BILL REQ. #:  S-4269.1 



_____________________________________________ 

SENATE BILL 6690
_____________________________________________
State of Washington60th Legislature2008 Regular Session

By Senators Kilmer, Kastama, Hobbs, Sheldon, Rockefeller, and Shin

Read first time 01/22/08.   Referred to Committee on Economic Development, Trade & Management.



     AN ACT Relating to the office of regulatory assistance; amending RCW 43.42.005, 43.42.020, 43.42.030, 43.42.050, 43.42.060, 43.42.070, 43.21A.690, 43.70.630, 43.300.080, and 70.94.085; reenacting and amending RCW 43.42.010 and 43.30.490; and adding new sections to chapter 43.42 RCW.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

Sec. 1   RCW 43.42.005 and 2007 c 94 s 1 are each amended to read as follows:
     (1) ((The legislature finds that the health and safety of its citizens, natural resources, and the environment are vital interests of the state that must be protected to preserve the state's quality of life. The legislature also finds that the state's economic well-being is a vital interest that depends upon the development of fair, accessible, and coordinated permitting and regulatory requirements that ensure that the state not only protects public health and safety and natural resources but also encourages appropriate activities that stimulate growth and development. The legislature further finds that Washington's permitting and regulatory programs have established strict standards to protect public health and safety and the environment.
     (2) The legislature also finds that, as the number of environmental and land use laws and requirements have grown in Washington, so have the number of permits required of business and government. The increasing number of permits and permitting agencies has generated the potential for conflict, overlap, and duplication among state, local, and federal permitting and regulatory requirements.
     (3) The legislature further finds that not all project proponents require the same type of assistance. Proponents with small projects may merely need information and assistance in starting the permitting and application process, while intermediate-sized projects may require more of a facilitated and periodically assisted permitting process, and large complex projects may need extensive and more continuous coordination among local, state, and federal agencies and tribal governments.
     (4) The legislature further finds that persons doing business in Washington state should have access to clear and appropriate information regarding regulations, permit requirements, and agency rule-making processes.
     (5) The legislature, therefore, finds that a range of assistance and coordination options should be available to project proponents from a state office independent of any local, state, or federal permit agency. The legislature finds that citizens, businesses, and project proponents should be provided with:
     (a) A reliable and consolidated source of information concerning federal, state, and local environmental and land use laws and procedures that may apply to any given project;
     (b) Facilitated interagency forums for discussion of significant issues related to the multiple permitting processes if needed for some project proponents; and
     (c) Active coordination of all applicable regulatory and land use permitting procedures if needed for some project proponents.
     (6) The legislature declares that the purpose of this chapter is to:
     (a) Assure that citizens, businesses, and project proponents will continue to be provided with vital information regarding environmental and land use laws and with assistance in complying with environmental and land use laws to promote understanding of these laws and to protect public health and safety and the environment;
     (b) Ensure that facilitation of project permit decisions by permit agencies promotes both process efficiency and environmental protection;
     (c) Allow for coordination of permit processing for large projects upon project proponents' request and at project proponents' expense to promote efficiency, ensure certainty, and avoid conflicts among permit agencies; and
     (d) Provide these services through an office independent of any permit agency to ensure that any potential or perceived conflicts of interest related to providing these services or making permit decisions can be avoided.
     (7) The legislature also declares that the purpose of this chapter is to provide citizens of the state with access to information regarding state regulations, permit requirements, and agency rule-making processes in Washington state.
     (8)
)) The legislature finds that the health and safety of its citizens and environment are of vital interest to the state's long-term quality of life. The legislature also finds that Washington state is a national leader in protecting its environment. Further, the legislature finds that Washington has a vibrant and diverse economy that is dependent on the state maintaining high environmental standards. Further, the legislature finds that the complex and confusing network of environmental and land use laws and business regulations creates a burden on business.
     (2) Therefore, the legislature finds that to best promote accountability, timeliness, and predictability for citizens, business, and state and local permitting agencies, it is necessary to provide information and assistance on the regulatory process through the creation of the office of regulatory assistance in the governor's office.
     (3) The office of regulatory assistance is created to work to continually improve the function of environmental and business regulatory processes by identifying conflicts and overlap in the state's rules, statutes, and operational practices. The office of regulatory assistance is also created to provide businesses with active assistance for all permitting, licensing, and other regulatory procedures required for completion of specific projects. Further, the office of regulatory assistance is created to ensure that citizens, businesses, and local governments have access to, and clear information regarding, regulatory processes for permitting and business regulation, including state rules, permit and license requirements, and agency rule-making processes.
     (4) The legislature declares that the purpose of this chapter is to provide a forum for improving the regulatory process and for assistance through regulatory processes on individual projects in furtherance of the state's goals of governmental transparency and accountability.
     (5)
The legislature intends that establishing an office of regulatory assistance will provide these services without abrogating or limiting the authority of any agency to make decisions on permits, licenses, and regulatory requirements ((that it requires)) or ((any rule-making)) agency ((to make decisions on regulations)) rule making. The legislature therefore declares that the office of regulatory assistance shall have authority to provide ((these)) services but shall not have any authority to make decisions on permits.

