Passed by the House April 26, 2009 Yeas 61   ________________________________________ Speaker of the House of Representatives Passed by the Senate April 26, 2009 Yeas 31   ________________________________________ President of the Senate | I, Barbara Baker, Chief Clerk of the House of Representatives of the State of Washington, do hereby certify that the attached is ENGROSSED SUBSTITUTE HOUSE BILL 1216 as passed by the House of Representatives and the Senate on the dates hereon set forth. ________________________________________ Chief Clerk | |
Approved ________________________________________ Governor of the State of Washington | Secretary of State State of Washington |
State of Washington | 61st Legislature | 2009 Regular Session |
READ FIRST TIME 04/06/09.
AN ACT Relating to the capital budget; making appropriations and authorizing expenditures for capital improvements; amending RCW 28B.15.210, 28B.15.310, 28B.35.370, 28B.50.360, 43.63A.125, 79.17.010, 79.17.020, 43.99N.060, 28A.335.210, 28B.10.027, and 43.17.200; amending 2008 c 328 ss 6001, 1004, 3003, 3006, 3008, and 3010 (uncodified); amending 2007 c 520 ss 2020, 2023, 2046, 2085, 2083, 2084, 3026, 3042, 3022, 3041, 3135, and 5137 (uncodified); creating new sections; repealing 2007 c 520 s 6006 (uncodified); providing an effective date; providing expiration dates; and declaring an emergency.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1 (1) A capital budget is hereby adopted and,
subject to the provisions set forth in this act, the several dollar
amounts hereinafter specified, or so much thereof as shall be
sufficient to accomplish the purposes designated, are hereby
appropriated and authorized to be incurred for capital projects during
the period beginning with the effective date of this act and ending
June 30, 2011, out of the several funds specified in this act.
(2) The definitions in this subsection apply throughout this act
unless the context clearly requires otherwise.
(a) "Fiscal year 2010" or "FY 2010" means the fiscal year ending
June 30, 2010.
(b) "Fiscal year 2011" or "FY 2011" means the fiscal year ending
June 30, 2011.
(c) "Lapse" or "revert" means the amount shall return to an
unappropriated status.
(d) "Provided solely" means the specified amount may be spent only
for the specified purpose.
Unless otherwise specifically authorized in this act, any portion
of an amount provided solely for a specified purpose that is not
expended subject to the specified conditions and limitations to fulfill
the specified purpose shall lapse.
NEW SECTION. Sec. 1001 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Rural Washington Loan Fund (19882002)
Reappropriation:
Rural Washington Loan Account--State . . . . . . . . . . . . $1,036,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,856,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,892,000
NEW SECTION. Sec. 1002 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Drinking Water Assistance Account (20044002)
The reappropriation in this section is subject to the following
conditions and limitations: Expenditures of the reappropriation shall
comply with RCW 70.119A.170.
Reappropriation:
Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $4,200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $12,493,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $16,693,000
NEW SECTION. Sec. 1003 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Drinking Water State Revolving Fund - Authorization to Use Loan
Repayments (20044010)
Reappropriation:
Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $5,867,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $9,333,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $15,200,000
NEW SECTION. Sec. 1004 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Local and Community Projects (20044011)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The projects must comply with RCW 43.63A.125(2)(c) and other
requirements for community projects administered by the department,
except that the Highline historical society project is land
acquisition.
(2) The reappropriation is subject to the project list in section
204, chapter 277, Laws of 2004.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $12,615,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $13,315,000
NEW SECTION. Sec. 1005 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Local and Community Projects (20064008)
The reappropriation in this section is subject to the following
conditions and limitations: (1) $64,319 of the remaining
reappropriation for El Centro de la raza may be used for building
infrastructure. (2) $10,000 of the remaining reappropriation for
miracle league handicapped baseball may be used for pre-grading and
resurfacing construction. (3) $1,394,107 of the remaining
reappropriation for MOBIUS/inland northwest science and technology
center may be used for design and construction.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $10,658,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $37,141,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $47,799,000
NEW SECTION. Sec. 1006 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Housing Assistance, Weatherization, and Affordable Housing
(20064001)
Reappropriation:
State Taxable Building Construction Account--State . . . . . . . . . . . . $1,843,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $98,157,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $100,000,000
NEW SECTION. Sec. 1007 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Public Works Trust Fund (20064004)
Reappropriation:
Public Works Assistance Account--State . . . . . . . . . . . . $61,339,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $227,561,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $288,900,000
NEW SECTION. Sec. 1008 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Rural Washington Loan Fund (20064010)
Reappropriation:
Rural Washington Loan Account--State . . . . . . . . . . . . $3,878,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $249,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,127,000
NEW SECTION. Sec. 1009 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Community Economic Revitalization Board (20064011)
The reappropriation in this section is subject to the following
conditions and limitations: A maximum of twenty-five percent of the
reappropriation in this section may be used for grants.
Reappropriation:
Public Facility Construction Loan Revolving
Account--State . . . . . . . . . . . . $15,549,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,899,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $20,448,000
NEW SECTION. Sec. 1010 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Drinking Water Assistance Program (20064003)
Reappropriation:
Drinking Water Assistance Repayment
Account--State . . . . . . . . . . . . $21,780,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $8,100,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $29,880,000
NEW SECTION. Sec. 1011 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Water System Acquisition and Rehabilitation Program (20064850)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation must be jointly
administered by the department of health, the public works board, and
the department of community, trade, and economic development using the
drinking water state revolving fund loan program as an administrative
model. In order to expedite the use of these funds and minimize
administration costs, this reappropriation must be administered by
guidance, rather than rule. Projects must generally be prioritized
using the drinking water state revolving fund loan program criteria.
All financing provided through this program must be in the form of
grants that must partially cover project costs. The maximum grant to
any eligible entity may not exceed twenty-five percent of the funds
allocated to this reappropriation.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $6,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,994,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 1012 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Housing Assistance, Weatherization, and Affordable Housing
(20064851)
Reappropriation:
Washington Housing Trust Account--State . . . . . . . . . . . . $172,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $16,828,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $17,000,000
NEW SECTION. Sec. 1013 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Job and Economic Development Grants (20064950)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The reappropriation is subject to the provisions of section
107, chapter 371, Laws of 2006.
(2) The reappropriation is subject to the project list in section
107, chapter 371, Laws of 2006.
(3) Up to $1,000,000 of the reappropriation for the Pacific
Northwest national labs campus infrastructure project is provided
solely for giga-pop infrastructure.
(4) Up to $2,200,000 of the reappropriation is provided solely for
military communities infrastructure projects. Military communities
infrastructure projects shall include:
(a) Grants to counties and cities for the purchase of development
easements and the purchase of real property in fee simple to restrict
the use of accident potential zones and clear zones. The office of
financial management shall establish a competitive process for
selecting projects to receive the grants. Final allocation of these
grants shall be at the discretion and with the approval of the director
of the office of financial management.
The grants are subject to the following conditions:
(i) The county or city must be subject to and in compliance with
RCW 36.70A.530;
(ii) The grants may not be used to remove encroachments into these
zones allowed by county or city zoning or permitting actions;
(iii) The county or city must have an encroachment prevention plan
preventing future encroachment into these zones; and
(iv) The grant provided by the state must not exceed one-third of
the project cost with funds from local and federal sources providing
the balance of the funds.
(b) Up to $481,000 of the reappropriation is provided solely for
improvements to a military department site on Fairchild air force base.
Reappropriation:
Public Works Assistance Account--State . . . . . . . . . . . . $14,172,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $35,828,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $50,000,000
NEW SECTION. Sec. 1014 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Jobs in Communities (20064951)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is subject to the
provisions of section 140, chapter 488, Laws of 2005.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $10,960,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,290,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $12,250,000
NEW SECTION. Sec. 1015 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Building for the Arts Grants (20074001)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The reappropriation is subject to the provisions of RCW
43.63A.750.
(2) The reappropriation is subject to the provisions of section
1027, chapter 520, Laws of 2007.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,240,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $9,760,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $12,000,000
NEW SECTION. Sec. 1016 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Community Services Facilities Grants (20074002)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The reappropriation is subject to the provisions of RCW
43.63A.125.
(2) The reappropriation is subject to the provisions of section
1029, chapter 520, Laws of 2007.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,495,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $8,652,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $10,147,000
NEW SECTION. Sec. 1017 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Youth Recreational Facilities Grants (20074003)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The reappropriation is subject to the provisions of RCW
43.63A.135.
(2) The reappropriation is subject to the provisions of section
1007, chapter 328, Laws of 2008.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,050,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $9,050,000
NEW SECTION. Sec. 1018 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Drinking Water Assistance Program (20074004)
Reappropriation:
Drinking Water Assistance Account--State . . . . . . . . . . . . $8,718,000
Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $21,100,000
Subtotal Reappropriation . . . . . . . . . . . . $29,818,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,082,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $31,900,000
NEW SECTION. Sec. 1019 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Public Works Trust Fund (20074005)
Reappropriation:
Public Works Assistance Account--State . . . . . . . . . . . . $232,000,000
State Taxable Building Construction Account--
State . . . . . . . . . . . . $95,000,000
Subtotal Reappropriation . . . . . . . . . . . . $327,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $327,000,000
NEW SECTION. Sec. 1020 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Water System Acquisition Rehabilitation Program (20074006)
The reappropriation in this section is subject to the following
conditions and limitations: Up to $1,000,000 of the reappropriation is
provided solely for the city of Republic to acquire the Pine Grove
water system.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,191,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,559,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,750,000
NEW SECTION. Sec. 1021 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Rural Washington Loan Fund (20074008)
Reappropriation:
Rural Washington Loan Account--State . . . . . . . . . . . . $1,782,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $245,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,027,000
NEW SECTION. Sec. 1022 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Housing Assistance, Weatherization, and Affordable Housing
(20074009)
The reappropriations in this section are subject to the following
conditions and limitations:
(1) Up to $9,000,000 of the reappropriations are provided solely
for weatherization administered through the energy matchmakers program.
(2) Up to $5,000,000 of the reappropriations are provided solely to
promote development of safe and affordable housing units for persons
eligible for services from the division of developmental disabilities
within the department of social and health services.
(3) Up to $2,500,000 of the reappropriations are provided solely
for grants to nonprofit organizations and public housing authorities
for revolving loan, self-help housing programs for low and moderate
income families.
(4) Up to $1,000,000 of the reappropriations are provided solely
for shelters, transitional housing, or other housing facilities for
victims of domestic violence.
(5) Up to $5,000,000 of the reappropriations are provided solely
for the development of emergency shelters and transitional housing
opportunities for homeless families with children.
(6) Up to $1,500,000 of the reappropriations are provided solely
for the development of housing for low-income or homeless Native
Americans. The department shall work with Native American tribes, not-for–profit organizations with experience in serving Native American
populations, and Native American housing development organizations to
prioritize projects located in the areas of highest identified need.
(7) Up to $4,000,000 of the reappropriations are provided solely
for loans and grants to eligible organizations to purchase
manufactured/mobile home communities with the intent of preserving the
communities for affordable housing.
(8) Up to $10,000,000 of the reappropriations are for the creation
and development of low-income housing within areas declared disasters
by the governor after November 2007.
(9) Up to $2,000,000 of the reappropriation from the state taxable
building construction account is provided solely for the development or
preservation of farmworker housing for migrant and seasonal farmworkers
located on private farms. This reappropriation is subject to
appropriate agreements to protect the public investment. Any of this
reappropriation that is not obligated by June 30, 2009, shall be added
to the amount appropriated for the general pool of projects.
(10) The reappropriations in this section from the state building
construction account shall be distributed as grants.
(11) Up to $250,000 of the reappropriation from the Washington
housing trust account is provided solely to the city of Burien for
housing related purposes.
(12) The reappropriations in this section shall not be used for the
administrative costs of the department. The amount of the
reappropriations shall be included in the calculation of annual funds
available for determining the administrative costs authorized under RCW
43.185.050.
(13) Within available funding provided in this section, the
department shall prepare an inventory of housing assistance programs.
The inventory shall include all state funded programs, the housing
finance commission programs, all programs funded by local governments
and housing authorities, including a description of expenditures from
fees and taxes specifically authorized by state law for housing
assistance and homeless programs, all property tax and sales tax
provisions that are intended to support housing assistance programs,
and all federally funded housing assistance programs provided in the
state. The inventory shall include a description of the program,
biennial appropriation and expenditure levels since the 1999-2001
biennium through the 2007-2009 biennium, a description of eligibility
criteria and the amount of benefit provided per unit or per family, and
the number of units or families assisted. The department shall
coordinate with the joint legislative audit and review committee to
reduce duplicative efforts that may be required by legislation.
(14)(a) Up to $10,000,000 of the reappropriations are provided
solely for the department to contract with the Washington state housing
finance commission to provide grants or loans to eligible
organizations, described under RCW 43.185A.040, to purchase land or
real property for affordable housing and community facilities
preservation or development in rapidly gentrifying neighborhoods,
redevelopment areas, or communities with a significant low-income
population that is threatened with displacement by such gentrification.
Loans or grants may be made to purchase land or real property for the
preservation or development of affordable housing or community
facilities, including reasonable costs and fees. The Washington state
housing finance commission's review and evaluation of projects for
loans and grants must include, but is not limited to the following:
(i) Consideration of mobile home parks facing closure; (ii) properties
in neighborhoods in King county that are facing gentrification or
redevelopment; and (iii) properties located in the city of Spokane that
are facing the threat of displacing low-income tenants due to the loss
of affordable housing rental units. The Washington state housing
finance commission, with approval from the department, may adopt
guidelines and requirements that are necessary to administer the
affordable housing and community facilities rapid response program. A
loan recipient must preserve affordable rental housing acquired or
developed under this section as affordable housing for a minimum of
thirty years. Interest rates on loans made under this section may be
as low as zero percent but may not exceed three percent. All loan
repayments must be deposited into the Washington housing trust account
and accounted for separately from other funds in the account.
(b) By December 1, 2009, the Washington state housing finance
commission shall report to the department and the appropriate
committees of the legislature: (i) The number of loans that were made
in the program; (ii) for what purposes the loans were made; (iii) to
whom the loans were made; and (iv) when the loans are expected to be
paid back.
(15) Up to $10,000,000 of the reappropriations are for the
department to contract with the Washington state housing finance
commission to administer the facilitation of nonprofit entities' use of
tax-exempt multifamily bonds issued by the Washington state housing
finance commission.
(16)(a) Up to $100,000 of the reappropriation from the Washington
housing trust account is provided solely for the department to work in
consultation with the affordable housing advisory board and
representatives from nonprofit housing development organizations and
affordable housing advocacy groups in the state to:
(i) Identify and analyze all costs associated with affordable
housing development projects financed through the Washington housing
trust fund under chapters 43.185 and 43.185A RCW, which may include,
but are not limited to, costs associated with legal and architectural
services, permitting and impact fees, land acquisition, and general
construction costs;
(ii) Make recommendations for strategies, which must include
recommendations for changes to public policy and department procedures,
to reduce the costs identified in (a)(i) of this subsection; and
(iii) Make recommendations for potential performance measures
appropriate for each strategy identified.
(b) In developing recommendations for strategies to reduce costs,
the department shall analyze and address the fiscal impact of public
policies of the state and of local governments, Washington housing
trust fund policies, and general market forces on affordable housing
development.
(c) The department shall report its findings and recommendations to
the governor and to the appropriate committees of the legislature by
September 30, 2009.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $24,152,000
State Taxable Building Construction Account--State . . . . . . . . . . . . $48,097,000
Washington Housing Trust Account--State . . . . . . . . . . . . $12,950,000
Subtotal Reappropriation . . . . . . . . . . . . $85,199,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $114,801,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $200,000,000
NEW SECTION. Sec. 1023 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Job Development Fund Grants (20074010)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is subject to the
provisions of section 1032, chapter 520, Laws of 2007.
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
a grant to the port of Grays Harbor for the bulk liquid facility
project.
Reappropriation:
Job Development Account--State . . . . . . . . . . . . $22,228,000
Appropriation:
Job Development Account--State . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $24,702,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $49,930,000
NEW SECTION. Sec. 1024 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Community Economic Revitalization Board (20074015)
The reappropriations in this section are subject to the following
conditions and limitations: A maximum of twenty-five percent of the
appropriation may be used for grants.
Reappropriation:
State Taxable Building Construction Account--State . . . . . . . . . . . . $8,130,000
Public Facility Construction Loan Revolving
Account--State . . . . . . . . . . . . $7,289,000
Subtotal Reappropriation . . . . . . . . . . . . $15,419,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,581,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $20,000,000
NEW SECTION. Sec. 1025 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Longview Regional Water Treatment Plant Dredging (20081001)
The reappropriation in this section is subject to the following
conditions and limitations: Funding is provided solely for emergency
dredging to prevent the sandbars in the Cowlitz river from obstructing
the intake facility necessary for the city of Longview to obtain
drinking water.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $150,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $150,000
NEW SECTION. Sec. 1026 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Quincy Water Treatment System Phase 1 (20081002)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation in this section is
provided solely to increase the capacity of the water treatment
facility in the city of Quincy.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,500,000
NEW SECTION. Sec. 1027 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Innovation Partnership Zones (20082003)
The reappropriation in this section is subject to the following
conditions and limitations: The state will designate unique areas of
the state as innovation partnership zones, where globally competitive
companies, research institutions, and advanced training are creating
special competitive advantages for the state. From among the
innovation partnership zones, using a competitive process based on
need, estimated economic impact, geographic diversity, and local
matches, six zones or projects will be selected to receive funding.
The reappropriation in this section is provided solely for shared
telecommunications within the zone, shared infrastructure and
facilities, long-term capital purchases, and up to 10 percent for zone
administration through the locally-designated innovation partnership
zone administrator. It is the intent of the legislature that
innovation partnership zone grants should consider the
commercialization of inventions and innovations.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,021,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $979,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 1028 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Washington State Horse Park (20082004)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The reappropriation shall complete the state's capital
obligation for the facility.
(2) Land provided for the state horse park by the county or city in
which the park is located shall remain in the ownership of that county
or city unless the county or city determines otherwise. The
legislature encourages the county or city to provide a long-term lease
of selected property to the Washington state horse park authority at a
minimal charge.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,376,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $124,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,500,000
NEW SECTION. Sec. 1029 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Local and Community Projects (20084001)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The projects must comply with RCW 43.63A.125 and other
requirements for community projects administered by the department.
(2) The reappropriation is subject to the provisions of section
1008, chapter 328, Laws of 2008.
(3) $1,000,000 of the remaining reappropriation for the Evergreen
school district health and biosciences academy may be used for land
acquisition. If the facility is not constructed by June 30, 2015, the
school district shall reimburse the state an amount equal to $1,000,000
increased by the average percentage appreciation in property values for
undeveloped land in the surrounding area between the date the school
district acquired the property and June 30, 2015 or the date the school
district disposes of the property.
(4) $600,000 of the remaining reappropriation for the institute for
community leadership may be used for land acquisition.
(5) $250,000 of the remaining reappropriation for the Pacific
Northwest ilocandia association may be used for acquisition and
renovation.
(6) $200,000 of the remaining reappropriation for the library
connection at Greenbridge may be used for construction and equipment.
(7) $1,000,000 of the remaining reappropriation for the Evergreen
school district health and biosciences academy may be used for land
acquisition.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $61,200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $71,694,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $132,894,000
NEW SECTION. Sec. 1030 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Community Development Fund (20084850)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The reappropriation is subject to the provisions of section
1014, chapter 328, Laws of 2008.
(2) $105,521 of the remaining reappropriation for El Centro de la
raza center may be used for building infrastructure.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $9,715,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $11,451,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $21,166,000
NEW SECTION. Sec. 1031 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Belfair Sewer Improvements (20084852)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,500,000
Public Works Assistance Account--State . . . . . . . . . . . . $4,800,000
Subtotal Reappropriation . . . . . . . . . . . . $10,300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $10,300,000
NEW SECTION. Sec. 1032 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Building Communities Fund Program (20084855)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $50,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 1033 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Community Schools Program (20084856)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The reappropriation is provided solely for the acquisition,
rehabilitation, expansion, or improvement of surplus school buildings
to be converted into community facilities for the delivery of
nonresidential coordinated services for children and families.
(2) Eligible applicants include local governments, nonprofit
organizations, nonprofit early learning providers, and tribal
governments. Only the following surplus schools may be eligible for
grant funding under this section: (a) Allen school; (b) Crown Hill
school; (c) Fauntleroy school; (d) University Heights school; (e)
Martin Luther King elementary school; and (f) Lincoln high school north
wing.
(3) As part of the grant process, applicants must submit a
comprehensive plan for the use of the surplus school that includes
information on the following:
(a) A list of partner entities that will assist the lead eligible
applicant to provide or coordinate services for children and families;
(b) A memorandum of understanding between the lead eligible
applicant and each partner; and
(c) An examination of capital and operating funding sources that
applicants intend to apply to the project and coordinated services at
each school to be served, whether such funding is derived from grants
under this section or from other federal, state, local, or private
sources.
(4) Project applicants must demonstrate that the proposed project
is ready to proceed, will make timely use of the funds, and requires
state funding to accomplish a discrete, usable phase of the project
that may include acquisition.
(5) If grant funds under this subsection are used for the
acquisition of surplus school facilities, the sale proceeds must be
used by the local school board disposing of such property for
renovation, replacement, or new construction of school facilities in
the district, but shall not be used as local match for projects
receiving state school construction assistance grants.
(6) In contracts for grants authorized under this subsection, the
department shall include provisions that require that capital
improvements must be held by the grantee for a specified period of time
appropriate to the amount of the grant and that facilities must be used
for the express purpose of the grant. If the grantee is found to be
out of compliance with provisions of the contract, the grantee shall
repay to the state general fund the principal amount of the grant plus
interest calculated at the rate of interest on state of Washington
general obligation bonds issued most closely to the date of
authorization of the grant.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,927,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $658,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,585,000
NEW SECTION. Sec. 1034 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Quillayute Valley Wood-Fire Boiler (20084858)
Reappropriation:
Energy Freedom Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 1035 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Snohomish County Biodiesel (20084859)
Reappropriation:
Energy Freedom Account--State . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 1036 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
2008 Local and Community Projects (20084861)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is subject to the
provisions of section 1019, chapter 328, Laws of 2008.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $12,751,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,378,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $18,129,000
NEW SECTION. Sec. 1037 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Grays Harbor Wind Project (20084950)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 1038 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Skagit County Digester (20084951)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 1039 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Drinking Water State Revolving Fund Loan Program (30000005)
Appropriation:
Drinking Water Assistance Account--State . . . . . . . . . . . . $8,000,000
Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $31,201,000
Subtotal Appropriation . . . . . . . . . . . . $39,201,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $215,974,000
TOTAL . . . . . . . . . . . . $255,175,000
NEW SECTION. Sec. 1040 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Building for the Arts Grants (30000006)
The appropriation in this section is subject to the following
conditions and limitations:
(1) Projects must be selected based on their readiness to proceed.
(2) The appropriation is provided solely for the following list of
projects:
Admiral Theatre-No Theatre Left Behind | $140,000 |
$1,000,000 | |
$250,000 | |
Campus Consolidation (Cornish) | $375,000 |
$500,000 | |
$20,000 | |
Downstairs at the 5th | $800,000 |
Federal Way Performing Arts Center | $325,000 |
$150,000 | |
$150,000 | |
Langston Hughes Performing Arts Center | $475,000 |
$200,000 | |
Modular Classrooms for Dance (Gladish) | $30,000 |
Mt. Baker Theatre | $1,000,000 |
Museum Expansion (Maryhill) | $1,500,000 |
$1,000,000 | |
Reconstruction of First Stage (Issaquah) | $400,000 |
Seattle Opera Center | $650,000 |
Stage Two (Whidbey) | $450,000 |
Vashon Arts Center | $1,115,000 |
$1,000,000 | |
$70,000 | |
Total | $11,600,000 |
NEW SECTION. Sec. 1041 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Youth Recreational Facilities Grants (30000007)
The appropriation in this section is subject to the following
conditions and limitations:
(1) Projects must be selected based on their readiness to proceed.
(2) The appropriation is provided solely for the following list of
projects:
Allen Place | $800,000 |
Auburn Boys & Girls Club | $800,000 |
$800,000 | |
Coal Creek Family YMCA | $800,000 |
East Pierce County HOPE Center | $800,000 |
Highline YMCA | $800,000 |
Hough Pool Renovation | $150,000 |
Jim Parsley Community Center | $800,000 |
Kitsap Girl Scout Center | $205,000 |
Naval Avenue Boys & Girls Club | $80,000 |
Toutle River Ranch | $360,000 |
West Sound Teen Center | $305,000 |
YMCA Spokane Central | $800,000 |
Total | $7,500,000 |
NEW SECTION. Sec. 1042 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Building Communities Fund Grants (30000008)
The appropriation in this section is subject to the following
conditions and limitations:
(1) Except as otherwise directed before the effective date of this
section, the department shall not expend the appropriation in this
section unless and until the nonstate share of project costs have been
either expended, or firmly committed, or both, in an amount sufficient
to complete the project or a distinct phase of the project that is
useable to the public for the purpose intended by the legislature.
(2) Prior to receiving funds, project recipients must demonstrate
that the project site is under control for a minimum of ten years,
either through ownership or a long-term lease. This requirement does
not apply to appropriations for preconstruction activities or
appropriations whose sole purpose is to purchase real property that
does not include a construction or renovation component.
(3) Projects funded in this section may be required to comply with
Washington's high performance building standards as required by chapter
39.35D RCW.
(4) Project funds are available on a reimbursement basis only, and
shall not be advanced under any circumstances.
(5) Projects funded in this section must be held by the recipient
for a minimum of ten years and used for the same purpose or purposes
intended by the legislature as required in RCW 43.63A.125(2)(c).
(6) Projects funded in this section, including those that are owned
and operated by nonprofit organizations, are generally required to pay
state prevailing wages.
(7) The appropriation is provided solely for the following list of
projects:
A Home for Opportunity - CASA Latina | $325,000 |
Building the new Eastside Clinic - Community Health Care | $1,900,000 |
Community Center for Sand Point Housing | $350,000 |
Donald G. Topping HOPE Center - Boys & Girls Clubs of Puget Sound | $1,934,250 |
Dove House (Domestic Violence/Sexual Assault Program of Jefferson County) | $240,000 |
Duvall Multi-Service Center - Hopelink | $617,985 |
Education and Training Center Mt. Baker Planned Parenthood | $881,847 |
Emmanuel Family Life Center - Richard Allen Enterprises | $400,594 |
Eritrean Community Center Expansion | $300,000 |
Ferndale Boys & Girls Club | $752,847 |
Giant Step - RRA | $520,761 |
Greenbridge Early Learning Center | $1,419,281 |
High Point Neighborhood Center | $2,000,000 |
Highline YMCA | $1,163,000 |
Milgard Work Opportunity Center - Tacoma Goodwill | $1,850,000 |
Northeast Community Center Expansion | $1,300,000 |
Pierce County Therapy Center | $128,000 |
Rainier Vista & Rainier Valley Teen Center | $2,400,000 |
Repurposing Daybreak Star | $87,500 |
Riverwalk Point Community Building - Spokane Neighborhood Action Program | $79,253 |
Rotary Support Center for Families | $3,500,000 |
Safety & Systems Improvements at El Centro de la raza | $250,031 |
TAF Community Learning Space (CLS) | $1,500,000 |
The Keller House Services Center | $600,000 |
YMCA/YWCA Central Spokane Facility | $3,500,000 |
Total | $28,000,349 |
NEW SECTION. Sec. 1043 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Community Economic Revitalization Board (30000010)
Appropriation:
Public Facility Construction Loan Revolving
Account--State . . . . . . . . . . . . $6,253,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $109,735,000
TOTAL . . . . . . . . . . . . $115,988,000
NEW SECTION. Sec. 1044 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Innovation Partnership Zones (30000012)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
TOTAL . . . . . . . . . . . . $21,500,000
NEW SECTION. Sec. 1045 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Housing Assistance, Weatherization, and Affordable Housing
(30000013)
The appropriations in this section are subject to the following
conditions and limitations:
(1) $7,000,000 of the appropriations is provided solely for
facilities housing low-income migrant, seasonal, or temporary
farmworkers. The operation of the facilities built under this section
shall be in compliance with 8 U.S.C. Sec. 1342. The department shall
work with the farmworker housing advisory committee to prioritize
funding of projects to the areas of highest need. Funding may also be
provided, to the extent qualified projects are submitted, for health
and safety projects. Any of this appropriation that is not obligated
by June 30, 2011, shall be added to the amount appropriated for the
general pool of projects.
(2) $3,000,000 of the appropriations is provided solely to promote
development of safe and affordable housing units for persons eligible
for services from the division of developmental disabilities within the
department of social and health services.
(3) $10,000 of the appropriations is provided solely to the Ballard
food bank/Ballard homes for all coalition for the construction of a
mobile camp facility.
(4) $2,500,000 of the appropriations is provided solely for the
development of farm infrastructure improvements. Any of this
appropriation that is not obligated by June 30, 2011, must be added to
the amount appropriated for the general pool of projects.
(5) $1,000,000 from the taxable bonds account is provided solely
for the development or preservation of farmworker housing for migrant
and seasonal farmworkers located on private farms.
(6) $5,000,000 of the appropriation from the state building
construction account is provided solely to build low-income housing
units in underserved communities and to concurrently develop capacity
in these same communities. Underserved communities of concern are
those that have high levels of poverty, specifically, thirty percent of
the local median income; experience chronic homelessness; and lack
affordable housing. Underserved communities include veterans,
immigrants, refugees, and those communities of color disproportionately
impacted by chronic homelessness and lack of affordable housing. The
department shall collaborate with representatives of underserved
communities and organizations committed to assistance in these efforts
to prioritize and plan distribution of funding.
(7) The department may not make loans from capital bond proceeds
appropriated in this section if the appropriations are also obligated
for other grants or loans or if the anticipated repayments of the loans
are from future state legislative appropriations.
(8) The legislature recognizes and supports the housing priorities
reflected in the American recovery and reinvestment act of 2009 with
the estimated amount of $144,000,000 provided solely for the following
programs:
(a) The community development fund's neighborhood stabilization
fund to purchase and rehabilitate foreclosed vacant properties and to
help create affordable housing and stabilize neighborhoods.
(b) The public housing capital fund to assist housing authorities
build and rehabilitate low-income housing stock. Housing authorities
are required to give priority consideration to the rehabilitation of
vacant rental units and capital projects that are already underway or
included in the five-year capital fund plans.
(c) HOME funding to the Washington state housing finance commission
for a competitive program pursuant to the qualified allocation plan to
owners of projects who have received or receive simultaneously an award
of low-income housing tax credits under section 42(h) of the internal
revenue code of 1986.
(d) Weatherization appropriated in section 1052 of this act for
grants and loans to local energy programs for weatherization of
multifamily and single family homes.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $30,000,000
State Taxable Building Construction
Account--State . . . . . . . . . . . . $60,000,000
Washington Housing Trust Account--State . . . . . . . . . . . . $10,000,000
Subtotal Appropriation . . . . . . . . . . . . $100,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $400,000,000
TOTAL . . . . . . . . . . . . $500,000,000
NEW SECTION. Sec. 1046 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Community Schools (91000002)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation in this section is
provided solely for the following:
(1) The acquisition, rehabilitation, expansion, or improvement of
surplus school buildings to be converted into community facilities for
the delivery of nonresidential coordinated services for children and
families.
(a) Eligible applicants include local governments, nonprofit
organizations, nonprofit early learning providers, and tribal
governments. Only the following surplus schools may be eligible for
grant funding under this section: Fauntleroy school, University
Heights school, and Martin Luther King elementary school.
(b) As part of the grant process, applicants must submit a
comprehensive plan for the use of the surplus school that includes
information on the following:
(i) A list of partner entities that will assist the lead eligible
applicant to provide or coordinate services for children and families;
(ii) A memorandum of understanding between the lead eligible
applicant and each partner; and
(iii) An examination of capital and operating funding sources that
applicants intend to apply to the project and coordinated services at
each school to be served, whether such funding is derived from grants
under this section or from other federal, state, local, or private
sources.
(c) Project applicants must demonstrate that the proposed project
is ready to proceed, will make timely use of the funds, and requires
state funding to accomplish a discrete, usable phase of the project
that may include acquisition.
(d) If grant funds under this subsection are used for the
acquisition of surplus school facilities, the sale proceeds must be
used by the local school board disposing of such property for
renovation, replacement, or new construction of school facilities in
the district, but shall not be used as local match for projects
receiving state school construction assistance grants.
(e) In contracts for grants authorized under this subsection, the
department shall include provisions that require that capital
improvements must be held by the grantee for a specified period of time
appropriate to the amount of the grant and that facilities must be used
for the express purpose of the grant. If the grantee is found to be
out of compliance with provisions of the contract, the grantee shall
repay to the state general fund the principal amount of the grant plus
interest calculated at the rate of interest on state of Washington
general obligation bonds issued most closely to the date of
authorization of the grant.
