BILL REQ. #: H-3974.1
State of Washington | 61st Legislature | 2010 Regular Session |
Prefiled 01/08/10. Read first time 01/11/10. Referred to Committee on Agriculture & Natural Resources.
AN ACT Relating to the cost of processing applications for water right permits; amending RCW 90.03.470 and 90.44.050; adding new sections to chapter 90.03 RCW; creating a new section; prescribing penalties; and providing an expiration date.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1 It is the intent of the legislature to
recover the actual cost of processing applications for water right
permits and to stop subsidizing the processing of water right permits
out of general tax revenues. The legislature recognizes that the
largest beneficiary of receiving a water permit is the person receiving
the water permit.
It is further the intent of the legislature that the backlog of
applications be eliminated within four years of the effective date of
this section and that thereafter water right permit applications be
processed to a conclusion within twelve months of an application being
made to the department of ecology.
NEW SECTION. Sec. 2 A new section is added to chapter 90.03 RCW
to read as follows:
The water rights processing and dam safety account is created in
the state treasury. All receipts from the fees collected under RCW
90.03.470 must be deposited into the account. Moneys in the account
may be spent only after appropriation. Expenditures from the account
may be used only to support the processing of water right applications
and change applications as provided in this chapter and chapters 90.38,
90.42, and 90.44 RCW and the safety inspection of hydraulic works and
plans and specifications for such works.
Sec. 3 RCW 90.03.470 and 2005 c 412 s 2 are each amended to read
as follows:
The fees specified in this section shall be collected by the
department in advance of the requested action.
(1)(a) For the examination of an application for a permit to
appropriate water, a minimum fee of ((fifty)) five hundred dollars must
be remitted with the application. For an amount of water exceeding
one-half cubic foot per second, the examination fee shall be assessed
at the rate of ((one)) ten dollars per one hundredth cubic foot per
second. ((In no case will)) Except as provided in (b) of this
subsection, the examination fee may not be less than ((fifty)) five
hundred dollars or more than twenty-five thousand dollars. ((No fee is
required under this subsection (1) for an))
(b) The fee required for a permit application filed by a party to
a cost-reimbursement agreement made under RCW 90.03.265 is one-fifth
the amounts provided in (a) of this subsection but no less than two
hundred fifty dollars and no more than five thousand dollars.
(2)(a) For the examination of an application to store water, a fee
of ((two)) twenty dollars for each acre foot of storage proposed shall
be charged, but a minimum fee of ((fifty)) five hundred dollars must be
remitted with the application. ((In no case will)) Except as provided
in (b) of this subsection, the examination fee for a storage project
may not be less than ((fifty)) five hundred dollars or more than
twenty-five thousand dollars. ((No fee is required under this
subsection (2) for an))
(b) The fee required for a reservoir application filed by a party
to a cost-reimbursement agreement made under RCW 90.03.265 is one-fifth
the amounts provided in (a) of this subsection but no less than two
hundred fifty dollars and no more than five thousand dollars.
(3)(a) For the examination of an application to transfer, change,
or amend a water right certificate, permit, or claim as authorized by
RCW 90.44.100, 90.44.105, or 90.03.380, a minimum fee of ((fifty)) five
hundred dollars for each type of change requested must be remitted with
the application. For an application for change involving an amount of
water exceeding one cubic foot per second, the total examination fee
shall be assessed at the rate of ((fifty cents)) five dollars per one
hundredth cubic foot per second for each type of change requested. For
an application for change of a storage water right, the total
examination fee shall be assessed at the rate of ((one)) five dollars
for each acre foot of water involved in the change. The fee shall be
based on the amount of water subject to change as proposed in the
application, not on the total amount of water reflected in the water
right certificate, permit, or claim. In no case will the examination
fee charged for a change application be less than ((fifty)) five
hundred dollars or more than twelve thousand five hundred dollars.
(b) The fee paid to the department for an application for change
filed with a water conservancy board under chapter 90.80 RCW or for an
application for change filed by a party to a cost-reimbursement
agreement under RCW 90.03.265 must be one-fifth of the amounts provided
in (a) of this subsection but no less than one hundred dollars and no
more than three thousand dollars. A conservancy board may charge its
own processing fees in accordance with RCW 90.80.060.
(c) The examination fee for a temporary or seasonal change under
RCW 90.03.390 is ((fifty)) two hundred dollars and must be remitted
with the application.
(((c))) (d) No fee is required under this subsection (3) for:
(i) An application to process a change relating to donation of a
trust water right to the state; or
(ii) An application to process a change when the department
otherwise acquires a trust water right for purposes of improving
instream flows or for other public purposes((;)).