Sec. 2   RCW 43.42.020 and 2007 c 94 s 3 are each amended to read as follows:
     (1) The office shall operate on ((the principle that citizens of the state of Washington should receive)) principles of accountability and transparency with a goal of providing the following information regarding permits to citizens and business:
     (a) ((A date and time for a decision on a permit or regulatory requirement)) The current average and median turnaround times from the date of application to date of decision for the required permit, licenses, or other necessary regulatory decisions for projects of a comparable size and complexity;
     (b) The information required for an agency to make a decision on a permit or regulatory requirement, recognizing that changes in the project or other circumstances may change the information required, including the agency's best estimate of the number of times an applicant will be asked to clarify, improve, or provide supplemental information to the agency before a decision and the average and median review time needed for each review cycle; and
     (c) An estimate of the maximum amount of costs in fees((,)) to be paid to state agencies and the type of any necessary studies((, or)) and timing of any expected public processes that will be incurred by the project proponent.
     (2) This section does not create an independent cause of action, affect any existing cause of action, or establish time limits for purposes of RCW 64.40.020.

Sec. 3   RCW 43.42.030 and 2007 c 94 s 4 are each amended to read as follows:
     The definitions in this section apply throughout this chapter unless the context clearly requires otherwise.
     (1) "Director" means the director of the office of regulatory assistance.
     (2)
"Office" means the office of regulatory assistance in the office of financial management established in RCW 43.42.010.
     (((2))) (3) "Permit" means any permit, certificate, use authorization, or other form of governmental review or approval required in order to construct, expand, or operate a project in the state of Washington.
     (((3))) (4) "Permit agency" means any state, local, or federal agency authorized by law to issue permits.
     (((4))) (5) "Project" means any activity, the conduct of which requires a permit or permits from one or more permit agencies.
     (((5))) (6) "Project proponent" means a citizen, business, or any entity applying for or seeking a permit or permits in the state of Washington.
     (7) "Qualifying coordinated permit process project" means a qualifying project as designated by the director that is not required to use cost-reimbursement.

Sec. 4   RCW 43.42.010 and 2007 c 231 s 5 and 2007 c 94 s 2 are each reenacted and amended to read as follows:
     (1) The office of regulatory assistance is created in the office of financial management and shall be administered by the office of the governor to assist citizens, businesses, and project proponents.
     (2) The governor shall appoint a director. The director may employ a deputy director and a confidential secretary and such staff as are necessary to carry out the purposes of this chapter.
     (3)
The office shall provide the following services:
     (a) ((Maintain and furnish information as provided in RCW 43.42.040;
     (b) Furnish facilitation as provided in RCW 43.42.050;
     (c) Furnish coordination as provided in RCW 43.42.060;
     (d) Coordinate cost reimbursement as provided in RCW 43.42.070;
     (e) Work with governmental agencies to continue to develop a range of permitting and regulatory assistance options for project proponents;
     (f) Help
)) Preapplication project scoping as provided in RCW 43.42.050;
     (b) Facilitation as provided in RCW 43.42.060;
     (c) Coordinated permit process as provided in section 7 of this act;
     (d) Helping
local jurisdictions comply with the requirements of RCW 36.70B.080 by:
     (i) Providing information about best practices and compliance with the requirements of RCW 36.70B.080; and
     (ii) Providing technical assistance in reducing the turnaround time between submittal of an application for a development permit and the issuance of the permit; and
     (((g) Work to develop informal processes for dispute resolution between agencies and permit proponents;
     (h) Conduct customer surveys to evaluate its effectiveness; and
     (i)
)) (e) Maintaining and furnishing information as provided in RCW 43.42.040.
     (4) The office shall p
rovide the following reports by ((June)) September 1, 2008, and biennially thereafter, to the governor and the appropriate committees of the legislature for public hearing:
     (((i))) (a) A performance report((, based on the customer surveys required in (h) of this subsection)) including:
     (i) Information regarding use of the office's voluntary cost-reimbursement services as provided in RCW 43.42.070;
     (ii) The number and type of projects where the office provided services; and
     (iii) The agencies involved on specific projects
; and
     (((ii))) (b) A report ((on)) with recommendations on system improvements including any conflicts ((identified by the office in the course of its duties)), overlaps, and inconsistencies arising from differing statutory or regulatory authorities, roles and missions of agencies, timing and sequencing of permitting and procedural requirements, or otherwise, as identified by the office in the course of its duties and how these were or could be resolved((; and
     (iii) A report regarding negotiation and implementation of voluntary cost-reimbursement agreements and use of outside independent consultants under RCW 43.42.070, including the nature and amount of work performed and implementation of requirements relating to costs
)).
     (((3))) (5) The office shall ensure the equitable delivery and provision of assistance services, regardless of project type, scale, fund source, or assistance request.

