SSB 6036 -
By Committee on Agriculture & Natural Resources
ADOPTED 04/08/2009
Strike everything after the enacting clause and insert the following:
"NEW SECTION. Sec. 1 A new section is added to chapter 90.48 RCW
to read as follows:
The department shall amend the state water quality standards to
authorize compliance schedules in excess of ten years for discharge
permits issued under this chapter that implement allocations contained
in a total maximum daily load under certain circumstances. Any such
amendment must be submitted to the United States environmental
protection agency under the clean water act. Compliance schedules for
the permits may exceed ten years if the department determines that:
(1) The permittee is meeting its requirements under the total
maximum daily load as soon as possible;
(2) The actions proposed in the compliance schedule are sufficient
to achieve water quality standards as soon as possible;
(3) A compliance schedule is appropriate; and
(4) The permittee is not able to meet its waste load allocation
solely by controlling and treating its own effluent."