(2) The construction of a non-mobile facility, accessible to
students in central and eastern Washington for the purpose of financial
literacy education, for the eastern and western Washington junior
achievement world initiative.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 1047 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Renewable Farming (91000001)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
the Washington renewable farming group to conduct grant writing
activities in order to raise funds other than state funds to promote
research, development, and marketing of bioproducts.
Appropriation:
Energy Freedom Account--State . . . . . . . . . . . . $45,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $45,000
NEW SECTION. Sec. 1048 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Local and Community Projects (30000019)
The appropriation in this section is subject to the following
conditions and limitations:
(1) Prior to receiving funds, project recipients must demonstrate
that the project site is under control for a minimum of ten years,
either through ownership or a long-term lease. This requirement does
not apply to appropriations for preconstruction activities or
appropriations whose sole purpose is to purchase real property that
does not include a construction or renovation component.
(3) Projects funded in this section may be required to comply with
Washington's high performance building standards as required by chapter
39.35D RCW.
(4) Project funds are available on a reimbursement basis only, and
shall not be advanced under any circumstances.
(5) Projects funded in this section must be held by the recipient
for a minimum of ten years and used for the same purpose or purposes
intended by the legislature as required in RCW 43.63A.125(2)(c).
(6) Projects funded in this section, including those that are owned
and operated by nonprofit organizations, are generally required to pay
state prevailing wages.
(7) The appropriation is provided solely for the following list of
projects:
Local Community Projects | |
7th St. Theater | $330,000 |
Arc of Tri-Cities | $900,000 |
Bellevue Clinic--Seattle Children's Hospital | $2,000,000 |
Blessed Sacrament Food and Emergency Facilities Renovation | $200,000 |
Children's Village Expansion Project | $500,000 |
Clark County Food Distribution Facility | $1,500,000 |
Coal Creek YMCA (Newcastle) | $800,000 |
Dawson Place Child Advocacy Center | $1,000,000 |
Federal Way National Little League Field Lighting Project and Monument Entry Sign | $177,000 |
Harlequin Theater | $235,000 |
Home Dialysis Center and Professional Workforce Training | $250,000 |
Kirkland Park Place Redevelopment | $2,000,000 |
Livingston Baker Fire and Life Safety | $750,000 |
Marshland Diking District | $500,000 |
Marysville Boys & Girls Club | $500,000 |
McClure Middle School Energy Saving Performance Contract Demonstration Project | $1,000,000 |
Mountains to Sound Greenway | $100,000 |
Mukilteo Boys & Girls Club | $150,000 |
Neighborcare Health Clinic and Rainier Beach Medical Clinic | $1,000,000 |
Parkland at Japanese Gulch | $1,000,000 |
Petrovitsky Park Upgrade | $750,000 |
Phoenix House | $200,000 |
Poulsbo Marine Center | $500,000 |
Public Broadcasting Frequency Expansion | $223,000 |
Ready by Five Early Learning Center | $1,000,000 |
Renovations to Mill Creek City Annex Building | $30,000 |
Snohomish County Emergency Center | $1,000,000 |
South Tacoma Community Center | $1,000,000 |
Whatcom Hospice House | $700,000 |
Zina Linnik | $950,000 |
NEW SECTION. Sec. 1049 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Community Development Block Grant (91000011)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided from the
American recovery and reinvestment act of 2009 for community
development block grants.
Appropriation:
General Fund--Federal . . . . . . . . . . . . $4,200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,200,000
NEW SECTION. Sec. 1050 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Temporary Public Works Grant Program (92000021)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
grants for the specified public works projects and competitive public
works grant programs specified below. The public works board (board)
shall administer the following competitive public works grant programs
within the amounts specified, provided that up to ten percent of the
amounts provided for competitive grant programs may be transferred to
other competitive grant categories if acceptable applications for any
category do not total the amount available.
(1) $9,531,000 is provided solely for a competitive public works
grant program for local governments serving communities in rural
counties as defined in RCW 43.160.020. The board shall prioritize
applications for funding for this small community jobs program based on
the following criteria:
(a) The unemployment rate of the community;
(b) The ability of the applicant to complete the project promptly;
and
(c) The value the project presents to the community in lasting
improvements to public safety, environmental quality, recreation and
community life, or economic development.
(2) $9,531,000 is provided solely for a competitive public works
grant program for local governments serving high density urban
communities. The board shall prioritize applications for funding from
this urban vitality program based on the following criteria:
(a) The proposed project's ability to decrease the per capita
vehicle miles driven in the community by increasing access to mass
transit, supporting residential density in proximity to employment
opportunities, and improving the safety and appeal of walking and
biking in a community;
(b) The ability of the applicant to complete the project promptly;
and
(c) The local support for the project as indicated by the level of
local matching funds devoted to the project. Local matching funds do
not include funds from other state sources.
(3) The state taxable building construction account--state
appropriation is provided solely for emergency loans under RCW
43.155.065.
(4) $23,535,000 is provided solely for the following list of
projects. The appropriation for Airway Heights wastewater treatment
plant is contingent upon a capacity agreement with the Kalispel Tribe
that precludes the need to build multiple wastewater treatment
facilities on the West Plains. If any project on the following list is
unable to show reasonable progress towards accomplishing the intended
project by December 31, 2010, the board may transfer the amount
allocated for the project to the competitive grant categories in
subsections (1) and (2) of this section.
Airway Heights Water Treatment Plant | $1,000,000 |
Small Community Jobs - Assistance for Grand Coulee School | $500,000 |
Small Community Jobs - Camano Island County Park Development | $300,000 |
Small Community Jobs - Connell Infrastructure | $1,100,000 |
Small Community Jobs - Dayton School Biomass Heating System | $100,000 |
Small Community Jobs - Grandview Downtown Revitalization | $500,000 |
Small Community Jobs - Green Acres Neighborhood Park | $200,000 |
Small Community Jobs - Hoh Tribe Fire Station | $623,000 |
Small Community Jobs - Longview Elementary Safety Underpass | $250,000 |
Small Community Jobs - Mesa Playground | $35,000 |
Small Community Jobs - Pasco Commercial Avenue Construction | $800,000 |
Small Community Jobs - Union Gap School Crossing Improvement | $227,000 |
Small Community Jobs - Yakima Downtown Futures | $1,000,000 |
Small Community Jobs - Yelm Longmire Park | $400,000 |
Urban Vitality - Federal Way Urban Infrastructure | $5,000,000 |
Urban Vitality - Infrastructure for Puyallup (Parametrix) | $2,000,000 |
Urban Vitality - Percival Landing | $3,000,000 |
Urban Vitality - Redmond Square Development | $2,000,000 |
Urban Vitality - Renton Hawks Landing | $1,700,000 |
Water - Gig Harbor Waste Water Treatment | $2,500,000 |
Water - Pine Terrace Water Association Project | $300,000 |
NEW SECTION. Sec. 1051 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Energy Freedom Program (30000056)
The appropriation in this section is subject to the following
conditions and limitations: $38,500,000 of the general fund--federal
is provided solely for deposit in the energy recovery act account to
establish a revolving loan program, consistent with provisions of
chapter . . ., Laws of 2009 (ESHB 2289). The department must consult
with the clean energy leadership council, once it is established, prior
to awarding funds from this account. The utilization of these funds
shall be consistent with the recommendations, once developed, of the
clean energy leadership council created by chapter . . ., Laws of 2009
(SSB 5921).
Appropriation:
Energy Recovery Act Account--Federal . . . . . . . . . . . . $38,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $38,500,000
NEW SECTION. Sec. 1052 FOR THE DEPARTMENT OF COMMUNITY, TRADE,
AND ECONOMIC DEVELOPMENT
Weatherization (91000013)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $49,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $49,000,000
NEW SECTION. Sec. 1053 FOR THE OFFICE OF FINANCIAL MANAGEMENT
Oversight of State Facilities (20082855)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,532,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,419,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $6,192,000
TOTAL . . . . . . . . . . . . $9,143,000
NEW SECTION. Sec. 1054 FOR THE OFFICE OF FINANCIAL MANAGEMENT
Cowlitz River Dredging (20082856)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $313,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $687,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 1055 FOR THE OFFICE OF FINANCIAL MANAGEMENT
Catastrophic Flood Relief (20084850)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $47,351,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,649,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $50,000,000
NEW SECTION. Sec. 1056 FOR THE OFFICE OF FINANCIAL MANAGEMENT
Graving Dock Settlement (20084001)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation in this section is
provided solely to fulfill the state's obligations in the settlement
agreement in the case of Lower Elwha Klallam Tribe et al v. State et
al, Thurston county superior court, cause no. 05-2-01595-8, and the
associated economic development agreement, specifically to the city of
Port Angeles for archaeological work as specified in the settlement
agreement.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $280,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $15,480,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $140,000
TOTAL . . . . . . . . . . . . $15,900,000
NEW SECTION. Sec. 1057 FOR THE OFFICE OF FINANCIAL MANAGEMENT
Law Enforcement Academy Evaluation (92000001)
The appropriation in this section is subject to the following
conditions and limitations: The office of financial management shall
contract with the police executive research forum to conduct an
analysis of options for delivering basic law enforcement training to
local law enforcement agencies and the Washington state patrol. The
office of financial management shall establish a steering committee to
advise the office of financial management and direct the work of the
contractor. The steering committee shall include a representative of
the governor, a representative of the Washington association of
sheriffs and police chiefs, a representative of the criminal justice
training commission, a representative of the Washington state patrol,
a member of the senate, and a member of the house of representatives.
The analysis shall include, but is not limited to:
(1) Evaluation of the existing academy resources of the Washington
state patrol and the criminal justice training commission, basic law
enforcement academy, including the ability to meet demand for training,
the potential for growth, and the condition of the facilities; and
(2) Evaluation of the modes for delivering the training, including
but not limited to: The use of community colleges for criminal law
instruction; the use of distance learning at community and technical
colleges; maintaining separate, geographically separate academies for
the criminal justice training commission and the Washington state
patrol; sharing facilities but maintaining separate curricula and
instructors; and the consolidating instruction and facilities.
The office of financial management shall submit the final report to
the legislature by November 1, 2009. The contract required by this
section is not subject to chapter 5, Laws of 2009.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $100,000
NEW SECTION. Sec. 1058 FOR THE OFFICE OF FINANCIAL MANAGEMENT
Higher Education Preservation Information (30000001)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely to
refresh preservation information that resides in the state's comparable
framework for higher education buildings including any necessary
revisions or adjustments that will enable more direct translation of
information, updates for last renewal or replacement of major systems,
and quality assurance field sampling. In executing this continued
capital study, the office of financial management shall consult the
legislative fiscal committees about its workplan to ensure field
sampling of facilities prioritized for renovation or replacement, and
timely delivery of assembled facilities information and related capital
models in an easy to understand format. As a general condition, upon
appropriations provided to higher education agencies in this act, the
state board for community and technical colleges and each state
baccalaureate institution shall provide requested facilities
information in a timely manner to enable the office of financial
management to complete the tasks and oversight assigned in this
section.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $300,000
NEW SECTION. Sec. 1059 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Minor Works - Program (20082012)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $15,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $355,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $370,000
NEW SECTION. Sec. 1060 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Transportation Building Preservation (20021008)
Reappropriation:
Thurston County Capital Facilities Account--State . . . . . . . . . . . . $2,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $7,116,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $22,706,000
TOTAL . . . . . . . . . . . . $32,322,000
NEW SECTION. Sec. 1061 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Highway-License Building Repair and Renewal (20061013)
Reappropriation:
Thurston County Capital Facilities Account--State . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,423,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,523,000
NEW SECTION. Sec. 1062 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Heritage Center/Executive Office Bldg Development (20082954)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,700,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 1063 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Natural Resources Building Repairs and Renewal (20061014)
Reappropriation:
State Vehicle Parking Account--State . . . . . . . . . . . . $30,000
Thurston County Capital Facilities Account--State . . . . . . . . . . . . $100,000
Subtotal Reappropriation . . . . . . . . . . . . $130,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,853,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,520,000
TOTAL . . . . . . . . . . . . $7,503,000
NEW SECTION. Sec. 1064 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Minor Works - Infrastructure Preservation (20081004)
Reappropriation:
Thurston County Capital Facilities Account--State . . . . . . . . . . . . $136,000
State Building Construction Account--State . . . . . . . . . . . . $584,000
Subtotal Reappropriation . . . . . . . . . . . . $720,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,401,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,121,000
NEW SECTION. Sec. 1065 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
O'Brien Building Improvements (20081007)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $9,671,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,481,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $5,329,000
TOTAL . . . . . . . . . . . . $17,981,000
NEW SECTION. Sec. 1066 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Capitol Campus High Voltage System Improvements (20081010)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $904,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,204,000
NEW SECTION. Sec. 1067 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Legislative Building Improvements (20081011)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
the repair and patching of the outside of the legislative building.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $172,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,079,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,639,000
TOTAL . . . . . . . . . . . . $6,390,000
NEW SECTION. Sec. 1068 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Minor Works - Facility Preservation (20081015)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $380,000
Thurston County Capital Facilities Account--State . . . . . . . . . . . . $723,000
Subtotal Reappropriation . . . . . . . . . . . . $1,103,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,583,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,686,000
NEW SECTION. Sec. 1069 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Infrastructure Relocation (20082028)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $500,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 1070 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Emergency Newhouse Repairs and South Campus Plan (20082952)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $175,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $575,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $750,000
NEW SECTION. Sec. 1071 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Capital Lake Plan Completion (20082953)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $300,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 1072 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Campus Monuments Repair and Restoration (20091003)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $88,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $288,000
NEW SECTION. Sec. 1073 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Minor Works Preservation (30000012)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,800,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $34,109,000
TOTAL . . . . . . . . . . . . $36,909,000
NEW SECTION. Sec. 1074 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Emergency Repairs (30000033)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $7,000,000
TOTAL . . . . . . . . . . . . $9,500,000
NEW SECTION. Sec. 1075 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Powerhouse: Improvements and Preservation (30000056)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,459,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,459,000
NEW SECTION. Sec. 1076 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Facility Oversight Program: Staffing (30000063)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation in this section is
provided solely for the department of general administration to assist
the office of financial management with the development and
implementation of RCW 43.82.035 and 43.82.055.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $740,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $5,597,000
TOTAL . . . . . . . . . . . . $6,337,000
NEW SECTION. Sec. 1077 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Heritage Center and Executive Office Building (20082858)
The appropriations in this section are subject to the following
conditions and limitations: The appropriations are provided to
reimburse the general administration services account for design costs
for the executive office building, and for a revision to the predesign
of the heritage center executive office building. The revised
predesign must align the scope of the project with the level of
financing that available revenues will support. The revised predesign
must specify the tenants of the executive office building, based on the
capital campus master plan criteria, and must reduce the size of the
heritage center to what is needed for the state library and exhibit
space for historically significant documents from the state archives
and rotating exhibits from national, state, and local historical
museums.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,200,000
Washington State Heritage Center Account--State . . . . . . . . . . . . $1,000,000
Subtotal Appropriation . . . . . . . . . . . . $3,200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,805,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $9,005,000
NEW SECTION. Sec. 1078 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Engineering and Architectural Services: Staffing (30000086)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $9,300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $43,033,000
TOTAL . . . . . . . . . . . . $52,333,000
NEW SECTION. Sec. 1079 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Infrastructure Savings (30000480)
The appropriation in this section is subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1
NEW SECTION. Sec. 1080 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Disposal Plan for Downtown Olympia DFW Properties (92000001)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
the development of a plan for the disposal of the department of fish
and wildlife facilities in downtown Olympia. The plan shall include
consultation with the city of Olympia for determining how development
options for the site fit within the city's development plans for
downtown. The plan shall also recommend options for disposal that will
yield the highest return to the state, including selling the property
as is under existing surplus property laws, transferring the property
to the city for eventual development with the appropriate share of
investment returns paid to the state, preparing the site for
development and then selling the property, and other options for
disposal.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $100,000
NEW SECTION. Sec. 1081 FOR THE DEPARTMENT OF GENERAL
ADMINISTRATION
Pro Arts Building (91000002)
The appropriation in this section is subject to the following
conditions and limitations: Predesign and design funds are provided
solely to develop a new office building. Up to $225,000 may be used to
develop the predesign for the Pro Arts site to include a new office
building that may house tenants from the general administration
building including the office of financial management, the Puget Sound
partnership, the office of the state treasurer, and other small
commissions and agencies. The predesign shall be developed with
representatives from the capitol campus design advisory committee, the
department of general administration, and the office of financial
management. The predesign shall be used to develop the optimum use of
space for the Pro Arts site, identify any required mitigation, parking
requirements, schedule of construction, and cost of construction. The
predesign shall be provided to the appropriate fiscal committees of the
legislature and the office of financial management by February 1, 2010.
The allotment for design funds will be made after the predesign is
approved by the office of financial management and the appropriate
fiscal committees of the legislature.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 1082 FOR THE LIQUOR CONTROL BOARD
Minor Works (30000009)
Appropriation:
Liquor Control Board Construction and Maintenance
Account--State . . . . . . . . . . . . $315,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $315,000
NEW SECTION. Sec. 1083 FOR THE MILITARY DEPARTMENT
Minor Works - Facility Preservation (20081004)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $1,610,000
State Building Construction Account--State . . . . . . . . . . . . $374,000
Subtotal Reappropriation . . . . . . . . . . . . $1,984,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,839,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $7,823,000
NEW SECTION. Sec. 1084 FOR THE MILITARY DEPARTMENT
Minor Works - Program (20082003)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $1,467,000
State Building Construction Account--State . . . . . . . . . . . . $255,000
Subtotal Reappropriation . . . . . . . . . . . . $1,722,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,381,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,103,000
NEW SECTION. Sec. 1085 FOR THE MILITARY DEPARTMENT
Flood Warning Systems (20082851)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation in this section is
provided solely for the emergency management division in consultation
with the department of ecology, the department of community, trade, and
economic development, the Washington association of counties, the
United States army corps of engineers, the national oceanic and
atmospheric association, and the national weather service to develop
the following:
(1) An inventory and description of flood warning systems currently
in place in flood hazard areas of the state, including manual systems
and electronic systems;
(2) A needs assessment indication what specific areas of the state
could be better served by flood warning systems based on flooding areas
mapped under the federal emergency management act. The needs
assessment must include recommendations regarding how to make timely
notification of flood warnings and how to gather and share data about
potential flood areas;
(3) An information bank of flood warning systems, with descriptions
of available and emerging technologies, and estimates of the costs of
purchasing, installing, and maintaining these systems;
(4) Sources of potential federal assistance for local flood warning
systems; and
(5) Recommendations to assist local governments in the financing of
capital costs of flood warning systems, including the potential to
modify existing state programs.
The recommendations must be reported to the office of financial
management and legislature by December 15, 2009.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 1086 FOR THE MILITARY DEPARTMENT
Minor Works Preservation (30000002)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $3,069,000
State Building Construction Account--State . . . . . . . . . . . . $1,709,000
Subtotal Appropriation . . . . . . . . . . . . $4,778,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $18,700,000
TOTAL . . . . . . . . . . . . $23,478,000
NEW SECTION. Sec. 1087 FOR THE MILITARY DEPARTMENT
Minor Works Program (30000003)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $679,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $10,229,000
TOTAL . . . . . . . . . . . . $10,908,000
NEW SECTION. Sec. 1088 FOR THE MILITARY DEPARTMENT
Emergency Repairs (30000059)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $100,000
General Fund--Federal . . . . . . . . . . . . $100,000
Subtotal Appropriation . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $800,000
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 1089 FOR THE MILITARY DEPARTMENT
Infrastructure Savings (30000480)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1
NEW SECTION. Sec. 1090 FOR THE MILITARY DEPARTMENT
Energy Conservation Projects (20082005)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $30,000
State Building Construction Account--State . . . . . . . . . . . . $30,000
Subtotal Reappropriation . . . . . . . . . . . . $60,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $490,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $550,000
NEW SECTION. Sec. 1091 FOR THE DEPARTMENT OF ARCHAEOLOGY AND
HISTORIC PRESERVATION
Historical Courthouse Rehabilitation (20082851)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The reappropriation is provided solely for courthouse
protection and preservation, including character defining architectural
features, general repairs, system upgrades, payments for renovation
completed since January 1, 2006, and improvements to access and
accommodations for persons with disabilities. All rehabilitation work
must comply with the secretary of interior's standards for
rehabilitation. Grants may not be used for expenditures for courthouse
maintenance. Only counties with historic courthouses that continue to
maintain county functions are eligible for grants. Counties receiving
grants shall provide an equal amount of matching funds from public or
private sources. The department shall use up to two percent of the
appropriation for program administration.
(2) The society shall continue to use the revised eligibility
criteria and grant application process that includes the review of
projects selected for funding by the courthouse advisory committee.
Those projects chosen for funding shall undergo a review by the
department of general administration's barrier free program to ensure
that they meet Americans with disabilities act standards and
accessibility and all other Americans with disabilities act
requirements are maintained during the construction. The existing
historic courthouse advisory committee shall continue to review grant
applications and make funding recommendations to the state historic
preservation officer.
(3) The society and the courthouse advisory committee shall include
readiness to proceed when developing the priority list of projects to
fund.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,800,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,200,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 1092 FOR THE DEPARTMENT OF ARCHAEOLOGY AND
HISTORIC PRESERVATION
Historic Barn Preservation (20084851)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is provided solely for
implementation of the heritage barn preservation program created in
chapter 333, Laws of 2007.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $158,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $342,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $800,000
NEW SECTION. Sec. 1093 FOR THE DEPARTMENT OF ARCHAEOLOGY AND
HISTORIC PRESERVATION
Courthouse Preservation (30000004)
The appropriation in this section is subject to the following
conditions and limitations:
(1) The appropriation is provided solely for courthouse protection
and preservation, including character defining architectural features,
general repairs, system upgrades, payments for renovation completed
since January 1, 2006, and improvements to access and accommodations
for persons with disabilities. All rehabilitation work must comply
with the secretary of interior's standards for rehabilitation. Grants
may not be used for expenditures for courthouse maintenance. Only
counties with historic courthouses that continue to maintain county
functions are eligible for grants. Counties receiving grants shall
provide an equal amount of matching funds from public or private
sources. The department shall use up to two percent of the
appropriation for program administration.
(2) The department shall continue to use the revised eligibility
criteria and grant application process that includes the review of
projects selected for funding by the courthouse advisory committee.
Those projects chosen for funding shall undergo a review by the
department of general administration's barrier free program to ensure
that they meet the Americans with disabilities act standards and that
all other Americans with disabilities act requirements are maintained
during the construction. The existing historic courthouse advisory
committee shall continue to review grant applications and make funding
recommendations to the state historic preservation officer.
(3) The department and the courthouse advisory committee shall
include readiness to proceed when developing the priority list of
projects to fund.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 1094 FOR THE STATE CONVENTION AND TRADE CENTER
Convention Center Expansion (91000001)
The appropriation in this section is subject to the following
conditions and limitations:
(1) The appropriation is provided solely to the state convention
and trade center corporation, after July 1, 2010, for the convention
place station expansion including the planning, environmental studies,
design, preparation of construction plans and specifications,
exploration of potential codevelopment, bidding and contingent
construction contracting, and other activities for the expansion. By
December 1, 2009, the state convention and trade center corporation
shall submit to the office of financial management and the fiscal
committees of the legislature, a study of the feasibility and a
proposal for the long-term financing of expansion of the state
convention center. The study shall include a description by the state
treasurer's office of options for financing the convention center
expansion without the use of bonds subject to the state constitutional
limit on debt service payments with the estimated annual debt service
payments for those options. The report shall also include a forecast
by the office of financial management of revenues that are intended to
support debt service payments for the convention center expansion.
(2) The convention and trade center corporation shall work with
labor and business stakeholders from the hospitality industry to
develop a plan that must include the following elements: (a)
Recommendations on how to best achieve the creation of full-time,
stable, living wage jobs in the hospitality/hotel industry resulting
from the convention place station expansion; (b) ways to recruit local
residents and members of communities experiencing high unemployment for
the new jobs created; (c) a process to promote positive labor relations
in order to protect the government's financial investment and to avoid
disruptions of the convention center operations and of businesses
supporting the convention center and its visitors; and (d) a
competitive bidding process for the selection of a hotel developer and
operator in potential public/private hotel partnerships. The report
must be submitted with the feasibility study, required in this
subsection, to the office of financial management and the fiscal
committees of the legislature.
Appropriation:
State Convention and Trade Center Account--State . . . . . . . . . . . . $10,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $10,000,000
NEW SECTION. Sec. 1095 FOR THE STATE CONVENTION AND TRADE
CENTER
Minor Works Facility Preservation (30000001)
The appropriation in this section is subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Convention and Trade Center Account--State . . . . . . . . . . . . $5,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 2001 FOR THE CRIMINAL JUSTICE TRAINING
COMMISSION
Replace Hawthorne Hall Dormitory (20082001)
The appropriation in this section is subject to the following
conditions and limitations: The office of financial management shall
allot funds for the dormitory construction at the criminal justice
training commission only after the recommendation of the steering
committee participating in the analysis in section 1057 of this act has
been provided to the legislative fiscal committees and submitted to the
office of financial management for review.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $16,745,000
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $632,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,293,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $18,670,000
NEW SECTION. Sec. 2002 FOR THE CRIMINAL JUSTICE TRAINING
COMMISSION
School Mapping (30000011)
The appropriation in this section is subject to the following
conditions and limitations: The legislature intends to complete half
of the remaining community and technical college mapping with this
appropriation and to appropriate funding for the remaining half of
unmapped square feet in community and technical colleges in the 2011-13
biennium.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $546,000
TOTAL . . . . . . . . . . . . $1,046,000
NEW SECTION. Sec. 2003 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Statewide: Facilities Assessment and Cultural Resources Planning
(20061120)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $150,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $150,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,200,000
TOTAL . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 2004 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Green Hill School: New Inmate Management Unit, Health Center, and
Administration (20062202)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,600,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $11,227,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $14,827,000
NEW SECTION. Sec. 2005 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Mental Health Division-Eastern Washington: Evaluation and Treatment
(20064352)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 2006 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Mental Health Division-Children's Long-Term Inpatient Program
Facilities: Preservation (20064353)
The reappropriation in this section is subject to the following
conditions and limitations: The department shall evaluate options for
maximizing federal fund contributions for capital needs of privately
owned facilities that contract with the department for children's
long-term inpatient program services.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,762,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,012,000
NEW SECTION. Sec. 2007 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Emergency Repairs (20081101)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $877,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $977,000
NEW SECTION. Sec. 2008 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Minor Works - Health, Safety, and Code Requirements (20081111)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,200,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,200,000
NEW SECTION. Sec. 2009 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Minor Works - Facility Preservation (20081112)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,500,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $9,000,000
NEW SECTION. Sec. 2010 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Minor Works - Infrastructure Preservation (20081113)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,700,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,700,000
NEW SECTION. Sec. 2011 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Hazards Abatement and Demolition (20081119)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
TOTAL . . . . . . . . . . . . $2,600,000
NEW SECTION. Sec. 2012 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Western State Hospital New Kitchen and Commissary Building
(20081319)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $400,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $650,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $250,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,300,000
NEW SECTION. Sec. 2013 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Western State Hospital Laundry Upgrades (20081325)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,658,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,858,000
NEW SECTION. Sec. 2014 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Special Commitment Center: Utility Replacements (20081504)
The reappropriation and appropriation in this section are subject
to the following conditions and limitations: It is the intent of the
appropriation and reappropriation to replace essential utilities, such
as sanitary sewer, high voltage electrical, and fiber optic
communications, serving the special commitment center and McNeil
corrections center on McNeil Island by replacing the Island's
electrical feed from the shoreline landing to the McNeil corrections
center generator building, and continuing on to the special commitment
center. The department shall coordinate the work with the department
of corrections for the most cost-effective approach to the work.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,900,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,490,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $140,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,530,000
NEW SECTION. Sec. 2015 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Rainier School Waste Treatment Plant (20082001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,800,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,200,000
NEW SECTION. Sec. 2016 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Special Commitment Center Medium Management Housing Addition
(20082505)
The reappropriation in this section is subject to the following
conditions and limitations:
The reappropriation is to add residential space to existing
facilities by remodeling existing residential space and converting
existing program space to residential space for additional beds.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $575,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $53,664,000
TOTAL . . . . . . . . . . . . $54,939,000
NEW SECTION. Sec. 2017 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Fircrest Campus Master Plan (20082850)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The department shall resume and complete a master plan of the
portion of the Fircrest campus that is not utilized by the Fircrest
school or the department of health.
(2) In drafting the master plan, the department shall consult with
the following:
(a) The city of Shoreline;
(b) The department of natural resources;
(c) The department of health regarding their master planning
effort;
(d) Representatives of institutions of higher education with whom
the department has a partnership; and
(e) Representatives of the Shoreline community and neighboring
communities.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $50,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $395,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $445,000
NEW SECTION. Sec. 2018 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Lakeland Village: Nine Cottages Renovation, Phase 4, 5, and 6
(20061402)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,536,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $3,063,000
TOTAL . . . . . . . . . . . . $8,799,000
NEW SECTION. Sec. 2019 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Echo Glen Children's Center - Housing Units (20081041)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $900,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,400,000
NEW SECTION. Sec. 2020 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Minor Works - Health, Safety, and Code Requirements (30000366)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,650,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $20,458,000
TOTAL . . . . . . . . . . . . $23,108,000
NEW SECTION. Sec. 2021 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Minor Works - Infrastructure Preservation (30000367)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,320,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $16,658,000
TOTAL . . . . . . . . . . . . $18,978,000
NEW SECTION. Sec. 2022 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Minor Works - Facilities Preservation (30000368)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,590,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $30,739,000
TOTAL . . . . . . . . . . . . $36,329,000
NEW SECTION. Sec. 2023 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Emergency Repairs (30000485)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 2024 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Capital Project Management: Staffing (30000486)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,250,000
NEW SECTION. Sec. 2025 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Western State Hospital: Traffic Study Implementation (30000843)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $355,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $996,000
TOTAL . . . . . . . . . . . . $1,351,000
NEW SECTION. Sec. 2026 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Echo Glen Childrens Center: Portable Classroom Replacement
(30000844)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $850,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $743,000
TOTAL . . . . . . . . . . . . $1,593,000
NEW SECTION. Sec. 2027 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Eastern State Hospital: Roof Replacements (30000846)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,085,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,088,000
TOTAL . . . . . . . . . . . . $2,173,000
NEW SECTION. Sec. 2028 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Western State Hospital: Roof Replacements (30000851)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $620,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $3,198,000
TOTAL . . . . . . . . . . . . $3,818,000
NEW SECTION. Sec. 2029 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Eastern State Hospital: Westlake Building Renovation (30000852)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $840,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,093,000
TOTAL . . . . . . . . . . . . $2,933,000
NEW SECTION. Sec. 2030 FOR THE DEPARTMENT OF SOCIAL AND HEALTH
SERVICES
Infrastructure Savings (30000480)
The appropriation in this section is subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1
NEW SECTION. Sec. 2031 FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory Addition (20082003)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $8,165,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,012,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $10,177,000
NEW SECTION. Sec. 2032 FOR THE DEPARTMENT OF HEALTH
Drinking Water Assistance Program (20064001)
Reappropriation:
Drinking Water Assistance Account--Federal . . . . . . . . . . . . $36,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $58,596,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $94,596,000
NEW SECTION. Sec. 2033 FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory HVAC Systems Upgrades (20081002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $412,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,912,000
NEW SECTION. Sec. 2034 FOR THE DEPARTMENT OF HEALTH
Drinking Water Assistance Program (30000013)
The appropriation in this section is subject to the following
conditions and limitations: $38,462,000 is provided from the American
recovery and reinvestment act of 2009.
Appropriation:
Drinking Water Assistance Account--Federal . . . . . . . . . . . . $24,348,000
Drinking Water Assistance Account--Federal
American Recovery and Reinvestment Act . . . . . . . . . . . . $38,462,000
Subtotal Appropriation . . . . . . . . . . . . $62,810,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $62,810,000
NEW SECTION. Sec. 2035 FOR THE DEPARTMENT OF HEALTH
Greywater Rule Development (91000001)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
greywater rule development activities required by RCW 90.46.015 for the
protection of public health. The rules must be adopted by December 31,
2010. As a part of the rulemaking process, the department must
consider methods to reduce barriers to and provide incentives for
greywater use.