Sec. 5   RCW 43.42.050 and 2007 c 94 s 6 are each amended to read as follows:
     ((At the request of a project proponent, the office shall assist the project proponent in determining what regulatory requirements, processes, and permits apply to the project, as provided in this section.
     (1) The office shall assign a project facilitator who shall discuss applicable regulatory requirements, permits, and processes with the project proponent and explain the available options for obtaining required permits and regulatory review.
))
     (1) Upon request of a project proponent, the office shall determine the level of project scoping needed by the project proponent, taking into consideration the complexity of the project.
     (2) ((If the project proponent and the project facilitator agree that the project would benefit from a project scoping, the project facilitator shall conduct a project scoping with the project proponent and the relevant permitting and regulatory agencies. The project facilitator shall invite the participation of the relevant federal agencies and tribal governments.))
     (a) The purpose of the project scoping is to identify ((the)) relevant issues and information needs of the project proponent and ((the participating permit agencies regarding the project, share perspectives, and jointly develop a strategy for the processing of required permits by each participating permit agency)) permitting agencies and to reach a common understanding regarding the process, timing, and sequencing for obtaining applicable permits.
     (b) The ((scoping)) extent of preapplication project scoping shall consider the complexity, size, and needs for assistance of the project and shall address as appropriate:
     (i) The permits that are required for the project;
     (ii) The permit application forms and other application requirements of the participating permit agencies;
     (iii) The specific information needs and issues of concern of each participant and their significance;     
     (iv) Any statutory or regulatory conflicts that might arise from the differing authorities and roles of the permit agencies;
     (v) Any natural resources, including federal or state listed species, that might be adversely affected by the project and might cause an alteration of the project or require mitigation; and
     (vi) The anticipated time required for permit decisions by each participating permit agency, including the time required to determine if the permit application is complete, to conduct environmental review, and to review and process the application. In determining the time required, full consideration must be given to achieving the greatest possible efficiencies through any concurrent studies and any consolidated applications, hearings, and comment periods.
     (c) The outcome of the project scoping shall be documented in writing, furnished to the project proponent, and be made available to the public.
     (d) The project scoping shall be completed within sixty days of the project proponent's request for a project scoping.
     (e) Upon completion of the project scoping, the participating permit agencies shall proceed under their respective authority. The agencies are encouraged to remain in communication for purposes of coordination until their final permit decisions are made.
     (3) This section does not create an independent cause of action, affect any existing cause of action, or establish time limits for purposes of RCW 64.40.020.

Sec. 6   RCW 43.42.060 and 2007 c 94 s 7 are each amended to read as follows:
     (1) The office may ((coordinate the processing by participating permit agencies of permits required for a project,)) provide facilitation services at the request of ((the)) a project proponent regarding interjurisdictional permitting issues, project-related conflict and dispute resolution, and as part of the coordinated permit process. Facilitation may be provided through a cost-reimbursement agreement as provided in ((subsection (3) of this section or with the agreement of the project proponent as provided in subsection (4) of this section)) RCW 43.42.070 or in section 7(10) of this act. Facilitation may also be provided without cost-reimbursement as determined by the director.
     (2) The office shall assign a project ((coordinator)) facilitator to perform any or all of the following functions, as specified by the terms of a cost-reimbursement agreement under ((subsection (3) of this section or an agreement under subsection (4) of this section)) RCW 43.42.070 or as designated by the director:
     (a) Serve as the main point of contact for the project proponent;
     (b) Conduct a project scoping as provided in RCW 43.42.050(2);
     (c) Verify that the project proponent has all the information needed to complete applications;
     (d) ((Coordinate the permit processes of the permit agencies)) Provide facilitation services as a stand-alone event or as an element of broader project facilitation for project assistance, interagency coordination, or planning teams;
     (e) ((Manage the)) Coordinate applicable administrative procedures among participating agencies;
     (f) Work to assure that timely permit decisions are made by the permit agencies and maintain contact with the project proponent and the permit agencies to ensure adherence to schedules;
     (g) Assist in resolving any conflict or inconsistency among permit requirements and conditions; and
     (h) Coordinate with relevant federal permit agencies and tribal governments to the extent possible.
     (((3) At the request of a project proponent and as provided in RCW 43.42.070, the project coordinator shall coordinate negotiations among the project proponent, the office, and participating permit agencies to enter into a cost reimbursement agreement and shall coordinate implementation of the agreement, which shall govern coordination of permit processing by the participating permit agencies.
     (4) For industrial projects of statewide significance or if the office determines that it is in the public interest to coordinate the processing of permits for certain projects that are complex in scope, require multiple permits, involve multiple jurisdictions, or involve a significant number of affected parties, the office shall, upon the proponent's request, enter into an agreement with the project proponent and the participating permit agencies to coordinate the processing of permits for the project. The office may limit the number of such agreements according to the resources available to the office and the permit agencies at the time.
))

