"NEW SECTION. Sec. 1 A new section is added to chapter 47.01 RCW
to read as follows:
(1) The legislature finds that the replacement of the vulnerable
state route number 99 Alaskan Way viaduct is a matter of urgency for
the safety of Washington's traveling public and the needs of the
transportation system in central Puget Sound. The state route number
99 Alaskan Way viaduct is susceptible to damage, closure, or
catastrophic failure from earthquakes and tsunamis. Additionally, the
viaduct serves as a vital route for freight and passenger vehicles
through downtown Seattle.
Since 2001, the department has undertaken an extensive evaluation
of multiple options to replace the Alaskan Way viaduct, including an
initial evaluation of seventy-six conceptual alternatives and a more
detailed analysis of five alternatives in 2004. In addition to a
substantial technical review, the department has also undertaken
considerable public outreach, which included consultation with a
stakeholder advisory committee that met sixteen times over a thirteen-month period.
Therefore, it is the conclusion of the legislature that time is of
the essence, and that Washington state cannot wait for a disaster to
make it fully appreciate the urgency of the need to replace this
vulnerable structure. The state shall take the necessary steps to
expedite the environmental review and design processes to replace the
Alaskan Way viaduct with a deep bore tunnel under First Avenue from the
vicinity of the sports stadiums in Seattle to Aurora Avenue north of
the Battery Street tunnel. The tunnel must include four general
purpose lanes in a stacked formation.
(2) The state route number 99 Alaskan Way viaduct replacement
project finance plan must include state funding not to exceed two
billion four hundred million dollars and must also include at least
four hundred million dollars in toll revenue. These funds must be used
solely to build a replacement tunnel, as described in subsection (1) of
this section, and to remove the existing state route number 99 Alaskan
Way viaduct. All costs associated with city utility relocations for
state work as described in this section must be borne by the city of
Seattle and provided in a manner that meets project construction
schedule requirements as determined by the department. State funding
is not authorized for any utility relocation costs, or for central
seawall or waterfront promenade improvements.
(3) The department shall provide updated cost estimates for
construction of the bored tunnel and also for the full Alaskan Way
viaduct replacement project to the legislature and governor by January
1, 2010. The department must also consult with independent tunnel
engineering experts to review the estimates and risk assumptions. The
department shall not enter into a design-build contract for
construction of the bored tunnel until the report in this section has
been submitted.
(4) Any contract the department enters into related to construction
of the deep bored tunnel must include incentives and penalties to
encourage on-time completion of the project and to minimize the
potential for cost overruns.
(5) It is important that the public and policymakers have accurate
and timely access to information related to the Alaskan Way viaduct
replacement project as it proceeds to, and during, construction of all
aspects of the project, specifically including but not limited to
information regarding costs, schedules, contracts, project status, and
neighborhood impacts. Therefore it is the intent of the legislature
that the state, city, and county departments of transportation
establish a single source of accountability for integration,
coordination, tracking, and information of all requisite components of
the replacement project, which must include, at minimum:
(a) A master schedule of all subprojects included in the full
replacement project or program; and
(b) A single point of contact for the public, media, stakeholders,
and other interested parties.
(6) The state, city, and county departments of transportation shall
be responsible for the cost, delivery, and associated risks of the
project components for which each department is responsible, as
outlined in the January 13, 2009, letter of agreement signed by the
governor, city, and county.
NEW SECTION. Sec. 2 The department of transportation must
prepare a traffic and revenue study for a state route number 99 deep
bore tunnel for the purpose of determining the facility's potential to
generate toll revenue. The department shall regularly report to the
transportation commission regarding the progress of the study for the
purpose of guiding the commission's toll setting on the facility. The
study must include the following information:
(1) An analysis of the potential diversion from state route number
99 to other parts of the transportation system resulting from tolls on
the facility;
(2) An analysis of potential mitigation measures to offset or
reduce diversion from state route number 99;
(3) A summary of the amount of revenue generated from tolling the
deep bore tunnel; and
(4) An analysis of the impact of tolls on the performance of the
facility.
The department must provide the results of the study to the
governor and the legislature by January 2010.
NEW SECTION. Sec. 3 A new section is added to chapter 47.01 RCW
to read as follows:
(1) The legislature finds that the city of Seattle has agreed to
pay for and ensure the adequate and efficient access for freight and
vehicles, and adequate and efficient access to neighborhoods along the
state route number 99 corridor, as part of their responsibilities in
the Alaskan Way viaduct replacement project as recommended by the
governor, King county, and the city of Seattle in the letter of
agreement dated January 13, 2009. The elements of the city's plan
include:
(a) Performing all work necessary to ensure that the Alaskan Way
surface street is an efficient alternative access route for freight and
vehicles, including:
(i) Operating the four-lane Alaskan Way surface street between
Holgate Street via Elliot Avenue and Western Avenue to Denny Way in a
manner that optimizes through traffic and freight movement to and
through the surface street corridor along the waterfront, including
synchronizing traffic lights and traffic control devices and erecting
additional traffic lights and traffic control devices if necessary;
(ii) Synchronizing traffic lights and traffic control devices along
state route number 99 between Spokane Street and the Aurora Avenue
Bridge, and erecting additional traffic lights and control devices, if
necessary, to prioritize vehicular and freight traffic flow;
(iii) Providing for reliable and effective access to the port of
Seattle and other major destinations south of the port, including
implementing measures to facilitate efficient traffic flow along
Alaskan Way by way of the state route number 99 and state route number
519 interchange; and
(iv) Providing for reliable and effective access to and from state
route number 99 and to and from the Mercer corridor for the port of
Seattle and other residents and businesses in northwest Seattle;
(b) Working with the state department of transportation and, prior
to removal of the viaduct, developing a plan that optimizes traffic
flow from neighborhoods in northwest Seattle to the deep bored tunnel,
including:
(i) Providing for the efficient movement of traffic along major
arterials including, but not limited to, North 46th Street, North 39th
Street, Nickerson Street, Dexter Avenue North, Mercer Street, and West
Mercer Street; and
(ii) Providing for traffic light synchronization, and addressing
on-street parking, congestion near the Aurora Avenue bridge related to
the Queen Anne Drive and 6th Avenue North turnaround, and bridge
policies that affect congestion and traffic flow; and
(c) Prior to removal of the viaduct, developing and implementing a
plan that maximizes safe and efficient vehicle throughput on Mercer
Street, including: Optimizing traffic flow on Mercer Street, which
includes two-way West Mercer Street improvements, and from Elliott
Avenue to state route number 99; and providing safe and efficient
access to state route number 99 and the deep bored tunnel.
(2) In order to ensure that the city of Seattle complies with its
commitment as described in subsection (1) of this section, the state
shall make fifty million dollars of the transportation partnership
account--state appropriation as provided in the 2009-2011 omnibus
transportation appropriations act, or as much thereof as is
appropriated from this account, whichever is smaller, available for
contribution to the south Spokane Street viaduct component of the
Alaskan Way viaduct replacement project, contingent on the city of
Seattle complying with this section.
(3) All costs related to the work performed by the city of Seattle
to provide adequate and efficient access for freight and vehicles along
the state route number 99 corridor, as described in subsection (1) of
this section, shall be borne by the city.
(4) The city of Seattle may comply with this section by entering
into an agreement with the department of transportation in which the
city agrees to make all improvements identified in subsection (1) of
this section and to be solely responsible for all costs associated with
the listed improvements.
NEW SECTION. Sec. 4 This act is necessary for the immediate
preservation of the public peace, health, or safety, or support of the
state government and its existing public institutions, and takes effect
July 1, 2009."
Correct the title.