BILL REQ. #:  Z-0484.1 



_____________________________________________ 

SENATE BILL 5222
_____________________________________________
State of Washington61st Legislature2009 Regular Session

By Senators Fraser and Brandland; by request of Governor Gregoire

Read first time 01/16/09.   Referred to Committee on Ways & Means.



     AN ACT Relating to the capital budget; making appropriations and authorizing expenditures for capital improvements; amending RCW 43.155.050, 43.155.068, 43.155.070, 40.14.024, 43.09.282, 67.40.040, 79.17.010, 79.17.020, 43.19.501, and 43.99N.060; amending 2008 c 328 s 5001 (uncodified); amending 2007 c 520 s 6013 (uncodified); creating new sections; repealing 2007 c 520 s 6006 (uncodified); providing an effective date; providing expiration dates; and declaring an emergency.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

NEW SECTION.  Sec. 1   (1) A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period beginning with the effective date of this act and ending June 30, 2011, out of the several funds specified in this act.
     (2) The definitions in this subsection apply throughout this act unless the context clearly requires otherwise.
     (a) "Fiscal year 2010" or "FY 2010" means the fiscal year ending June 30, 2010.
     (b) "Fiscal year 2011" or "FY 2011" means the fiscal year ending June 30, 2011.
     (c) "Lapse" or "revert" means the amount shall return to an unappropriated status.
     (d) "Provided solely" means the specified amount may be spent only for the specified purpose.
     Unless otherwise specifically authorized in this act, any portion of an amount provided solely for a specified purpose that is not expended subject to the specified conditions and limitations to fulfill the specified purpose shall lapse.

PART 1
GENERAL GOVERNMENT

NEW SECTION.  Sec. 1001   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Rural Washington Loan Fund (19882002)

Reappropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $1,036,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,859,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,895,000

NEW SECTION.  Sec. 1002   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water Assistance Account (20044002)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) Expenditures of the appropriation shall comply with RCW 70.119A.170.
     (2)(a) The state building construction account reappropriation is provided solely to provide assistance to counties, cities, and special purpose districts to identify, acquire, and rehabilitate public water systems that have water quality problems or have been allowed to deteriorate to a point where public health is an issue. Eligibility is confined to applicants that already own at least one group A public water system and that demonstrate a track record of sound drinking water utility management. Funds may be used for: Planning, design, and other preconstruction activities; system acquisition; and capital construction costs.
     (b) The state building construction account reappropriation must be jointly administered by the department of health, the public works board, and the department of community, trade, and economic development using the drinking water state revolving fund loan program as an administrative model. In order to expedite the use of these funds and minimize administration costs, this reappropriation must be administered by guidance, rather than rule. Projects must generally be prioritized using the drinking water state revolving fund loan program criteria. All financing provided through this program must be in the form of grants that must partially cover project costs. The maximum grant to any eligible entity may not exceed twenty-five percent of the funds allocated to the appropriation in section 201, chapter 277, Laws of 2004.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,000
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $4,200,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,206,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,494,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,700,000

NEW SECTION.  Sec. 1003   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water State Revolving Fund - Authorization to Use Loan Repayments (20044010)

Reappropriation:
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $10,801,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,399,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,200,000

NEW SECTION.  Sec. 1004   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local and Community Projects (20044011)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The projects must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department, except that the Highline historical society project is land acquisition.
     (2) The reappropriation is subject to the project list in section 204, chapter 277, Laws of 2004.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,615,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,315,000

NEW SECTION.  Sec. 1005   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local and Community Projects (20064008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $14,034,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $33,766,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $47,800,000

NEW SECTION.  Sec. 1006   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing Assistance, Weatherization, and Affordable Housing (20064001)

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $1,926,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $112,174,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $114,100,000

NEW SECTION.  Sec. 1007   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Public Works Trust Fund (20064004)

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $61,339,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $227,561,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $288,900,000

NEW SECTION.  Sec. 1008   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Rural Washington Loan Fund (20064010)

Reappropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $3,878,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,128,000

NEW SECTION.  Sec. 1009   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Economic Revitalization Board (20064011)

     The reappropriation in this section is subject to the following conditions and limitations: A maximum of twenty-five percent of the reappropriation in this section may be used for grants.