NEW SECTION.  Sec. 7   A new section is added to chapter 43.42 RCW to read as follows:
     (1) At the request of a project proponent, the office shall assist the project proponent in coordinating the permit process by determining what regulatory requirements, processes, and permits may be required for development and operation of the proposed project.
     (2) A project proponent who requests the designation of a coordinated permit process project through a cost-reimbursement agreement or is designated as a qualifying coordinated permit process project must provide the office with a description of the project. The office may request any information from the project proponent that is necessary to make the designation under this section, and may convene a scoping meeting of the likely participating permit agencies.
     (3) The office shall serve as the main point of contact for the project proponent and participating permitting agencies with regard to the coordinated permit process for the project and shall manage the procedural aspects of that processing consistent with existing laws governing the participating permit agencies and with the procedures agreed to by those agencies. In carrying out these responsibilities, the office shall ensure that the project proponent has all the information needed to apply for all the component permits that are incorporated in the coordinated permit process for the project, coordinate the review of those permits by the respective participating permit agencies, facilitate so that timely permit decisions are made by the participating permit agencies, and assist in resolving any conflict or inconsistency among the permit requirements and conditions that are to be imposed by the participating permit agencies with regard to the project. The office shall keep in contact with the project proponent as well as with other permit agencies in order to assist the process in progressing as scheduled. The office shall also make contact, at least once, with any local, tribal, or federal jurisdiction that is responsible for issuing a permit for the project.
     (4) Within thirty days, or longer with agreement of the project proponent, of the date that the office designates a qualifying coordinated permit process project or enters into a cost-reimbursement agreement for a coordinated permit process project, it shall convene a meeting with the project proponent for the project and the participating permit agencies. Additional meetings must be convened within twenty-one days of a permit decision or at least once every nine months unless the meetings are waived by the project proponent. The meeting agenda shall include at least all of the following:
     (a) An estimation of the permits that are required for the project;
     (b) A review of the permit application forms and other application requirements of the agencies that are participating in the coordinated permit process;
     (c)(i) A determination of the timelines that will be used by the office and each participating permit agency to make permit decisions, including the time periods required to determine if the permit applications are complete, to review the application or applications, to process the component permits, and the anticipated number of revision cycles. In the development of this timeline, full attention shall be given to achieving the maximum efficiencies possible through concurrent studies, consolidated applications, hearings, and comment periods. Except as provided in (c)(ii) of this subsection, the timelines established under this subsection, with the assent of the office and each participating permit agency, shall commit the office and each participating permit agency to act on the component permit within time periods that are different than those required by other applicable provisions of law;
     (ii) An accelerated time period for the consideration of a permit application may not be set if that accelerated time period would be inconsistent with, or in conflict with, any time period or series of time periods set by statute for that consideration, or with any statute, rule, or regulation, or adopted state policy, standard, or guideline that requires any of the following:
     (A) Other agencies, interested persons, federally recognized Indian tribes, or the public to be given adequate notice of the application;
     (B) Other agencies to be given a role in, or be allowed to participate in, the decision to approve or disapprove the application; or
     (C) Interested persons or the public to be provided the opportunity to challenge, comment on, or otherwise voice their concerns regarding the application;
     (d) Information available regarding and estimated timing of any public hearings that are required to issue permits for the project and a determination of the feasibility of coordinating or consolidating any of those required public hearings; and
     (e) A discussion of fee arrangements for the coordinated permit process, including an estimate of the costs allowed by statute and the billing schedule.
     (5) Each agency shall send at least one representative qualified to make decisions concerning the applicability and timelines associated with all permits administered by that jurisdiction. At the request of the project proponent, the office shall notify any relevant federal agency or federally recognized Indian tribe of the date of the meeting and invite that agency's participation in the process.
     (6) If a permit agency or the project proponent foresees, at any time, that it will be unable to meet its obligations under the agreement, it shall notify the office of the problem. The office shall notify the participating permit agencies and the project proponent and, upon agreement of all parties, adjust the schedule, or, if necessary, schedule another work plan meeting.
     (7) The office may request any information from the project proponent that is necessary to comply with its obligations under this section, consistent with the timelines set under this section.
     (8) A summary of the decisions made under this section shall be made available for public review upon the filing of the coordinated permit process application or permit applications.
     (9) The project proponent may withdraw from the coordinated permit process by submitting to the office a written request that the process be terminated. Upon receipt of the request, the office shall notify each participating permit agency that a coordinated permit process is no longer applicable to the project.
     (10) For industrial projects of statewide significance, essential public facilities as provided in chapter 36.70A RCW, or if the director determines that it is in the public interest to coordinate and facilitate the processing of permits for certain projects, the office shall, upon the proponent's request, enter into an agreement with the project proponent to provide such services according to the resources available to the office and the permit agencies at the time.