Appropriation:
Public Works Assistance Account--State . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $100,000
NEW SECTION. Sec. 2036 FOR THE DEPARTMENT OF HEALTH
Minor Works - Facility Preservation (30000015)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $597,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $597,000
NEW SECTION. Sec. 2037 FOR THE DEPARTMENT OF VETERANS AFFAIRS
State Veterans Cemetery (20082004)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $6,815,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,010,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $7,825,000
NEW SECTION. Sec. 2038 FOR THE DEPARTMENT OF VETERANS AFFAIRS
Minor Works - Facilities Preservation (30000003)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $6,585,000
TOTAL . . . . . . . . . . . . $7,085,000
NEW SECTION. Sec. 2039 FOR THE DEPARTMENT OF VETERANS AFFAIRS
Minor Works - Program Projects (30000004)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $115,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $5,463,000
TOTAL . . . . . . . . . . . . $5,578,000
NEW SECTION. Sec. 2040 FOR THE DEPARTMENT OF VETERANS AFFAIRS
Emergency Repairs (30000053)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,200,000
TOTAL . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 2041 FOR THE DEPARTMENT OF CORRECTIONS
Coyote Ridge Corrections Center: Design and Construct Medium
Security Beds (19982011)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,772,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $228,170,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $232,942,000
NEW SECTION. Sec. 2042 FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Regional Infrastructure (20042008)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,700,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $900,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $9,029,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
TOTAL . . . . . . . . . . . . $19,629,000
NEW SECTION. Sec. 2043 FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections: Replace and Stabilize Housing Unit
Siding (20061005)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,394,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,087,000
TOTAL . . . . . . . . . . . . $7,881,000
NEW SECTION. Sec. 2044 FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: South Close Security Complex
(20062021)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $35,950,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $29,344,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $14,276,000
TOTAL . . . . . . . . . . . . $79,570,000
NEW SECTION. Sec. 2045 FOR THE DEPARTMENT OF CORRECTIONS
Monroe Corrections Center: Health Care Facility (20062043)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $283,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $417,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $89,446,000
TOTAL . . . . . . . . . . . . $90,146,000
NEW SECTION. Sec. 2046 FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center for Women: Healthcare Center
(20062066)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $7,700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $11,358,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $19,058,000
NEW SECTION. Sec. 2047 FOR THE DEPARTMENT OF CORRECTIONS
Clallam Bay Corrections Center Install Close Custody Slider Doors
(20062070)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $374,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,160,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $376,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
TOTAL . . . . . . . . . . . . $18,910,000
NEW SECTION. Sec. 2048 FOR THE DEPARTMENT OF CORRECTIONS
Larch Corrections Center: 80-Bed Expansion (20062852)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $560,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,512,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,072,000
NEW SECTION. Sec. 2049 FOR THE DEPARTMENT OF CORRECTIONS
Airway Heights Heating and Cooling Loop Replacement (20081001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $180,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,745,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,925,000
NEW SECTION. Sec. 2050 FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center: Replace Barge Slip Pilings
(20081002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,612,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $288,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,900,000
NEW SECTION. Sec. 2051 FOR THE DEPARTMENT OF CORRECTIONS
Replace Kitchen Roofs at Monroe Correctional Complex (20081003)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,812,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,062,000
NEW SECTION. Sec. 2052 FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Replace G Building Roof (20081004)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $412,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,019,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,431,000
NEW SECTION. Sec. 2053 FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Replace Roofs (20081005)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $900,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,766,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,666,000
NEW SECTION. Sec. 2054 FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Replace Roofs (20081007)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $589,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,789,000
NEW SECTION. Sec. 2055 FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Replace Fire Alarm System
(20081008)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $600,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $924,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,524,000
NEW SECTION. Sec. 2056 FOR THE DEPARTMENT OF CORRECTIONS
Replace Electrical Distribution Building at Special Offenders Unit
(20081009)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $539,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $683,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,222,000
NEW SECTION. Sec. 2057 FOR THE DEPARTMENT OF CORRECTIONS
Washington State Reformatory: Replace Cell Door and Electronics
(20081010)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $230,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,315,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,545,000
NEW SECTION. Sec. 2058 FOR THE DEPARTMENT OF CORRECTIONS
Clallam Bay Corrections Center: Replace Telecommunications
Infrastructure (20081013)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,329,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $521,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $19,045,000
TOTAL . . . . . . . . . . . . $20,895,000
NEW SECTION. Sec. 2059 FOR THE DEPARTMENT OF CORRECTIONS
Minor Works - Infrastructure Preservation (20081018)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,034,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $966,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 2060 FOR THE DEPARTMENT OF CORRECTIONS
Minor Works - Health, Safety, and Code Requirements (20081031)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,391,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,609,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 2061 FOR THE DEPARTMENT OF CORRECTIONS
Minor Works - Facility Preservation (20081024)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $441,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,559,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 2062 FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Laundry Improvements (20081033)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,701,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $350,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,051,000
NEW SECTION. Sec. 2063 FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Expand Reception Center (20082016)
The appropriation in this section is subject to the following
conditions and limitations: Prior to the allotment of design funds,
the office of financial management shall undertake a budget evaluation
study of the project.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $73,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $397,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $64,100,000
TOTAL . . . . . . . . . . . . $64,570,000
NEW SECTION. Sec. 2064 FOR THE DEPARTMENT OF CORRECTIONS
Mission Creek Corrections Center for Women: 100-Bed Expansion
(20082020)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,331,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,296,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,627,000
NEW SECTION. Sec. 2065 FOR THE DEPARTMENT OF CORRECTIONS
Monroe Correctional Complex: Close Sewer Lagoon (20082022)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $101,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,162,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $128,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $9,524,000
TOTAL . . . . . . . . . . . . $10,915,000
NEW SECTION. Sec. 2066 FOR THE DEPARTMENT OF CORRECTIONS
Airway Heights Corrections Center: Sex Offender Treatment Program
Building (20082028)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $550,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,397,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,947,000
NEW SECTION. Sec. 2067 FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center for Women: Roof Replacement
(30000178)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,832,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,832,000
NEW SECTION. Sec. 2068 FOR THE DEPARTMENT OF CORRECTIONS
300 Minimum Security Bed Expansion - Three Locations (20082850)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $321,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $156,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $477,000
NEW SECTION. Sec. 2069 FOR THE DEPARTMENT OF CORRECTIONS
Minor Works - Infrastructure Preservation (30000016)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,446,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $9,238,000
TOTAL . . . . . . . . . . . . $10,684,000
NEW SECTION. Sec. 2070 FOR THE DEPARTMENT OF CORRECTIONS
Minor Works - Health, Safety, and Code Requirements (30000047)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,609,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $13,374,000
TOTAL . . . . . . . . . . . . $15,983,000
NEW SECTION. Sec. 2071 FOR THE DEPARTMENT OF CORRECTIONS
Minor Works - Facility Preservation (30000086)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,857,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $11,741,000
TOTAL . . . . . . . . . . . . $14,598,000
NEW SECTION. Sec. 2072 FOR THE DEPARTMENT OF CORRECTIONS
Clallam Bay Corrections Center: Replace 5 Towers and Housing Roofs
(30000108)
The appropriation in this section is subject to the following
conditions and limitations: The funding is provided solely for the
replacement of roofs on offender housing units.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 2073 FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center for Women: Replace Fire Alarm
(30000121)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,625,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,625,000
NEW SECTION. Sec. 2074 FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Replace Fire Detection/Suppression
(30000123)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,098,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,098,000
NEW SECTION. Sec. 2075 FOR THE DEPARTMENT OF CORRECTIONS
Monroe Corrections Center: Water Line Replacements (30000137)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,809,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,809,000
NEW SECTION. Sec. 2076 FOR THE DEPARTMENT OF CORRECTIONS
Minor Works - Programmatic Projects (30000173)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,734,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $21,423,000
TOTAL . . . . . . . . . . . . $25,157,000
NEW SECTION. Sec. 2077 FOR THE DEPARTMENT OF CORRECTIONS
Emergency Repairs (30000346)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
TOTAL . . . . . . . . . . . . $13,500,000
NEW SECTION. Sec. 2078 FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Kitchen Improvements (20061007)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $402,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $228,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $630,000
NEW SECTION. Sec. 2079 FOR THE DEPARTMENT OF CORRECTIONS
Infrastructure Savings (30000480)
The appropriation in this section is subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1
NEW SECTION. Sec. 3001 FOR THE DEPARTMENT OF ECOLOGY
Water Supply Facilities (19742006)
Reappropriation:
State and Local Improvements Revolving Account
(Water Supply Facilities)--State . . . . . . . . . . . . $2,035,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $18,163,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $20,198,000
NEW SECTION. Sec. 3002 FOR THE DEPARTMENT OF ECOLOGY
Low-Level Nuclear Waste Disposal Trench Closure (19972012)
The appropriation in this section is subject to the following
conditions and limitations: $9,000,000 of the appropriation is
provided solely for design, engineering, and construction of a cover
for filled trenches at the commercial low-level radioactive waste
disposal facility. The cover must be placed as an interim remedial
action in accordance with WAC 173-340-430. The office of financial
management shall not authorize expenditure of this funding until the
department of ecology and the department of health jointly submit to
the office of financial management an updated schedule of actions and
funding needed to complete site closure and decommissioning in
accordance with the requirements described in the May 28, 2004, final
environmental impact statement for the commercial low-level radioactive
waste disposal site, located on the Hanford federal facility site.
Reappropriation:
Site Closure Account--State . . . . . . . . . . . . $3,900,000
Appropriation:
Site Closure Account--State . . . . . . . . . . . . $9,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,533,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $15,433,000
NEW SECTION. Sec. 3003 FOR THE DEPARTMENT OF ECOLOGY
Water Supply Facilities (20024006)
Reappropriation:
State and Local Improvements Revolving Account
(Water Supply Facilities)--State . . . . . . . . . . . . $1,022,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,978,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,000,000
NEW SECTION. Sec. 3004 FOR THE DEPARTMENT OF ECOLOGY
Water Supply Facilities (20044006)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,600,000
State and Local Improvements Revolving Account
(Water Supply Facilities)--State . . . . . . . . . . . . $392,000
Subtotal Reappropriation . . . . . . . . . . . . $1,992,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $11,658,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $13,650,000
NEW SECTION. Sec. 3005 FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Fund (20044007)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,481,000
Water Quality Capital Account--State . . . . . . . . . . . . $31,000
Subtotal Reappropriation . . . . . . . . . . . . $1,512,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $43,538,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $45,050,000
NEW SECTION. Sec. 3006 FOR THE DEPARTMENT OF ECOLOGY
Water Conveyance Infrastructure Projects (20052850)
Reappropriation:
Water Quality Capital Account--State . . . . . . . . . . . . $81,000
State Building Construction Account--State . . . . . . . . . . . . $1,708,000
State and Local Improvements Revolving Account
(Water Supply Facilities)--State . . . . . . . . . . . . $438,000
Subtotal Reappropriation . . . . . . . . . . . . $2,227,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,573,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,800,000
NEW SECTION. Sec. 3007 FOR THE DEPARTMENT OF ECOLOGY
Sunnyside Valley Irrigation District Water Conservation (20052851)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,800,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,850,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,147,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
TOTAL . . . . . . . . . . . . $13,797,000
NEW SECTION. Sec. 3008 FOR THE DEPARTMENT OF ECOLOGY
Quad Cities Water Right Mitigation (20052852)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,925,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $275,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,200,000
NEW SECTION. Sec. 3009 FOR THE DEPARTMENT OF ECOLOGY
State Drought Preparedness (20054009)
Reappropriation:
State Drought Preparedness Account--State . . . . . . . . . . . . $738,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $15,662,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $16,400,000
NEW SECTION. Sec. 3010 FOR THE DEPARTMENT OF ECOLOGY
Low Impact Development for Storm Water Management (20062006)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is provided solely for
grants to local governments in Puget Sound to fund innovative, low-impact development storm water management projects to meet critical
storm water management needs and protect or restore water quality.
Projects may include use of bioretention, rainwater harvest, permeable
pavement, vegetated roofs, and other low-impact development techniques.
Projects funded in Puget Sound must meet the design guidelines
contained in the low-impact development technical guidance manual for
Puget Sound, unless the municipality can demonstrate that site
conditions warrant a deviation from the design guidelines and the
deviations in design provides similar performance. All projects must
include performance monitoring.
Reappropriation:
State Toxics Control Account--State . . . . . . . . . . . . $799,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,701,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,500,000
NEW SECTION. Sec. 3011 FOR THE DEPARTMENT OF ECOLOGY
Columbia River Program (20062010)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,423,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $14,577,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $16,000,000
NEW SECTION. Sec. 3012 FOR THE DEPARTMENT OF ECOLOGY
Motor Vehicle Mercury Removal Program (20062850)
Reappropriation:
State Toxics Control Account--State . . . . . . . . . . . . $498,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $502,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 3013 FOR THE DEPARTMENT OF ECOLOGY
Columbia River Basin Water Supply Development Program (20062950)
Reappropriation:
Columbia River Basin Water Supply Development
Account--State . . . . . . . . . . . . $42,874,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,626,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $60,000,000
TOTAL . . . . . . . . . . . . $104,500,000
NEW SECTION. Sec. 3014 FOR THE DEPARTMENT OF ECOLOGY
Water Pollution Control Revolving Account (20064002)
The reappropriations in this section are subject to the following
conditions and limitations:
(1) The department must give priority loan funding consideration to
on-site septic system rehabilitation and replacement programs in Mason,
Kitsap, and Jefferson counties for up to $1,000,000 from the water
pollution control revolving account--state in the second year of the
funding cycle.
(2) Up to $5,000,000 of the water pollution control revolving
account--state reappropriation is for loans for on-site sewage
replacement. This reappropriation may be used to: (a) Establish new
or expand existing on-site sewage repair and replacement loan programs
by county governments or tribes; or (b) develop a pilot program to
administer an on-site sewage repair and replacement loan program
through a qualified private or nonprofit lending institution. This
reappropriation must be used in conjunction with water quality capital
account--state reappropriation in section 3015 of this act provided
solely for this purpose. The department must work with the department
of health, the Puget Sound water quality action team, local
governments, and the lending industry in developing and piloting this
program.
Reappropriation:
Water Pollution Control Revolving
Account--Federal . . . . . . . . . . . . $14,602,000
Water Pollution Control Revolving
Account--State . . . . . . . . . . . . $23,752,000
Subtotal Reappropriation . . . . . . . . . . . . $38,354,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $201,262,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $239,616,000
NEW SECTION. Sec. 3015 FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Program (20064007)
Reappropriation:
Water Quality Capital Account--State . . . . . . . . . . . . $3,663,000
State Building Construction Account--State . . . . . . . . . . . . $4,637,000
Subtotal Reappropriation . . . . . . . . . . . . $8,300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $39,190,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $47,490,000
NEW SECTION. Sec. 3016 FOR THE DEPARTMENT OF ECOLOGY
Local Toxics Grants for Cleanup and Prevention (20064008)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $21,237,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $77,663,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $98,900,000
NEW SECTION. Sec. 3017 FOR THE DEPARTMENT OF ECOLOGY
Transfer of Water Rights for Cabin Owners (20081951)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is provided solely for
the purchase of water for domestic water users in the Yakima Basin
(Water Resource Inventory Areas 37, 38, and 39) that have a surface
water right with a priority date later than May 10, 1905, as well as
for all out-of-priority surface water users in the Yakima Basin. A
portion of the reappropriation may be used for administrative and other
costs associated with acquiring and transferring the water rights. The
department must recover all costs from participating domestic water
users for their prorated portion of the cost of securing a water right
or rights for this purpose and associated annual operational costs owed
to the United States bureau of reclamation. Funds recovered in this
manner shall be placed in the drought preparedness account.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $450,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $450,000
NEW SECTION. Sec. 3018 FOR THE DEPARTMENT OF ECOLOGY
Puget Sound Storm Water Projects (20082002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $17,294,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $626,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $17,920,000
NEW SECTION. Sec. 3019 FOR THE DEPARTMENT OF ECOLOGY
Storm Water Projects (20082003)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,792,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,208,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 3020 FOR THE DEPARTMENT OF ECOLOGY
Breazeale Interpretive Center (20082856)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $270,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $225,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $495,000
NEW SECTION. Sec. 3021 FOR THE DEPARTMENT OF ECOLOGY
Reclaimed Water (20084002)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation in this section is
provided solely for grants to local governments in Puget Sound to
complete reclaimed water projects. Priority must be given to projects
in water short areas where reclaimed water can be used to replace other
water sources and where reclaimed water can be used to restore
important ecosystem functions in Puget Sound.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,782,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $673,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,455,000
NEW SECTION. Sec. 3022 FOR THE DEPARTMENT OF ECOLOGY
Puget Sound Aquatic Cleanup and Restoration (20084004)
Reappropriation:
State Toxics Control Account--State . . . . . . . . . . . . $2,209,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,791,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 3023 FOR THE DEPARTMENT OF ECOLOGY
Cleanup Toxic Sites in Puget Sound (20084005)
The reappropriation in this section is subject to the following
conditions and limitations: Funding is provided solely for the clean-up of contaminated sites that lie adjacent to and are within one-half
mile of Puget Sound. Clean-ups must include orphaned and abandoned
sites that pose a threat to Puget Sound with the highest priority sites
being cleaned up first. The department must provide the Puget Sound
partnership, as created by chapter 341, Laws of 2007, the opportunity
to review and provide comment on proposed projects and activities
recommended for funding. This review must be consistent with the
funding schedule for the program.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,431,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,336,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,767,000
NEW SECTION. Sec. 3024 FOR THE DEPARTMENT OF ECOLOGY
Remedial Action Grants (20084008)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $54,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $38,875,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $92,875,000
NEW SECTION. Sec. 3025 FOR THE DEPARTMENT OF ECOLOGY
Safe Soils Remediation Grants (20084009)
Reappropriation:
State Toxics Control Account--State . . . . . . . . . . . . $2,069,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,431,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,500,000
NEW SECTION. Sec. 3026 FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Program (20084010)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $34,870,000
Water Quality Capital Account--State . . . . . . . . . . . . $4,698,000
Subtotal Reappropriation . . . . . . . . . . . . $39,568,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $27,315,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $66,883,000
NEW SECTION. Sec. 3027 FOR THE DEPARTMENT OF ECOLOGY
Water Pollution Control Loan Program (20084011)
Reappropriation:
Water Pollution Control Revolving
Account--Federal . . . . . . . . . . . . $46,769,000
Water Pollution Control Revolving
Account--State . . . . . . . . . . . . $55,521,000
Subtotal Reappropriation . . . . . . . . . . . . $102,290,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $37,710,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $140,000,000
NEW SECTION. Sec. 3028 FOR THE DEPARTMENT OF ECOLOGY
On-Site Septic Replacement Program (20084012)
Reappropriation:
Water Quality Capital Account--State . . . . . . . . . . . . $2,133,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $867,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 3029 FOR THE DEPARTMENT OF ECOLOGY
Coordinated Prevention Grants (20084015)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $16,275,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $9,225,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $25,500,000
NEW SECTION. Sec. 3030 FOR THE DEPARTMENT OF ECOLOGY
Reduce Public Health Risks from Wood Stove Pollution (20084019)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $350,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,650,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 3031 FOR THE DEPARTMENT OF ECOLOGY
Skykomish Cleanup (20084020)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,000,000
Cleanup Settlement Account--State . . . . . . . . . . . . $422,000
Subtotal Reappropriation . . . . . . . . . . . . $3,422,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,578,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $10,000,000
NEW SECTION. Sec. 3032 FOR THE DEPARTMENT OF ECOLOGY
Waste Tire Pile Cleanup (20084022)
Reappropriation:
Waste Tire Removal Account--State . . . . . . . . . . . . $2,450,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,550,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 3033 FOR THE DEPARTMENT OF ECOLOGY
Reduce Health Risks from Toxic Diesel Pollution (20084024)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) Up to $5,380,000 of the reappropriation is provided solely for
clean diesel school bus projects for local school districts, that the
department may use for the purposes of RCW 28A.160.205.
(2) Up to $4,830,000 of the reappropriation is provided solely for
clean diesel projects, other than for school buses, as described in RCW
70.94.017(2)(a) and may be distributed through grants to air pollution
control authorities.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,449,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,761,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $10,210,000
NEW SECTION. Sec. 3034 FOR THE DEPARTMENT OF ECOLOGY
Twin Lake Aquifer Recharge Project (20042951)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $497,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $497,000
NEW SECTION. Sec. 3035 FOR THE DEPARTMENT OF ECOLOGY
Yakima River Basin Water Storage Feasibility Study (20084026)
The appropriation and reappropriation in this section are subject
to the following conditions and limitations: The appropriation and
reappropriation are provided solely for completion of the United States
bureau of reclamation's Yakima Basin storage feasibility study,
including the associated joint national environmental policy act, the
state environmental policy act, and environmental impact statement.
The appropriated and reappropriated funds are to be used by the bureau
of reclamation and the department of ecology to evaluate potential in
basin storage facilities such as the proposed Black Rock and Wymer
reservoirs and other reasonable alternatives that will enhance water
supply in the Yakima Basin.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $500,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,750,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,250,000
NEW SECTION. Sec. 3036 FOR THE DEPARTMENT OF ECOLOGY
Water Irrigation Efficiencies (20084028)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,715,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,285,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 3037 FOR THE DEPARTMENT OF ECOLOGY
Watershed Plan Implementation and Flow Achievement (20084029)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is provided solely for
grants for projects that improve water supplies and help achieve
instream flows by implementing watershed plans, as follows:
(1) Surface or ground water storage projects, where such projects
are consistent with the recommendations of the water storage task
force. The department shall consult the departments of agriculture and
fish and wildlife before issuing water storage grants.
(2) Infrastructure or water management projects that resolve
conflicts among water needs for municipal, agricultural, rural, and
fish restoration purposes. The stream flow improvements and other
public benefits secured from these projects must be commensurate with
the investment of state funds.
(3) Agricultural water supply projects that improve water
conservation and water use efficiency.
(4) Purchase and installation of water measuring devices in salmon
critical basins and areas participating in the department of fish and
wildlife fish screening and cooperative compliance program, and basins
where watershed plans call for additional water use measurement.
(5) Acquisition of water to achieve instream flows or to establish
water banks. The department must give priority to acquisitions in
salmon critical basins. The department must place acquired water into
the state's trust water rights program (chapters 90.38 and 90.42 RCW).
(6) Up to $200,000 of the reappropriation is provided solely for a
portion of the costs of the Ahtanum creek watershed restoration
program, including construction of the Pine Hollow reservoir, provided
there is agreement among the Yakama nation, Ahtanum irrigation
district, and other jurisdictional federal, state, and local agencies
and entities to proceed with the environmental impact statement.
(7) Up to $560,000 is provided solely for the Chehalis watershed.
(8) Up to $300,000 is provided solely for a grant to the Nisqually
river foundation to support the watershed conservation plan, low-impact
development program, and Nisqually river education program.
(9) Up to $1,200,000 of the reappropriation is provided solely for
grants to lead local government entities for planning unit
administrative support to watershed planning units. Such grants must
be provided only to those entities that have completed, approved plans
that are actively being implemented. Grant amounts will range from
$30,000 to $60,000, based on criteria to be developed by the
department. Criteria should consider factors including complexity of
water issues, geographical size, population growth pressure, rate of
plan implementation, and others issues to be determined by the
department.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $12,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,000,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $14,000,000
NEW SECTION. Sec. 3038 FOR THE DEPARTMENT OF ECOLOGY
Mason County Consortium (20084851)
Reappropriation:
State Toxics Control Account--State . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 3039 FOR THE DEPARTMENT OF ECOLOGY
Flood Protection Study (20082855)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation in this section is
provided solely for the department to conduct a study to determine the
number of decertified levees in the state and to identify strategies
for recertifying the levees so that they provide optimum protection for
the communities protected by the levees. The department must
prioritize areas to include in the study based on population and the
economic impact of potential flood damage.
The study must include the following components:
(1) A working group of levee managers to advise and inform the
study;
(2) A technical review of the structural integrity of levee
systems;
(3) An inventory, map, and rate the effectiveness of existing levee
systems; and
(4) The development of strategies and actions needed to improve the
existing levee system and to ensure certification by the United States
army corps of engineers for one-hundred year flood protection.
The study must be completed and a report provided to the
appropriate legislative committees by July 1, 2010.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $280,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $280,000
NEW SECTION. Sec. 3040 FOR THE DEPARTMENT OF ECOLOGY
Water Measuring Devices (2001H009)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $652,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,878,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,530,000
NEW SECTION. Sec. 3041 FOR THE DEPARTMENT OF ECOLOGY
Watershed Plan Implementation and Flow Achievement (20062003)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,600,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $11,694,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $14,294,000
NEW SECTION. Sec. 3042 FOR THE DEPARTMENT OF ECOLOGY
Water Pollution Control Revolving Fund Program (30000007)
The appropriations in this section are subject to the following
conditions and limitations: $65,000,000 is provided from the American
recovery and reinvestment act of 2009. For 2011 funding cycle, the
department must accept applications until December 1, 2009. When
reviewing project applications for financial assistance, the department
shall prioritize projects related to actions required under federal and
state permits and compliance orders, including projects with a history
of noncompliance.
Appropriation:
Water Pollution Control Revolving
Account--State . . . . . . . . . . . . $65,000,000
Water Pollution Control Revolving
Account--Federal . . . . . . . . . . . . $45,000,000
Water Pollution Control--Federal ARRA . . . . . . . . . . . . $68,700,000
Subtotal Appropriation . . . . . . . . . . . . $178,700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $285,000,000
TOTAL . . . . . . . . . . . . $463,700,000
NEW SECTION. Sec. 3043 FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Program (30000008)
The appropriation in this section is subject to the following
conditions and limitations: For the 2011 funding cycle, the department
must accept applications for the program until December 1, 2009. The
program must include competitive application processes for projects
relating to storm water systems, sewer systems, and septic systems
prioritized on a worst-case, first-need basis.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $30,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $240,000,000
TOTAL . . . . . . . . . . . . $270,000,000
NEW SECTION. Sec. 3044 FOR THE DEPARTMENT OF ECOLOGY
Reducing Health Threats from Woodstove Pollution (30000010)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
TOTAL . . . . . . . . . . . . $9,000,000
NEW SECTION. Sec. 3045 FOR THE DEPARTMENT OF ECOLOGY
Padilla Bay Reserve Boat Garage (30000011)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $265,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $265,000
NEW SECTION. Sec. 3046 FOR THE DEPARTMENT OF ECOLOGY
Cleanup and Prevention of Waste Tire Piles (30000012)
Appropriation:
Waste Tire Removal Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 3047 FOR THE DEPARTMENT OF ECOLOGY
Coordinated Prevention Grants (30000013)
The appropriation in this section is subject to the following
conditions and limitations: $4,270,000 of the appropriation is
provided solely for grants to local governments for local waste and
pollution prevention projects. Grants must fund new organics
composting and conversion, green building, and moderate risk waste
initiatives described in the state "beyond waste" plan, including
alternatives to backyard burning of organic materials.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $10,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $125,680,000
TOTAL . . . . . . . . . . . . $135,680,000
NEW SECTION. Sec. 3048 FOR THE DEPARTMENT OF ECOLOGY
Swift Creek Natural Asbestos Cleanup (30000015)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $14,800,000
TOTAL . . . . . . . . . . . . $15,800,000
NEW SECTION. Sec. 3049 FOR THE DEPARTMENT OF ECOLOGY
Upper Columbia River Black Sand Beach Cleanup (30000016)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 3050 FOR THE DEPARTMENT OF ECOLOGY
Orphaned and Abandoned Site Cleanup Initiative (30000018)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Cleanup Settlement Account--State . . . . . . . . . . . . $277,000
Subtotal Appropriation . . . . . . . . . . . . $1,277,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $7,600,000
TOTAL . . . . . . . . . . . . $8,877,000
NEW SECTION. Sec. 3051 FOR THE DEPARTMENT OF ECOLOGY
Water Irrigation Efficiencies (30000027)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $14,000,000
TOTAL . . . . . . . . . . . . $15,000,000
NEW SECTION. Sec. 3052 FOR THE DEPARTMENT OF ECOLOGY
Safe Soils Remediation Program (30000019)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 3053 FOR THE DEPARTMENT OF ECOLOGY
Skykomish Cleanup and Restoration (30000020)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,300,000
Cleanup Settlement Account--State . . . . . . . . . . . . $2,050,000
Subtotal Appropriation . . . . . . . . . . . . $4,350,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,350,000
NEW SECTION. Sec. 3054 FOR THE DEPARTMENT OF ECOLOGY
Storm Water Retrofit and Low-Impact Development Grant
Program (30000097)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,000,000
State and Local Improvements Revolving Account - Waste
Disposal Facilities . . . . . . . . . . . . $1,284,000
State and Local Improvements Revolving Account - Waste
Disposal Facilities, 1980 . . . . . . . . . . . . $325,000
Subtotal Appropriation . . . . . . . . . . . . $4,609,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,609,000
NEW SECTION. Sec. 3055 FOR THE DEPARTMENT OF ECOLOGY
Protect Communities from Flood and Drought (92000002)
The appropriation in this section is subject to the following
conditions and limitations:
(1) $2,500,000 of the appropriation is provided solely for the
Columbia basin ground water management area ground water hydrologic
modeling project. The project shall submit a report to the appropriate
committees of the legislature that does the following:
(a) Describes the physical properties of the aquifer system and the
variation of those properties throughout the area of concern,
(b) Quantifies the rate and location of aquifer recharge and
discharge within the subarea,
(c) Quantifies the water balance for the by land use type,
(d) Demonstrates with empirical data a viable solution to the
observed problems in the area of concern,
(e) Estimates the quantity of water needed for the solution, and
(f) Evaluates the physical and legal availability of such water
from the Columbia River. The final report must be submitted by June
30, 2011.
(2) $10,000,000 of the appropriation is provided solely for a grant
to repair the Horseshoe Bend levy that protects communities in the Kent
valley.
(3) $150,000 of the appropriation is provided solely for a grant
for the King County fire protection district no. 16 to prevent flood
damage to the fire station.
(4) $2,350,000 of the appropriation is provided solely for a
competitive grant program for projects that protect communities from
flood damage and prepare communities for drought and water shortages.
The department shall prioritize applications from communities most at
risk to flood damage and drought and who are least able to fund
mitigation projects from local resources. The department shall also
seek to balance the needs of different regions of the state, and choose
projects most ready to proceed.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $15,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $15,000,000
NEW SECTION. Sec. 3056 FOR THE DEPARTMENT OF ECOLOGY
Habitat Mitigation (91000007)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,400,000
NEW SECTION. Sec. 3057 FOR THE DEPARTMENT OF ECOLOGY
Protect Coastal Beaches in Southwest Washington (30000024)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,700,000
NEW SECTION. Sec. 3058 FOR THE DEPARTMENT OF ECOLOGY
Watershed Plan Implementation and Flow Achievement (30000028)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
grants for projects that improve water supplies and help achieve
instream flows by implementing watershed plans, as follows:
(1) Surface or groundwater storage feasibility projects, where such
projects are consistent with the recommendations of the water storage
task force report to the Legislature, February 2001 (department of
ecology publication # 01-11-2002). The department shall consult the
departments of agriculture and fish and wildlife before issuing water
storage grants.
(2) Infrastructure or water management projects that resolve
conflicts among water needs for municipal, agricultural, rural, and
fish restoration purposes. The stream flow improvements and other
public benefits secured from these projects must be commensurate with
the investment of state funds.
(3) Water supply projects for public agriculture water supply
facilities that improve water conservation and water use efficiency.
(4) Purchase and installation of water measuring devices in salmon
critical basins and areas participating in the department of fish and
wildlife fish screening and cooperative compliance program, and basins
where watershed plans call for additional water use or stream flow
measurement.
(5) Acquisition of water to achieve instream flows or to establish
water banks, water exchanges or similar tools. The department of
ecology must give priority to water acquisitions in salmon critical
basins and in basins with approved watershed plans. The department of
ecology must place acquired water into the state's trust water rights
program (chapters 90.38 and 90.42 RCW).
(6) Up to $600,000 of the appropriation is provided solely for
grants to lead local government entities for planning unit
administrative support to watershed planning units. Such grants shall
only be provided to those entities that have completed, approved plans
that are actively being implemented and provide one hundred percent in-kind or monetary match. Grant amounts will range from $30,000 to
$60,000, based on criteria to be developed by the department. Criteria
should consider factors including complexity of water issues,
geographical size, population growth pressure, rate of plan
implementation, and others issues to be determined by the department.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $6,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
TOTAL . . . . . . . . . . . . $46,000,000
NEW SECTION. Sec. 3059 FOR THE DEPARTMENT OF ECOLOGY
Kittitas Groundwater Study (30000029)
Appropriation:
State and Local Improvements Revolving Account
(Water Supply Facilities)--State . . . . . . . . . . . . $700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $700,000
NEW SECTION. Sec. 3060 FOR THE DEPARTMENT OF ECOLOGY
Remedial Action Grant Program (30000039)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $37,700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $180,000,000
TOTAL . . . . . . . . . . . . $217,700,000
NEW SECTION. Sec. 3061 FOR THE DEPARTMENT OF ECOLOGY
Leaking Underground Tanks (91000002)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided from the
American recovery and reinvestment act of 2009 for leaking underground
tanks.