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $16,530,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,920,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,450,000

NEW SECTION.  Sec. 1010   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Water System Acquisition and Rehabilitation Program (20064850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation must be jointly administered by the department of health, the public works board, and the department of community, trade, and economic development using the drinking water state revolving fund loan program as an administrative model. In order to expedite the use of these funds and minimize administration costs, this appropriation must be administered by guidance, rather than rule. Projects must generally be prioritized using the drinking water state revolving fund loan program criteria. All financing provided through this program must be in the form of grants that must partially cover project costs. The maximum grant to any eligible entity may not exceed twenty-five percent of the funds allocated to this appropriation.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $327,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,674,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,001,000

NEW SECTION.  Sec. 1011   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing Assistance, Weatherization, and Affordable Housing (20064851)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) Up to $6,800,000 of the reappropriation from the Washington housing trust account is provided solely for the backlog, as defined by the department, of projects determined by the department to be eligible under chapter 43.185 or 43.185A RCW.
     (2) Up to $4,500,000 of the reappropriation from the Washington housing trust account is provided solely for weatherization administered through the energy matchmakers program.
     (3) Up to $850,000 of the reappropriation from the Washington housing trust account is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social and health services.
     (4) Up to $500,000 of the reappropriation from the Washington housing trust account is provided solely for shelters, transitional housing, or other housing facilities for victims of domestic violence.
     (5) Up to $3,000,000 of the reappropriation from the Washington housing trust account is provided solely for farm worker housing projects and programs to meet the full spectrum of housing needs of Washington's farm workers and their families. The department shall work with stakeholders representing a diversity of farm worker housing interests to develop a strategic plan in implementing this provision.
     (6) Up to $200,000 of the reappropriation from the Washington housing trust account is provided solely for the implementation and management of a manufactured and mobile home landlord-tenant ombudsman conflict resolution program by the office of mobile home affairs as generally described in section 3, chapter 429, Laws of 2005. The office of mobile home affairs shall also determine the number of complaints made to the department since May 2005 that, in the best estimate of the department, do in fact present violations of chapter 59.20 RCW and shall produce a summary of the number and types of complaints. The office of mobile home affairs shall also continue to maintain and update a database with information about all mobile home parks and manufactured housing communities.
     (7) Up to $150,000 of the reappropriation from the Washington housing trust account is provided solely for a program to assist individuals and communities in the home-buying process, including, but not limited to: Homebuyer education classes, credit and budget counseling, financial literacy training, and down payment assistance programs. The department shall contract with a nonprofit organization as defined under section 501(c)(3) of the Internal Revenue Code or similar successor provision that has experience and expertise in addressing language access barriers in the home-buying process to implement this program.
     (8) Reappropriations in this section must be included in the calculation of annual funds available for determining the administrative costs of the department, which shall not exceed five percent of the annual funds available for the housing assistance program and the affordable housing program as authorized under RCW 43.185.050 and 43.185A.030.

Reappropriation:
     Washington Housing Trust Account--State . . . . . . . . . . . . $444,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $16,557,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,001,000

NEW SECTION.  Sec. 1012   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Job and Economic Development Grants (20064950)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of section 107, chapter 371, Laws of 2006.
     (2) The reappropriation is subject to the project list in section 107, chapter 371, Laws of 2006.
     (3) Up to $1,000,000 of the reappropriation for the Pacific Northwest national labs campus infrastructure project is provided solely for giga-pop infrastructure.
     (4) Up to $5,000,000 of the reappropriation is provided solely for military communities infrastructure projects. Military communities infrastructure projects shall include:
     (a) Grants to counties and cities for the purchase of development easements and the purchase of real property in fee simple to restrict the use of accident potential zones and clear zones. The office of financial management shall establish a competitive process for selecting projects to receive the grants. Final allocation of these grants shall be at the discretion and with the approval of the director of the office of financial management.
     The grants are subject to the following conditions:
     (i) The county or city must be subject to and in compliance with RCW 36.70A.530;
     (ii) The grants may not be used to remove encroachments into these zones allowed by county or city zoning or permitting actions;
     (iii) The county or city must have an encroachment prevention plan preventing future encroachment into these zones; and
     (iv) The grant provided by the state must not exceed one-third of the project cost with funds from local and federal sources providing the balance of the funds.
     (b) Up to $481,000 of the reappropriation is provided solely for improvements to a military department site on Fairchild air force base.

