FINAL BILL REPORT
SSB 5881
C 286 L 07
Synopsis as Enacted
Brief Description: Modifying water power license fees.
Sponsors: Senate Committee on Water, Energy & Telecommunications (originally sponsored by Senators Poulsen, Delvin, Regala and Fraser; by request of Department of Ecology).
Senate Committee on Water, Energy & Telecommunications
House Committee on Agriculture & Natural Resources
House Committee on Appropriations
Background: Most of the dams in Washington were built more than 50 years ago to provide
electricity and flood control. Currently, 56 hydroelectric projects in Washington have licenses
from the Federal Energy Regulatory Commission (FERC). In accordance with state law, owners
of projects pay an annual hydropower fee, which the state uses to pay for its stream gauging
program. Currently, the annual power license fee is based upon the theoretical water power
claimed under each and every separate claim to water. The fees have not been updated since
1929.
The Department of Ecology's (DOE) stream gauging program is run cooperatively with the U.S.
Geological Survey (USGS), and is used as a water management tool. DOE pays for half the cost
to install and maintain these gauges. USGS owns and operates the gauges and provides the
funding for the remaining half. The hydropower fees fund gauges that collect information on
stream flows at 36 locations. This information is used for decision-making about water supplies,
water rights, drought, climate change, flooding, and setting and achieving of instream flows.
The Federal Power Act requires that owners of hydropower projects renew FERC licenses every
35 to 50 years. Many of the hydropower projects and dams were first licensed before adoption
of the Clean Water Act. A major part of licensing involves addressing environmental concerns,
that were not previously considered. The licensing process takes a minimum of five years, and
FERC requires that hydropower owners respond to new information throughout the life of the
license, and manage the project accordingly. This approach requires oversight of license
conditions by FERC, DOE, and Department of Fish & Wildlife (DFW). As part of the FERC
license conditions, states must certify that hydropower projects meet state water quality standards.
Summary: DOE collects an annual fee on water power projects based upon the theoretical water
power claimed under each and every separate claim to water. Annual license fees are due the first
day of January of each year.
For projects in operation, the annual license fee rates apply:
For FERC projects in operation, the following rates also apply:
The fees for FERC projects expire June 30, 2017.
The fees do not apply to projects that generate 50 horsepower or less or to hydropower projects
owned by the United States. Projects developed by an irrigation district in conjunction with the
district's water conveyance system will have their fees reduced by 50 percent to reflect the portion
of the year the project is not operable.
DOE must submit a biennial progress report to the Legislature beginning December 31, 2009.
The progress report must describe how license fees were used in the FERC licensing process,
expected workload, and include recommendations from DOE, DFW, hydropower project
operators and interested parties, and recognize hydropower operators that exceed their
environmental regulatory requirements.
Votes on Final Passage:
Senate 39 9
House 65 33 (House amended)
Senate 37 12 (Senate concurred)
Effective: July 22, 2007