Appropriation:
General Fund--Federal . . . . . . . . . . . . $3,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,500,000
NEW SECTION. Sec. 3062 FOR THE DEPARTMENT OF ECOLOGY
Diesel Emissions Reduction (91000003)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided from the
American recovery and reinvestment act of 2009 for diesel emissions
reduction.
Appropriation:
General Fund--Federal . . . . . . . . . . . . $1,730,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,730,000
NEW SECTION. Sec. 3063 FOR THE STATE PARKS AND RECREATION
COMMISSION
Rocky Reach - Chelan County Public Utility District (20061023)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation in this section is
provided solely to construct and surface the northern mile of Rocky
Reach trail, and partially fund installation of signs, interpretive
panels, and bridges related to the 5.1 mile project.
Reappropriation:
Parks Renewal and Stewardship Account--Private/Local . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 3064 FOR THE STATE PARKS AND RECREATION
COMMISSION
Cama Beach Donation (20062853)
Reappropriation:
General Fund--Private/Local . . . . . . . . . . . . $1,630,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $286,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,916,000
NEW SECTION. Sec. 3065 FOR THE STATE PARKS AND RECREATION
COMMISSION
Hood Canal Wastewater (20061850)
Reappropriation:
Hood Canal Aquatic Rehabilitation Bond Account--
State . . . . . . . . . . . . $3,930,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,990,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,920,000
NEW SECTION. Sec. 3066 FOR THE STATE PARKS AND RECREATION
COMMISSION
Puget Sound Wastewater (20061851)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,075,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $7,375,000
NEW SECTION. Sec. 3067 FOR THE STATE PARKS AND RECREATION
COMMISSION
Minor Works - Facility Preservation (20081001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,810,000
State Toxics Control Account--State . . . . . . . . . . . . $100,000
Subtotal Reappropriation . . . . . . . . . . . . $2,910,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,090,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $9,000,000
NEW SECTION. Sec. 3068 FOR THE STATE PARKS AND RECREATION
COMMISSION
Historic Preservation (20081002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,127,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,064,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,191,000
NEW SECTION. Sec. 3069 FOR THE STATE PARKS AND RECREATION
COMMISSION
Cape Disappointment Major Park Upgrade (20081012)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $10,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $490,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 3070 FOR THE STATE PARKS AND RECREATION
COMMISSION
Lake Sammamish Major Park Upgrade (20081014)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $425,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $758,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,183,000
NEW SECTION. Sec. 3071 FOR THE STATE PARKS AND RECREATION
COMMISSION
Storm Water Improvements (20081027)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $235,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $336,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $571,000
NEW SECTION. Sec. 3072 FOR THE STATE PARKS AND RECREATION
COMMISSION
Road Preservation (20081036)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,227,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,473,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,700,000
NEW SECTION. Sec. 3073 FOR THE STATE PARKS AND RECREATION
COMMISSION
Ft. Flagler - Parkwide Sewage Treatment System (20081044)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $800,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,973,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,773,000
NEW SECTION. Sec. 3074 FOR THE STATE PARKS AND RECREATION
COMMISSION
Visible Park Improvements (20081951)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,730,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $7,270,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $10,000,000
NEW SECTION. Sec. 3075 FOR THE STATE PARKS AND RECREATION
COMMISSION
Nisqually Mashel State Park (20081953)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $84,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $416,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,618,000
TOTAL . . . . . . . . . . . . $2,118,000
NEW SECTION. Sec. 3076 FOR THE STATE PARKS AND RECREATION
COMMISSION
Pearrygin Lake Major Park Upgrade (20082016)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $460,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $907,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,367,000
NEW SECTION. Sec. 3077 FOR THE STATE PARKS AND RECREATION
COMMISSION
Bay View Park Wide Wastewater Treatment System (20082041)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,760,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $427,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,187,000
NEW SECTION. Sec. 3078 FOR THE STATE PARKS AND RECREATION
COMMISSION
Bigelow House (20082850)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is provided solely for
a grant for capital improvements to the Bigelow house.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $100,000
NEW SECTION. Sec. 3079 FOR THE STATE PARKS AND RECREATION
COMMISSION
Ike Kinswa State Park Improvement (20082950)
Reappropriation:
Parks Renewal and Stewardship Account--Private/Local . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 3080 FOR THE STATE PARKS AND RECREATION
COMMISSION
Clean Vessel Boating Pumpout Grants (20084035)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $300,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 3081 FOR THE STATE PARKS AND RECREATION
COMMISSION
Trail Development (20081008)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $950,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,050,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 3082 FOR THE STATE PARKS AND RECREATION
COMMISSION
Minor Works Preservation (30000001)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $6,930,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $40,641,000
TOTAL . . . . . . . . . . . . $47,571,000
NEW SECTION. Sec. 3083 FOR THE STATE PARKS AND RECREATION
COMMISSION
Trail Development (30000003)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $800,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $800,000
NEW SECTION. Sec. 3084 FOR THE STATE PARKS AND RECREATION
COMMISSION
Facility and Infrastructure Backlog Reduction (30000005)
The appropriation in this section is subject to the following
conditions and limitations: Based on the plan developed during the
2007-09 biennium that addressed the key findings in the 2006 study of
the commission's capital development, execution, and monitoring
process, the commission shall, prior to allotment of funds, provide the
office of financial management a comprehensive list of deferred
maintenance projects that when completed will reduce the commission's
backlog of preservation projects.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $14,000,000
TOTAL . . . . . . . . . . . . $15,500,000
NEW SECTION. Sec. 3085 FOR THE STATE PARKS AND RECREATION
COMMISSION
Federal Grant Authority (30000006)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $990,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
TOTAL . . . . . . . . . . . . $4,990,000
NEW SECTION. Sec. 3086 FOR THE STATE PARKS AND RECREATION
COMMISSION
Local Grant Authority (30000007)
Appropriation:
Parks Renewal and Stewardship Account--Private/Local . . . . . . . . . . . . $990,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
TOTAL . . . . . . . . . . . . $4,990,000
NEW SECTION. Sec. 3087 FOR THE STATE PARKS AND RECREATION
COMMISSION
Parkland Acquisition (91000005)
Appropriation:
Parkland Acquisition Account--State . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 3088 FOR THE STATE PARKS AND RECREATION
COMMISSION
Emergency Repairs (30000010)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $600,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,400,000
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 3089 FOR THE STATE PARKS AND RECREATION
COMMISSION
Clean Vessel Boating Pumpout Grants (30000021)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $3,465,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $7,200,000
TOTAL . . . . . . . . . . . . $10,665,000
NEW SECTION. Sec. 3090 FOR THE STATE PARKS AND RECREATION
COMMISSION
Illahee State Park Wastewater Treatment Upgrade (30000447)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,850,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,850,000
NEW SECTION. Sec. 3091 FOR THE STATE PARKS AND RECREATION
COMMISSION
Cama Beach State Park (30000101)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,265,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,265,000
NEW SECTION. Sec. 3092 FOR THE STATE PARKS AND RECREATION
COMMISSION
Rocky Reach State Park Trail Development (30000169)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $168,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,000,000
TOTAL . . . . . . . . . . . . $1,168,000
NEW SECTION. Sec. 3093 FOR THE STATE PARKS AND RECREATION
COMMISSION
Flaming Geyser State Park Park-wide Infrastructure Redevelopment
(30000173)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,533,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,533,000
NEW SECTION. Sec. 3094 FOR THE STATE PARKS AND RECREATION
COMMISSION
Dash Point State Park Sanitary Sewer Collection System (30000269)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,820,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,820,000
NEW SECTION. Sec. 3095 FOR THE STATE PARKS AND RECREATION
COMMISSION
Kiket Island Acquisition (30000431)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $8,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $8,000,000
NEW SECTION. Sec. 3096 FOR THE STATE PARKS AND RECREATION
COMMISSION
Admirality Inlet Heritage Forest (30000432)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 3097 FOR THE STATE PARKS AND RECREATION
COMMISSION
Fort Worden State Park Housing Areas Exterior Improvements
(30000433)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $746,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,476,000
TOTAL . . . . . . . . . . . . $3,222,000
NEW SECTION. Sec. 3098 FOR THE STATE PARKS AND RECREATION
COMMISSION
Infrastructure Savings (30000480)
The appropriation in this section is subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1
NEW SECTION. Sec. 3099 FOR THE STATE PARKS AND RECREATION
COMMISSION
Puget Sound Initiative (30000050)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $26,698,000
TOTAL . . . . . . . . . . . . $28,698,000
NEW SECTION. Sec. 3100 FOR THE STATE PARKS AND RECREATION
COMMISSION
Twanoh State Park: Storm Water Improvements (30000054)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,374,000
TOTAL . . . . . . . . . . . . $2,624,000
NEW SECTION. Sec. 3101 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Boating Facilities Projects (19982001)
Reappropriation:
Recreation Resources Account--State . . . . . . . . . . . . $359,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $25,019,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $25,378,000
NEW SECTION. Sec. 3102 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Washington Wildlife and Recreation Program (19982003)
The reappropriations in this section are subject to the following
conditions and limitations: The reappropriations are subject to the
provisions in section 158, chapter 371, Laws of 2006.
Reappropriation:
Outdoor Recreation Account--State . . . . . . . . . . . . $596,000
Habitat Conservation Account--State . . . . . . . . . . . . $687,000
Subtotal Reappropriation . . . . . . . . . . . . $1,283,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $176,988,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $178,271,000
NEW SECTION. Sec. 3103 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Firearms and Archery Range Program (19982004)
Reappropriation:
Firearms Range Account--State . . . . . . . . . . . . $13,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $872,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $885,000
NEW SECTION. Sec. 3104 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Firearms and Archery Range Program (20020001)
Reappropriation:
Firearms Range Account--State . . . . . . . . . . . . $21,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $379,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $400,000
NEW SECTION. Sec. 3105 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Boating Facilities Program (20024001)
Reappropriation:
Recreation Resources Account--State . . . . . . . . . . . . $158,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,776,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,934,000
NEW SECTION. Sec. 3106 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Washington Wildlife and Recreation Program (20024003)
The reappropriations in this section are subject to the following
conditions and limitations: Any amount of the reappropriations that is
not obligated to a specific project may be used to fund projects in the
following order: (1) The department of natural resources Cypress
Island project; and (2) alternate projects approved by the legislature
from the same account in biennia succeeding that in which the funds
were originally appropriated.
Reappropriation:
Outdoor Recreation Account--State . . . . . . . . . . . . $158,000
Habitat Conservation Account--State . . . . . . . . . . . . $479,000
Subtotal Reappropriation . . . . . . . . . . . . $637,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $44,363,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $45,000,000
NEW SECTION. Sec. 3107 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Salmon Recovery Funding Board Programs (20024007)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $253,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $69,313,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $69,566,000
NEW SECTION. Sec. 3108 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Salmon Recovery Fund Board Programs (20044001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,500,000
General Fund--Federal . . . . . . . . . . . . $9,540,000
Subtotal Reappropriation . . . . . . . . . . . . $12,040,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $34,335,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $46,375,000
NEW SECTION. Sec. 3109 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Washington Wildlife and Recreation Program (20044002)
The reappropriations in this section are subject to the following
conditions and limitations: Any amount of the reappropriations that is
not obligated to a specific project may be used to fund alternate
projects approved by the legislature from the same account in biennia
succeeding that in which the moneys were originally appropriated.
Reappropriation:
Outdoor Recreation Account--State . . . . . . . . . . . . $1,499,000
Habitat Conservation Account--State . . . . . . . . . . . . $4,789,000
Subtotal Reappropriation . . . . . . . . . . . . $6,288,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $38,712,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $45,000,000
NEW SECTION. Sec. 3110 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Boating Facilities Program (20044003)
Reappropriation:
Recreation Resources Account--State . . . . . . . . . . . . $165,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $7,342,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $7,507,000
NEW SECTION. Sec. 3111 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Nonhighway and Off-Road Vehicle Activities Program (20044004)
Reappropriation:
NOVA Program Account--State . . . . . . . . . . . . $1,032,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,895,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,927,000
NEW SECTION. Sec. 3112 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Firearms and Archery Range Program (20044006)
Reappropriation:
Firearms Range Account--State . . . . . . . . . . . . $28,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $222,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 3113 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Land and Water Conservation Fund (20044007)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $267,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,468,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,735,000
NEW SECTION. Sec. 3114 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Boating Infrastructure Grant (20044009)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $262,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,666,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,928,000
NEW SECTION. Sec. 3115 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Youth Athletic Fields (20062952)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is provided solely for
competitive grants for acquisition, development, and renovation of
youth athletic fields. The committee shall follow the applicable rules
of the youth athletic facilities program, except that grants for
maintenance are not eligible and the amount of a grant need not be in
proportion to the population of the city or county where the community
outdoor athletic facility is located, and if there are not enough
project applications submitted in a category within the account to meet
the requirement of equal distribution of funds to each category, the
recreation and conservation funding board may distribute any remaining
funds to other categories within the youth athletic facility account.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,971,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $529,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,500,000
NEW SECTION. Sec. 3116 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Salmon Recovery Fund Board Programs (20064001)
The reappropriations in this section are subject to the following
conditions and limitations: The reappropriations are provided solely
for grants for salmon recovery efforts. These grants may include a
grant to any regional recovery board and/or may include grants for
additional restoration projects, monitoring activities, or other salmon
recovery actions.
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $21,012,000
State Building Construction Account--State . . . . . . . . . . . . $6,522,000
Subtotal Reappropriation . . . . . . . . . . . . $27,534,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $34,466,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $62,000,000
NEW SECTION. Sec. 3117 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Washington Wildlife and Recreation Program (20064002)
The reappropriations in this section are subject to the following
conditions and limitations:
(1) The reappropriations are provided solely for the approved list
of projects in LEAP capital document No. 2005-14 as developed on April
9, 2005.
(2) Funds reappropriated for distribution according to RCW
79A.15.050 must fulfill the uses and restrictions of each category
whether the funds are distributed according to the statutory allotment,
the unallocated distribution, or a reassignment of reappropriations.
If the cumulative total for acquisition projects is less than the
statutory requirement, the difference may be allocated to the remaining
development projects.
(3) Funds reappropriated for distribution according to the
provisions of RCW 79A.15.040(1)(c) must be allocated forty percent to
local government projects and sixty percent to state agency projects.
If the cumulative total of local government projects is less than forty
percent of the total distribution to this category, the difference may
be allocated to state agency projects.
Reappropriation:
Habitat Conservation Account--State . . . . . . . . . . . . $6,725,000
Outdoor Recreation Account--State . . . . . . . . . . . . $6,859,000
Subtotal Reappropriation . . . . . . . . . . . . $13,584,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $36,416,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $50,000,000
NEW SECTION. Sec. 3118 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Boating Facilities Program (20064003)
Reappropriation:
Recreation Resources Account--State . . . . . . . . . . . . $451,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,820,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $7,271,000
NEW SECTION. Sec. 3119 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Nonhighway and Off-Road Vehicle Program (20064004)
The reappropriation in this section is subject to the following
conditions and limitations: Up to $100,000 of the reappropriation is
for the following studies:
(1) The board must prepare cost estimates for creating a database
of motorized and nonmotorized off-road trails and facilities in
Washington state. The cost estimate shall consider the possibility of
a database that allows the downloading of maps formatted for the most
widely used global positioning system devices, including the
feasibility and cost to make global positioning system maps readily
available for all users of Washington recreational lands and
facilities. For this purpose, available global positioning system maps
shall include global positioning system maps developed by state
agencies, by federal agencies, and proprietary maps offered by private
companies.
(2) The board must recommend a program for enhanced education and
enforcement regarding excessive noise from off-road vehicles. The
study must include a review of relevant existing laws and regulations.
The recommendations must address the appropriate equipment needed for
enforcement, model ordinances, enhanced educational strategies, and a
proposed grant program to assist local governments to more effectively
reduce the impact of excessive off-road vehicle noise in rural
residential neighborhoods and nonresidential areas, including
consideration of grant programs for planning departments, code
enforcement departments, health departments, or other entities of local
government.
Reappropriation:
NOVA Program Account--State . . . . . . . . . . . . $2,364,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,215,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $7,579,000
NEW SECTION. Sec. 3120 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Firearm and Archery Range Program (20064006)
Reappropriation:
Firearms Range Account--State . . . . . . . . . . . . $18,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $204,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $222,000
NEW SECTION. Sec. 3121 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Land and Water Conservation Fund (20064007)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $1,880,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,474,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,354,000
NEW SECTION. Sec. 3122 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
National Recreation Trails Program (20064008)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $501,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,297,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,798,000
NEW SECTION. Sec. 3123 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Family Forest and Fish Passage Program (20082001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,859,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,141,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,000,000
NEW SECTION. Sec. 3124 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Boating Facilities Program (20084001)
Reappropriation:
Recreation Resources Account--State . . . . . . . . . . . . $6,850,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,171,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $8,021,000
NEW SECTION. Sec. 3125 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Boating Improvement Grants (20084002)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $158,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $42,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $200,000
NEW SECTION. Sec. 3126 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Firearms and Archery Range Recreation (20084003)
Reappropriation:
Firearms Range Account--State . . . . . . . . . . . . $358,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $114,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $472,000
NEW SECTION. Sec. 3127 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Puget Sound Restoration and Acquisition (20084004)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $29,083,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $11,667,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $40,750,000
NEW SECTION. Sec. 3128 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Aquatic Lands Enhancement Account (20084005)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The reappropriation in this section is provided solely for the
list of projects in LEAP capital document No. 2007-1, developed March
17, 2007.
(2) The board shall submit a list of recommended projects to be
funded from the aquatic lands enhancement account in the 2009-2011
capital budget to the office of financial management and the
appropriate legislative committees. The list must result from a
competitive grants program developed by the board based upon, at a
minimum: (a) Uniform criteria for selecting projects and awarding
grants for up to fifty percent of the total projects cost; (b) local
community support for the projects; and (c) environmental benefits to
be derived from projects.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,326,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,699,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,025,000
NEW SECTION. Sec. 3129 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Hatchery Reform Program (20084006)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,600,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,000,000
NEW SECTION. Sec. 3130 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Land and Water Conservation Fund (20084007)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $765,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $235,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 3131 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Nonhighway Off-Road Vehicle Activities Program (20084008)
The reappropriation in this section is subject to the following
conditions and limitations: Up to $450,000 of the reappropriation is
provided solely for grants to local law enforcement and noise
enforcement agencies for the enforcement of existing state noise laws
and regulations. Grants may be used to acquire noise monitoring
equipment and to compensate law enforcement agencies for staff overtime
and administrative expenses. Funds for noise enforcement grants shall
come from amounts allocated for the purposes specified in RCW
46.09.170(2)(d).
Reappropriation:
NOVA Program Account--State . . . . . . . . . . . . $7,184,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,852,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $9,036,000
NEW SECTION. Sec. 3132 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
National Recreational Trails Program (20084009)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $2,395,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,105,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,500,000
NEW SECTION. Sec. 3133 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Washington Wildlife Recreation Grants (20084011)
The reappropriations in this section are subject to the following
conditions and limitations:
(1) The reappropriations are provided solely for the approved list
of projects in LEAP capital document No. 2007-3 as developed on March
17, 2007, and LEAP capital document No. 2008-1 as developed on February
13, 2008.
(2) If additional funds are available after funding the farmlands
preservation account projects approved in subsection (1) of this
section, the committee may: Provide one-time grants of up to $25,000
each to counties requesting assistance in developing farmlands
preservation strategies for the purpose of seeking grants from the
farmlands preservation account in future grant cycles.
(3) Funds reappropriated for distribution according to the
provisions of RCW 79A.15.040(1)(c) must be allocated forty percent to
local government projects and sixty percent to state agency projects.
If the cumulative total of local government projects is less than forty
percent of the total distribution to this category, the difference may
be allocated to state agency projects.
(4) Up to $627,299 of the reappropriation from the riparian
protection account is provided solely for the Chehalis river surge
plain natural area preserve. This amount may not be expended for the
project until the department of natural resources has completed a
management plan for the preserve that maintains recreational access and
that management plan is presented to the house of representatives
capital budget and senate ways and means committees.
Reappropriation:
Farmlands Preservation Account--State . . . . . . . . . . . . $5,300,000
Riparian Protection Account--State . . . . . . . . . . . . $12,500,000
Habitat Conservation Account--State . . . . . . . . . . . . $23,956,000
Outdoor Recreation Account--State . . . . . . . . . . . . $22,994,000
Subtotal Reappropriation . . . . . . . . . . . . $64,750,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $35,250,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $100,000,000
NEW SECTION. Sec. 3134 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Salmon Recovery Fund Board Programs (20084851)
The reappropriations in this section are subject to the following
conditions and limitations:
(1) The reappropriations in this section are provided solely for
grants for salmon recovery efforts. These grants may include grants to
any regional recovery board and/or may include grants for additional
restoration projects, monitoring activities, or other salmon recovery
actions.
(2) The administrative funding currently provided by the salmon
recovery funding board for the regional salmon recovery organization in
Puget Sound shall be redirected to the Puget Sound partnership created
in chapter 341, Laws of 2007.
(3) Prior to awarding project grants for projects in Puget Sound,
the salmon recovery funding board must submit the list of proposed
projects to the Puget Sound partnership for their review. The Puget
Sound partnership must provide their comments back to the salmon
recovery funding board within forty-five days of receiving the proposed
list of projects.
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $25,616,000
State Building Construction Account--State . . . . . . . . . . . . $11,681,000
Subtotal Reappropriation . . . . . . . . . . . . $37,297,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $22,703,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $60,000,000
NEW SECTION. Sec. 3135 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Washington Wildlife Recreation Grants (30000002)
The appropriations in this section are subject to the following
conditions and limitations:
The appropriations are provided solely for the list of projects in
LEAP capital document No. 2009-1a, developed April 23, 2009.
Appropriation:
Riparian Protection Account--State . . . . . . . . . . . . $10,000,000
Habitat Conservation Account--State . . . . . . . . . . . . $27,000,000
Outdoor Recreation Account--State . . . . . . . . . . . . $27,000,000
Farmlands Preservation Account--State . . . . . . . . . . . . $6,000,000
Subtotal Appropriation . . . . . . . . . . . . $70,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $200,000,000
TOTAL . . . . . . . . . . . . $270,000,000
NEW SECTION. Sec. 3136 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Salmon Recovery Fund Board Programs (30000003)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $60,000,000
State Building Construction Account--State . . . . . . . . . . . . $10,000,000
Subtotal Appropriation . . . . . . . . . . . . $70,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $240,000,000
TOTAL . . . . . . . . . . . . $310,000,000
NEW SECTION. Sec. 3137 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Land and Water Conservation Fund (30000005)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $4,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
TOTAL . . . . . . . . . . . . $20,000,000
NEW SECTION. Sec. 3138 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Aquatic Lands Enhancement Account (30000007)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
the list of projects in LEAP capital document No. 2009-3, developed
March 9, 2009.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,025,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $20,100,000
TOTAL . . . . . . . . . . . . $25,125,000
NEW SECTION. Sec. 3139 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Firearms and Archery Range Recreation (30000009)
Appropriation:
Firearms Range Account--State . . . . . . . . . . . . $495,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,412,000
TOTAL . . . . . . . . . . . . $1,907,000
NEW SECTION. Sec. 3140 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Boating Improvement Grants (30000010)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
TOTAL . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 3141 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
National Recreational Trails Program (30000012)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $4,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
TOTAL . . . . . . . . . . . . $20,000,000
NEW SECTION. Sec. 3142 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Puget Sound Acquisition and Restoration (30000080)
The appropriation in this section is subject to the following
conditions and limitations:
(1) The appropriation is provided solely to protect and restore
habitat in Puget Sound with a focus on acquiring and protecting
critical habitat and restoring habitat function.
(2) Only projects on approved watershed three-year work plans or
specified in the Puget Sound action agenda are eligible for funding.
Projects approved must advance the priorities of the Puget Sound salmon
recovery plan, the Hood Canal summer chum plan, or the action agenda.
(3) The salmon recovery funding board shall award grants pursuant
to a prioritized list submitted by the leadership council of the Puget
Sound partnership. The list shall be based upon recommendations made
by the Puget Sound salmon recovery council and the Hood Canal
coordinating council. The technical review panel of the salmon
recovery funding board shall conduct final design review and advise the
board on project selection.
(4) The recreation and conservation office shall administer these
grants and shall retain three percent for administrative purposes. The
partnership and the recreation and conservation office may negotiate an
additional amount not to exceed six percent to cover costs incurred by
lead entities and the partnership to recruit, review, and prioritize
these projects.
(5) An equitable share of the cost of the technical review panel of
the salmon recovery funding board shall be paid from this appropriation
to conduct final design review and advise the salmon recovery funding
board and the partnership of its views on proposed projects.
(6) By September 15, 2010, the Puget Sound partnership leadership
council shall submit a list of proposed projects to the office of
financial management for the 2011-2013 biennium.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $33,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $132,000,000
TOTAL . . . . . . . . . . . . $165,000,000
NEW SECTION. Sec. 3143 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Puget Sound Estuary and Salmon Restoration Program (30000081)
The appropriation in this section is subject to the following
conditions and limitations:
(1) The appropriation is provided solely to restore nearshore
habitat and estuaries in Puget Sound. The focus shall be on protecting
and restoring natural nearshore processes, including protection and
restoration of beach sediments and removal of existing bulkheads.
(2) The recreation and conservation office shall award grants
pursuant to a prioritized list submitted by the leadership council of
the Puget Sound partnership. Project evaluation criteria shall be
developed in cooperation with the Puget Sound nearshore steering
committee and the Puget Sound partnership. The criteria shall be
consistent and aligned with the actions and priorities of the action
agenda and the technical guidance developed by the Puget Sound
nearshore science team.
(3) Eligible projects must be within Puget Sound and identified in
a current salmon recovery, watershed, nearshore habitat restoration and
protection plan or the Puget Sound partnership 2020 action agenda.
(4) The recreation and conservation office shall retain three
percent for administrative purposes.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $7,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $28,000,000
TOTAL . . . . . . . . . . . . $35,000,000
NEW SECTION. Sec. 3144 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Family Forest Fish Passage Program (91000001)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $18,000,000
TOTAL . . . . . . . . . . . . $23,000,000
NEW SECTION. Sec. 3145 FOR THE RECREATION AND CONSERVATION
FUNDING BOARD
Habitat Restoration Grants (91000002)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 3146 FOR THE STATE CONSERVATION COMMISSION
Livestock Nutrient Program (20084001)
Reappropriation:
Water Quality Capital Account--State . . . . . . . . . . . . $700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,300,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 3147 FOR THE STATE CONSERVATION COMMISSION
Conservation Reserve Enhancement Program Water Quality (20084002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $707,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $709,000
NEW SECTION. Sec. 3148 FOR THE STATE CONSERVATION COMMISSION
Conservation Reserve Enhancement Program Cost Share (20084005)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $70,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,170,000
NEW SECTION. Sec. 3149 FOR THE STATE CONSERVATION COMMISSION
Flood Assistance for Farm Communities (20084850)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is provided solely to
restore agricultural infrastructure and equipment necessary to repair,
replace, or maintain infrastructure that provides public health and
safety, water quality, and fish and wildlife habitat protection,
including debris removal, fencing, replacing manure lagoons, and
properly functioning equipment and facilities.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 3150 FOR THE STATE CONSERVATION COMMISSION
Skokomish Anaerobic Digester (20064009)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $474,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $86,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $560,000
NEW SECTION. Sec. 3151 FOR THE STATE CONSERVATION COMMISSION
Livestock Nutrient Program (30000001)
Appropriation:
State Taxable Building Construction Account--State . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
TOTAL . . . . . . . . . . . . $18,000,000
NEW SECTION. Sec. 3152 FOR THE STATE CONSERVATION COMMISSION
Conservation Reserve Enhancement Program (30000003)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $7,200,000
TOTAL . . . . . . . . . . . . $8,200,000
NEW SECTION. Sec. 3153 FOR THE STATE CONSERVATION COMMISSION
Practice Incentive Payment Loan Program (30000005)
Appropriation:
Conservation Assistance Revolving Account--State . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
TOTAL . . . . . . . . . . . . $2,400,000
NEW SECTION. Sec. 3154 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Facility, Infrastructure, Lands, and Access Condition Improvements
(20061002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $240,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,255,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,495,000
NEW SECTION. Sec. 3155 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Puget Sound Initiative - Nearshore Salmon Restoration (20062001)
The reappropriations in this section are subject to the following
conditions and limitations:
(1) The reappropriations are provided solely for efforts to restore
nearshore habitat and estuaries in Puget Sound. The department of fish
and wildlife must focus on restoring natural nearshore processes,
including protection and restoration of beach sediments and removal of
existing bulkheads.
(2) The department of fish and wildlife shall provide the Puget
Sound partnership, as created by chapter 341, Laws of 2007 the
opportunity to review and provide comment on proposed projects and
activities recommended for funding. This review must be consistent
with the funding schedule for the program.
(3) Funded projects require a nonstate match or in-kind
contributions. The department of fish and wildlife must seek to
maximize the amount of nonstate match from local, state, tribal, and
federal partners. Individual projects require a minimum 33 percent
cash or in-kind match.
(4) Eligible projects must be within Puget Sound and identified by
a salmon recovery lead entity or marine resource committee and
identified in a current salmon recovery, watershed, or nearshore
habitat restoration and protection plan.
(5) Project evaluation criteria must be developed by the Puget
Sound nearshore steering committee. The criteria must be consistent
with the technical guidance developed by the Puget Sound nearshore
science team and shall be coordinated with the salmon recovery funding
board to ensure that project funding and matching requirements are
maximized to the greatest extent possible.
(6) The department of fish and wildlife must not utilize any amount
of these reappropriations to support administration or overhead.
Funding to support the administration of the funds and the
implementation of selected projects must be obtained from the
department of fish and wildlife's operating budget.
(7) In recognition of the urgent need to complete the Puget Sound
nearshore ecosystem restoration project general investigation, up to
$1,446,000 of these reappropriations may be used to match federal funds
implementing the cost-share agreement between the department and the
United States army corps of engineers.
(8) Up to $2,061,735 of the reappropriations are provided solely
for the following projects:
Project Amount
Duwamish Garden estuary restoration $300,000
Seahurst Park bulkhead phase II $1,100,000
Lower Dosewallips floodplain $609,875
Titlow Beach pocket estuary restoration $51,860
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $6,636,000
General Fund--Federal . . . . . . . . . . . . $600,000
Subtotal Reappropriation . . . . . . . . . . . . $7,236,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $7,190,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $14,426,000
NEW SECTION. Sec. 3156 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Health Safety and Code Requirements (20081001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,850,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,100,000
NEW SECTION. Sec. 3157 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Voights Creek Hatchery (20081003)
The appropriation in this section is subject to the following
conditions and limitations:
(1) $200,000 of the amount appropriated is provided solely for the
repair necessary to restore the facility for limited operations;
(2) $550,000 of the amount appropriated is provided solely for
property acquisition. If the department does not acquire property, the
amount provided in this subsection shall lapse; and
(3) $50,000 of the amount appropriated is provided solely for the
department to participate in a work group with the Puyallup Tribe of
Indians that will make recommendations no later than December 1, 2009,
regarding the options for improving production from hatcheries along
the Puyallup river system while reducing cost. Options to be
considered include shifting production among the hatcheries,
consolidation of hatcheries, and shifting responsibilities for
construction, maintenance and operations of hatcheries.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $150,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $800,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $355,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,800,000
TOTAL . . . . . . . . . . . . $3,105,000
NEW SECTION. Sec. 3158 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Statewide Fencing Renovation and Replacement (20081009)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $140,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,291,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,431,000
NEW SECTION. Sec. 3159 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Facility Preservation (20081013)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $829,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,696,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,525,000
NEW SECTION. Sec. 3160 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Infrastructure Preservation (20081014)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,018,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,982,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,000,000
NEW SECTION. Sec. 3161 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Wiley Slough Restoration (20081028)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $265,000
General Fund--Federal . . . . . . . . . . . . $500,000
Subtotal Reappropriation . . . . . . . . . . . . $765,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,030,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $318,000
TOTAL . . . . . . . . . . . . $3,113,000
NEW SECTION. Sec. 3162 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Bee Be Property (20081029)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $252,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $3,250,000
TOTAL . . . . . . . . . . . . $3,752,000
NEW SECTION. Sec. 3163 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Issaquah Hatchery Gravity Intake (20081850)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $560,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $562,000
NEW SECTION. Sec. 3164 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Grazing Monitoring on Fish and Wildlife Lands (20082001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $60,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $140,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $200,000
NEW SECTION. Sec. 3165 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Spokane Region One Office (20082008)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $180,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,027,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,561,000
TOTAL . . . . . . . . . . . . $10,768,000
NEW SECTION. Sec. 3166 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Skookumchuck Hatchery Renovation (20082015)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $200,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,728,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $328,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,256,000
NEW SECTION. Sec. 3167 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Stemilt Basin Acquisition (20082029)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $200,000
NEW SECTION. Sec. 3168 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Mitigation Projects and Dedicated Funding (20082048)
The reappropriation in this section is subject to the following
conditions and limitations: Up to $2,300,000 of the reappropriation is
provided solely for capital projects and engineering to pay the total
cost of labor and materials provided by the department of fish and
wildlife.
