chapters of the Revised Code of Washington pertaining to land use, property development, and construction permitting.
Vesting of "Subdivisions" and "Short Subdivisions"
A property owner must have a proposed division of land reviewed and approved by the county,
city or town in which the land is located. Such divisions of land are generally categorized as
either "subdivisions" or "short subdivisions." Subdivisions are defined as land divisions resulting
in five or more lots, tracts, or parcels. Short subdivisions are defined as land divisions resulting
in four or fewer lots, tracts, or parcels. However, a city, town or Growth Management Act
planning county may adopt a local ordinance increasing to a maximum of nine the number of
lots, tracts, or parcels that may be contained within a short subdivision.
State law distinguishes between subdivisions and short subdivisions with respect to the vesting
of development rights. For a period of five years following approval by the local planning
authority of the final plat, the development of a subdivision is governed by the pertinent laws and
regulations in effect at the time of such approval. In other words, subdivision development
rights are vested for a period of five years following approval of the final plat. If the property is
not developed within this five year period, the property is divested and the subdivision may be
subject to development regulations enacted subsequent to final plat approval. In addition, a local
government may make changes to the applicable development regulations prior to the expiration
of this five year period in response to a change of conditions that creates a serious threat to
public health or safety.
Short subdivisions, on the other hand, are not subject to the five year vesting limitation
applicable to subdivisions. Development rights with respect to short subdivisions become fully
vested at the time that a complete application for short plat approval is submitted to the local
planning authority and, therefore, are not subject to subsequent changes in land use or
development regulations.
Washington State Building Code: Building Permits and the Vesting Doctrine
The Washington State Building Code (Code) consists of a series of national model codes and
standards that regulate the construction of residential, commercial, and industrial buildings and
structures. The general purpose to the Code is to create minimum performance standards and
requirements for construction and construction materials, consistent with accepted standards for
engineering and safety. Counties and cities are authorized to create local amendments to the
Code, provided such amendments are consistent with the Code's objectives and minimum
performance standards.
The Code does not contain regulatory provisions pertaining to land use, property division,
zoning, or site development. Rather, the Code explicitly states that such regulations are "reserved
to local jurisdictions". However, the Code does contain vesting provisions pertaining to
applications for building permits. Under these provisions, a land owner's development rights
vest at the time a permit is submitted to the local building authority and, thereafter, the land
owner is subject to only those permitting, zoning, or land use ordinances in effect at the time of
permit submission.
"Local Project Review" by Local Governments (Chapter 36.70B.RCW)
In order to ensure that a proposed development project is consistent with a local government's
Growth Management Act (GMA) development regulations or the applicable GMA
comprehensive plan, local governments planning under the GMA are required to implement a
"local project review" (project review) process. The project review process is designed to
integrate land use and environmental impact analysis so as to enable the concurrent analysis of
the projects consistency with GMA development regulations and the requirements of the State
Environmental Policy Act (SEPA). Local governments not planning under the GMA are also
required to develop a process for the review of project permit applications that combines the
environmental review process , both procedural and substantive, with the procedure for review
of project permits.
In GMA planning jurisdictions, the project review must include provisions for:
In using the project review process to determine whether a proposed development project is consistent with GMA development regulations or a GMA comprehensive plan, a local government must consider:
With the exception of "development agreements", discussed below, the statutes outlining the
local project review process do not contain any vesting provisions.
"Development Agreements" and Vesting Provisions (RCW 36.70B. 170 through 36.70B. 210)
The statutory scheme for "local project review" contains a series of provisions allowing local
governments to enter into "development agreements" with respect to land use projects meeting
specified criteria. A local government may enter into a development agreement with a person
having ownership or control of real property within its jurisdiction. Such agreement must state
the development standards and other provisions that shall govern and vest the development and
use of the property for the term of the agreement. The agreement must be consistent with the
GMA development regulations adopted by the local government. However, the statutes
authorizing the creation of development agreements appear to give local governments broad
discretion in determining the specific requirements and conditions set forth in an agreement.
Development agreements are subject to specified vesting provisions. Under these provisions, the
development agreement, and the development standards it contains, shall govern during the term
of the agreement, or for all or that part of the build-out period specified in the agreement.
Accordingly, a development agreement may not be subject to either new or amended ordinances,
regulations, or standards adopted after the effective date of the agreement.
"Determination of Invalidity" by a Growth Management Hearings Board
A growth management hearings board (GMHB) may determine that all or part of a
comprehensive plan or development regulation is invalid. In determining such invalidity, a
GMHB must:
The effect of a determination of invalidity is "prospective" and does not effect property or
development rights vested under state or local law before receipt of the board's order by the city
or county. Accordingly, a development permit application by a property owner that is already
vested to local development regulations before the issuance of the of the GMHB's order is not
affected by the order.