Sec. 8   RCW 43.42.070 and 2007 c 94 s 8 are each amended to read as follows:
     (1) The office may ((coordinate negotiation and implementation of a written agreement among the)) enter into cost-reimbursement agreements with a project proponent, the office, and participating permit agencies to recover from the project proponent the reasonable costs incurred by the office in carrying out the provisions of RCW 43.42.050(2) and 43.42.060(2) and by participating permit agencies in carrying out permit processing tasks specified in the agreement.
     (2) ((The office may coordinate negotiation and implementation of a written agreement among the project proponent, the office, and participating permit agencies to recover from the project proponent the reasonable costs incurred by outside independent consultants selected by the office and participating permit agencies to perform permit processing tasks.
     (3) Outside independent consultants may only bill for the costs of performing those permit processing tasks that are specified in a cost-reimbursement agreement under this section. The billing process shall provide for accurate time and cost accounting and may include a billing cycle that provides for progress payments.
     (4)
)) The office shall adopt a policy to coordinate cost-reimbursement agreements with outside independent consultants. ((Cost-reimbursement agreements coordinated)) The office shall develop guidelines to ensure that, in developing cost-reimbursement agreements, conflicts of interest are eliminated. Contracts with independent consultants hired by the office under this section must be based on competitive bids that are awarded for each agreement from a prequalified consultant roster.
     (((5) Independent consultants hired under a cost-reimbursement agreement shall report directly to the permit agency. The office shall assure that final decisions are made by the permit agency and not by the consultant.
     (6) The office shall develop procedures for determining, collecting, and distributing cost reimbursement for carrying out the provisions of this chapter.
     (7) For a cost-reimbursement agreement, the office and participating permit agencies shall negotiate a work plan and schedule for reimbursement. Prior to distributing scheduled reimbursement to the agencies, the office shall verify that the agencies have met the obligations contained in their work plan.
     (8) Prior to commencing negotiations with the project proponent for a cost-reimbursement agreement, the office shall request work load analyses from each participating permitting agency. These analyses shall be available to the public. The work load of a participating permit agency may only be modified with the concurrence of the agency and if there is both good cause to do so and no significant impact on environmental review.
     (9) The office shall develop guidance to ensure that, in developing cost-reimbursement agreements, conflicts of interest are eliminated.
     (10)
)) (3) For project permit processes that it coordinates, the office shall coordinate the negotiation of all cost-reimbursement agreements executed under RCW 43.21A.690, 43.30.490, 43.70.630, 43.300.080, and 70.94.085. The office, proponent, and the permit agencies shall be signatories to the agreements. Each permit agency shall manage performance of its portion of the agreement. Independent consultants hired under a cost-reimbursement agreement shall report directly to the permit agency. The office shall assure that final decisions are made by the permit agency and not by the consultant.
     (((11))) (4) For a cost-reimbursement agreement, the office and participating permit agencies shall negotiate a work plan and schedule for reimbursement. Before distributing scheduled reimbursement to the agencies, the office shall verify that the agencies have met the obligations contained in their work plan. The cost-reimbursement agreement shall identify the specific tasks of each agency and costs for work conducted under the agreement. The agreement must include a schedule that states:
     (a) The median number of weeks for initial review of the permit application for comparable projects;
     (b) The anticipated number of revision cycles;
     (c) The average number of weeks for review of subsequent revision submittals;
     (d) Estimated number of billable hours of employee time;
     (e) The rate per hour; and
     (f) A date for revision of the agreement if necessary.
     (5)
If a permit agency or the project proponent foresees, at any time, that it will be unable to meet its obligations under the cost-reimbursement agreement, it shall notify the office and state the reasons. The office shall notify the participating permit agencies and the project proponent and, upon agreement of all parties, adjust the schedule, or, if necessary, coordinate revision of the work plan.

