2805.E AMS KING GORR 568

EHB 2805 - S AMD TO LCCP S5131.1 263

By Senator King

NOT ADOPTED 3/03/2010

    On page 2, line 8, after "primarily of", strike all material through "considered" on line 11, and insert the following:

"structural precast concrete, structural steel, pipe systems, or sheet metal duct work; (b) produced specifically for the public work and not considered by the awarding agency"

 

    Renumber the sections consecutively and correct any internal references accordingly.

 

      

           EFFECT:  Clarifies the definition of "off-site, prefabricated, nonstandard, project specific items" 

 

 

--- END ---