Certain development permit applications which are not vested prior to the order determining
invalidity are nevertheless not subject to invalidation by such order. Subject to specified criteria,
the permits and applications subject to this exception include:
Procedures for the Siting of Energy Facilities
The Energy Facility Site Evaluation Council (EFSEC) was created in 1970 to provide one-stop
licensing for large energy projects. The EFSEC's membership includes mandatory representation
from five state agencies and discretionary representation from four additional state agencies. The
EFSEC's membership may include representatives from the particular city, county, or port
district where potential projects may be located.
The EFSEC's jurisdiction includes the siting of large intrastate natural gas and petroleum
pipelines, specified electric power plants, new oil refineries, large expansions of existing
facilities, and underground natural gas storage fields. The EFSEC is granted the authority to
develop and apply ecological and environmental guidelines regarding the type, design, location,
construction, and operational conditions of energy facilities falling within its jurisdiction.
The EFSEC siting process generally involves six steps: (1) a potential site study followed by an
application; (2) a State Environmental Policy Act review; (3) a review for consistency with
applicable local land use laws and plans; (4) a formal adjudication on all issues related to the
project; (5) certain air and water pollution discharge permitting reviews as delegated by the U.S.
Environmental Protection Agency; and (6) a recommendation to the Governor who then decides
whether to accept, reject, or remand the application. The EFSEC must report its siting
recommendations to the governor within twelve months of the EFSEC's receipt of an application
for certification, or at such later time as is mutually agreed by the EFSEC and the applicant.
The statutes pertaining to the EFSEC siting process contain no vesting-related provisions.
Summary of Bill:
Introduction
The act revises certain vesting-related provisions in state law by amending and repealing several
statutes in various chapters of the Revised Code of Washington, as well as adding a new statute.
The act has the general effect of revising the current "vested rights doctrine" as it has been
previously codified by the Legislature.
The substance of each section of the act will be addressed below.
Vesting of "Subdivisions" and "Short Subdivisions"
The development rights of a property owner to divide his or her land into a subdivision or short
subdivision vest at the time the local government issues its preliminary approval of the proposed
land division. However, if applicable zoning or development regulations are changed prior to
both the final plat approval and the beginning of "substantial construction" in good faith reliance
on the preliminary plat approval, then the property owner is divested and the property in question
may be subject to the new regulatory requirements. In other words, if applicable development
regulations change prior to the beginning of substantial construction and the approval of the final
plat, then the preliminary plat may be revised in accordance with the changes in development
regulations.
Washington State Building Code: Building Permits and the Vesting Doctrine
Under the permitting statute of the Washington State Building Code, development rights of an
applicant for a building permit vest on the day the permit is approved by the local building
authority and, therefore, the permit shall be subject to the applicable development regulations in
effect on that day. However, if the applicable development regulations are changed prior to the
beginning of "substantial construction" in good faith reliance on the building permit, then the
permit shall be revised or rescinded as necessary to be consistent with the new regulations.
"Local Project Review" by Local Goverments (Chapter 36.70B.RCW)
The act adds vesting-related provisions to the statutes governing the "local project review"
process. Under these provisions, the decision of a local government to approve or deny a project
permit application shall be based on the development regulations in effect at the time of the
decision. Decisions relating to requests for reconsideration or those following appeals shall also
be based current development regulations.
In addition, if the applicable development regulations are changed prior to the beginning of
"substantial construction" in good faith reliance on the project permit, then the permit shall be
revised or rescinded as necessary to be consistent with the new regulations.
"Development Agreements" and Vesting Provisions (RCW 36.70B. 170 through 36.70B. 210)
All statutes in chapter 36.70B RCW pertaining to development agreements are repealed.
Accordingly, there is no longer a legal basis for the creation of development agreements as part
of the local project review process created under that chapter.
"Determination of Invalidity" by a Growth Management Hearings Board
The consequences of a determination invalidity (invalidity order) by a GMHB are revised with
respect to vesting-related statutory provisions. Rather than being prospective in effect and
preserving vested rights existing prior to the issuance of the invalidity order, under the act an
invalidity order is "remedial and retrospective" and does not preserve preexisting vested rights.
Specifically, if an order invalidates a comprehensive plan or development regulation, then a
project permit approved by a local government under the invalidated plan or regulation may
itself be invalidated. In other words, an invalidity order may serve to divest a property owner of
rights previously vested under a local government's comprehensive plan or development
regulation if such plan or regulation is later found to be invalid by a GMHB.
Procedures for the Siting of Energy Facilities
The act adds a vesting-related provision to the requirements pertaining to the EFSEC's
recommendation procedures for the siting of an energy project. Under the act, the EFSEC's siting
recommendation must be based on the ecological and environmental siting guidelines in effect
on the date the recommendation is made, rather than those in effect on the date of the filing of
the siting application.
Appropriation: None.
Fiscal Note: Not requested.
Effective Date: The bill takes effect 90 days after adjournment of session in which bill is passed.