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $9,000,000
Appropriation:
General Fund--Private/Local . . . . . . . . . . . . $2,500,000
Game Special Wildlife Account--Federal . . . . . . . . . . . . $600,000
Game Special Wildlife Account--Private/Local . . . . . . . . . . . . $900,000
General Fund--Federal . . . . . . . . . . . . $25,000,000
Subtotal Appropriation . . . . . . . . . . . . $29,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $19,125,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $114,800,000
TOTAL . . . . . . . . . . . . $171,925,000
NEW SECTION. Sec. 3169 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Facility Preservation (30000149)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $677,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
TOTAL . . . . . . . . . . . . $10,677,000
NEW SECTION. Sec. 3170 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Methow Culverts Replacement (20081027)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $350,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $404,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $482,000
TOTAL . . . . . . . . . . . . $1,236,000
NEW SECTION. Sec. 3171 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Migratory Waterfowl Habitat (20082045)
Appropriation:
Wildlife Account--State . . . . . . . . . . . . $550,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $700,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
TOTAL . . . . . . . . . . . . $4,250,000
NEW SECTION. Sec. 3172 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Road Maintenance and Abandonment Plan (30000022)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,050,000
TOTAL . . . . . . . . . . . . $5,050,000
NEW SECTION. Sec. 3173 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Access Areas Preservation (30000086)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $408,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $9,167,000
TOTAL . . . . . . . . . . . . $9,575,000
NEW SECTION. Sec. 3174 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Washougal Hatchery Pond Renovation (30000094)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,236,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,236,000
NEW SECTION. Sec. 3175 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Grays River Intake Replacement (30000089)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $549,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $3,499,000
TOTAL . . . . . . . . . . . . $4,048,000
NEW SECTION. Sec. 3176 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Skamania Hatchery Intake Replacement (30000088)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $824,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $8,900,000
TOTAL . . . . . . . . . . . . $9,724,000
NEW SECTION. Sec. 3177 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Health Safety and Code Requirements (30000135)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
TOTAL . . . . . . . . . . . . $11,000,000
NEW SECTION. Sec. 3178 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Dam and Dike (30000145)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $943,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $3,780,000
TOTAL . . . . . . . . . . . . $4,723,000
NEW SECTION. Sec. 3179 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Infrastructure Preservation (30000147)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $19,119,000
TOTAL . . . . . . . . . . . . $20,119,000
NEW SECTION. Sec. 3180 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Emergency Projects (30000161)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $750,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
TOTAL . . . . . . . . . . . . $3,750,000
NEW SECTION. Sec. 3181 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Fish Passage Barrier Corrections (30000173)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $9,250,000
TOTAL . . . . . . . . . . . . $10,250,000
NEW SECTION. Sec. 3182 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Programmatic (30000179)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $5,500,000
TOTAL . . . . . . . . . . . . $5,900,000
NEW SECTION. Sec. 3183 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Deschutes Watershed Center (20062008)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $979,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,216,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $7,425,000
TOTAL . . . . . . . . . . . . $10,620,000
NEW SECTION. Sec. 3184 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Chambers Creek Adult Trap (20081004)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $240,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $12,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $450,000
TOTAL . . . . . . . . . . . . $702,000
NEW SECTION. Sec. 3185 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Tokul Creek Hatchery (20081005)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $235,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $3,108,000
TOTAL . . . . . . . . . . . . $3,543,000
NEW SECTION. Sec. 3186 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Bebee Springs Phase 3 (92000006)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,643,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,643,000
NEW SECTION. Sec. 3187 FOR THE DEPARTMENT OF FISH AND WILDLIFE
Arlington Hatchery (91000002)
Appropriation:
Wildlife Account--State . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $200,000
NEW SECTION. Sec. 3188 FOR THE DEPARTMENT OF NATURAL RESOURCES
Marine Station (20081015)
Reappropriation:
Resource Management Cost Account--State . . . . . . . . . . . . $550,000
State Building Construction Account--State . . . . . . . . . . . . $550,000
Subtotal Reappropriation . . . . . . . . . . . . $1,100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $400,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 3189 FOR THE DEPARTMENT OF NATURAL RESOURCES
Colville Armory (20082851)
Reappropriation:
Forest Development Account--State . . . . . . . . . . . . $306,000
Resource Management Cost Account--State . . . . . . . . . . . . $323,000
State Building Construction Account--State . . . . . . . . . . . . $292,000
Subtotal Reappropriation . . . . . . . . . . . . $921,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $21,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
TOTAL . . . . . . . . . . . . $3,942,000
NEW SECTION. Sec. 3190 FOR THE DEPARTMENT OF NATURAL RESOURCES
Forest Legacy (20042015)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $4,200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $18,300,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $41,000,000
TOTAL . . . . . . . . . . . . $63,500,000
NEW SECTION. Sec. 3191 FOR THE DEPARTMENT OF NATURAL RESOURCES
Land Acquisition Grants (20052021)
Reappropriation:
General Fund--Federal . . . . . . . . . . . . $23,098,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $27,308,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $32,000,000
TOTAL . . . . . . . . . . . . $82,406,000
NEW SECTION. Sec. 3192 FOR THE DEPARTMENT OF NATURAL RESOURCES
Blanchard Mountain (20081951)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely as a
continuing compensation for preservation of the core of Blanchard
mountain in Skagit County and the subsequent acquisition of replacement
working forest lands as Skagit county state forest lands. The
department shall consult with the University of Washington college of
forest resources' northwest environmental forum and with other interest
groups prior to the purchase.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,975,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $25,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,500,000
NEW SECTION. Sec. 3193 FOR THE DEPARTMENT OF NATURAL RESOURCES
Road Maintenance and Abandonment Projects (30000071)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,800,000
TOTAL . . . . . . . . . . . . $2,300,000
NEW SECTION. Sec. 3194 FOR THE DEPARTMENT OF NATURAL RESOURCES
Natural Areas Facilities Preservation and Access (30000079)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $13,923,000
TOTAL . . . . . . . . . . . . $14,623,000
NEW SECTION. Sec. 3195 FOR THE DEPARTMENT OF NATURAL RESOURCES
Recreation Capital Renovations (30000109)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $816,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $32,682,000
TOTAL . . . . . . . . . . . . $33,498,000
NEW SECTION. Sec. 3196 FOR THE DEPARTMENT OF NATURAL RESOURCES
Land Bank (30000050)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
acquisition of working forest lands at risk of conversion to nonforest
uses and working natural resource lands that will protect and enhance
the value of trust land holdings. The legislature finds that the
chronic loss of working forest lands threatens the long-term prospects
of the timber products and other natural resource industries, which in
turn threatens the long-term economic return for the beneficiaries of
state trust lands. Acquisition of these lands is intended to help
stabilize the primary source of revenue to trust land beneficiaries.
The department shall submit a report to the appropriate committees of
the legislature by October 1, 2010, and every two years thereafter,
indicating the lands purchased under this section, showing the
locations, acres, purchase price, and within that purchase price, the
value of the property attributed to the future value of timber harvests
given an expected rate of return for timber lands, and the value of the
property attributed to future development of the property. It is the
intent of the legislature to lease the development rights of these
conversion lands and retain them as long-term working natural resource
lands under the sustainable harvest plan. Working forest lands
acquired under this section shall be managed at a level equal to or
greater than seventy-five percent of the expected harvest under the
sustainable harvest plan.
Appropriation:
Resources Management Cost Account--State . . . . . . . . . . . . $25,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $100,000,000
TOTAL . . . . . . . . . . . . $125,000,000
NEW SECTION. Sec. 3197 FOR THE DEPARTMENT OF NATURAL RESOURCES
Natural Resources Real Property Replacement (30000051)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
acquisition of working forest lands at risk of conversion to nonforest
uses and working natural resource lands that will protect and enhance
the value of trust land holdings. The legislature finds that the
chronic loss of working forest lands threatens the long-term prospects
of the timber products and other natural resource industries, which in
turn threatens the long-term economic return for the beneficiaries of
state trust lands. Acquisition of these lands is intended to help
stabilize the primary source of revenue to trust land beneficiaries.
The department shall submit a report to the appropriate committees of
the legislature by October 1, 2010, and every two years thereafter,
indicating the lands purchased under this section, showing the
locations, acres, purchase price, and within that purchase price, the
value of the property attributed to the future value of timber harvests
given an expected rate of return for timber lands, and the value of the
property attributed to future development of the property. It is the
intent of the legislature to lease the development rights of these
conversion lands and retain them as long-term working natural resource
lands under the sustainable harvest plan. Working forest lands
acquired under this section shall be managed at a level equal to or
greater than seventy-five percent of the expected harvest under the
sustainable harvest plan.
Appropriation:
Natural Resources Real Property Replacement
Account--State . . . . . . . . . . . . $50,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $200,000,000
TOTAL . . . . . . . . . . . . $250,000,000
NEW SECTION. Sec. 3198 FOR THE DEPARTMENT OF NATURAL RESOURCES
Forest Legacy (30000060)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $9,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $41,000,000
TOTAL . . . . . . . . . . . . $50,000,000
NEW SECTION. Sec. 3199 FOR THE DEPARTMENT OF NATURAL RESOURCES
Land Acquisition Grants (30000061)
Appropriation:
General Fund--Federal . . . . . . . . . . . . $6,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $32,000,000
TOTAL . . . . . . . . . . . . $38,000,000
NEW SECTION. Sec. 3200 FOR THE DEPARTMENT OF NATURAL RESOURCES
Statewide Aquatic Restoration Projects (30000062)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,535,000
TOTAL . . . . . . . . . . . . $1,835,000
NEW SECTION. Sec. 3201 FOR THE DEPARTMENT OF NATURAL RESOURCES
State Lands Maintenance (30000063)
Appropriation:
Resources Management Cost Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $13,732,000
TOTAL . . . . . . . . . . . . $14,732,000
NEW SECTION. Sec. 3202 FOR THE DEPARTMENT OF NATURAL RESOURCES
Community and Technical College Trust Land Acquisition (30000065)
Appropriation:
Community and Technical College Forest
Reserve Account--State . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,050,000
TOTAL . . . . . . . . . . . . $1,250,000
NEW SECTION. Sec. 3203 FOR THE DEPARTMENT OF NATURAL RESOURCES
Trust Land Transfer (30000066)
The appropriation in this section is subject to the following
conditions and limitations:
(1) The total appropriation is provided to the department solely to
transfer from trust status, or enter into fifty year leases for,
certain trust lands of statewide significance deemed appropriate for
state park, fish and wildlife habitat, natural area preserve, natural
resources conservation area, open space, housing and essential
government services, or recreation purposes. The approved list of
properties for lease or transfer is identified in the LEAP capital
document No. 2009-2a, developed April 23, 2009.
(2) Property transferred under this section must be appraised and
transferred at fair market value. The value of the timber transferred
must be deposited by the department to the common school construction
account in the same manner as timber revenues from other common school
trust lands. No deduction may be made for the resource management cost
account under RCW 79.64.040. The value of the land transferred must be
deposited in the natural resources real property replacement account.
(3) Property subject to lease agreements under this section must be
appraised at fair market value. Lease terms must be fifty years with
options to renew for an additional fifty years. Lease payments must be
lump sum payments for the entire term of the lease at the beginning of
the lease. The department shall calculate such lump sum payments using
professional appraisal standards. These lease payments may not exceed
the fee simple purchase price based on current fair market value and
must be deposited by the department to the common school construction
account in the same manner as lease revenues from other common school
trust lands. No deduction may be made for the resource management cost
account under RCW 79.64.040.
(4) All reasonable costs incurred by the department to implement
this section are authorized to be paid out of the appropriations.
Authorized costs include the actual cost of appraisals, staff time,
environmental reviews, surveys, and other similar costs and shall not
exceed one and nine-tenths percent of the appropriation.
(5) Intergrant exchanges between common school and other trust
lands of equal value may occur if the exchange is in the interest of
each trust, as determined by the board of natural resources.
(6) Prior to or concurrent with conveyance of these properties, the
department, with full cooperation of the receiving agencies, shall
execute and record a real property instrument that dedicates the
transferred properties to the purposes identified in subsection (1) of
this section. Transfer and lease agreements for properties identified
in subsection (1) of this section must include terms that restrict the
use of the property to the intended purpose. Transfer and lease
agreements may include provisions for receiving agencies to request
alternative uses of the property, provided the alternative uses are
compatible with the original intended public purpose and the department
and legislature approves such uses.
(7) The department and receiving agencies shall work in good faith
to carry out the intent of this section. However, the department or
receiving agencies may remove a property from the transfer list based
on new, substantive information, if it is determined that transfer of
the property is not in the statewide interest of either the common
school trust or the receiving agency.
(8) The department shall execute trust land transfers that, after
the deduction of reasonable costs as provided in subsection (4) of this
section, eighty percent of the total value of transferred property is
timber value and is deposited in the common school construction
account. To achieve the eighty percent requirement, the department may
choose to lease properties originally intended as transfers.
(9) $4,189,000 of the amount appropriated is provided solely for
fifty-year leases of development rights from timber lands at risk of
conversion to non-timber land uses purchased from appropriations in the
2007-2009 fiscal period.
(10) On June 30, 2011, the state treasurer shall transfer all
remaining uncommitted funds from this appropriation to the common
school construction account and the appropriations in this section
shall be reduced by an equivalent amount.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $100,133,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $400,000,000
TOTAL . . . . . . . . . . . . $500,133,000
NEW SECTION. Sec. 3204 FOR THE DEPARTMENT OF NATURAL RESOURCES
Riparian Open Space Program (30000064)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
TOTAL . . . . . . . . . . . . $4,500,000
NEW SECTION. Sec. 3205 FOR THE DEPARTMENT OF NATURAL RESOURCES
Minor Works - Programmatic (30000067)
Appropriation:
Forest Development Account--State . . . . . . . . . . . . $143,000
Resources Management Cost Account--State . . . . . . . . . . . . $142,000
Subtotal Appropriation . . . . . . . . . . . . $285,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $13,100,000
TOTAL . . . . . . . . . . . . $13,385,000
NEW SECTION. Sec. 3206 FOR THE DEPARTMENT OF NATURAL RESOURCES
Hazardous Fuels Reduction, Forest Health, and Ecosystem
Improvements (91000001)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided from the
American recovery and reinvestment act of 2009 for hazardous fuels
reduction, forest health, and ecosystem improvements.
Appropriation:
General Fund--Federal . . . . . . . . . . . . $20,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $20,000,000
NEW SECTION. Sec. 3207 FOR THE DEPARTMENT OF NATURAL RESOURCES
Right-of-Way Acquisition (30000069)
Appropriation:
Forest Development Account--State . . . . . . . . . . . . $150,000
Resources Management Cost Account--State . . . . . . . . . . . . $350,000
Subtotal Appropriation . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,450,000
TOTAL . . . . . . . . . . . . $2,950,000
NEW SECTION. Sec. 3208 FOR THE DEPARTMENT OF NATURAL RESOURCES
Minor Works - Preservation (30000098)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $201,000
Forest Development Account--State . . . . . . . . . . . . $134,000
Resources Management Cost Account--State . . . . . . . . . . . . $144,000
Subtotal Appropriation . . . . . . . . . . . . $479,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $9,600,000
TOTAL . . . . . . . . . . . . $10,079,000
NEW SECTION. Sec. 3209 FOR THE DEPARTMENT OF AGRICULTURE
Fair Improvements (30000001)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $400,000
NEW SECTION. Sec. 4001 FOR THE WASHINGTON STATE PATROL
Minor Works - Preservation (20081001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $80,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $400,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $480,000
NEW SECTION. Sec. 4002 FOR THE WASHINGTON STATE PATROL
Fire Training Academy Sanitary System (20082002)
Reappropriation:
Fire Service Training Account--State . . . . . . . . . . . . $440,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,060,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,500,000
NEW SECTION. Sec. 4003 FOR THE WASHINGTON STATE PATROL
Replace Existing Dormitory (20082003)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $131,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,229,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,360,000
NEW SECTION. Sec. 4004 FOR THE WASHINGTON STATE PATROL
DNA Crime Lab Computer System (20082952)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 4005 FOR THE WASHINGTON STATE PATROL
Minor Works Projects (30000015)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $375,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $570,000
TOTAL . . . . . . . . . . . . $945,000
NEW SECTION. Sec. 4006 FOR THE WASHINGTON STATE DEPARTMENT OF
TRANSPORTATION
Columbia River Dredging (2003H001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,977,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $15,723,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $17,700,000
NEW SECTION. Sec. 4007 FOR THE WASHINGTON STATE DEPARTMENT OF
TRANSPORTATION
Culvert Replacements (20081001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,900,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $100,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 4008 FOR THE WASHINGTON STATE DEPARTMENT OF
TRANSPORTATION
Commute Trip Reduction for Thurston County State Agencies
(92000001)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
implementation of chapter . . . . (Substitute Senate Bill No. 6088
(commute trip reduction)), Laws of 2009.
Appropriation:
State Vehicle Parking Account--State . . . . . . . . . . . . $734,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $734,000
NEW SECTION. Sec. 4009 FOR THE WASHINGTON STATE DEPARTMENT OF
TRANSPORTATION--LOCAL PROGRAMS--PROGRAM Z--CAPITAL
The appropriation in this section is subject to the following
conditions and limitations: The entire appropriation is provided
solely for the west Vancouver freight access project (4LP701F) as
identified on LEAP Transportation Document ALL PROJECTS 2009-2 as
developed April 24, 2009, Program - Local Program (Z) referenced in
section 311, chapter . . . (Engrossed Substitute Senate Bill No. 5352),
Laws of 2009.
Appropriation:
Freight Mobility Multimodal Account--State . . . . . . . . . . . . $700,000
NEW SECTION. Sec. 5001 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
2001-03 School Construction Assistance Grant Program (20024001)
Reappropriation:
Common School Construction Account--State . . . . . . . . . . . . $135,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $346,718,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $346,853,000
NEW SECTION. Sec. 5002 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
2003-05 School Construction Assistance Grant Program (20044001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $6,190,000
Common School Construction Account--State . . . . . . . . . . . . $3,950,000
Subtotal Reappropriation . . . . . . . . . . . . $10,140,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $392,129,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $402,269,000
NEW SECTION. Sec. 5003 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
2005-07 School Construction Assistance Grant Program (20064100)
Reappropriation:
Common School Construction Account--State . . . . . . . . . . . . $60,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $581,766,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $641,766,000
NEW SECTION. Sec. 5004 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
2005-07 High Performance School Building Grants (20064852)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,942,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,558,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $6,500,000
NEW SECTION. Sec. 5005 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
Aviation High School (20081002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $900,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $275,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,175,000
NEW SECTION. Sec. 5006 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
School Construction Assistance Grants (20084200)
Reappropriation:
Common School Construction Account--State . . . . . . . . . . . . $176,922,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $137,267,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $477,570,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $791,759,000
NEW SECTION. Sec. 5007 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
Vocational Skills Centers (20084300)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $58,546,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $15,161,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $73,707,000
NEW SECTION. Sec. 5008 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
Northeast King County Skills Center (20084855)
Appropriation:
School Construction/Skills Center Building
Account--State . . . . . . . . . . . . $9,049,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $550,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $9,599,000
NEW SECTION. Sec. 5009 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
North Central Technical Skills Center (20084861)
Appropriation:
School Construction/Skills Center Building
Account--State . . . . . . . . . . . . $4,007,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $50,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $18,500,000
TOTAL . . . . . . . . . . . . $22,557,000
NEW SECTION. Sec. 5010 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
Pierce County Skills Center (20084856)
Reappropriation:
School Construction/Skills Center Building
Account--State . . . . . . . . . . . . $1,563,000
Appropriation:
School Construction/Skills Center Building
Account--State . . . . . . . . . . . . $10,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $473,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $12,036,000
NEW SECTION. Sec. 5011 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
Health, Safety, and Small Repair Grants (91000007)
The appropriation in this section is subject to the following
conditions and limitations:
(1) Up to $3,000,000 of the appropriation is provided solely for
nonrecurring costs associated with school facility repairs and
renovations necessary for health and safety. The office of the
superintendent of public instruction, after consulting with maintenance
and operations administrators of school districts, shall develop
criteria for providing funding for specific projects to stay within the
appropriation level provided in this section. The criteria must
include, but are not limited to, the following: (a) Limiting recipient
district applications to one hundred thousand dollars per three-year
period; (b) limiting districts eligible to receive the grant only once
in any three-year period; and (c) requiring any district receiving
funding provided in this section to demonstrate a consistent commitment
to addressing school facilities needs.
(2) The appropriation is provided solely for energy operational
cost savings and safety and health infrastructure improvements to
school facilities initiated after July 1, 2009. The appropriation must
be distributed using the performance-based contracting method of
delivering energy operational cost savings and safety and health
infrastructure improvements to public facilities, unless the minimal
cost or the immediacy of the project makes performance-based
contracting impracticable. If the minimal cost or immediacy of the
project makes performance-based contracting impracticable, the school
district must receive a waiver from the office of the superintendent of
public instruction in order to use the appropriation to address safety
and health needs.
(3) The superintendent of public instruction must report to the
appropriate committees of the legislature and the office of financial
management on the timing and use of the funds by the end of each fiscal
year, until the funds are fully expended.
(4) $100,000 of the appropriation is provided solely to the Monroe
public schools for retrofitting the Frank Wagner Elementary chimney.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $20,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $20,000,000
NEW SECTION. Sec. 5012 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
Capital Project Administration (30000037)
Within amounts appropriated in this section, the office of the
superintendent of public instruction shall:
(1) Develop a plan, in consultation with the department of natural
resources, to assist schools in regularly communicating with the
department of natural resources about options for school districts to
acquire and lease state trust land;
(2) Continue to develop an asset preservation program;
(3) Conduct an analysis of the appropriate level for the state area
cost allowance and the average square-foot space needs for use in the
school construction funding formula. The office of the superintendent
of public instruction shall provide recommendations regarding the
appropriate levels for the area cost allowance and average square-foot
space needs to the joint task force on school construction funding by
September 1, 2009; and
(4) Convene a definitions work group on the joint use of public
school facilities. The work group must report its findings and
recommendations to the appropriate committees of the legislature by
January 1, 2010.
Appropriation:
Common School Construction Account--State . . . . . . . . . . . . $3,337,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $14,097,000
TOTAL . . . . . . . . . . . . $17,434,000
NEW SECTION. Sec. 5013 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
Vocational Skills Center Minor Capital Projects (30000002)
Appropriation:
School Construction and Skill Centers Building
Account--State . . . . . . . . . . . . $3,694,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,694,000
NEW SECTION. Sec. 5014 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
2009-11 School Construction Assistance Grant Program (30000031)
The appropriation in this section is subject to the following
conditions and limitations:
(1) The office of the superintendent of public instruction shall
develop a tracking system to increase accuracy in predicting the timing
of school district claims for reimbursement for school construction
assistance grants. The office of the superintendent of public
instruction shall also improve its communication with school districts
regarding the status of grant projects and create requirements
regarding the timing of reimbursement claims. The office of the
superintendent of public instruction shall submit a report on the
progress of the new tracking and communication system to the
appropriate committees of the legislature by November 15, 2009. The
report must include a list of school district capital projects
receiving state funding and each project's anticipated final
reimbursement date.
(2) In calculating square foot eligibility for state assistance
grants, kindergarten student headcount shall not be reduced by fifty
percent.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $369,920,000
Common School Construction Account--State . . . . . . . . . . . . $259,029,000
Common School Construction Account--Federal . . . . . . . . . . . . $2,500,000
School Construction and Skill Centers Building
Account--Bond--State . . . . . . . . . . . . $58,284,000
Subtotal Appropriation . . . . . . . . . . . . $689,733,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $3,921,000,000
TOTAL . . . . . . . . . . . . $4,610,733,000
NEW SECTION. Sec. 5015 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
Apple Awards (91000001)
The appropriation in this section is subject to the following
conditions and limitations: Grants of $25,000 may be awarded to public
elementary schools whose students propose capital projects on school
property or on other public property in the community, city, or county
in which the school is located. The program must be administered by
the office of the superintendent of public instruction which shall
determine competitive criteria for awarding the grants. $125,000 of
the appropriation is available for five awards of $25,000 each in the
2009-2010 school year and $125,000 of the appropriation for five awards
of $25,000 each in the 2010-2011 school year. The funds must be used
exclusively for capital projects as proposed by the students in the
schools and approved by the district's school board.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 5016 FOR THE SUPERINTENDENT OF PUBLIC
INSTRUCTION
Tri-Tech Skills Center Walla Walla Branch Campus (91000005)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
the predesign phase of the Walla Walla branch campus of the tri-tech
skills center.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $100,000
NEW SECTION. Sec. 5017 (1) The joint legislative task force on
school construction funding, established in the 2007-09 capital budget,
is continued to explore the following: (a) Changing the state funding
assistance ratio used in the school construction assistance grant
program formula; (b) methods to accommodate specialized program space
or unique building circumstances (such as all-day kindergarten and
science labs); and (c) ways to account for regional cost differences in
the school construction assistance grant program formula.
(2)(a) The task force shall consist of six members, including one
member from each major caucus from the house of representatives,
appointed by the speaker of the house of representatives, and one
member from each major caucus from the senate, appointed by the
president of the senate. The president of the senate and the speaker
of the house of representatives jointly shall appoint two members
representing large and small school districts.
(3) Staff support for the task force must be provided by the senate
committee services and the house of representatives office of program
research.
(4) The task force must conduct its work without incurring travel,
per diem, or other costs.
(5) The task force must report its findings and recommendations to
the appropriate committees of the legislature by January 1, 2010.
NEW SECTION. Sec. 5018 FOR THE STATE SCHOOL FOR THE BLIND
Minor Works Preservation (30000002)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $620,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,290,000
TOTAL . . . . . . . . . . . . $2,910,000
NEW SECTION. Sec. 5019 FOR THE STATE SCHOOL FOR THE BLIND
New Physical Education Center (20082001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $200,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $9,100,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $9,400,000
NEW SECTION. Sec. 5020 FOR THE STATE SCHOOL FOR THE DEAF
Vocational Education, Cafeteria, and Maintenance Support Building
(20082002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,713,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $9,187,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $10,900,000
NEW SECTION. Sec. 5021 FOR THE STATE SCHOOL FOR THE DEAF
Minor Works Preservation (30000001)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $820,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,794,000
TOTAL . . . . . . . . . . . . $3,614,000
NEW SECTION. Sec. 5022 FOR THE UNIVERSITY OF WASHINGTON
Computing and Communications Upgrades and Data Center (20082004)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $10,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $14,500,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $15,000,000
TOTAL . . . . . . . . . . . . $40,000,000
NEW SECTION. Sec. 5023 FOR THE UNIVERSITY OF WASHINGTON
Savery Hall Renovation (20061005)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $11,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $50,510,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $61,510,000
NEW SECTION. Sec. 5024 FOR THE UNIVERSITY OF WASHINGTON
Clark Hall Renovation (20061007)
Reappropriation:
Education Construction Account--State . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $16,054,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $18,054,000
NEW SECTION. Sec. 5025 FOR THE UNIVERSITY OF WASHINGTON
Minor Works - Facility Preservation (20081001)
Reappropriation:
University of Washington Building Account--State . . . . . . . . . . . . $16,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $7,000,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $23,000,000
NEW SECTION. Sec. 5026 FOR THE UNIVERSITY OF WASHINGTON
Denny Hall Renovation (20081002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,200,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $47,992,000
TOTAL . . . . . . . . . . . . $53,692,000
NEW SECTION. Sec. 5027 FOR THE UNIVERSITY OF WASHINGTON
Balmer Hall Reconstruction (20081004)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $38,600,000
TOTAL . . . . . . . . . . . . $42,600,000
NEW SECTION. Sec. 5028 FOR THE UNIVERSITY OF WASHINGTON
Intermediate Student Service and Classroom Improvements (20081005)
Reappropriation:
Education Construction Account--State . . . . . . . . . . . . $7,245,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,036,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $13,281,000
NEW SECTION. Sec. 5029 FOR THE UNIVERSITY OF WASHINGTON
Interdisciplinary Academic Building (20082003)
In conjunction with the reappropriation in this section, the
University of Washington is authorized to issue a bond or bonds in an
amount not to exceed $53,554,000 in value for construction of the
molecular engineering building identified in this section. The bond
shall be financed from building fee and trust land revenues deposited
into the university's bond retirement account, in accordance with RCW
28B.20.700 through 28B.20.740.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,000,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 5030 FOR THE UNIVERSITY OF WASHINGTON
UW Tacoma (20082005)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,000,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $34,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,150,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $17,044,000
TOTAL . . . . . . . . . . . . $57,194,000
NEW SECTION. Sec. 5031 FOR THE UNIVERSITY OF WASHINGTON
UW Bothell (20082006)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $150,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $62,850,000
TOTAL . . . . . . . . . . . . $68,000,000
NEW SECTION. Sec. 5032 FOR THE UNIVERSITY OF WASHINGTON
Burke Museum Renovation (20082850)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $300,000
NEW SECTION. Sec. 5033 FOR THE UNIVERSITY OF WASHINGTON
UW Tacoma - Soils Remediation (20082852)
Reappropriation:
State Toxics Control Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 5034 FOR THE UNIVERSITY OF WASHINGTON
UW Tacoma - Land Acquisition (20062852)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $384,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,616,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 5035 FOR THE UNIVERSITY OF WASHINGTON
UW Tacoma - Land Acquisition (20092003)
Reappropriation:
Education Construction Account--State . . . . . . . . . . . . $469,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,531,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 5036 FOR THE UNIVERSITY OF WASHINGTON
Anderson Hall Renovation (20091002)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $21,225,000
TOTAL . . . . . . . . . . . . $21,425,000
NEW SECTION. Sec. 5037 FOR THE UNIVERSITY OF WASHINGTON
Lewis Hall Renovation (20081003)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $23,585,000
TOTAL . . . . . . . . . . . . $25,585,000
NEW SECTION. Sec. 5038 FOR THE UNIVERSITY OF WASHINGTON
House of Knowledge Longhouse (30000021)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $11,757,000
TOTAL . . . . . . . . . . . . $12,057,000
NEW SECTION. Sec. 5039 FOR THE UNIVERSITY OF WASHINGTON
Minor Works - Facility Preservation (30000027)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $26,000,000
University of Washington Building Account--State . . . . . . . . . . . . $8,175,000
Subtotal Appropriation . . . . . . . . . . . . $34,175,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $146,000,000
TOTAL . . . . . . . . . . . . $180,175,000
NEW SECTION. Sec. 5040 FOR THE UNIVERSITY OF WASHINGTON
Minor Works - Program (30000110)
Appropriation:
University of Washington Building Account--State . . . . . . . . . . . . $5,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
TOTAL . . . . . . . . . . . . $25,000,000
NEW SECTION. Sec. 5041 FOR THE UNIVERSITY OF WASHINGTON
Preventative Facility Maintenance and Building System Repairs
(30000287)
Appropriation:
University of Washington Building Account--State . . . . . . . . . . . . $25,825,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $103,300,000
TOTAL . . . . . . . . . . . . $129,125,000
NEW SECTION. Sec. 5042 FOR THE UNIVERSITY OF WASHINGTON
Safe Campus (30000022)
Appropriation:
University of Washington Building Account--State . . . . . . . . . . . . $8,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $8,000,000
NEW SECTION. Sec. 5043 FOR THE UNIVERSITY OF WASHINGTON
Infrastructure Savings (30000289)
The appropriations in this section are subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1
Subtotal Appropriation . . . . . . . . . . . . $2
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2
NEW SECTION. Sec. 5044 FOR THE WASHINGTON STATE UNIVERSITY
WSU Pullman - Biomedical Sciences Facility (20042009)
In conjunction with the appropriations in this section, Washington
State University is authorized to issue a bond or bonds in an amount
not to exceed $95,780,000 in value for construction of the facility
identified in this section. The bond shall be financed from building
fee and trust land revenues deposited into the university's bond
retirement account in accordance with RCW 28B.30.700 through
28B.30.780.