(iii) An application filed with a water conservancy board according
to chapter 90.80 RCW or for the review of a water conservancy board's
record of decision submitted to the department according to chapter
90.80 RCW; or
(iv) An application filed by a party to a cost-reimbursement
agreement made under RCW 90.03.265
(((d))) (e) For a change, transfer, or amendment involving a single
project operating under more than one water right, including related
secondary diversion rights, or involving the consolidation of multiple
water rights, only one examination fee and one certificate fee are
required to be paid.
(4) The ((fifty-dollar)) minimum fee payable with the application
shall be a credit to the total amount whenever the examination fee
totals more than fifty dollars under the schedule specified in
subsections (1) through (3) of this section and in such case the
further fee due shall be the total computed amount, less the amount
previously paid. Within five working days from receipt of an
application, the department shall notify the applicant by registered
mail of any additional fees due under subsections (1) through (3) of
this section.
(5) The ((fees specified in subsections (1) through (3) of this
section do not apply to any filings)) fee for filing an emergency
withdrawal authorization((s)) or temporary drought-related water right
change((s)) authorized under RCW 43.83B.410 that ((are)) is received by
the department while a drought condition order issued under RCW
43.83B.405 is in effect is one hundred dollars.
(6) For applying for each extension of time for beginning
construction work under a permit to appropriate water, for completion
of construction work, or for completing application of water to a
beneficial use, a fee of two hundred fifty dollars is required. These
fees also apply to similar extensions of time requested under a change
or transfer authorization.
(7) For the inspection of any hydraulic works to ((insure)) ensure
safety to life and property, a fee based on the actual cost of the
inspection, including the expense incident thereto, is required except
as follows: (a) For any hydraulic works less than ten years old, that
the department examined and approved the construction plans and
specifications as to its safety when required under RCW 90.03.350,
there shall be no fee charged; or (b) for any hydraulic works more than
ten years old, but less than twenty years old, that the department
examined and approved the construction plans and specifications as to
its safety when required under RCW 90.03.350, the fee charged shall not
exceed the fee for a significant hazard dam.
(8) For the examination of plans and specifications as to safety of
controlling works for storage of ten acre feet or more of water, a
minimum fee of ((ten)) five hundred dollars, or a fee equal to the
actual cost, is required.
(9) For recording an assignment either of a permit to appropriate
water or of an application for such a permit, a fee of ((fifty)) two
hundred dollars is required.
(10) For preparing and issuing all water right certificates, a fee
of ((fifty)) two hundred dollars is required.
(11) For filing and recording a formal protest against granting any
application, a fee of fifty dollars is required. No fee is required to
submit a comment, by mail or otherwise, regarding an application.
(12) For filing an application to amend a water right claim filed
under chapter 90.14 RCW, a fee of ((fifty)) two hundred dollars is
required.
(13) For the registration of each permit exempt groundwater
withdrawal as required by RCW 90.44.050, a fee of three hundred dollars
must be remitted.
(14)(a) Each person who holds a water right permit application, a
reservoir permit application, or a change, transfer, or amendment
application that is pending at any time between the effective date of
this section and June 30, 2011, must remit a one-time fee of two
hundred dollars to the department to retain an application in good
standing. The department shall provide written notice by certified
mail to each holder of an application for the fees that are due under
this section. The notice must require that the fees be paid within
ninety days of the date of receipt, but in no case may payment be due
later than June 30, 2011. For ease of administration, the department
may distribute the issuance of the notices by geographic area. The
surcharge paid under this subsection is a credit against the
application fees required in this section.
(b) Applications not in good standing must be canceled. The
department shall issue an order to any holder of an application who
fails to pay the fee within the prescribed time. The order must state
that the application is canceled unless payment is received within
thirty days.
(15) An application or request for an action as provided for under
this section is incomplete unless accompanied by the fee or the minimum
fee. If no fee or an amount less than the minimum fee accompanies an
application or other request for an action as provided under this
section, the department shall return the application or request to the
applicant with advice as to the fee that must be remitted with the
application or request for it to be accepted for processing. If
additional fees are due, the department shall provide timely
notification by certified mail with return receipt requested to the
applicant. No action may be taken by the department until the fee is
paid in full. Failure to remit fees within sixty days of the
department's notification is grounds for rejecting the application or
request or canceling the permit. Cash shall not be accepted. Fees
must be paid by check or money order and are nonrefundable.
(((14))) (16) For purposes of calculating fees for groundwater
filings, one cubic foot per second shall be regarded as equivalent to
four hundred fifty gallons per minute.
(((15) Eighty percent of the fees collected by the department under
this section shall be deposited in the state general fund. Twenty
percent of the fees collected by the department under this section
shall be deposited in the water rights tracking system account
established in RCW 90.14.240.)) (17) The fees collected by the department under this section
must be deposited in the water rights processing and dam safety account
created in section 2 of this act.
