FINAL BILL REPORT
2SHB 1506



C 494 L 07
Synopsis as Enacted

Brief Description: Changing alternative works provisions.

Sponsors: By House Committee on Capital Budget (originally sponsored by Representatives Haigh, Armstrong, Hunt and Ormsby).

House Committee on State Government & Tribal Affairs
House Committee on Capital Budget
Senate Committee on Government Operations & Elections

Background:

Alternative forms of public works were first used on a very limited basis and then adopted in statute in 1994 for certain pilot projects. These alternative procedures include a design-build process and a general contractor/construction manager (GC/CM) process and may be used on projects costing in excess of $10 million.

The design-build procedure is a multi-step competitive process to award a contract to a single firm that agrees to both design and build a public facility that meets specific criteria. It may be used on projects valued over $10 million where:

The contract is awarded following a public request of proposals for design-build services. Following extensive evaluation of the proposals, the contract is awarded to the firm that submits the best and final proposal with the lowest price.

The GC/CM method employs the services of a project management firm that bears significant responsibility and risk in the contracting process. The government agency contracts with an architectural and engineering firm to design the facility and, early in the project, also contracts with a GC/CM firm to assist in the design of the facility, manage the construction of the facility, act as the general contractor, and guarantee that the facility will be built within budget. When the plans and specifications for a project phase are complete, the GC/CM firm subcontracts with construction firms to construct the project. Initial selection of GC/CM finalists is based on the qualifications and experience of the firm.

In 2003 job order contracting was authorized as an alternative public works contracting procedure. Under a job order contract, a contractor agrees to perform an indefinite quantity of public works jobs, defined by individual work orders, over a fixed period of time. A public entity may not have more than two job order contracts in effect at any one time. The maximum total dollar amount that is awarded under a job order contract may not exceed $3 million in the first year, $5 million over the first two years, or $8 million over a three-year period if the contract is renewed or extended.

With some restrictions, the use of alternative public works contracting procedures are authorized to a limited number of public entities:

In 2005 the Capital Projects Advisory Review Board (Board) was established to monitor and evaluate the use of traditional and alternative public works contracting procedures and to evaluate potential future use of other alternative contracting procedures. The Board also provides a forum in which best practices and concerns about alternative public works contracting are discussed.

The authorization to use alternative public works procedures expires June 30, 2007.

Summary:

The use of alternative public works contracting procedures is extended to 2014.

Project Review Committee.
A Project Review Committee (Committee) is created to approve the use of the design-build, GC/CM, or both procedures, through a certification process or through approval on a project-by-project basis. Members of the Committee are appointed by the Board and appointments must represent a balance among the industries and public owners represented on the Board. All meetings of the Committee are public and must allow for public comment.

Certification Process.
A public body may apply to the Committee for a three-year certification to use design-build, GC/CM, or both procedures. The public body must submit an application to the Committee that includes a description of its qualifications, its capital plan for the certification period, its intended use of the alternative contracting procedures, and any other information requested by the Committee.

To certify a public body, the Committee must determine that the public body has:

Once a public body has been certified to use design-build, GC/CM, or both procedures, it may use the procedure without seeking approval by the Committee on a project-by-project basis. However, a public body certified to use GC/CM must seek additional approval to use that procedure for projects estimated to cost less than $10 million.

A public body may seek certification for one additional three-year period by submitting updated information on its capital plan to the Committee. The Committee may revoke any public body's certification upon a finding that its use of the alternative contracting procedure no longer serves the public interest.

Project by Project Approval.
Public bodies that are not certified to use design-build or GC/CM may seek approval to use either procedure on a project-by-project basis by submitting an application that includes its qualifications, a description of the proposed project, and which alternative contracting procedure it plans to use.

To approve a proposed project, the Committee must determine that:

Appeal of Committee Determinations.
A determination by the Committee may be appealed to the Board within seven days of the Committee's decision. The Board must resolve an appeal within 45 days and the Board's decision is final.

Design-Build.
Several policy changes are made relating to the use of the design-build procedure, including:

Criteria for evaluating proposals for design-build contracts are added and include the proposer's technical qualifications, its capability to perform, and its past performance. Additional factors are considered for analyzing finalists' proposals, including:

If all proposals are rejected, the public body must provide its reasons to the proposers in writing.

