"Sec. 1 RCW 90.48.555 and 2004 c 225 s 2 are each amended to read
as follows:
The provisions of this section apply to the construction and
industrial storm water general permits issued by the department
pursuant to the federal clean water act, 33 U.S.C. Sec. 1251 et seq.,
and this chapter.
(1) Effluent limitations shall be included in construction and
industrial storm water general permits as required under the federal
clean water act, 33 U.S.C. Sec. 1251 et seq., and its implementing
regulations. In accordance with federal clean water act requirements,
pollutant specific, water quality-based effluent limitations shall be
included in construction and industrial storm water general permits if
there is a reasonable potential to cause or contribute to an excursion
of a state water quality standard.
(2) Subject to the provisions of this section, both technology and
water quality-based effluent limitations may be expressed as:
(a) Numeric effluent limitations;
(b) Narrative effluent limitations; or
(c) A combination of numeric and narrative effluent discharge
limitations.
(3) The department must condition storm water general permits for
industrial and construction activities issued under the national
pollutant discharge elimination system of the federal clean water act
to require compliance with numeric effluent discharge limits when such
discharges are subject to:
(a) Numeric effluent limitations established in federally adopted,
industry-specific effluent guidelines;
(b) State developed, industry-specific performance-based numeric
effluent limitations;
(c) Numeric effluent limitations based on a completed total maximum
daily load analysis or other pollution control measures; or
(d) A determination by the department that:
(i) The discharges covered under either the construction or
industrial storm water general permits have a reasonable potential to
cause or contribute to violation of state water quality standards; and
(ii) Effluent limitations based on nonnumeric best management
practices are not effective in achieving compliance with state water
quality standards.
(4) In making a determination under subsection (3)(d) of this
section, the department shall use procedures that account for:
(a) Existing controls on point and nonpoint sources of pollution;
(b) The variability of the pollutant or pollutant parameter in the
storm water discharge; and
(c) As appropriate, the dilution of the storm water in the
receiving waters.
(5) Narrative effluent limitations requiring both the
implementation of best management practices, when designed to satisfy
the technology and water quality-based requirements of the federal
clean water act, 33 U.S.C. Sec. 1251 et seq., and compliance with water
quality standards, shall be used for construction and industrial storm
water general permits, unless the provisions of subsection (3) of this
section apply.
(6) Compliance with water quality standards shall be presumed,
unless discharge monitoring data or other site specific information
demonstrates that a discharge causes or contributes to violation of
water quality standards, when the permittee is:
(a) In full compliance with all permit conditions, including
planning, sampling, monitoring, reporting, and recordkeeping
conditions; and
(b)(i) Fully implementing storm water best management practices
contained in storm water technical manuals approved by the department,
or practices that are demonstrably equivalent to practices contained in
storm water technical manuals approved by the department, including the
proper selection, implementation, and maintenance of all applicable and
appropriate best management practices for on-site pollution control.
(ii) For the purposes of this section, "demonstrably equivalent"
means that the technical basis for the selection of all storm water
best management practices are documented within a storm water pollution
prevention plan. The storm water pollution prevention plan must
document:
(A) The method and reasons for choosing the storm water best
management practices selected;
(B) The pollutant removal performance expected from the practices
selected;
(C) The technical basis supporting the performance claims for the
practices selected, including any available existing data concerning
field performance of the practices selected;
(D) An assessment of how the selected practices will comply with
state water quality standards; and
(E) An assessment of how the selected practices will satisfy both
applicable federal technology-based treatment requirements and state
requirements to use all known, available, and reasonable methods of
prevention, control, and treatment.
(7)(a) By November 1, 2009, the department shall modify or reissue
the industrial storm water general permit to require compliance ((by
May 1, 2009,)) with appropriately derived numeric water quality-based
effluent limitations for existing discharges to water bodies listed as
impaired according to 33 U.S.C. Sec. 1313(d) (Sec. 303(d) of the
federal clean water act, 33 U.S.C. Sec. 1251 et seq.).