Sec. 9   RCW 43.21A.690 and 2007 c 94 s 10 are each amended to read as follows:
     (1) The department may enter into a written cost-reimbursement agreement with a permit applicant or project proponent to recover from the applicant or proponent the reasonable costs incurred by the department in carrying out the requirements of this chapter, as well as the requirements of other relevant laws, as they relate to permit coordination, environmental review, application review, technical studies, and permit processing.
     (2) The cost-reimbursement agreement shall identify the specific tasks((,)) and costs((, and schedule)) for work to be conducted under the agreement. The agreement must include a schedule that states:
     (a) The average number of weeks for initial review of the permit application;
     (b) The anticipated number of revision cycles;
     (c) The average number of weeks of subsequent revision submittals;
     (d) Estimated number of hours of employee time;
     (e) The rate per hour; and
     (f) A date for revision of the agreement if necessary.

     (((2))) (3) The written cost-reimbursement agreement shall be negotiated with the permit applicant or project proponent. Under the provisions of a cost-reimbursement agreement, funds from the applicant shall be used by the department to contract with an independent consultant to carry out the work covered by the cost-reimbursement agreement. The department may also use funds provided under a cost-reimbursement agreement to assign current staff to review the work of the consultant, to provide necessary technical assistance when an independent consultant with comparable technical skills is unavailable, and to recover reasonable and necessary direct and indirect costs that arise from processing the permit. The department shall, in developing the agreement, ensure that final decisions that involve policy matters are made by the agency and not by the consultant. The department shall make an estimate of the number of permanent staff hours to process the permits, and shall contract with consultants to replace the time and functions committed by these permanent staff to the project. The billing process shall provide for accurate time and cost accounting and may include a billing cycle that provides for progress payments. ((Use of cost-reimbursement agreements shall not reduce the current level of staff available to work on permits not covered by cost-reimbursement agreements. The department may not use any funds under a cost-reimbursement agreement to replace or supplant existing funding.))
     (4) The cost-reimbursement agreement must not negatively impact the processing of other permit applications. In order to maintain permit processing capacity, the agency may hire outside consultants, temporary employees, or make internal administrative changes. Consultants or temporary employees hired as part of a cost-reimbursement agreement or to maintain agency capacity are hired as agents of the state not of the permit applicant. The restrictions of chapter 42.52 RCW apply to any cost-reimbursement agreement, and to any person hired as a result of a cost-reimbursement agreement.

Sec. 10   RCW 43.30.490 and 2007 c 188 s 1 and 2007 c 94 s 11 are each reenacted and amended to read as follows:
     (1) The department may enter into a written cost-reimbursement agreement with a permit or lease applicant or project proponent to recover from the applicant or proponent the reasonable costs incurred by the department in carrying out the requirements of this chapter, as well as the requirements of other relevant laws, as they relate to permit coordination, environmental review, application review, technical studies, establishment of development units and approval or establishment of pooling agreements under chapter 78.52 RCW, including necessary technical studies, permit or lease processing, and monitoring for permit compliance.
     (2) The cost-reimbursement agreement shall identify the specific tasks((,)) and costs((, and schedule)) for work to be conducted under the agreement. The agreement must include a schedule that states:
     (a) The average number of weeks for initial review of the permit application;
     (b) The anticipated number of revision cycles;
     (c) The average number of weeks of subsequent revision submittals;
     (d) Estimated number of hours of employee time;
     (e) The rate per hour; and
     (f) A date for revision of the agreement if necessary.