Prior Biennia (Expenditures) . . . . . . . . . . . . $250,000
TOTAL . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 5045 FOR THE WASHINGTON STATE UNIVERSITY
WSU Pullman - Biotechnology and Life Sciences 2 (20042085)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $5,710,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $57,768,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $63,478,000
NEW SECTION. Sec. 5046 FOR THE WASHINGTON STATE UNIVERSITY
WSU Spokane - Nursing Building at Riverpoint (20042941)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,750,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $32,850,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $34,600,000
NEW SECTION. Sec. 5047 FOR THE WASHINGTON STATE UNIVERSITY
WSU Vancouver - Applied Technology and Classroom Building
(20062950)
In conjunction with the appropriation in this section, Washington
State University is authorized to issue a bond or bonds in an amount
not to exceed $10,000,000 in value for construction of the facility
identified in this section. The bond must be financed from building
fee and trust land revenues deposited into the university's bond
retirement account in accordance with RCW 28B.30.700 through
28B.30.780.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $26,742,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,420,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $31,662,000
NEW SECTION. Sec. 5048 FOR THE WASHINGTON STATE UNIVERSITY
WSU Vancouver - Undergraduate Classroom Building (20062951)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $6,117,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $21,883,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $28,000,000
NEW SECTION. Sec. 5049 FOR THE WASHINGTON STATE UNIVERSITY
Utilities Extension (20081100)
Reappropriation:
Washington State University Building Account--State . . . . . . . . . . . . $900,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $10,636,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $11,536,000
NEW SECTION. Sec. 5050 FOR THE WASHINGTON STATE UNIVERSITY
University-wide Infrastructure (20081701)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,500,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $8,000,000
NEW SECTION. Sec. 5051 FOR THE WASHINGTON STATE UNIVERSITY
Library Road Infrastructure (20081703)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $250,000
Washington State University Building Account--State . . . . . . . . . . . . $2,950,000
Subtotal Reappropriation . . . . . . . . . . . . $3,200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $11,800,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $15,000,000
NEW SECTION. Sec. 5052 FOR THE WASHINGTON STATE UNIVERSITY
Minor Works - Program (20082002)
Reappropriation:
Washington State University Building Account--State . . . . . . . . . . . . $1,900,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $15,100,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $17,000,000
NEW SECTION. Sec. 5053 FOR THE WASHINGTON STATE UNIVERSITY
Minor Works - Facility Preservation (20081001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,475,000
Washington State University Building Account--State . . . . . . . . . . . . $2,350,000
Subtotal Reappropriation . . . . . . . . . . . . $3,825,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $35,075,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $38,900,000
NEW SECTION. Sec. 5054 FOR THE WASHINGTON STATE UNIVERSITY
WSU Spokane - Riverpoint Biomedical & Health Sciences (20162953)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,340,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $39,775,000
TOTAL . . . . . . . . . . . . $44,115,000
NEW SECTION. Sec. 5055 FOR THE WASHINGTON STATE UNIVERSITY
Minor Works - Preservation (30000065)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $16,128,000
Washington State University Building Account--
State . . . . . . . . . . . . $10,000,000
Subtotal Appropriation . . . . . . . . . . . . $26,128,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $26,128,000
NEW SECTION. Sec. 5056 FOR THE WASHINGTON STATE UNIVERSITY
Minor Works - Program (30000066)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $7,042,000
Washington State University Building Account--
State . . . . . . . . . . . . $10,485,000
Subtotal Appropriation . . . . . . . . . . . . $17,527,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $3,073,000
TOTAL . . . . . . . . . . . . $20,600,000
NEW SECTION. Sec. 5057 FOR THE WASHINGTON STATE UNIVERSITY
Preventative Facility Maintenance and Building System Repairs
(30000287)
Appropriation:
Washington State University Building Account--
State . . . . . . . . . . . . $10,115,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $40,460,000
TOTAL . . . . . . . . . . . . $50,575,000
NEW SECTION. Sec. 5058 FOR THE WASHINGTON STATE UNIVERSITY
Global Animal Health Phase I (92000001)
Contingent upon expenditure of a $25,000,000 million private grant
for the same purpose, Washington State University is authorized to
issue a bond or bonds in an amount not to exceed $6,200,000 in value
for construction of the facility identified in this section. The bond
shall be financed from building fee and trust land revenues deposited
into the university's bond retirement account in accordance with RCW
28B.30.700 through 28B.30.780.
NEW SECTION. Sec. 5059 FOR THE WASHINGTON STATE UNIVERSITY
Infrastructure Savings (30000421)
The appropriations in this section are subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1
Subtotal Appropriation . . . . . . . . . . . . $2
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2
NEW SECTION. Sec. 5060 FOR THE EASTERN WASHINGTON UNIVERSITY
Minor Works - Facility Preservation (20081001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $250,000
Eastern Washington University Capital Projects
Account--State . . . . . . . . . . . . $1,500,000
Subtotal Reappropriation . . . . . . . . . . . . $1,750,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,250,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 5061 FOR THE EASTERN WASHINGTON UNIVERSITY
Minor Works - Health, Safety, and Code Requirements (20081002)
Reappropriation:
Education Construction Account--State . . . . . . . . . . . . $1,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,500,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 5062 FOR THE EASTERN WASHINGTON UNIVERSITY
Minor Works - Infrastructure Preservation (20081003)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,500,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 5063 FOR THE EASTERN WASHINGTON UNIVERSITY
Minor Works - Program (20082001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Eastern Washington University Capital Projects
Account--State . . . . . . . . . . . . $2,300,000
Subtotal Reappropriation . . . . . . . . . . . . $3,300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $7,700,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $11,000,000
NEW SECTION. Sec. 5064 FOR THE EASTERN WASHINGTON UNIVERSITY
Patterson Hall Remodel (20062002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $400,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $26,600,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,734,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $34,416,000
TOTAL . . . . . . . . . . . . $63,150,000
NEW SECTION. Sec. 5065 FOR THE EASTERN WASHINGTON UNIVERSITY
Preventive Maintenance and Building System Repairs (30000044)
Appropriation:
Eastern Washington University Capital Projects
Account--State . . . . . . . . . . . . $2,217,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $8,868,000
TOTAL . . . . . . . . . . . . $11,085,000
NEW SECTION. Sec. 5066 FOR THE EASTERN WASHINGTON UNIVERSITY
Biology Chemistry Science Center (30000001)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $59,491,000
TOTAL . . . . . . . . . . . . $59,891,000
NEW SECTION. Sec. 5067 FOR THE EASTERN WASHINGTON UNIVERSITY
Minor Works - Health, Safety and Code Compliance (30000053)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
TOTAL . . . . . . . . . . . . $12,500,000
NEW SECTION. Sec. 5068 FOR THE EASTERN WASHINGTON UNIVERSITY
Minor Works - Facility Preservation (30000054)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
TOTAL . . . . . . . . . . . . $15,000,000
NEW SECTION. Sec. 5069 FOR THE EASTERN WASHINGTON UNIVERSITY
Minor Works - Infrastructure Preservation (30000055)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $500,000
Eastern Washington University Capital Projects
Account--State . . . . . . . . . . . . $1,000,000
Subtotal Appropriation . . . . . . . . . . . . $1,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $6,000,000
TOTAL . . . . . . . . . . . . $7,500,000
NEW SECTION. Sec. 5070 FOR THE EASTERN WASHINGTON UNIVERSITY
Minor Works - Program (30000056)
Appropriation:
Eastern Washington University Capital Projects
Account--State . . . . . . . . . . . . $3,306,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $27,200,000
TOTAL . . . . . . . . . . . . $30,506,000
NEW SECTION. Sec. 5071 FOR THE EASTERN WASHINGTON UNIVERSITY
Riverpoint Center Acquisition (30000061)
The appropriation in this section is subject to the following
conditions and limitations:
(1) Eastern Washington University is authorized to sell its center
at 701 West First Avenue in downtown Spokane, and directed to deposit
the proceeds of the sale into the Eastern Washington University capital
projects account.
(2) Contingent upon and following the sale, and after completion of
a current independent appraisal, Eastern Washington University is
authorized to expend an amount not to exceed the total appropriation in
this section to acquire an at least fifty percent ownership interest in
a facility on or adjacent to the Riverpoint higher education campus to
support delivery of the university's Spokane-based programs.
(3) The university shall report to the office of financial
management and to the appropriate committees of the legislature upon
the sale of the downtown center and completion of the updated
appraisal.
Appropriation:
Eastern Washington University Capital Projects
Account--State . . . . . . . . . . . . $5,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,500,000
NEW SECTION. Sec. 5072 FOR THE EASTERN WASHINGTON UNIVERSITY
Infrastructure Savings (30000421)
The appropriations in this section are subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1
Subtotal Appropriation . . . . . . . . . . . . $2
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2
NEW SECTION. Sec. 5073 FOR THE CENTRAL WASHINGTON UNIVERSITY
Minor Works - Facility Preservation (20081001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,175,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,175,000
NEW SECTION. Sec. 5074 FOR THE CENTRAL WASHINGTON UNIVERSITY
Minor Works - Health, Safety, and Code Requirements (20081009)
Reappropriation:
Central Washington University Capital Projects
Account--State . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,085,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,335,000
NEW SECTION. Sec. 5075 FOR THE CENTRAL WASHINGTON UNIVERSITY
Minor Works - Infrastructure Preservation (20081010)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $500,000
Central Washington University Capital Projects
Account--State . . . . . . . . . . . . $100,000
Subtotal Reappropriation . . . . . . . . . . . . $600,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,690,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,290,000
NEW SECTION. Sec. 5076 FOR THE CENTRAL WASHINGTON UNIVERSITY
Minor Works - Program (20082002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $500,000
Central Washington University Capital Projects
Account--State . . . . . . . . . . . . $500,000
Subtotal Reappropriation . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,800,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $7,800,000
NEW SECTION. Sec. 5077 FOR THE CENTRAL WASHINGTON UNIVERSITY
Hogue Hall Renovation and Addition (20082003)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1,500,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $27,265,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,500,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $18,837,000
TOTAL . . . . . . . . . . . . $49,102,000
NEW SECTION. Sec. 5078 FOR THE CENTRAL WASHINGTON UNIVERSITY
Minor Works - Health Safety and Code Requirements (30000002)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $950,000
Central Washington University Capital Projects
Account--State . . . . . . . . . . . . $700,000
Subtotal Appropriation . . . . . . . . . . . . $1,650,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
TOTAL . . . . . . . . . . . . $13,650,000
NEW SECTION. Sec. 5079 FOR THE CENTRAL WASHINGTON UNIVERSITY
Minor Works - Infrastructure Preservation (30000009)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $690,000
Central Washington University Capital Projects
Account--State . . . . . . . . . . . . $2,050,000
Subtotal Appropriation . . . . . . . . . . . . $2,740,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
TOTAL . . . . . . . . . . . . $14,740,000
NEW SECTION. Sec. 5080 FOR THE CENTRAL WASHINGTON UNIVERSITY
Minor Works - Facility Preservation (30000016)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,610,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
TOTAL . . . . . . . . . . . . $14,610,000
NEW SECTION. Sec. 5081 FOR THE CENTRAL WASHINGTON UNIVERSITY
Minor Works - Program (30000025)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Central Washington University Capital Projects
Account--State . . . . . . . . . . . . $1,181,000
Subtotal Appropriation . . . . . . . . . . . . $3,181,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $28,000,000
TOTAL . . . . . . . . . . . . $31,181,000
NEW SECTION. Sec. 5082 FOR THE CENTRAL WASHINGTON UNIVERSITY
Science Building (30000045)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $600,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $55,870,000
TOTAL . . . . . . . . . . . . $56,470,000
NEW SECTION. Sec. 5083 FOR THE CENTRAL WASHINGTON UNIVERSITY
Preventative Facility Maintenance and Building System Repairs
(30000287)
Appropriation:
Central Washington University Capital
Project Account--State . . . . . . . . . . . . $2,422,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $9,688,000
TOTAL . . . . . . . . . . . . $12,110,000
NEW SECTION. Sec. 5084 FOR THE CENTRAL WASHINGTON UNIVERSITY
Infrastructure Savings (30000421)
The appropriations in this section are subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1
Subtotal Appropriation . . . . . . . . . . . . $2
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2
NEW SECTION. Sec. 5085 FOR THE EVERGREEN STATE COLLEGE
Minor Works - Preservation (20081001)
Reappropriation:
The Evergreen State College Capital Projects
Account--State . . . . . . . . . . . . $910,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,390,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,300,000
NEW SECTION. Sec. 5086 FOR THE EVERGREEN STATE COLLEGE
Minor Works - Health, Safety, and Code Requirements (20081002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $725,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,275,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 5087 FOR THE EVERGREEN STATE COLLEGE
Minor Works - Infrastructure Preservation (20081004)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $500,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $700,000
NEW SECTION. Sec. 5088 FOR THE EVERGREEN STATE COLLEGE
Minor Works - Program (20082003)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $75,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $855,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $930,000
NEW SECTION. Sec. 5089 FOR THE EVERGREEN STATE COLLEGE
Longhouse Expansion (20082007)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $760,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $940,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,700,000
NEW SECTION. Sec. 5090 FOR THE EVERGREEN STATE COLLEGE
College Activities Building Renovation (20082009)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,120,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $780,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,900,000
NEW SECTION. Sec. 5091 FOR THE EVERGREEN STATE COLLEGE
Communications Laboratory Building Preservation and Renovation
(30000002)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,821,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $8,835,000
TOTAL . . . . . . . . . . . . $10,656,000
NEW SECTION. Sec. 5092 FOR THE EVERGREEN STATE COLLEGE
Minor Works - Preservation (30000003)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $760,000
The Evergreen State College Capital Projects
Account--State . . . . . . . . . . . . $3,765,000
Subtotal Appropriation . . . . . . . . . . . . $4,525,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,525,000
NEW SECTION. Sec. 5093 FOR THE EVERGREEN STATE COLLEGE
Minor Works - Health, Safety, Code Compliance (30000016)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,515,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,515,000
NEW SECTION. Sec. 5094 FOR THE EVERGREEN STATE COLLEGE
Laboratory and Art Annex Building Renovation (30000026)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,849,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,849,000
NEW SECTION. Sec. 5095 FOR THE EVERGREEN STATE COLLEGE
Minor Works - Program (30000031)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,550,000
The Evergreen State College Capital Projects
Account--State . . . . . . . . . . . . $520,000
Subtotal Appropriation . . . . . . . . . . . . $2,070,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,070,000
NEW SECTION. Sec. 5096 FOR THE EVERGREEN STATE COLLEGE
Minor Works - Infrastructure (30000046)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,380,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,380,000
NEW SECTION. Sec. 5097 FOR THE EVERGREEN STATE COLLEGE
Preventative Facility Maintenance and Building System Repairs
(30000287)
Appropriation:
The Evergreen State College Capital Projects
Account--State . . . . . . . . . . . . $760,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $760,000
NEW SECTION. Sec. 5098 FOR THE EVERGREEN STATE COLLEGE
Infrastructure Savings (30000421)
The appropriations in this section are subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1
Subtotal Appropriation . . . . . . . . . . . . $2
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2
NEW SECTION. Sec. 5099 FOR THE WESTERN WASHINGTON UNIVERSITY
Academic Instructional Center (20022026)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Western Washington University Capital Projects
Account--State . . . . . . . . . . . . $400,000
Subtotal Reappropriation . . . . . . . . . . . . $1,400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $62,844,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $64,244,000
NEW SECTION. Sec. 5100 FOR THE WESTERN WASHINGTON UNIVERSITY
Miller Hall Renovation (20041953)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $54,625,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,773,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $60,398,000
NEW SECTION. Sec. 5101 FOR THE WESTERN WASHINGTON UNIVERSITY
Minor Works - Health, Safety, and Code Requirements (20081090)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,533,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,933,000
NEW SECTION. Sec. 5102 FOR THE WESTERN WASHINGTON UNIVERSITY
Minor Works - Facility Preservation (20081091)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,351,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,051,000
NEW SECTION. Sec. 5103 FOR THE WESTERN WASHINGTON UNIVERSITY
Minor Works - Infrastructure Preservation (20081092)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $900,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,116,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,016,000
NEW SECTION. Sec. 5104 FOR THE WESTERN WASHINGTON UNIVERSITY
Minor Works - Program (20082093)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Western Washington University Capital Projects
Account--State . . . . . . . . . . . . $2,500,000
Subtotal Reappropriation . . . . . . . . . . . . $4,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,000,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $10,000,000
NEW SECTION. Sec. 5105 FOR THE WESTERN WASHINGTON UNIVERSITY
Academic Facilities Modernization Projects (20082099)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $9,300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,700,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $11,000,000
NEW SECTION. Sec. 5106 FOR THE WESTERN WASHINGTON UNIVERSITY
Minor Works - Health, Safety, and Code Requirements (30000004)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,572,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
TOTAL . . . . . . . . . . . . $12,572,000
NEW SECTION. Sec. 5107 FOR THE WESTERN WASHINGTON UNIVERSITY
Minor Works - Facilities Preservation (30000005)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,911,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $14,000,000
TOTAL . . . . . . . . . . . . $17,911,000
NEW SECTION. Sec. 5108 FOR THE WESTERN WASHINGTON UNIVERSITY
Minor Works - Infrastructure (30000006)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,781,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
TOTAL . . . . . . . . . . . . $9,781,000
NEW SECTION. Sec. 5109 FOR THE WESTERN WASHINGTON UNIVERSITY
Minor Works - Program (30000007)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,248,000
Western Washington University Capital Projects
Account--State . . . . . . . . . . . . $3,000,000
Subtotal Appropriation . . . . . . . . . . . . $8,248,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $36,000,000
TOTAL . . . . . . . . . . . . $44,248,000
NEW SECTION. Sec. 5110 FOR THE WESTERN WASHINGTON UNIVERSITY
Network Infrastructure/Switches (30000011)
Appropriation:
Western Washington University Capital Projects
Account--State . . . . . . . . . . . . $4,616,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,616,000
NEW SECTION. Sec. 5111 FOR THE WESTERN WASHINGTON UNIVERSITY
Preventative Facility Maintenance and Building System Repairs
(30000287)
Appropriation:
Western Washington University Capital Projects
Account--State . . . . . . . . . . . . $3,614,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $14,456,000
TOTAL . . . . . . . . . . . . $18,070,000
NEW SECTION. Sec. 5112 FOR THE WESTERN WASHINGTON UNIVERSITY
Infrastructure Savings (30000421)
The appropriations in this section are subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1
Subtotal Appropriation . . . . . . . . . . . . $2
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2
NEW SECTION. Sec. 5113 FOR THE WASHINGTON STATE HISTORICAL
SOCIETY
Pacific-Lewis and Clark Station Camp Park Project (2002S001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,422,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,011,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,433,000
NEW SECTION. Sec. 5114 FOR THE WASHINGTON STATE HISTORICAL
SOCIETY
Lewis and Clark Trail Interpretive Infrastructure Grant (20024001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $918,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,082,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 5115 FOR THE WASHINGTON STATE HISTORICAL
SOCIETY
Washington Heritage Projects (20044004)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $690,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,310,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 5116 FOR THE WASHINGTON STATE HISTORICAL
SOCIETY
Statewide - Washington Heritage Project Grants (20064004)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is subject to the
provisions of section 733, chapter 488, Laws of 2005.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,318,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,346,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,664,000
NEW SECTION. Sec. 5117 FOR THE WASHINGTON STATE HISTORICAL
SOCIETY
Tacoma State History Museum Building Preservation (20071001)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $75,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $425,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 5118 FOR THE WASHINGTON STATE HISTORICAL
SOCIETY
Washington Heritage Grants (20074004)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is subject to the
project list in section 5137, chapter 520, Laws of 2007.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $7,630,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,370,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $10,000,000
NEW SECTION. Sec. 5119 FOR THE WASHINGTON STATE HISTORICAL
SOCIETY
Olympia - State Capitol Museum: Building Preservation (20081002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $60,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $147,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $207,000
NEW SECTION. Sec. 5120 FOR THE WASHINGTON STATE HISTORICAL
SOCIETY
Washington Heritage Project Capital Grants (30000011)
The appropriation in this section is subject to the following
conditions and limitations:
(1) The appropriation is subject to the provisions of RCW
27.34.330.
(2) The appropriation is provided solely for the following list of
projects.
(3) The 2011-13 projects must be selected based on their readiness
to proceed.
Project | Recommended |
Wenatchee Valley Museum | $150,000 |
West Point Light Station | $300,000 |
Des Moines Field House | $420,000 |
Washington Hall | $381,000 |
Percival Landing | $567,000 |
Roslyn City Hall & Library | $194,000 |
Spokane County courthouse | $500,000 |
Snoqualmie Chapel car #5 | $125,000 |
Edmonds Carnegie Library museum | $48,000 |
Ilwaco museum collections | $41,000 |
Minkler Mansion | $200,000 |
Cheney house for a museum | $87,000 |
Longview Columbia theatre | $1,000,000 |
Chinook School | $350,000 |
Territorial Courthouse of 1858 | $167,000 |
Hanford Interpretive Center | $147,000 |
Carnegie Library Museum | $883,000 |
Dynamite Train Canopy | $50,000 |
King Street Station | $750,000 |
Lakewood Carriage House | $110,000 |
Lincoln School | $175,000 |
Quincy Pioneer Church | $195,000 |
Ezra Meeker Mansion | $100,000 |
Port Townsend Storage Facility | $450,000 |
Puyallup Church Spire | $17,000 |
Morris House and Washington Harbor School | $27,000 |
Kalama Interpretive Center | $212,000 |
Foss Waterway Seaport Building | $750,000 |
Pioneer State Bank Building | $201,000 |
Kirkman House | $32,000 |
Malo Sawmill | $70,000 |
Stimson-Green Mansion | $23,000 |
Lightship #83 | $335,000 |
Masonic Temple Building | $350,000 |
Wilkeson Centennial Monument | $10,000 |
Eddon Boatyard ways and dock | $243,000 |
Commencement Restoration | $86,000 |
Vessel Shenandoah | $179,000 |
Walt's Mill | $75,000 |
TOTAL | $10,000,000 |
NEW SECTION. Sec. 5121 FOR THE WASHINGTON STATE HISTORICAL
SOCIETY
Minor Works - Preservation (30000093)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,402,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $9,000,000
TOTAL . . . . . . . . . . . . $10,402,000
NEW SECTION. Sec. 5122 FOR THE EASTERN WASHINGTON STATE
HISTORICAL SOCIETY
Museum System Repair and Upgrades/Preservation (20081013)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $400,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $857,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $600,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,857,000
NEW SECTION. Sec. 5123 FOR THE EASTERN WASHINGTON STATE
HISTORICAL SOCIETY
Minor Works - Health, Safety, and Code Requirements (30000001)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,250,000
TOTAL . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 5124 FOR THE EASTERN WASHINGTON STATE
HISTORICAL SOCIETY
Minor Works - Facility Preservation (30000004)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $534,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $534,000
NEW SECTION. Sec. 5125 FOR THE EASTERN WASHINGTON STATE
HISTORICAL SOCIETY
Minor Works - Program (30000008)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $298,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $191,000
TOTAL . . . . . . . . . . . . $489,000
NEW SECTION. Sec. 5126 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Pierce College Puyallup - Expansion (20002676)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $69,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $25,266,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $25,335,000
NEW SECTION. Sec. 5127 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Tacoma Community College - Science Building (20012687)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,773,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $30,123,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $31,896,000
NEW SECTION. Sec. 5128 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Green River Community College - Science Building (20012688)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $28,803,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $29,803,000
NEW SECTION. Sec. 5129 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Yakima Valley Community College - Glenn Anthon Hall - Replacement
(20041207)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1,573,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $27,072,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $28,645,000
NEW SECTION. Sec. 5130 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Peninsula College - Replacement Science and Technology Building
(20041208)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $37,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $23,603,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $23,640,000
NEW SECTION. Sec. 5131 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Skagit Valley College - Science Building Replacement (20041209)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $10,700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $20,737,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $31,437,000
NEW SECTION. Sec. 5132 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Spokane Community College - Science Building Replacement (20041212)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $15,487,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $15,887,000
NEW SECTION. Sec. 5133 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Bellingham Technical College - Welding and Auto Collision
Replacement (20041213)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $117,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $16,721,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $16,838,000
NEW SECTION. Sec. 5134 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Lower Columbia College - Instructional Fine Arts Building
(20041214)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $24,362,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $24,662,000
NEW SECTION. Sec. 5135 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Clark College - East County Satellite (20041689)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $5,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $24,876,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $29,876,000
NEW SECTION. Sec. 5136 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Green River Community College - Computer Technology Center
(20042682)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $11,800,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $12,000,000
NEW SECTION. Sec. 5137 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Bellevue Community College - Science and Technology (20042690)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $38,070,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $39,070,000
NEW SECTION. Sec. 5138 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Pierce College Puyallup - Communication Arts and Health Building
(20042691)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $18,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $8,750,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $27,250,000
NEW SECTION. Sec. 5139 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Everett Community College - University Center at North Puget Sound
(20042692)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,870,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $48,068,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $51,938,000
NEW SECTION. Sec. 5140 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Cascadia - Center for Arts, Technology, Communication (20042693)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $23,063,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $12,764,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $35,827,000
NEW SECTION. Sec. 5141 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Pierce College, Fort Steilacoom - Science and Technology (20042694)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $20,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $12,393,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $32,393,000
NEW SECTION. Sec. 5142 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
South Puget Sound Community College - Science Complex (20042695)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $250,000
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Subtotal Reappropriation . . . . . . . . . . . . $1,250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $27,870,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $29,120,000
NEW SECTION. Sec. 5143 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Centralia Community College - Science Building (20042850)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $194,000
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $3,000,000
Subtotal Reappropriation . . . . . . . . . . . . $3,194,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $28,919,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $32,113,000
NEW SECTION. Sec. 5144 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Spokane Falls - Business and Social Science Building (20051853)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $19,313,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $20,313,000
NEW SECTION. Sec. 5145 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
South Seattle Community College - Training Facility (20051854)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $32,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $9,720,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $9,752,000
NEW SECTION. Sec. 5146 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Minor Works Preservation (Repairs and Minor Improvements)
(20061001)
Reappropriation:
Community/Technical College Capital Projects
Account--State . . . . . . . . . . . . $474,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $13,526,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $14,000,000
NEW SECTION. Sec. 5147 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Roof Repairs (20061010)
Reappropriation:
Community/Technical College Capital Projects
Account--State . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $8,340,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $8,840,000
NEW SECTION. Sec. 5148 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Facility Repairs (20061050)
Reappropriation:
Community and Technical College Capital Projects
Account--State . . . . . . . . . . . . $2,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $19,827,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $22,327,000
NEW SECTION. Sec. 5149 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Site Repairs (20061090)
Reappropriation:
Community and Technical College Capital Projects
Account--State . . . . . . . . . . . . $800,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,037,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,837,000
NEW SECTION. Sec. 5150 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Olympic College - Humanities and Student Services (20061204)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $25,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $16,388,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $41,388,000
NEW SECTION. Sec. 5151 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Green River Community College - Humanities and Classroom Building
(20061205)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,054,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,827,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,881,000
NEW SECTION. Sec. 5152 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Grays Harbor College - Vocational Education Renovation (20061303)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $230,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $5,141,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,371,000
NEW SECTION. Sec. 5153 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Peninsula College - Library Renovation (20061305)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $40,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $13,960,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $14,000,000
NEW SECTION. Sec. 5154 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Shoreline Community College - Annex Renovation (20061312)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $180,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,559,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,739,000
NEW SECTION. Sec. 5155 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Green River Community College - Physical Education Renovation
(20061313)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $900,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,395,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,295,000
NEW SECTION. Sec. 5156 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Yakima Valley Community College - Raymond Hall Renovation
(20061325)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $150,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,018,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $4,168,000
NEW SECTION. Sec. 5157 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Pierce College Fort Steilacoom - Cascade Core (20061326)
Reappropriation:
Community/Technical College Capital Projects
Account--State . . . . . . . . . . . . $1,000,000
State Building Construction Account--State . . . . . . . . . . . . $5,000,000
Subtotal Reappropriation . . . . . . . . . . . . $6,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $20,953,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $26,953,000
NEW SECTION. Sec. 5158 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
North Seattle Community College - Wellness Center Repairs
(20061330)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,750,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 5159 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Green River Community College - Water System Replacement (20061501)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1,942,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $9,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,951,000
NEW SECTION. Sec. 5160 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Seattle Central Community College - Maritime Academy Repairs
(20061502)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1,700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $256,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,956,000
NEW SECTION. Sec. 5161 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Infrastructure Savings (20061751)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $519,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,197,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,716,000
NEW SECTION. Sec. 5162 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Minor Works - Program (20062130)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $920,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $19,083,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $20,003,000
NEW SECTION. Sec. 5163 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Seattle Central Community College - Greenhouse/Educational Center
(20062410)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $206,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $44,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 5164 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Spokane Falls Community College - Campus Classrooms (20062696)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,450,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $434,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,884,000
NEW SECTION. Sec. 5165 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Lake Washington Technical College - Allied Health Building
(20062697)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $900,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $25,986,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,029,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $27,915,000
NEW SECTION. Sec. 5166 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
South Puget Sound Community College - Learning Resource Center
(20062698)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,256,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $209,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,465,000
NEW SECTION. Sec. 5167 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Clover Park Technical College - Allied Health Care Facility
(20062699)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,020,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,425,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,445,000
NEW SECTION. Sec. 5168 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
North Seattle Community College - Employment Resource Center
(20062851)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $700,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,790,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $7,490,000
NEW SECTION. Sec. 5169 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Shoreline Community College - Automotive Building (Phase I)
(20062951)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $769,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $231,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 5170 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Minor Works - Preservation - Repairs and Minor Improvements
(20081001)
Reappropriation:
Community/Technical College Capital Projects
Account--State . . . . . . . . . . . . $8,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $7,000,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $15,000,000
NEW SECTION. Sec. 5171 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Minor Works - Facility Preservation - Roof Repairs (20081010)
Reappropriation:
Education Construction Account--State . . . . . . . . . . . . $2,500,000
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Subtotal Reappropriation . . . . . . . . . . . . $3,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $4,176,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $7,676,000
NEW SECTION. Sec. 5172 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Minor Works - Facility Preservation (20081050)
Reappropriation:
Community/Technical College Capital Projects
Account--State . . . . . . . . . . . . $13,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $8,243,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $21,243,000
NEW SECTION. Sec. 5173 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Minor Works - Infrastructure Preservation (20081090)
Reappropriation:
Community/Technical College Capital Projects
Account--State . . . . . . . . . . . . $924,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,158,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,082,000
NEW SECTION. Sec. 5174 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Seattle Central Community College: Wood Construction Center
(20081216)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $24,645,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $549,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $27,194,000
NEW SECTION. Sec. 5175 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Columbia Basin College: Vocational Building (20081217)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,100,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $20,144,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $702,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $21,946,000
NEW SECTION. Sec. 5176 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Peninsula College: Business and Humanities Center (20081218)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,200,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $33,627,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,100,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $35,927,000
NEW SECTION. Sec. 5177 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Spokane Falls Community College - Chemistry and Life Science
Building (20081219)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,200,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $27,800,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,320,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $30,320,000
NEW SECTION. Sec. 5178 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Spokane Community College - Technical Education Building (20081220)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,600,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $30,718,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $793,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $33,111,000
NEW SECTION. Sec. 5179 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Everett Community College - Index Hall Replacement (20081221)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,150,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,301,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,650,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $40,205,000
TOTAL . . . . . . . . . . . . $45,306,000
NEW SECTION. Sec. 5180 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Green River Community College - Trades and Industry Building
(20081222)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $11,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,625,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $127,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $28,737,000
TOTAL . . . . . . . . . . . . $31,500,000
NEW SECTION. Sec. 5181 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Bellingham Technical College - Instructional Resource Center
(20081223)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 5182 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Skagit Valley College - Academic and Student Services Building
(20081224)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $35,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,116,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $101,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $28,949,000
TOTAL . . . . . . . . . . . . $31,201,000
NEW SECTION. Sec. 5183 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Lower Columbia College - Health and Science Building (20081225)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,969,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,500,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $36,405,000
TOTAL . . . . . . . . . . . . $41,874,000
NEW SECTION. Sec. 5184 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Grays Harbor College - Science and Math Building (20081226)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $45,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,583,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $231,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $40,478,000
TOTAL . . . . . . . . . . . . $44,337,000
NEW SECTION. Sec. 5185 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Seattle Central Community College - Edison North Renovation
(20081314)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $16,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,784,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $18,284,000
NEW SECTION. Sec. 5186 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Columbia Basin College - Business Education Building (20081315)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,620,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,020,000
NEW SECTION. Sec. 5187 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
South Puget Sound Community College - Building 22 Renovation
(20081316)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $9,300,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $10,002,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,059,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $20,361,000
NEW SECTION. Sec. 5188 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Yakima Valley Community College - Brown Dental Hygiene Building
(20081317)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,500,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $2,175,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $5,675,000
NEW SECTION. Sec. 5189 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Edmonds Community College - Meadowdale Hall Renovation (20081318)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $8,400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $856,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $9,256,000
NEW SECTION. Sec. 5190 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Spokane Community College - Building 7 Renovation (20081319)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $986,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $9,748,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $23,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $10,757,000
NEW SECTION. Sec. 5191 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Spokane Falls Community College - Music Building 15 Renovation
(20081320)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $475,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $13,806,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $667,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $14,948,000
NEW SECTION. Sec. 5192 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Pierce College Fort Steilacoom - Cascade Core (20081321)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,200,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $15,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,042,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $17,242,000
NEW SECTION. Sec. 5193 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Green River Community College - Primary Electrical Replacement
(20081506)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $589,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $1,281,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,870,000
NEW SECTION. Sec. 5194 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Edmonds Community College - Primary Electrical Replacement
(20081508)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,662,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $804,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,466,000
NEW SECTION. Sec. 5195 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Bellevue Community College - L Building Emergency Repairs
(20081850)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,460,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $203,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,663,000
NEW SECTION. Sec. 5196 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Minor Works - Program (20082130)
Reappropriation:
Community/Technical College Capital Projects
Account--State . . . . . . . . . . . . $8,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $12,000,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $20,000,000
NEW SECTION. Sec. 5197 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Shoreline Community College - Automotive Training Center (20082413)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $994,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $6,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 5198 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Centralia College - Health and Wellness Education Center (20082414)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $995,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 5199 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Spokane Falls Community College - Magnuson Building Remodel
(20082415)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $888,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $53,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $941,000
NEW SECTION. Sec. 5200 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Grays Harbor College - Child Care Facility (20082416)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $954,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $46,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 5201 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Clark College - Child and Family Studies Center (20082417)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 5202 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Tacoma Community College - Early Childhood Education and Child Care
Center (20082418)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $6,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $994,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 5203 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Walla Walla Community College - Culinary Arts/Student Development
Center (20082419)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $975,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $25,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 5204 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Tacoma Community College - Health Careers Center (20082701)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $15,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,946,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $240,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $35,565,000
TOTAL . . . . . . . . . . . . $38,766,000
NEW SECTION. Sec. 5205 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Bellevue Community College - Health Science Building (20082702)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $4,350,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $144,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $36,506,000
TOTAL . . . . . . . . . . . . $41,000,000
NEW SECTION. Sec. 5206 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Bates Technical College - Mohler Communications Technology Center
(20082703)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $20,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,755,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $153,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $23,398,000
TOTAL . . . . . . . . . . . . $25,326,000
NEW SECTION. Sec. 5207 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Columbia Basin College - Social Science Center (20082704)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $25,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $86,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $14,041,000
TOTAL . . . . . . . . . . . . $14,152,000
NEW SECTION. Sec. 5208 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Clark College - Health and Advanced Technologies Building
(20082705)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $14,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,506,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $236,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $33,598,000
TOTAL . . . . . . . . . . . . $36,354,000
NEW SECTION. Sec. 5209 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Higher Education Cost Escalation (20082850)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is provided solely for
the state board for community and technical colleges to assist public
community and technical colleges to manage unanticipated cost
escalation for projects bid during the 2007-09 biennium. Not more than
$750,000 shall be made available to any single project and amounts
provided for this purpose must be matched equally from other resources.