General Contractor/Construction Manager.
The major policy changes related to the use of GC/CM include:

Numerous other procedural changes are made to the contracting procedure.

Contract management responsibilities are expanded. A public body must provide contract documents that obligate it to accept or reject a request for equitable adjustment, change order, or claim within 60 days. If the public body does not respond in writing, the request is deemed denied.

Incentive clauses for early completion, cost savings, or other performance goals must be included in the request for proposals. Incentives may not be paid from any contingency fund established for coordination of the construction documents or coordination of the work. The public body must issue a change order within 30 days on change orders agreed to in writing by the GC/CM. If the public body fails to issue the change order, interest at a rate of 1 percent per month accrues on the dollar amount of the additional work satisfactorily completed.

The maximum allowable construction cost (MACC) may only be negotiated when the design is at least 90 percent complete. Major subcontractor bid packages may be bid prior to agreement of the MACC. The public body may authorize the GC/CM to bid and award bid packages before receipt of complete plans and specifications; however, any contracts awarded must be incorporated in the negotiated MACC. If the MACC varies more than 15 percent from the bid estimated MACC due to approved changes in the scope of work, the percent fee must be renegotiated.

Public bodies may not evaluate or disqualify proposals for a GC/CM contract based on the terms of a collective bargaining agreement. A GC/CM may not violate or waive the terms of a collective bargaining agreement in preparing subcontract bid packages.

Bidder eligibility criteria for subcontractors listed in statute are removed and responsibility is determined based on specific objective criteria that must be listed in the bid documents. If a determination is made that a bidder is not responsible, the bidder must be given an opportunity to establish responsibility.

A GC/CM may only bid on subcontract work or for the supply of equipment or materials if that work is customarily performed or supplied by the GC/CM, if the bid opening is managed by the public body, and if notification of the GC/CM's intent to bid is included in the solicitation of bids. The GC/CM is prohibited from purchasing equipment and materials for assignment to subcontract bid package bidders for installation or warranty. The GC/CM may not perform subcontract work in excess of 30 percent of the negotiated MACC.

Prebid determination of subcontractor eligibility must be preceded by a public hearing to receive comments and determine if establishing bidder eligibility in advance of seeking bids is in the best interests of the project.

If a subcontract bidder is determined to be "not responsible," the bidder must be given an opportunity to establish "responsibility."

Subcontract agreements must not delegate or assign the GC/CM's implied duty not to hinder or delay a subcontractor or delegate or assign the GC/CM's authority to resolve subcontractor conflicts, restrict a subcontractor's right to damages, require a subcontractor to bear the cost of trade damage repair, or require the subcontractor to execute progress payment applications that waive claims for additional time or compensation or bond or retainage rights as a condition of receipt of progress payment.

Job Order Contracting.
The authority to use the job order contracting procedure is limited to the same public bodies except that the Department of General Administration (GA) may issue work orders for Washington State Parks. The maximum total dollar amount awarded under a job order contract is increased from $3 million to $4 million in the first year and from $8 million to $12 million over the three years of the contract. The GA is authorized to have four job order contracts in effect at any one time. The amount of work that must be subcontracted on a job order contract is changed from 80 percent to 90 percent. The maximum dollar amount of a work order is increased from $300,000 to $350,000.

Data Collection.
All alternative contracting procedures require public owners, as well as contractors and subcontractors, to report data required by the Board. The Board must develop questionnaires designed to provide quantitative and qualitative data on alternative public works contracting procedures.

Other Provisions.
Projects approved by the School District Project Review Board and the Hospital District Project Review Board prior to the effective date of the act may proceed without approval of the Committee. If a design-build or GC/CM project has been advertised, but a contract has not been signed by the effective date of the act, the project may go forward without approval by the Committee.

The Board may grant an exemption from any provision of the act for projects advertised before the effective date of the act. A public body seeking an exemption must submit a request in writing to the Board no later than December 31, 2007, and the Board must respond within 60 calendar days.

The act contains a sunset provision and requires an evaluation by the Joint Legislative Audit and Review Committee by June 30, 2013.

Votes on Final Passage:

House   98   0
Senate   47   0   (Senate amended)
House   98   0   (House concurred)

Effective: July 1, 2007
         May 15, 2007 (Section 104)
         June 30, 2007 (Section 508)