     (((2))) (3) The written cost-reimbursement agreement shall be negotiated with the permit or lease applicant or project proponent. Under the provisions of a cost-reimbursement agreement, funds from the applicant or proponent shall be used by the department to contract with an independent consultant to carry out the work covered by the cost-reimbursement agreement. The department may also use funds provided under a cost-reimbursement agreement to assign current staff to review the work of the consultant, to provide necessary technical assistance when an independent consultant with comparable technical skills is unavailable, and to recover reasonable and necessary direct and indirect costs that arise from processing the permit or lease. The department shall, in developing the agreement, ensure that final decisions that involve policy matters are made by the agency and not by the consultant. The department shall make an estimate of the number of permanent staff hours to process the permits or leases, and shall contract with consultants to replace the time and functions committed by these permanent staff to the project. The billing process shall provide for accurate time and cost accounting and may include a billing cycle that provides for progress payments. ((Use of cost-reimbursement agreements shall not reduce the current level of staff available to work on permits or leases not covered by cost-reimbursement agreements. The department may not use any funds under a cost-reimbursement agreement to replace or supplant existing funding.))
     (4) The cost-reimbursement agreement must not negatively impact the processing of other permit applications. In order to maintain permit processing capacity, the agency may hire outside consultants, temporary employees, or make internal administrative changes. Consultants or temporary employees hired as part of a cost-reimbursement agreement or to maintain agency capacity are hired as agents of the state not of the permit applicant. The restrictions of chapter 42.52 RCW apply to any cost-reimbursement agreement, and to any person hired as a result of a cost-reimbursement agreement.

Sec. 11   RCW 43.70.630 and 2007 c 94 s 12 are each amended to read as follows:
     (1) The department may enter into a written cost-reimbursement agreement with a permit applicant or project proponent to recover from the applicant or proponent the reasonable costs incurred by the department in carrying out the requirements of this chapter, as well as the requirements of other relevant laws, as they relate to permit coordination, environmental review, application review, technical studies, and permit processing.
     (2) The cost-reimbursement agreement shall identify the specific tasks((,)) and costs((, and schedule)) for work to be conducted under the agreement. The agreement must include a schedule that states:
     (a) The average number of weeks for initial review of the permit application;
     (b) The anticipated number of revision cycles;
     (c) The average number of weeks of subsequent revision submittals;
     (d) Estimated number of hours of employee time;
     (e) The rate per hour; and
     (f) A date for revision of the agreement if necessary.

     (((2))) (3) The written cost-reimbursement agreement shall be negotiated with the permit applicant or project proponent. Under the provisions of a cost-reimbursement agreement, funds from the applicant or proponent shall be used by the department to contract with an independent consultant to carry out the work covered by the cost-reimbursement agreement. The department may also use funds provided under a cost-reimbursement agreement to assign current staff to review the work of the consultant, to provide necessary technical assistance when an independent consultant with comparable technical skills is unavailable, and to recover reasonable and necessary direct and indirect costs that arise from processing the permit. The department shall, in developing the agreement, ensure that final decisions that involve policy matters are made by the agency and not by the consultant. The department shall make an estimate of the number of permanent staff hours to process the permits, and shall contract with consultants to replace the time and functions committed by these permanent staff to the project. The billing process shall provide for accurate time and cost accounting and may include a billing cycle that provides for progress payments. ((Use of cost-reimbursement agreements shall not reduce the current level of staff available to work on permits not covered by cost-reimbursement agreements. The department may not use any funds under a cost-reimbursement agreement to replace or supplant existing funding.))
     (4) The cost-reimbursement agreement must not negatively impact the processing of other permit applications. In order to maintain permit processing capacity, the agency may hire outside consultants, temporary employees, or make internal administrative changes. Consultants or temporary employees hired as part of a cost-reimbursement agreement or to maintain agency capacity are hired as agents of the state not of the permit applicant. The restrictions of chapter 42.52 RCW apply to any cost-reimbursement agreement, and to any person hired as a result of a cost-reimbursement agreement.

Sec. 12   RCW 43.300.080 and 2007 c 94 s 13 are each amended to read as follows:
     (1) The department may enter into a written cost-reimbursement agreement with a permit applicant or project proponent to recover from the applicant or proponent the reasonable costs incurred by the department in carrying out the requirements of this chapter, as well as the requirements of other relevant laws, as they relate to permit coordination, environmental review, application review, technical studies, and permit processing.
     (2) The cost-reimbursement agreement shall identify the specific tasks((,)) and costs((, and schedule)) for work to be conducted under the agreement. The agreement must include a schedule that states:
     (a) The average number of weeks for initial review of the permit application;
     (b) The anticipated number of revision cycles;
     (c) The average number of weeks of subsequent revision submittals;
     (d) Estimated number of hours of employee time;
     (e) The rate per hour; and
     (f) A date for revision of the agreement if necessary.