The state board for community and technical colleges shall manage the
distribution of funds to ensure that the requesting college has managed
its project within the current appropriation through preparation of bid
documents and that the scope of the project is no greater than was
originally specified in the design. Prior to the office of financial
management approving use of a minor works appropriation as a match, and
its transfer to the project with unanticipated cost escalation, the
state board for community and technical colleges shall require the
college to describe what it has done to identify and develop
alternative resources for a match, and the specific minor works
projects that would be deferred as a result of the transfer. The state
board for community and technical colleges will report to the office of
financial management and the appropriate fiscal committees of the
legislature on the use of these funds.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,641,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $597,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,238,000
NEW SECTION. Sec. 5210 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Roof Repairs "A" (30000010)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $8,493,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $24,000,000
TOTAL . . . . . . . . . . . . $32,493,000
NEW SECTION. Sec. 5211 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Site Repairs "A" (30000036)
Appropriation:
Community/Technical College Capital Projects
Account--State . . . . . . . . . . . . $2,710,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
TOTAL . . . . . . . . . . . . $18,710,000
NEW SECTION. Sec. 5212 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Facility Repairs "A" (30000048)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $16,728,000
Community/Technical College Capital Projects
Account--State . . . . . . . . . . . . $1,807,000
Subtotal Appropriation . . . . . . . . . . . . $18,535,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $80,000,000
TOTAL . . . . . . . . . . . . $98,535,000
NEW SECTION. Sec. 5213 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Minor Works - Program (30000078)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,858,000
Community/Technical College Capital Projects
Account--State . . . . . . . . . . . . $9,714,000
Subtotal Appropriation . . . . . . . . . . . . $13,572,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $80,000,000
TOTAL . . . . . . . . . . . . $93,572,000
NEW SECTION. Sec. 5214 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Yakima Valley Community College - College and City Library
(30000113)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 5215 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Olympic College - Sophia Bremer Child Development Center (30000115)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 5216 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Wenatchee Valley College - Music and Arts Center (30000119)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 5217 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Seattle Central Community College - Seattle Maritime Academy
(30000120)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,839,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $15,483,000
TOTAL . . . . . . . . . . . . $18,322,000
NEW SECTION. Sec. 5218 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Yakima Valley Community College - Palmer Martin Building (30000121)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,464,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $13,509,000
TOTAL . . . . . . . . . . . . $14,973,000
NEW SECTION. Sec. 5219 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
North Seattle Community College - Technology Building Renewal
(30000129)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,976,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $22,337,000
TOTAL . . . . . . . . . . . . $25,313,000
NEW SECTION. Sec. 5220 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Green River Community College - Science Math and Technology
Building (30000130)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,700,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $15,545,000
TOTAL . . . . . . . . . . . . $17,245,000
NEW SECTION. Sec. 5221 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Everett Community College - Infrastructure (30000190)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,061,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,061,000
NEW SECTION. Sec. 5222 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Seattle Central Community College: Culinary Kitchen Modernization
(91000009)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $378,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $378,000
NEW SECTION. Sec. 5223 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Minor Works - Preservation (30000210)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $15,116,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $15,116,000
NEW SECTION. Sec. 5224 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Preventative Facility Maintenance and Building System Repairs
(30000287)
Appropriation:
Community and Technical Colleges Capital
Projects Account--State . . . . . . . . . . . . $22,800,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $91,208,000
TOTAL . . . . . . . . . . . . $114,008,000
NEW SECTION. Sec. 5225 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Infrastructure Savings (30000421)
The appropriations in this section are subject to the following
conditions and limitations: Projects that are completed in accordance
with section 6004 of this act may have their remaining funds
transferred to this appropriation for other preservation projects
approved by the office of financial management.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1
Gardner-Evans Higher Education Construction
Account--State . . . . . . . . . . . . $1
Subtotal Appropriation . . . . . . . . . . . . $2
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2
NEW SECTION. Sec. 5226 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Tri-Cities STEM School (91000004)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $800,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $800,000
NEW SECTION. Sec. 5227 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Walla Walla Community College Water and Environment Center
(91000007)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,750,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,750,000
NEW SECTION. Sec. 5228 FOR THE COMMUNITY AND TECHNICAL COLLEGE
SYSTEM
Bellingham Technical College - Fisheries Program (30000117)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 6001 (1) Allotments for appropriations in this
act shall be provided in accordance with the capital project review
requirements adopted by the office of financial management and in
compliance with RCW 43.88.110. Projects that will be employing
alternative public works construction procedures under chapter 39.10
RCW are subject to the allotment procedures defined in this section and
RCW 43.88.110.
(2) Each project is defined as proposed in the legislative budget
notes or in the governor's budget document.
NEW SECTION. Sec. 6002 To ensure that major construction
projects are carried out in accordance with legislative and executive
intent, appropriations in this act in excess of $5,000,000 shall not be
expended or encumbered until the office of financial management has
reviewed and approved the agency's predesign. The predesign document
shall include but not be limited to program, site, and cost analysis in
accordance with the predesign manual adopted by the office of financial
management. To improve monitoring of major construction projects,
progress reports shall be submitted by the agency administering the
project to the office of financial management and to the fiscal
committees of the house of representatives and senate. Reports will be
submitted on July 1st and December 31st each year in a format to be
developed by the office of financial management.
NEW SECTION. Sec. 6003 (1) To ensure minor works appropriations
are carried out in accordance with legislative intent, funds
appropriated in this act shall not be allotted until project lists are
on file at the office of financial management, the house of
representatives capital budget committee, and the senate ways and means
committee. All projects must meet the criteria included in subsection
(2)(a) of this section. Revisions to the lists must be filed with the
office of financial management, the house of representatives capital
budget committee, and the senate ways and means committee and include
an explanation of variances from the prior lists before funds may be
expended on the revisions.
(2)(a) Minor works projects are single line appropriations that
include multiple projects of a similar nature and that are valued
between $25,000 and $1,000,000 each, with the exception of higher
education minor works projects that may be valued up to $2,000,000.
These projects can generally be completed within two years of the
appropriation with the funding provided. Agencies are prohibited from
including projects on their minor works lists that are a phase of a
larger project, and that if combined over a continuous period of time,
would exceed $1,000,000, or $2,000,000 for higher education minor works
projects. Improvements for accessibility in compliance with the
Americans with disabilities act may be included in any of the above
minor works categories.
(b) Minor works appropriations shall not be used for, among other
things: Studies, except for technical or engineering reviews or
designs that lead directly to and support a project on the same minor
works list; planning; design outside the scope of work on a minor works
list; moveable, temporary, and traditionally funded operating equipment
not in compliance with the equipment criteria established by the office
of financial management; software not dedicated to control of a
specialized system; moving expenses; land or facility acquisition; or
to supplement funding for projects with funding shortfalls unless
expressly authorized elsewhere in this act. The office of financial
management may make an exception to the limitations described in this
subsection (2)(b) for exigent circumstances after notifying the
legislative fiscal committees and waiting ten days for comments by the
legislature regarding the proposed exception.
(3) It is generally not the intent of the legislature to make
future appropriations for capital expenditures or for maintenance and
operating expenses for an acquisition project or a significant
expansion project that is initiated through the minor works process and
therefore does not receive a policy and fiscal analysis by the
legislature. Minor works projects are intended to be one-time
expenditures that do not require future state resources to complete.
NEW SECTION. Sec. 6004 (1) The office of financial management
may authorize a transfer of appropriation authority provided for a
capital project that is in excess of the amount required for the
completion of such project to another capital project for which the
appropriation is insufficient. No such transfer may be used to expand
the capacity of any facility beyond that intended in making the
appropriation. Such transfers may be effected only between capital
appropriations to a specific department, commission, agency, or
institution of higher education and only between capital projects that
are funded from the same fund or account. No transfers may occur
between projects to local government agencies except where the grants
are provided within a single omnibus appropriation and where such
transfers are specifically authorized by the implementing statutes that
govern the grants.
(2) The office of financial management may find that an amount is
in excess of the amount required for the completion of a project only
if: (a) The project as defined in the notes to the budget document is
substantially complete and there are funds remaining; or (b) bids have
been let on a project and it appears to a substantial certainty that
the project as defined in the notes to the budget document can be
completed within the biennium for less than the amount appropriated in
this act.
(3) For the purposes of this section, the intent is that each
project be defined as proposed to the legislature in the governor's
budget document, unless it clearly appears from the legislative history
that the legislature intended to define the scope of a project in a
different way.
(4) Transfers of funds to an agency's infrastructure savings
appropriation are subject to review and approval by the office of
financial management. Expenditures from an infrastructure savings
appropriation are limited to projects that have a primary purpose to
correct infrastructure deficiencies or conditions that: (a) Adversely
affect the ability to utilize the infrastructure for its current
programmatic use; (b) reduce the life expectancy of the infrastructure;
or (c) increase the operating costs of the infrastructure for its
current programmatic use. Eligible infrastructure projects may include
structures and surface improvements, site amenities, utility systems
outside building footprints and natural environmental changes or
requirements as part of an environmental regulation, a declaration of
emergency for an infrastructure issue in conformance with RCW
43.88.250, or infrastructure planning as part of a facility master
plan.
(5) A report of any transfer effected under this section, except
emergency projects or any transfer under $250,000, shall be filed with
the legislative fiscal committees of the senate and house of
representatives by the office of financial management at least thirty
days before the date the transfer is effected. The office of financial
management shall report all emergency or smaller transfers within
thirty days from the date of transfer.
NEW SECTION. Sec. 6005 (1) It is expected that projects be ready
to proceed in a timely manner depending on the type or phase of the
project or program that is the subject of the appropriation in this
act. Except for major projects that customarily may take more than two
biennia to complete from predesign to the end of construction, or large
infrastructure grant or loan programs supporting projects that often
take more than two biennia to complete, the legislature generally does
not intend to reappropriate funds more than once, particularly for
smaller grant programs, local/community projects, and minor works.
(2) Agencies shall expedite the expenditure of reappropriations and
appropriations in this act in order to: (a) Rehabilitate
infrastructure resources; (b) accelerate environmental rehabilitation
and restoration projects for the improvement of the state's natural
environment; (c) reduce additional costs associated with acquisition
and construction inflationary pressures; and (d) provide additional
employment opportunities associated with capital expenditures.
(3) To the extent feasible, agencies are directed to accelerate
expenditure rates at their current level of permanent employees and
shall use contracted design and construction services wherever
necessary to meet the goals of this section.
NEW SECTION. Sec. 6006 State agencies, including institutions of
higher education, shall allot and report full-time equivalent staff for
capital projects in a manner comparable to staff reporting for
operating expenditures.
NEW SECTION. Sec. 6007 The department of general administration
shall not charge the facility depreciation component of lease charges
for nonprofit tenants in the building adjoining Capitol Way and 11th
avenue during the 2009-2011 biennium.
NEW SECTION. Sec. 6008 Executive Order No. 05-05, archaeological
and cultural resources, was issued effective November 10, 2005.
Agencies and higher education institutions shall comply with the
requirements set forth in this executive order.
NEW SECTION. Sec. 6009
State agencies may enter into agreements with the department of
general administration and the state treasurer's office to develop
requests to the legislature for acquisition of properties and
facilities through financial contracts. The agreements may include
charges for services rendered.
Those noninstructional facilities of higher education institutions
authorized in this section to enter into financial contracts are not
eligible for state funded maintenance and operations. Instructional
space that is available for regularly scheduled classes for academic
transfer, basic skills, and workforce training programs may be eligible
for state funded maintenance and operations.
(1) Department of corrections: Enter into a financing contract for
up to $17,958,000 plus financing expenses and required reserves
pursuant to chapter 39.94 RCW to purchase or build work release beds,
violator beds, or other community-based re-entry facilities.
(2) Community and technical colleges:
(a) Enter into a financing contract on behalf of Walla Walla
Community College for up to $1,000,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to purchase up to 40
acres of land.
(b) Enter into a financing contract on behalf of Bellingham
Technical College for up to $1,390,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to develop an
instructional resource center.
(c) Enter into a financing contract on behalf of Bellingham
Technical College for up to $28,968,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to develop an
instructional resource center. The cost of this financing contract
shall be paid from the community and technical colleges capital
projects account. This facility shall be eligible for maintenance and
operations funding on the same terms as if constructed with state
general obligation bonds.
(d) Enter into a financing contract on behalf of Edmonds Community
College for up to $5,000,000 plus financing expenses and required
reserves pursuant to chapter 39.94 RCW to provide space for allied
health and construction industry.
(e) Contingent upon the sale and purchase specified in section 5071
of this act, enter into a financing contract on behalf of Spokane
Community College for up to $3,400,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to purchase the
Riverpoint One building.
(f) Enter into a financing contract on behalf of North Seattle
Community College for up to $8,900,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to develop an
employment resource center.
(g) Enter into a financing contract on behalf of Everett Community
College for up to $25,000,000 plus financing expenses and required
reserves pursuant to chapter 39.94 RCW to develop a student fitness and
health center.
(h) Enter into a financing contract on behalf of Wenatchee Valley
Community College for up to $2,700,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to purchase a music and
art center.
(i) Enter into a financing contract on behalf of Green River
Community College for up to $20,000,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to develop a 40,000
square foot addition to Green River Kent station.
(j) Enter into a financing contract on behalf of Walla Walla
Community College for up to $1,000,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW for the water and
environment center.
(k) Enter into a financing contract pursuant to chapter 39.94 RCW
on behalf of Green River Community College for up to $26,532,000 plus
financing expenses and required reserves to construct a new classrooms
facility as specified in project 20061205. The cost of this financing
contract shall be paid from the community and technical colleges
capital projects account. This facility shall be eligible for
maintenance and operations funding on the same terms as if constructed
with state general obligation bonds.
(3) Parks and recreation commission: Enter into a financing
contract for up to $2,500,000 plus financing expenses and required
reserves pursuant to chapter 39.94 RCW for the Mount Spokane lodge.
The parks and recreation commission shall use energy savings
performance contracting if practicable. The lodge shall be operated by
a private concessionaire under a contract with the parks and recreation
commission that is a qualified management contract under the applicable
internal revenue service guidelines.
(4) Department of general administration: Enter into a financing
contract for up to $27,144,000 plus financing expenses and required
reserves pursuant to chapter 39.94 RCW for the rehabilitation of the
John L. O'Brien building, subject to approval of the project scope by
the speaker of the house of representatives and the chief clerk of the
house of representatives.
(5) Department of ecology: Enter into a financing contract for up
to $11,000,000 plus financing expenses and required reserves pursuant
to chapter 39.94 RCW to rebuild the east wall of the department of
ecology's headquarters building in Lacey, Washington.
NEW SECTION. Sec. 6010
NEW SECTION. Sec. 6011
(2) One-half of one percent of moneys appropriated in this act for
original construction or any major renovation or remodel work exceeding
two hundred thousand dollars by colleges or universities is provided
solely for the purposes of RCW 28B.10.027. The Washington state arts
commission may combine the proceeds from individual projects in order
to fund larger works of art or mobile art displays in consultation with
the board of regents or trustees.
(3) One-half of one percent of moneys appropriated in this act for
original construction of any public building by a state agency as
defined in RCW 43.17.020 is provided solely for the purposes of RCW
43.17.200. The Washington state arts commission may combine the
proceeds from individual projects in order to fund larger works of art
or mobile art displays in consultation with the state agency.
(4) At least eighty-five percent of the moneys spent by the
Washington state arts commission during the 2009-2011 biennium for the
purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 must be expended
solely for direct acquisition of works of art. The commission may use
up to $100,000 of this amount to conserve or maintain existing pieces
in the state art collection pursuant to chapter 36, Laws of 2005.
NEW SECTION. Sec. 6012 The amounts shown under the headings
"Prior Biennia," "Future Biennia," and "Total" in this act are for
informational purposes only and do not constitute legislative approval
of these amounts. "Prior biennia" typically refers to the immediate
prior biennium for reappropriations, but may refer to multiple biennia
in the case of specific projects. A "future biennia" amount is an
estimate of what may be appropriated for the project or program in the
2011-2013 biennium and the following three biennia; an amount of zero
does not necessarily constitute legislative intent to not provide
funding for the project or program in the future.
NEW SECTION. Sec. 6013 (1) "Reappropriations" in this act are
appropriations and, unless the context clearly provides otherwise, are
subject to the relevant conditions and limitations applicable to
appropriations. Reappropriations shall be limited to the unexpended
balances remaining on June 30, 2009, from the 2007-2009 biennial
appropriations for each project.
(2) "Reappropriations" in sections 5126, 5130, and 5131 of this act
shall be reduced in this act to the unexpended balance remaining as of
the end of fiscal year 2009 for the 2007-09 biennial appropriations in
sections 1085, 1086, and 5145, chapter 520, Laws of 2007.
NEW SECTION. Sec. 6014 To carry out the provisions of this act,
the governor may assign responsibility for predesign, design,
construction, and other related activities to any appropriate agency.
NEW SECTION. Sec. 6015 If any federal moneys appropriated by
this act for capital projects are not received by the state, the
department or agency to which the moneys were appropriated may replace
the federal moneys with funds available from private or local sources.
No replacement may occur under this section without the prior approval
of the director of financial management in consultation with the senate
ways and means committee and the house of representatives capital
budget committee.
NEW SECTION. Sec. 6016 (1) Unless otherwise stated, for all
appropriations under this act that require a match of nonstate money or
in-kind contributions, the following requirement, consistent with RCW
43.88.150, shall apply: Expenditures of state money shall be timed so
that the state share of project expenditures never exceeds the intended
state share of total project costs.
(2) Provision of the full amount of required matching funds is not
required to permit the expenditure of capital budget appropriations for
phased projects if a proportional amount of the required matching funds
is provided for each distinct, identifiable phase of the project.
NEW SECTION. Sec. 6017
NEW SECTION. Sec. 6018 The office of financial management, in
consultation with the fiscal committees of the legislature, may select
capital projects that have completed predesign to undergo a budget
evaluation study. The budget evaluation study team approach using
value engineering techniques must be utilized by the office of
financial management in conducting the studies. The office of
financial management shall select the budget evaluation team members,
contract for the study, and report the results to the legislature and
agencies in a timely manner following the study. Funds from the
project appropriation must be used by the office of financial
management through an interagency agreement with the affected agencies
to cover the cost of the study.
Sec. 6019 RCW 28B.15.210 and 1985 c 390 s 20 are each amended to
read as follows:
Within thirty-five days from the date of collection thereof, all
building fees at the University of Washington, including building fees
to be charged students registering in the schools of medicine and
dentistry, shall be paid into the state treasury and credited as
follows:
One-half or such larger portion as may be necessary to prevent a
default in the payments required to be made out of the bond retirement
fund, and in no event shall such one-half be less than twelve dollars
and fifty cents per each resident student per quarter, and thirty-seven
dollars and fifty cents per each nonresident student per quarter to the
"University of Washington bond retirement fund" and the remainder
thereof to the "University of Washington building account." The sum so
credited to the University of Washington building account shall be used
exclusively for the purpose of erecting, altering, maintaining,
equipping, or furnishing buildings except for any sums transferred as
authorized in RCW 28B.20.725(3). The sum so credited to the University
of Washington bond retirement fund shall be used for the payment of
principal of and interest on bonds outstanding as provided by chapter
28B.20 RCW except for any sums transferred as authorized in RCW
28B.20.725(5). During the 2009-2011 biennium, sums credited to the
University of Washington building account shall also be used for
routine facility maintenance and utility costs.
Sec. 6020 RCW 28B.15.310 and 1985 c 390 s 22 are each amended to
read as follows:
Within thirty-five days from the date of collection thereof, all
building fees shall be paid into the state treasury and credited to the
Washington State University bond retirement fund, one-half or such
larger portion as may be necessary to prevent a default in the payments
required to be made out of such bond retirement fund; the remainder
thereof to the Washington State University building account.
The sum so credited to the Washington State University building
account shall be expended by the board of regents for buildings,
equipment, or maintenance on the campus of Washington State University
as may be deemed most advisable and for the best interests of the
university, except for any sums transferred as authorized by law.
During the 2009-2011 biennium, sums credited to the Washington State
University building account shall also be used for routine facility
maintenance and utility costs. Expenditures so made shall be accounted
for in accordance with existing law and shall not be expended until
appropriated by the legislature.
The sum so credited to the Washington State University bond
retirement fund shall be used to pay and secure the payment of the
principal of and interest on building bonds issued by the university,
except for any sums which may be transferred out of such fund as
authorized by law.
Sec. 6021 RCW 28B.35.370 and 1991 sp.s. c 13 s 49 are each
amended to read as follows:
Within thirty-five days from the date of collection thereof all
building fees of each regional university and The Evergreen State
College shall be paid into the state treasury and these together with
such normal school fund revenues as provided in RCW 28B.35.751 as are
received by the state treasury shall be credited as follows:
(1) On or before June 30th of each year the board of trustees of
each regional university and The Evergreen State College, if issuing
bonds payable out of its building fees and above described normal
school fund revenues, shall certify to the state treasurer the amounts
required in the ensuing twelve months to pay and secure the payment of
the principal of and interest on such bonds. The amounts so certified
by each regional university and The Evergreen State College shall be a
prior lien and charge against all building fees and above described
normal school fund revenues of such institution. The state treasurer
shall thereupon deposit the amounts so certified in the Eastern
Washington University capital projects account, the Central Washington
University capital projects account, the Western Washington University
capital projects account, or The Evergreen State College capital
projects account respectively, which accounts are hereby created in the
state treasury. The amounts deposited in the respective capital
projects accounts shall be used exclusively to pay and secure the
payment of the principal of and interest on the building bonds issued
by such regional universities and The Evergreen State College as
authorized by law. If in any twelve month period it shall appear that
the amount certified by any such board of trustees is insufficient to
pay and secure the payment of the principal of and interest on the
outstanding building and above described normal school fund revenue
bonds of its institution, the state treasurer shall notify the board of
trustees and such board shall adjust its certificate so that all
requirements of moneys to pay and secure the payment of the principal
of and interest on all such bonds then outstanding shall be fully met
at all times.
(2) All normal school fund revenue pursuant to RCW 28B.35.751 shall
be deposited in the Eastern Washington University capital projects
account, the Central Washington University capital projects account,
the Western Washington University capital projects account, or The
Evergreen State College capital projects account respectively, which
accounts are hereby created in the state treasury. The sums deposited
in the respective capital projects accounts shall be appropriated and
expended exclusively to pay and secure the payment of the principal of
and interest on bonds payable out of the building fees and normal
school revenue and for the construction, reconstruction, erection,
equipping, maintenance, demolition and major alteration of buildings
and other capital assets, and the acquisition of sites, rights-of-way,
easements, improvements or appurtenances in relation thereto except for
any sums transferred therefrom as authorized by law. During the 2009-2011 biennium, sums in the respective capital accounts shall also be
used for routine facility maintenance and utility costs.
Sec. 6022 RCW 28B.50.360 and 2005 c 488 s 922 are each amended to
read as follows:
Within thirty-five days from the date of start of each quarter all
collected building fees of each such community and technical college
shall be paid into the state treasury, and shall be credited as
follows:
(1) On or before June 30th of each year the college board if
issuing bonds payable out of building fees shall certify to the state
treasurer the amounts required in the ensuing twelve-month period to
pay and secure the payment of the principal of and interest on such
bonds. The state treasurer shall thereupon deposit the amounts so
certified in the community and technical college capital projects
account. Such amounts of the funds deposited in the community and
technical college capital projects account as are necessary to pay and
secure the payment of the principal of and interest on the building
bonds issued by the college board as authorized by this chapter shall
be exclusively devoted to that purpose. If in any twelve-month period
it shall appear that the amount certified by the college board is
insufficient to pay and secure the payment of the principal of and
interest on the outstanding building bonds, the state treasurer shall
notify the college board and such board shall adjust its certificate so
that all requirements of moneys to pay and secure the payment of the
principal and interest on all such bonds then outstanding shall be
fully met at all times.
(2) The community and technical college capital projects account is
hereby created in the state treasury. The sums deposited in the
capital projects account shall be appropriated and expended exclusively
to pay and secure the payment of the principal of and interest on bonds
payable out of the building fees and for the construction,
reconstruction, erection, equipping, maintenance, demolition and major
alteration of buildings and other capital assets owned by the state
board for community and technical colleges in the name of the state of
Washington, and the acquisition of sites, rights-of-way, easements,
improvements or appurtenances in relation thereto, engineering and
architectural services provided by the department of general
administration, and for the payment of principal of and interest on any
bonds issued for such purposes. During the 2009-2011 biennium, sums in
the capital projects account shall also be used for routine facility
maintenance and utility costs.
Sec. 6023 RCW 43.63A.125 and 2008 c 327 s 15 are each amended to
read as follows:
(1) The department shall establish the building communities fund
program. Under the program, capital and technical assistance grants
may be made to nonprofit organizations for acquiring, constructing, or
rehabilitating facilities used for the delivery of nonresidential
community services, including social service centers and multipurpose
community centers, including those serving a distinct or ethnic
population. Such facilities must be located in a distressed community
or serve a substantial number of low-income or disadvantaged persons.
(2) The department shall establish a competitive process to
solicit, ((and)) evaluate, and rank applications for the building
communities fund program as follows:
(a) The department shall conduct a statewide solicitation of
project applications from nonprofit organizations.
(b) The department shall evaluate and rank applications in
consultation with a citizen advisory committee using objective
criteria. To be considered qualified, applicants must demonstrate that
the proposed project:
(i) Will increase the range, efficiency, or quality of the services
provided to citizens;
(ii) Will be located in a distressed community or will serve a
substantial number of low-income or disadvantaged persons;
(iii) Will offer three or more distinct activities that meet a
single community service objective or a diverse set of activities that
meet multiple community service objectives, including but not limited
to: Providing social services; expanding employment opportunities for
or increasing the employability of community residents; or offering
educational or recreational opportunities separate from the public
school system or private schools, as long as recreation is not the sole
purpose of the facility;
(iv) Reflects a long-term vision for the development of the
community, shared by residents, businesses, leaders, and partners;
(v) Requires state funding to accomplish a discrete, usable phase
of the project;
(vi) Is ready to proceed and will make timely use of the funds;
(vii) Is sponsored by one or more entities that have the
organizational and financial capacity to fulfill the terms of the grant
agreement and to maintain the project into the future;
(viii) Fills an unmet need for community services;
(ix) Will achieve its stated objectives; and
(x) Is a community priority as shown through tangible commitments
of existing or future assets made to the project by community
residents, leaders, businesses, and government partners.
(c) The evaluation process shall also include an examination of
existing assets that applicants may apply to projects. Grant
assistance under this section shall not exceed twenty-five percent of
the total cost of the project, except, under exceptional circumstances,
the department may reduce the amount of nonstate match required. The
nonstate portion of the total project cost may include cash, the value
of real property when acquired solely for the purpose of the project,
and in-kind contributions.
(d) The department may not set a monetary limit to funding
requests.
(e) No more than ten percent of the total granted amount may be
awarded to qualified eligible projects that meet the definition of
exceptional circumstances defined in this subsection. For purposes of
this subsection, exceptional circumstances include but are not limited
to: Natural disasters affecting projects; emergencies beyond an
applicant's control, such as a fire or an unanticipated loss of a lease
where services are currently provided; a delay that could result in a
threat to public health or safety; or instances where a local community
could quantifiably demonstrate that they had exhausted all possible
fund-raising efforts.
(3) The department shall submit ((annually)) biennially to the
governor and the legislature in the department's capital budget request
((an unranked)) a ranked list of the qualified eligible projects for
which applications were received. The list must include a description
of each project, its total cost, and the amount of state funding
requested. The appropriate fiscal committees of the legislature shall
use this list to determine building communities fund projects that may
receive funding in the capital budget. The total amount of state
capital funding available for all projects on the ((annual)) biennial
list shall be determined by the capital budget beginning with the 2009-2011 biennium and thereafter. In addition, if cash funds have been
appropriated, up to three million dollars may be used for technical
assistance grants. The department shall not sign contracts or
otherwise financially obligate funds under this section until the
legislature has approved a specific list of projects.
(4) In addition to the list of ranked qualified eligible projects,
the department shall submit to the appropriate fiscal committees of the
legislature a summary report that describes the solicitation and
evaluation processes, including but not limited to the number of
applications received, the total amount of funding requested, issues
encountered, if any, and any recommendations for process improvements.
(5) After the legislature has approved a specific list of projects
in law, the department shall develop and manage appropriate contracts
with the selected applicants; monitor project expenditures and grantee
performance; report project and contract information; and exercise due
diligence and other contract management responsibilities as required.
(6) In contracts for grants authorized under this section the
department shall include provisions which require that capital
improvements shall be held by the grantee for a specified period of
time appropriate to the amount of the grant and that facilities shall
be used for the express purpose of the grant. If the grantee is found
to be out of compliance with provisions of the contract, the grantee
shall repay to the state general fund the principal amount of the grant
plus interest calculated at the rate of interest on state of Washington
general obligation bonds issued most closely to the date of
authorization of the grant.
Sec. 6024 RCW 79.17.010 and 2008 c 328 s 6012 are each amended to
read as follows:
(1) The department, with the approval of the board, may exchange
any state land and any timber thereon for any land of equal value in
order to:
(a) Facilitate the marketing of forest products of state lands;
(b) Consolidate and block-up state lands;
(c) Acquire lands having commercial recreational leasing potential;
(d) Acquire county-owned lands;
(e) Acquire urban property which has greater income potential or
which could be more efficiently managed by the department in exchange
for state urban lands as defined in RCW 79.19.100; or
(f) Acquire any other lands when such exchange is determined by the
board to be in the best interest of the trust for which the state land
is held.
(2) Land exchanged under this section shall not be used to reduce
the publicly owned forest land base.
(3) The board shall determine that each land exchange is in the
best interest of the trust for which the land is held prior to
authorizing the land exchange.
(4) During the biennium ending June 30, ((2009)) 2011, for the
purposes of maintaining working farm and forest landscapes or acquiring
natural resource lands at risk of development, the department, with
approval of the board of natural resources, may exchange any state land
and any timber thereon for any land and proceeds of equal value, when
it can be demonstrated that the trust fiduciary obligations can be
better fulfilled after an exchange is completed. Proceeds may be in
the form of cash or services in order to achieve the purposes
established in this section. Any cash received as part of an exchange
transaction shall be deposited in the resource management cost account
to pay for administrative expenses incurred in carrying out an exchange
transaction. These administrative expenses include road maintenance
and abandonment expenses. The amount of proceeds received from the
exchange partner may not exceed five percent of the total value of the
exchange. The receipt of proceeds shall not change the character of
the transaction from an exchange to a sale.