(16)
(18) Except for the fees relating to the inspection of hydraulic
works and the examination of plans and specifications of controlling
works provided for in subsections (7) and (8) of this section, nothing
in this section is intended to grant authority to the department to
amend the fees in this section by adoption of rules or otherwise.
Sec. 4 RCW 90.44.050 and 2003 c 307 s 1 are each amended to read
as follows:
(1) After June 6, 1945, no withdrawal of public groundwaters of the
state shall be begun, nor shall any well or other works for such
withdrawal be constructed, unless an application to appropriate such
waters has been made to the department and a permit has been granted by
it as herein provided: EXCEPT, HOWEVER, That any withdrawal of public
groundwaters for stock-watering purposes, or for the watering of a lawn
or of a noncommercial garden not exceeding one-half acre in area, or
for single or group domestic uses in an amount not exceeding five
thousand gallons a day, or as provided in RCW 90.44.052, or for an
industrial purpose in an amount not exceeding five thousand gallons a
day, is and shall be exempt from the provisions of this section, but,
to the extent that it is regularly used beneficially, shall be entitled
to a right equal to that established by a permit issued under the
provisions of this chapter: PROVIDED, HOWEVER, That the department
from time to time may require the person or agency making any such
small withdrawal to furnish information as to the means for and the
quantity of that withdrawal: PROVIDED, FURTHER, That at the option of
the party making withdrawals of groundwaters of the state not exceeding
five thousand gallons per day, applications under this section or
declarations under RCW 90.44.090 may be filed and permits and
certificates obtained in the same manner and under the same
requirements as is in this chapter provided in the case of withdrawals
in excess of five thousand gallons a day.
(2)(a) The owner of a permit exempt withdrawal established under
this section must register the withdrawal with the department on a
registration form provided by the department. The registration must
include information regarding the ownership and intended purpose of the
withdrawal, the amounts withdrawn or proposed to be withdrawn, and the
location, size, depth, and other particulars regarding the well. The
department shall make the registration form available on its internet
site and shall accept the filing of registration forms electronically
as well as by conventional mail or personal delivery.
(b) For each claimed permit exempt withdrawal the beneficial use of
which was commenced prior to January 1, 2010, the registration form
must be accompanied by a fee of fifty dollars. For each permit exempt
withdrawal the beneficial use of which is commenced on or after January
1, 2010, the registration form must be accompanied by a fee of three
hundred dollars. Upon receiving a completed registration form and fee,
the department shall make a record of the registration form and shall
return a copy of the registration marked as having been received and
registered.
(c) If the well or wells being registered have not previously been
tagged in accordance with RCW 18.104.040(6), the department shall
provide an identification tag for each well and shall instruct the
owner to affix the tags to the wells used to withdraw water.
(d) Whenever the owner of a permit exempt withdrawal adds dwelling
units or additional purposes for the use of the withdrawal or otherwise
increases the amount of water to be withdrawn by more than twenty
percent, a new registration form and fee of one hundred dollars must be
filed.
(e) For administrative efficiency, the department may phase in on
a county by county basis the requirement to register permit exempt
withdrawals in use prior to January 1, 2010.
(f) All fees collected under this section must be deposited into
the water rights processing and dam safety account created in section
2 of this act.
(3) The department may issue either an order under RCW 43.27A.190
or a civil penalty under RCW 90.03.600, or both, to the owner of a
permit exempt withdrawal who fails to file the registration form and
fee required in subsection (2) of this section. Before issuing an
order or penalty, the department shall inform the owner in writing by
registered mail with return receipt that the registration form and fee
must be remitted within thirty days. An order issued under this
subsection may require the owner to cease withdrawing and using water
until the form and fee have been filed. If the owner continues to
refuse to file the form and fee, the department may issue an order
requiring that the subject well or wells be decommissioned.
(4) A permit exempt withdrawal that has not been registered shall
not be recognized as a water right under a general adjudication of
water rights held under chapter 90.03 RCW.
NEW SECTION. Sec. 5 A new section is added to chapter 90.03 RCW
to read as follows:
The department must adjust the fees authorized in RCW 90.03.470 and
90.44.050 on a periodic basis to reflect the direct administrative
costs incurred in the processing of water right applications and change
applications and the safety inspection of hydraulic works and plans and
specifications for such works.
NEW SECTION. Sec. 6 A new section is added to chapter 90.03 RCW
to read as follows:
(1) The department shall submit a report to the legislature prior
to December 31, 2011, and biennially thereafter until December 31,
2019, on the status of the backlog of applications for water right
permits, the effectiveness of processing water right permit
applications to a conclusion within twelve months, and the
appropriateness of the fee amounts.