(b) ((No later than September 1, 2008,)) The industrial storm water
general permit must require permittees to comply with appropriately
derived numeric water quality-based effluent limitations in the permit,
as described in (a) of this subsection, by no later than six months
after the effective date of the industrial storm water general permit.
(c) For permittees that the department determines are unable to
comply with numeric water quality-based effluent limitations required
by (a) of this subsection, within the timeline established in (b) of
this subsection, the department shall establish a compliance schedule.
(i) A compliance schedule provided by the department must require
compliance as soon as possible, but no later than eighteen months after
the effective date of the industrial storm water general permit.
(ii) The department shall post the compliance schedule on the
department's web site prior to issuing the compliance schedule.
(d) The department shall report to the appropriate committees of
the legislature specifying how the numeric effluent limitation in (a)
of this subsection would be implemented. The report shall identify the
number of dischargers to impaired water bodies and provide an
assessment of anticipated compliance with the numeric effluent
limitation established by (a) of this subsection.
(8)(a) Construction and industrial storm water general permits
issued by the department shall include an enforceable adaptive
management mechanism that includes appropriate monitoring, evaluation,
and reporting. The adaptive management mechanism shall include
elements designed to result in permit compliance and shall include, at
a minimum, the following elements:
(i) An adaptive management indicator, such as monitoring
benchmarks;
(ii) Monitoring;
(iii) Review and revisions to the storm water pollution prevention
plan;
(iv) Documentation of remedial actions taken; and
(v) Reporting to the department.
(b) Construction and industrial storm water general permits issued
by the department also shall include the timing and mechanisms for
implementation of treatment best management practices.
(9) Construction and industrial storm water discharges authorized
under general permits must not cause or have the reasonable potential
to cause or contribute to a violation of an applicable water quality
standard. Where a discharge has already been authorized under a
national pollutant discharge elimination system storm water permit and
it is later determined to cause or have the reasonable potential to
cause or contribute to the violation of an applicable water quality
standard, the department may notify the permittee of such a violation.
(10) Once notified by the department of a determination of
reasonable potential to cause or contribute to the violation of an
applicable water quality standard, the permittee must take all
necessary actions to ensure future discharges do not cause or
contribute to the violation of a water quality standard and document
those actions in the storm water pollution prevention plan and a report
timely submitted to the department. If violations remain or recur,
coverage under the construction or industrial storm water general
permits may be terminated by the department, and an alternative general
permit or individual permit may be issued. Compliance with the
requirements of this subsection does not preclude any enforcement
activity provided by the federal clean water act, 33 U.S.C. Sec. 1251
et seq., for the underlying violation.
(11) Receiving water sampling shall not be a requirement of an
industrial or construction storm water general permit except to the
extent that it can be conducted without endangering the health and
safety of persons conducting the sampling.
(12) The department may authorize mixing zones only in compliance
with and after making determinations mandated by the procedural and
substantive requirements of applicable laws and regulations.
(13) The industrial storm water general permit must include a
provision to allow an entity subject to coverage by the permit to apply
for an individual storm water permit or coverage under another
alternative permit as provided in the industrial storm water general
permit.
NEW SECTION. Sec. 2 A new section is added to chapter 90.48 RCW
to read as follows:
The provisions of this section apply to the construction and
industrial storm water general permits issued by the department
pursuant to the federal clean water act, 33 U.S.C. Sec. 1251 et seq.,
and this chapter.
By July 1, 2010, the department shall implement a technical
assistance program as provided by RCW 43.05.030, 43.05.040, 43.05.050,
43.05.060, and 43.05.070. The department shall seek input from
stakeholders prior to establishing the technical assistance program and
periodically thereafter in an effort to maximize the effectiveness of
the technical assistance program. The department shall also seek input
from stakeholders to help identify resources needed to implement the
department's technical assistance program.