     (((2))) (3) The written cost-reimbursement agreement shall be negotiated with the permit applicant or project proponent. Under the provisions of a cost-reimbursement agreement, funds from the applicant shall be used by the department to contract with an independent consultant to carry out the work covered by the cost-reimbursement agreement. The department may also use funds provided under a cost-reimbursement agreement to assign current staff to review the work of the consultant, to provide necessary technical assistance when an independent consultant with comparable technical skills is unavailable, and to recover reasonable and necessary direct and indirect costs that arise from processing the permit. The department shall, in developing the agreement, ensure that final decisions that involve policy matters are made by the agency and not by the consultant. The department shall make an estimate of the number of permanent staff hours to process the permits, and shall contract with consultants to replace the time and functions committed by these permanent staff to the project. The billing process shall provide for accurate time and cost accounting and may include a billing cycle that provides for progress payments. ((Use of cost-reimbursement agreements shall not reduce the current level of staff available to work on permits not covered by cost-reimbursement agreements. The department may not use any funds under a cost-reimbursement agreement to replace or supplant existing funding.))
     (4) The cost-reimbursement agreement must not negatively impact the processing of other permit applications. In order to maintain permit processing capacity, the agency may hire outside consultants, temporary employees, or make internal administrative changes. Consultants or temporary employees hired as part of a cost-reimbursement agreement or to maintain agency capacity are hired as agents of the state not of the permit applicant. The restrictions of chapter 42.52 RCW apply to any cost-reimbursement agreement, and to any person hired as a result of a cost-reimbursement agreement.

Sec. 13   RCW 70.94.085 and 2007 c 94 s 14 are each amended to read as follows:
     (1) An authority may enter into a written cost-reimbursement agreement with a permit applicant or project proponent to recover from the applicant or proponent the reasonable costs incurred by the authority in carrying out the requirements of this chapter, as well as the requirements of other relevant laws, as they relate to permit coordination, environmental review, application review, technical studies, and permit processing.
     (2) The cost-reimbursement agreement shall identify the specific tasks((,)) and costs((, and schedule)) for work to be conducted under the agreement. The agreement must include a schedule that states:
     (a) The average number of weeks for initial review of the permit application;
     (b) The anticipated number of revision cycles;
     (c) The average number of weeks of subsequent revision submittals;
     (d) Estimated number of hours of employee time;
     (e) The rate per hour; and
     (f) A date for revision of the agreement if necessary.

     (((2))) (3) The written cost-reimbursement agreement shall be negotiated with the permit applicant or project proponent. Under the provisions of a cost-reimbursement agreement, funds from the applicant or proponent shall be used by the air pollution control authority to contract with an independent consultant to carry out the work covered by the cost-reimbursement agreement. The air pollution control authority may also use funds provided under a cost-reimbursement agreement to assign current staff to review the work of the consultant, to provide necessary technical assistance when an independent consultant with comparable technical skills is unavailable, and to recover reasonable and necessary direct and indirect costs that arise from processing the permit. The air pollution control authority shall, in developing the agreement, ensure that final decisions that involve policy matters are made by the agency and not by the consultant. The air pollution control authority shall make an estimate of the number of permanent staff hours to process the permits, and shall contract with consultants to replace the time and functions committed by these permanent staff to the project. The billing process shall provide for accurate time and cost accounting and may include a billing cycle that provides for progress payments. ((Use of cost-reimbursement agreements shall not reduce the current level of staff available to work on permits not covered by cost-reimbursement agreements. The air pollution control authority may not use any funds under a cost-reimbursement agreement to replace or supplant existing funding.))
     (4) The cost-reimbursement agreement must not negatively impact the processing of other permit applications. In order to maintain permit processing capacity, the agency may hire outside consultants, temporary employees, or make internal administrative changes. Consultants or temporary employees hired as part of a cost-reimbursement agreement or to maintain agency capacity are hired as agents of the state not of the permit applicant. The provisions of chapter 42.52 RCW apply to any cost-reimbursement agreement, and to any person hired as a result of a cost-reimbursement agreement. Members of the air pollution control authority's board of directors shall be considered as state officers, and employees of the air pollution control authority shall be considered as state employees, for the sole purpose of applying the restrictions of chapter 42.52 RCW to this section.

NEW SECTION.  Sec. 14   A new section is added to chapter 43.42 RCW to read as follows:
     This chapter shall not be construed to limit or abridge the powers and duties granted to a participating permit agency under the law that authorizes or requires the agency to issue a permit for a project. Each participating permit agency shall retain its authority to make all decisions on all nonprocedural matters with regard to the respective component permit that is within its scope of its responsibility including, but not limited to, the determination of permit application completeness, permit approval or approval with conditions, or permit denial. The office may not substitute its judgment for that of a participating permit agency on any such nonprocedural matters.

--- END ---