(5) Prior to executing an exchange under this section, and in
addition to the public notice requirements set forth in RCW 79.17.050,
the department shall consult with legislative members, other state and
federal agencies, local governments, tribes, local stakeholders,
conservation groups, and any other interested parties to identify and
address cultural resource issues and the potential of the state lands
proposed for exchange to be used for open space, park, school, or
critical habitat purposes.
Sec. 6025 RCW 79.17.020 and 2008 c 328 s 6013 are each amended to
read as follows:
(1) The board of county commissioners of any county and/or the
mayor and city council or city commission of any city or town and/or
the board shall have authority to exchange, each with the other, or
with the federal forest service, the federal government or any proper
agency thereof and/or with any private landowner, county land of any
character, land owned by municipalities of any character, and state
forest land owned by the state under the jurisdiction of the
department, for real property of equal value for the purpose of
consolidating and blocking up the respective land holdings of any
county, municipality, the federal government, or the state of
Washington or for the purpose of obtaining lands having commercial
recreational leasing potential.
(2) During the biennium ending June 30, ((2009)) 2011, for the
purposes of maintaining working farm and forest landscapes or acquiring
natural resource lands at risk of development, the department, with
approval of the board of natural resources, may exchange any state land
and any timber thereon for any land and proceeds of equal value, when
it can be demonstrated that the trust fiduciary obligations can be
better fulfilled after an exchange is completed. Proceeds may be in
the form of cash or services in order to achieve the purposes
established in this section. Any cash received as part of an exchange
transaction shall be deposited in the forest development account to pay
for administrative expenses incurred in carrying out an exchange
transaction. The amount of proceeds received from the exchange partner
may not exceed five percent of the total value of the exchange. The
receipt of proceeds shall not change the character of the transaction
from an exchange to a sale.
(3) Prior to executing an exchange under this section, and in
addition to the public notice requirements set forth in RCW 79.17.050,
the department shall consult with legislative members, other state and
federal agencies, local governments, tribes, local stakeholders,
conservation groups, and any other interested parties to identify and
address cultural resource issues, and the potential of the state lands
proposed for exchange to be used for open space, park, school, or
critical habitat purposes.
Sec. 6026 RCW 43.99N.060 and 2008 c 328 s 6017 are each amended
to read as follows:
(1) The stadium and exhibition center account is created in the
custody of the state treasurer. All receipts from the taxes imposed
under RCW 82.14.0494 and distributions under RCW 67.70.240(5) shall be
deposited into the account. Only the director of the office of
financial management or the director's designee may authorize
expenditures from the account. The account is subject to allotment
procedures under chapter 43.88 RCW. An appropriation is not required
for expenditures from this account.
(2) Until bonds are issued under RCW 43.99N.020, up to five million
dollars per year beginning January 1, 1999, shall be used for the
purposes of subsection (3)(b) of this section, all remaining moneys in
the account shall be transferred to the public stadium authority,
created under RCW 36.102.020, to be used for public stadium authority
operations and development of the stadium and exhibition center.
(3) After bonds are issued under RCW 43.99N.020, all moneys in the
stadium and exhibition center account shall be used exclusively for the
following purposes in the following priority:
(a) On or before June 30th of each year, the office of financial
management shall accumulate in the stadium and exhibition center
account an amount at least equal to the amount required in the next
succeeding twelve months for the payment of principal of and interest
on the bonds issued under RCW 43.99N.020;
(b) An additional reserve amount not in excess of the expected
average annual principal and interest requirements of bonds issued
under RCW 43.99N.020 shall be accumulated and maintained in the
account, subject to withdrawal by the state treasurer at any time if
necessary to meet the requirements of (a) of this subsection, and,
following any withdrawal, reaccumulated from the first tax revenues and
other amounts deposited in the account after meeting the requirements
of (a) of this subsection; and
(c) The balance, if any, shall be transferred to the youth athletic
facility account under subsection (4) of this section.
Any revenues derived from the taxes authorized by RCW 36.38.010(5)
and 36.38.040 or other amounts that if used as provided under (a) and
(b) of this subsection would cause the loss of any tax exemption under
federal law for interest on bonds issued under RCW 43.99N.020 shall be
deposited in and used exclusively for the purposes of the youth
athletic facility account and shall not be used, directly or
indirectly, as a source of payment of principal of or interest on bonds
issued under RCW 43.99N.020, or to replace or reimburse other funds
used for that purpose.
(4) Any moneys in the stadium and exhibition center account not
required or permitted to be used for the purposes described in
subsection (3)(a) and (b) of this section shall be deposited in the
youth athletic facility account hereby created in the state treasury.
Expenditures from the account may be used only for purposes of grants
or loans to cities, counties, and qualified nonprofit organizations for
community outdoor athletic facilities. ((For the 2005-2007 biennium,
moneys in the account may also be used for a recreation level of
service study for local and regional active recreation facilities.))
Only the director of the recreation and conservation office or the
director's designee may authorize expenditures from the account. The
account is subject to allotment procedures under chapter 43.88 RCW, but
an appropriation is not required for expenditures. The athletic
facility grants or loans may be used for acquiring, developing,
equipping, maintaining, and improving community outdoor athletic
facilities. Funds shall be divided equally between the development of
new community outdoor athletic facilities, the improvement of existing
community outdoor athletic facilities, and the maintenance of existing
community outdoor athletic facilities. Cities, counties, and qualified
nonprofit organizations must submit proposals for grants or loans from
the account. To the extent that funds are available, cities, counties,
and qualified nonprofit organizations must meet eligibility criteria as
established by the director of the recreation and conservation office.
The grants and loans shall be awarded on a competitive application
process and the amount of the grant or loan shall be in proportion to
the population of the city or county for where the community outdoor
athletic facility is located. Grants or loans awarded in any one year
need not be distributed in that year. In the ((2007–2009)) 2009-2011
biennium, if there are not enough project applications submitted in a
category within the account to meet the requirement of equal
distribution of funds to each category, the director of the recreation
and conservation office may distribute any remaining funds to other
categories within the account. The director of the recreation and
conservation office may expend up to one and one-half percent of the
moneys deposited in the account created in this subsection for
administrative purposes.
NEW SECTION. Sec. 6027 FOR FUTURE DEVELOPMENT OF FOUR-YEAR
HIGHER EDUCATION CAMPUS
It is the intent of the legislature that the next location for a
new campus or branch campus of a four-year state institution of higher
education will be in Snohomish county.
Sec. 6028 RCW 28A.335.210 and 2006 c 263 s 327 are each amended
to read as follows:
(1) The superintendent of public instruction shall allocate, as a
nondeductible item, out of any moneys appropriated for state assistance
to school districts for the original construction of any school plant
facility the amount of one-half of one percent of the appropriation to
be expended by the Washington state arts commission for the acquisition
of works of art. The works of art may be placed in accordance with
Article IX, sections 2 and 3 of the state Constitution on public lands,
integral to or attached to a public building or structure, detached
within or outside a public building or structure, part of a portable
exhibition or collection, part of a temporary exhibition, or loaned or
exhibited in other public facilities. The Washington state arts
commission shall, in consultation with the superintendent of public
instruction, determine the amount to be made available for the purchase
of works of art under this section, and payments therefor shall be made
in accordance with law. The designation of projects and sites,
selection, contracting, purchase, commissioning, reviewing of design,
execution and placement, acceptance, maintenance, and sale, exchange,
or disposition of works of art shall be the responsibility of the
Washington state arts commission in consultation with the
superintendent of public instruction and representatives of school
district boards of directors. The superintendent of public instruction
and the school district board of directors of the districts where the
sites are selected shall have the right to:
(((1))) (a) Waive its use of the one-half of one percent of the
appropriation for the acquisition of works of art before the selection
process by the Washington state arts commission;
(((2))) (b) Appoint a representative to the body established by the
Washington state arts commission to be part of the selection process
with full voting rights;
(((3))) (c) Reject the results of the selection process;
(((4))) (d) Reject the placement of a completed work or works of
art on school district premises if such works are portable.
Rejection at any point before or after the selection process shall
not cause the loss of or otherwise endanger state construction funds
available to the local school district. Any works of art rejected
under this section shall be applied to the provision of works of art
under this chapter, at the discretion of the Washington state arts
commission, notwithstanding any contract or agreement between the
affected school district and the artist involved. In addition to the
cost of the works of art the one-half of one percent of the
appropriation as provided in this section shall be used to provide for
the administration, including conservation of the state art collection,
by the Washington state arts commission and all costs for installation
of the work of art. For the purpose of this section building shall not
include sheds, warehouses, or other buildings of a temporary nature.
The executive director of the arts commission, the superintendent
of public instruction, and the Washington state school directors
association shall appoint a study group to review the operations of the
one-half of one percent for works of art under this section.
(2) The Washington state arts commission shall restrict the
purchase of works of art to artists residing in Washington state.
Sec. 6029 RCW 28B.10.027 and 2005 c 36 s 3 are each amended to
read as follows:
(1) All universities and colleges shall allocate as a nondeductible
item, out of any moneys appropriated for the original construction or
any major renovation or remodel work exceeding two hundred thousand
dollars of any building, an amount of one-half of one percent of the
appropriation to be expended by the Washington state arts commission
with the approval of the board of regents or trustees for the
acquisition of works of art. The works of art may be placed on public
lands of institutions of higher education, integral to or attached to
a public building or structure of institutions of higher education,
detached within or outside a public building or structure of
institutions of higher education, part of a portable exhibition or
collection, part of a temporary exhibition, or loaned or exhibited in
other public facilities.
(2) In addition to the cost of the works of art, the one-half of
one percent of the appropriation shall be used to provide for the
administration of the visual arts program, including conservation of
the state art collection, by the Washington state arts commission and
all costs for installation of the work of art. For the purpose of this
section building shall not include sheds, warehouses, and other
buildings of a temporary nature.
(3) The Washington state arts commission shall restrict the
purchase of works of art to artists residing in Washington state.
Sec. 6030 RCW 43.17.200 and 2005 c 36 s 4 are each amended to
read as follows:
(1) All state agencies including all state departments, boards,
councils, commissions, and quasi public corporations shall allocate, as
a nondeductible item, out of any moneys appropriated for the original
construction of any public building, an amount of one-half of one
percent of the appropriation to be expended by the Washington state
arts commission for the acquisition of works of art. The works of art
may be placed on public lands, integral to or attached to a public
building or structure, detached within or outside a public building or
structure, part of a portable exhibition or collection, part of a
temporary exhibition, or loaned or exhibited in other public
facilities. In addition to the cost of the works of art, the one-half
of one percent of the appropriation as provided herein shall be used to
provide for the administration of the visual arts program, including
conservation of the state art collection, by the Washington state arts
commission and all costs for installation of the works of art. For the
purpose of this section building shall not include highway construction
sheds, warehouses or other buildings of a temporary nature.
(2) The Washington state arts commission shall restrict the
purchase of works of art to artists residing in Washington state.
Sec. 6031 2008 c 328 s 6001 (uncodified) is amended to read as
follows:
State agencies may enter into agreements with the department of
general administration and the state treasurer's office to develop
requests to the legislature for acquisition of properties and
facilities through financial contracts. The agreements may include
charges for services rendered.
Those noninstructional facilities of higher education institutions
authorized in this section to enter into financial contracts are not
eligible for state funded maintenance and operations. Instructional
space that is available for regularly scheduled classes for academic
transfer, basic skills, and workforce training programs may be eligible
for state funded maintenance and operations.
(1) Washington state patrol: Enter into a financing contract for
up to $1,360,000 plus financing expenses and required reserves pursuant
to chapter 39.94 RCW to replace the dormitory facility at the
Washington state patrol fire training academy in North Bend,
Washington.
(2) Department of general administration: Enter into a financing
contract for up to $685,000 plus financing expenses and required
reserves pursuant to chapter 39.94 RCW for the preservation of the
transportation building.
(3) Department of corrections: Enter into a financing contract for
up to $17,000,000 plus financing expenses and required reserves
pursuant to chapter 39.94 RCW to provide additional work release beds.
(4) Parks and recreation commission: Enter into a financing
contract in an amount not to exceed $2,000,000 plus financing expenses
and required reserves pursuant to chapter 39.94 RCW to develop Cama
Beach state park.
(5) Community and technical colleges:
(a) Enter into a financing contract on behalf of Green River
Community College for up to $20,000,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to purchase Kent
Station phase 2.
(b) Enter into a financing contract on behalf of Tacoma Community
College for up to $3,600,000 plus financing expenses and required
reserves pursuant to chapter 39.94 RCW to construct an early childhood
education and learning center.
(c) Enter into a financing contract on behalf of Walla Walla
Community College for up to $1,000,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to purchase up to 40
acres of land.
(d) Enter into a financing contract on behalf of Columbia Basin
College for up to $300,000 plus financing expenses and required
reserves pursuant to chapter 39.94 RCW to develop an academic support
and achievement center.
(e) Enter into a financing contract on behalf of Wenatchee Valley
College for up to $3,347,000 plus financing expenses and required
reserves pursuant to chapter 39.94 RCW to develop a 72 bed student
housing facility.
(f) Enter into a financing contract on behalf of Seattle Central
Community College for up to $3,100,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to purchase property
adjacent the main campus.
(6) The Evergreen State College: Enter into a financing contract
for up to $16,000,000 plus financing expenses and required reserves
pursuant to chapter 39.94 RCW for the college activities building
renovation.
(7) Washington state convention and trade center: Enter into a
financing contract for up to $58,000,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to purchase and
renovate the museum condominium unit located adjacent to the state
convention center. The purchase price shall not exceed fair market
value. A purchase agreement with the owner of the unit on the
effective date of this section shall include the following
requirements: (a) Upon completion of the purchase of the property, the
seller shall retain $5,750,000 of the sale proceeds in a restricted
investment account, reserving such funds for capital costs associated
with development of its principal heritage center to be located within
the city of Seattle. Principal and accrued earnings in such an account
shall be available for expenditure by the seller when the seller or the
city of Seattle has executed a construction contract for either a new
facility or improvements to an existing structure to serve as the
principal heritage center to be operated by the seller within the city;
and (b) in the event that the conditions of (a) of this subsection are
not met by June 30, 2017, the entire amount in the restricted account
shall be transferred to the state general fund and shall represent a
recovery of the state's contribution towards the development of the
museum. In the event of such a transfer, the rightful ownership of the
property by the Washington state convention and trade center shall not
be impaired.
(8) Department of information services: Enter into a financing
contract for an amount approved by the office of financial management
for costs and financing expenses and required reserves pursuant to
chapter 39.94 RCW to lease develop or lease purchase a state
((general)) data center and an office building ((and facilities)) for
the department of information services and other state agency tenants,
as determined by the office of financial management, on the state-owned
property called "the Wheeler block" in Olympia. The office
building((s)) shall be constructed and financed so that agencies
occupancy costs per gross square foot or per employee will not exceed
110 percent of comparable private market rental rates per gross square
foot or per employee. The comparable ((general)) office space rate
shall be calculated based on recent Thurston county leases of new space
of at least 100,000 rentable square feet ((adjusted for known
escalation clauses, expected inflation, and differences in the level of
service provided by the comparable leases as determined by the
department in consultation with the department of general
administration. In addition to the department of information services,
state agency tenants shall include the consolidation of state patrol
offices and general office facilities for small agencies and offices.
The department of information services shall design and operate the
general office facilities for small agencies and offices as a
demonstration of the efficiencies gained from the integration of office
space and telecommunications and computer technology. The
demonstration project shall provide office space, furniture,
telecommunications, and computer technology as a single package. The
facility shall be designed so that small agencies and offices can move
in and out of the facility without the typical moving expenses that
result from individual agency ownership of furniture and technology.
The facility for small agencies and offices shall also provide for
staffing and space efficiencies resulting from central reception,
support services, and spaces. The office of financial management shall
certify to the state treasurer: (a) The project description and dollar
amount; and (b) that all requirements of this subsection (8) have been
met)). Such comparable leases shall be for typical office space with
typical office tenant improvements adjusted for known escalation
clauses, expected inflation, nontypical tenant improvements or code
requirements, leadership in energy and environmental design
requirements, nontypical on and off site requirements, infrastructure
upgrades, market conditions and differences in the level of service
provided by the comparable leases as determined by the department in
consultation with the office of financial management. The department
of information services shall design and operate the facilities.
Should the department of information services choose to use a financing
contract that does not provide for the issuance of certificates of
participation, the financing contract shall be subject to approval by
the state finance committee as required by RCW 39.94.010. ((In
approving a financing contract not providing for the use of
certificates of participation, the state finance committee should be
reasonably certain that the contract is excluded from the computation
of indebtedness, particularly that the contract is not backed by the
full faith and credit of the state and the legislature is expressly not
obligated to appropriate funds to make payments. For purposes of this
section, "financing contract" includes but is not limited to a
certificate of participation and tax exempt financing similar to that
authorized in RCW 47.79.140.)) The department, in consultation with
the office of financial management, shall submit an implementation plan
to the fiscal committees of the legislature by December 15, 2009
identifying a schedule of consolidation of agency data centers to
achieve cost savings to offset higher facility costs resulting from the
construction of the new consolidated data center.
(9) Office of the secretary of state: Enter into a financing
contract for up to $134,935,000 plus financing expenses and required
reserves pursuant to chapter 39.94 RCW to construct the heritage
center. The heritage center is one part of a combined facility of the
heritage center and executive office building, authorized in subsection
(10) of this section. The authorization for financing under this
subsection (9) shall lapse unless chapter 523, Laws of 2007 is enacted
by June 30, 2007.
(10) Department of general administration:
(a) Enter into a financing contract for up to $79,981,000 plus
financing expenses and required reserves pursuant to chapter 39.94 RCW
to construct the executive office building. The executive office
building is one part of a combined facility of the executive office
building and the heritage center authorized in subsection (9) of this
section. The authorization for financing under this subsection (10)
shall lapse unless chapter 523, Laws of 2007 is enacted by June 30,
2007.
(b) Enter into a financing contract for up to $17,144,000 plus
financing expenses and required reserves pursuant to chapter 39.94 RCW
for the rehabilitation of the John L. O'Brien building, subject to
approval of the project scope by the speaker of the house of
representatives and the chief clerk of the house of representatives.
(c) Enter into a financing contract for up to $2,000,000 plus
financing expenses and required reserves pursuant to chapter 39.94 RCW
for the "Perry street child care site" renovations and purchase.
(d) Enter into a financing contract for up to $2,685,000 plus
financing expenses and required reserves pursuant to chapter 39.94 RCW
for land acquisition in Olympia, Washington.
(11) Department of ecology: Enter into a financing contract for up
to $11,000,000 plus financing expenses and required reserves pursuant
to chapter 39.94 RCW to rebuild the east wall of the department of
ecology's headquarters building in Lacey, Washington.
Sec. 6032 2007 c 520 s 2020 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Statewide: Facilities Assessment and Cultural Resources Planning
(((06-1-120))) (20061120)
Reappropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State . . . . . . . . . . . . (($300,000))
$150,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $150,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $300,000
Sec. 6033 2007 c 520 s 2023 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Emergency Repairs (((08-1-101))) (20081101)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $100,000
Charitable, Educational, Penal, and Reformatory
Institutions Account--State . . . . . . . . . . . . (($933,000))
$833,000
State Social and Health Services Construction
Account--State . . . . . . . . . . . . $67,000
Subtotal Appropriation . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
TOTAL . . . . . . . . . . . . $5,000,000
Sec. 6034 2007 c 520 s 2046 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF VETERANS AFFAIRS
Building 10 Assisted Living Upgrades (((08-2-005))) (20082005)
Appropriation:
((Charitable, Educational, Penal, and Reformatory))
Institutions Account--State . . . . . . . . . . . . $1,242,000
State Building Construction Account--State . . . . . . . . . . . . (($571,000))
$1,813,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,813,000
Sec. 6035 2007 c 520 s 2085 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF CORRECTIONS
Minor Works - Infrastructure Preservation (((08-1-018))) (20081018)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . (($1,000,000))
$1,441,000
Charitable, Educational, Penal, and Reformatory
Institutions Account--State . . . . . . . . . . . . (($1,000,000))
$559,000
Subtotal Appropriation . . . . . . . . . . . . $2,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
TOTAL . . . . . . . . . . . . $10,000,000
Sec. 6036 2007 c 520 s 2083 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF CORRECTIONS
Minor Works - Facility Preservation (((08-1-024))) (20081024)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $469,000
Charitable, Educational, Penal, and Reformatory
Institutions Account--State . . . . . . . . . . . . (($3,000,000))
$2,531,000
Subtotal Appropriation . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
TOTAL . . . . . . . . . . . . $15,000,000
Sec. 6037 2007 c 520 s 2084 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF CORRECTIONS
Minor Works - Health, Safety, and Code Requirements (((08-1-031)))
(20081031)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,391,000
Charitable, Educational, Penal, and Reformatory
Institutions Account--State . . . . . . . . . . . . (($3,000,000))
$1,609,000
Subtotal Appropriation . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
TOTAL . . . . . . . . . . . . $15,000,000
Sec. 6038 2008 c 328 s 1004 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Public Works Trust Fund (((07-4-005))) (20074005)
The appropriations in this section ((is)) are subject to the
following conditions and limitations:
(1) Up to $10,000,000 of the appropriations ((is)) are for the
public works board, in consultation with the house of representatives
capital budget committee, the senate ways and means committee, and the
office of financial management, to implement an infrastructure interest
rate buy-down pilot program. The purpose of the program is to
demonstrate options for the most efficient use of the state's
investment in local infrastructure by funding more projects at an
accelerated rate.
(2) The pilot program must provide grants to local governments to
offset the difference in interest rates between one-half of one
percent, as offered by the public works board, and the interest rate
the local government receives on issuance of their own debt.
(3) The pilot program must include the following projects:
(a) Those with high scores from the list of projects that were not
funded, as identified in the public works board 2008 legislative
report;
(b) Projects located in economically distressed areas or that may
be significantly impacted by a possible upcoming recession; and
(c) Projects located in jurisdictions that have unused debt
capacity and are willing and able to acquire additional debt to finance
the proposed infrastructure project.
Appropriation:
Public Works Assistance Account--State . . . . . . . . . . . . (($327,000,000))
$232,000,000
State Taxable Building Construction
Account--State . . . . . . . . . . . . $95,000,000
Subtotal Appropriation . . . . . . . . . . . . $327,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $1,400,000,000
TOTAL . . . . . . . . . . . . $1,727,000,000
Sec. 6039 2007 c 520 s 3026 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF ECOLOGY
Local Toxics Grants for Cleanup and Prevention (((06-4-008)))
(20064008)
Reappropriation:
Local Toxics Control Account--State . . . . . . . . . . . . (($56,470,000))
$35,233,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $21,237,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $42,430,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $98,900,000
Sec. 6040 2007 c 520 s 3042 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF ECOLOGY
Storm Water Projects (((08-2-003))) (20082003)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,792,000
State Toxics Control Account--State . . . . . . . . . . . . (($3,000,000))
$1,208,000
Subtotal Appropriation . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $3,000,000
Sec. 6041 2008 c 328 s 3003 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Program (((08-4-010))) (20084010)
The appropriations in this section are subject to the following
conditions and limitations:
(1) Up to $10,000,000 of the state building construction account--state appropriation is for the extended grant payment to Spokane for
the Spokane-Rathdrum Prairie aquifer.
(2) $5,000,000 of the state building construction account--state
appropriation is provided solely for water quality grants for hardship
communities with a population of less than 5,000. The department shall
give priority consideration to: (a) Communities subject to a
regulatory order from the department of ecology for noncompliance with
water quality rules; (b) projects for which design work has been
completed; and (c) projects with a local match from reasonable water
quality rates and charges.
(3) $2,000,000 of the state building construction account--state
appropriation is provided solely for the Adams and Lincoln counties
ground water mapping project. The project shall submit a report to the
appropriate committees of the legislature describing the dynamic
relationship between groundwater and surface water in the region. The
report shall be submitted by January 1, 2009.
(4) $2,100,000 of the state toxics control account appropriation is
provided solely for wastewater and clean water improvement projects at
Illahee state park, Fort Flagler state park, and Larrabee state park.
(5)(a) $4,400,000 of the state building construction account--state
appropriation is provided solely for the Tenino waste water treatment
facility and collection system to replace the city of Tenino's septic
systems.
(b) $22,113,000 of the state building construction account--state
appropriation is provided solely for the following projects:
Project Amount
City of Carnation waste water treatment system $3,000,000
Mansfield waste water treatment upgrade $960,000
Rock Island waste water treatment system $870,000
Enumclaw waste water treatment system $750,000
Snohomish waste water treatment system $5,425,000
Freeland sewer district $1,000,000
Clark county regional sewer cooperative $4,000,000
Town of Warden waste water $3,000,000
Gig Harbor waste water system improvements $1,000,000
Ritzville waste water treatment system $1,608,000
Sultan waste water system improvements $500,000
(c) The appropriation for entities that are listed in (b) of this
subsection shall not affect the entities' eligibility for centennial
fund hardship assistance and shall be excluded from any financial
hardship calculation that would have the effect of reducing other
moneys for which the entity is currently contracted and eligible under
WAC 173-95A-030(8), as it existed on the effective date of this
section.
(d) The appropriation to the city of Carnation is for payment to
King county for the county connection charge and other eligible costs.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . (($42,629,000))
$58,427,000
Water Quality Capital Account--State . . . . . . . . . . . . $5,417,000
State Toxics Control Account--State . . . . . . . . . . . . (($18,837,000))
$3,039,000
Subtotal Appropriation . . . . . . . . . . . . $66,883,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $178,400,000
TOTAL . . . . . . . . . . . . $245,283,000
Sec. 6042 2007 c 520 s 3022 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Program (((06-4-007))) (20064007)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,900,000
Water Quality Capital Account--State . . . . . . . . . . . . $8,500,000
State Toxics Control Account--State . . . . . . . . . . . . (($10,000,000))
$8,700,000
Subtotal Reappropriation . . . . . . . . . . . . (($24,400,000))
$23,100,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,300,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $32,024,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $56,424,000
Sec. 6043 2007 c 520 s 3041 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF ECOLOGY
Puget Sound Storm Water Projects (((08-2-002))) (20082002)
The appropriations in this section are subject to the following
conditions and limitations: The appropriations are provided solely for
grants to local governments within Puget Sound for municipal storm
water projects, including but not limited to, retrofit of existing
storm water projects in urban areas where storm water is a significant
source of contamination, identification and removal of nonstorm water
discharges into municipal storm sewer systems, and local innovative
storm water projects that implement low-impact development. The
department shall provide the Puget Sound partnership, as created by
chapter . . . (Engrossed Substitute Senate Bill No. 5372), Laws of
2007, the opportunity to review and provide comment on proposed
projects and activities recommended for funding. This review shall be
consistent with the funding schedule for the program.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . (($12,920,000))
$17,482,000
Local Toxics Control Account--State . . . . . . . . . . . . (($5,000,000))
$438,000
Subtotal Appropriation . . . . . . . . . . . . $17,920,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $56,680,000
TOTAL . . . . . . . . . . . . $74,600,000
Sec. 6044 2008 c 328 s 3006 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF ECOLOGY
Cleanup Toxic Sites in Puget Sound (((08-4-005))) (20084005)
The appropriations in this section ((is)) are subject to the
following conditions and limitations: Funding is provided solely for
the clean up of contaminated sites that lie adjacent to and are within
one-half mile of Puget Sound. Clean ups shall include orphan and
abandoned sites that pose a threat to Puget Sound with the highest
priority sites being cleaned up first. The department shall provide
the Puget Sound partnership, as created by chapter 341, Laws of 2007,
the opportunity to review and provide comment on proposed projects and
activities recommended for funding. This review shall be consistent
with the funding schedule for the program.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,431,000
State Toxics Control Account--State . . . . . . . . . . . . (($6,767,000))
$1,336,000
Subtotal Appropriation . . . . . . . . . . . . $6,767,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $18,820,000
TOTAL . . . . . . . . . . . . $25,587,000
Sec. 6045 2008 c 328 s 3008 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF ECOLOGY
Remedial Action Grants (((08-4-008))) (20084008)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $54,000,000
Local Toxics Control Account--State . . . . . . . . . . . . (($92,875,000))
$38,875,000
Subtotal Appropriation . . . . . . . . . . . . $92,875,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $180,000,000
TOTAL . . . . . . . . . . . . $272,875,000
Sec. 6046 2008 c 328 s 3010 (uncodified) is amended to read as
follows:
FOR THE DEPARTMENT OF ECOLOGY
Skykomish Cleanup (((08-4-020))) (20084020)
The appropriations in this section ((is)) are subject to the
following conditions and limitations: $3,000,000 of the cleanup
settlement account appropriation is provided solely for implementation
of chapter 106 (Senate Bill No. 6722 (cleanup settlement account)),
Laws of 2008. If the bill is not enacted by June 30, 2008, the amounts
provided in this section shall lapse.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,000,000
State Toxics Control Account--State . . . . . . . . . . . . (($7,000,000))
$4,000,000
Clean Up Settlement Account--State . . . . . . . . . . . . $3,000,000
Subtotal Appropriation . . . . . . . . . . . . $10,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,050,000
TOTAL . . . . . . . . . . . . $12,050,000
Sec. 6047 2007 c 520 s 3135 (uncodified) is amended to read as
follows:
FOR THE RECREATION AND CONSERVATION FUNDING BOARD
Aquatic Lands Enhancement Account (((08-4-005))) (20084005)
The appropriation in this section is subject to the following
conditions and limitations:
(1) The appropriation in this section is provided solely for the
list of projects in LEAP capital document No. 2007-1, developed March
17, 2007.
(2) The committee shall submit a list of recommended projects to be
funded from the aquatic lands enhancement account in the 2009-2011
capital budget to the office of financial management and the
appropriate legislative committees. The list shall result from a
competitive grants program developed by the committee based upon, at a
minimum: (a) Uniform criteria for selecting projects and awarding
grants for up to fifty percent of the total projects cost; (b) local
community support for the projects; and (c) environmental benefits to
be derived from projects.
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,326,000
Aquatic Lands Enhancement Account--State . . . . . . . . . . . . (($5,025,000))
$1,699,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $20,100,000
TOTAL . . . . . . . . . . . . $25,125,000
Sec. 6048 2007 c 520 s 5137 (uncodified) is amended to read as
follows:
FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Washington Heritage Grants (07-4-004)
The appropriation in this section is subject to the following
conditions and limitations:
(1) The appropriation is subject to the provisions of RCW
27.34.330.
(2) The appropriation is provided solely for the following list of
projects:
Project Recommended
Cascade land conservancy $202,000
Suquamish museum and arts center $1,000,000
Moses Lake museum and arts center $1,000,000
White River Valley museum $245,000
The Tulalip tribe $1,000,000
City of Mukilteo $490,000
Lewis county historical museum $43,000
((Pacific county historical society $186,000))
City of Gig Harbor $1,000,000
Bainbridge Island metro parks and recreation $70,000
Polson museum $171,000
Washington trust for historic preservation $83,000
Historic Seattle PDA $500,000
City of Tacoma $77,000
City of Des Moines $1,000,000
Fort Walla Walla museum (($859,000))
$1,000,000
Foss waterway seaport $300,000
LaConner quilt museum $125,000
Cowlitz River Valley historical society $158,000
Western forest industries museum $158,000
San Juan historical society $25,000
Central Washington fair association $48,000
Urban league of metro Seattle $650,000
The center for wooden boats $235,000
Jefferson county historical society $200,000
Mansfield museum $10,000
Martin Luther King Ballet $50,000
The northwest railway museum $75,000
Northpoint cooperative preschool $40,000
Total (($10,000,000))
$9,955,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . (($10,000,000))
$9,955,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
TOTAL . . . . . . . . . . . . (($50,000,000))
$49,955,000
NEW SECTION. Sec. 6049
NEW SECTION. Sec. 6050 Section 6002 of this act expires June 30,
2011.
NEW SECTION. Sec. 6051 Sections 6022 and 6023 of this act expire
June 30, 2011.
NEW SECTION. Sec. 6052 2007 c 520 s 6006 (uncodified) is
repealed.
NEW SECTION. Sec. 6053 Part headings and captions in this act
are not any part of the law.
NEW SECTION. Sec. 6054 If any provision of this act or its
application to any person or circumstance is held invalid, the
remainder of the act or the application of the provision to other
persons or circumstances is not affected.
NEW SECTION. Sec. 6055 This act is necessary for the immediate
preservation of the public peace, health, or safety, or support of the
state government and its existing public institutions, and takes effect
immediately, except for sections 6020, 6021, and 6024 through 6027 of
this act which take effect July 1, 2009.