NEW SECTION. Sec. 3 A new section is added to chapter 90.48 RCW
to read as follows:
(1) The provisions of this section apply to the construction and
industrial storm water general permits issued by the department
pursuant to the federal clean water act, 33 U.S.C. Sec. 1251 et seq.,
and this chapter.
(2) By June 30, 2010, the department shall develop a long-term
compliance assessment and enforcement plan for the construction and
industrial storm water general permits in accordance with RCW
90.48.560. The plan must:
(a) Be developed with the assistance of a stakeholder advisory
committee with representatives of at least industrial and construction
permittees, nongovernmental organizations, affected agencies, tribes,
and local governments. The department may establish separate
stakeholder committees for the industrial storm water general permit
and the construction storm water general permit.
(b) Contain provisions to identify entities required to be covered
by the permits that are not covered and maximize the number of
facilities covered by the permit that are required to be covered by the
permit by June 30, 2011.
NEW SECTION. Sec. 4 A new section is added to chapter 90.48 RCW
to read as follows:
(1) The department shall create a storm water technical resource
center in partnership with a university, nonprofit organization, or
other public or private entity to provide tools for storm water
management. The center shall use its authority to support the duties
listed in this subsection through research, development, technology
demonstration, technology transfer, education, outreach, recognition,
and training programs. The center may:
(a) Review and evaluate emerging storm water technologies;
(b) Research and develop innovative and cost-effective technical
solutions to remove pollutants from runoff and to reduce or eliminate
storm water discharges;
(c) Conduct pilot projects to test technical solutions;
(d) Serve as a clearinghouse and outreach center for information on
storm water technology;
(e) Assist in the development of storm water control methods to
better protect water quality, including source control, product
substitution, pollution prevention, and storm water treatment;
(f) Coordinate with federal, state, and local agencies and private
organizations in administering programs related to storm water control
measures; and
(g) Collaborate with existing storm water outreach programs.
(2) The department shall consult with an advisory committee in the
development of the storm water technical resource center. The advisory
committee must include representatives from relevant state agencies,
local governments, the business community, the environmental community,
tribes, and the building and development industry.
(3) The department, in consultation with the storm water technical
resource center advisory committee, shall identify a funding strategy
for funding the storm water technical resource center.
(4) The department shall encourage all interested parties to help
and support the technical resource center with in-kind services.
(5) The department shall prepare and submit a biennial progress
report to the legislature.
NEW SECTION. Sec. 5 Section 1 of this act expires January 1,
2015."
Correct the title.
EFFECT: By November 1, 2009, the department of ecology (DOE) must
modify or reissue the industrial storm water general permit to require
compliance with appropriately derived numeric water quality-based
effluent limitations for existing discharges to 303(d) water bodies.
The industrial storm water general permit must require permittees to
comply by no later than 6 months after the effective date of the
industrial storm water general permit. The DOE may establish a
compliance schedule up to 18 months after the effective date of the
permit, for permittees that the DOE determines are unable to comply by
the original compliance date.
The industrial storm water general permit must include a provision
to allow an entity subject to coverage by the permit to apply for an
individual storm water permit or coverage under another alternative
permit.
By July 1, 2010, the DOE must implement a technical assistance
program. By June 30, 2010, the DOE must develop a long-term compliance
assessment and enforcement plan for the industrial and construction
general storm water permits.
The DOE, in consultation with an advisory committee, must create a
storm water technical resource center in partnership with a university,
nonprofit organization, or other public or private entity to provide
tools for storm water management. The center must use its authority to
support research, development, technology demonstration, technology
transfer, education, outreach, recognition, and training programs.
The DOE, in consultation with an advisory committee, must identify
a funding strategy for funding the storm water technical resource
center. The DOE must encourage all interested parties to help and
support the technical resource center with in-kind services.
The DOE must prepare and submit a biennial progress report to the