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $15,379,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $34,621,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 1013   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Jobs in Communities (20064951)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 140, chapter 488, Laws of 2005.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,960,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,291,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,251,000

NEW SECTION.  Sec. 1014   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Building for the Arts Grants (20074001)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of RCW 43.63A.750.
     (2) The reappropriation is subject to the provisions of section 1027, chapter 520, Laws of 2007.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,768,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $58,262,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $60,000,000

NEW SECTION.  Sec. 1015   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Services Facilities Grants (20074002)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of RCW 43.63A.125.
     (2) The reappropriation is subject to the provisions of section 1029, chapter 520, Laws of 2007.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $47,647,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,147,000

NEW SECTION.  Sec. 1016   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Youth Recreational Facilities Grants (20074003)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of RCW 43.63A.135.
     (2) The reappropriation is subject to the provisions of section 1007, chapter 328, Laws of 2008.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $37,050,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $41,050,000

NEW SECTION.  Sec. 1017   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water Assistance Program (20074004)

Reappropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $9,098,000
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $21,100,000
          Subtotal Reappropriation . . . . . . . . . . . . $30,198,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $153,502,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $183,700,000

NEW SECTION.  Sec. 1018   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Public Works Trust Fund (20074005)

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $327,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,400,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,727,000,000

NEW SECTION.  Sec. 1019   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Water System Acquisition Rehabilitation Program (20074006)

     The reappropriation in this section is subject to the following conditions and limitations: Up to $1,000,000 of the reappropriation is provided solely for the city of Republic to acquire the Pine Grove water system.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,928,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,822,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,750,000

NEW SECTION.  Sec. 1020   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Rural Washington Loan Fund (20074008)

Reappropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $1,782,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,853,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,635,000

NEW SECTION.  Sec. 1021   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing Assistance, Weatherization, and Affordable Housing (20074009)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) Up to $9,000,000 of the reappropriation is provided solely for weatherization administered through the energy matchmakers program.
     (2) Up to $5,000,000 of the reappropriation is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social and health services.
     (3) Up to $2,500,000 of the reappropriation is provided solely for grants to nonprofit organizations and public housing authorities for revolving loan, self-help housing programs for low and moderate income families.
     (4) Up to $1,000,000 of the reappropriation is provided solely for shelters, transitional housing, or other housing facilities for victims of domestic violence.
     (5) Up to $5,000,000 of the reappropriation is provided solely for the development of emergency shelters and transitional housing opportunities for homeless families with children.
     (6) Up to $1,500,000 of the reappropriation is provided solely for the development of housing for low-income or homeless Native Americans. The department shall work with Native American tribes, not-for–profit organizations with experience in serving Native American populations, and Native American housing development organizations to prioritize projects located in the areas of highest identified need.
     (7) Up to $4,000,000 of the reappropriation is provided solely for loans and grants to eligible organizations to purchase manufactured/mobile home communities with the intent of preserving the communities for affordable housing.
     (8) Up to $10,000,000 of the reappropriation is for the creation and development of low-income housing within areas declared disasters by the governor after November 2007.
     (9) Up to $2,000,000 of the reappropriation from the state taxable building construction account is provided solely for the development or preservation of farmworker housing for migrant and seasonal farmworkers located on private farms. This reappropriation is subject to appropriate agreements to protect the public investment. Any of this reappropriation that is not obligated by June 30, 2009, shall be added to the amount appropriated for the general pool of projects.
     (10) The reappropriations in this section from the state building construction account shall be distributed as grants.
     (11) Up to $250,000 of the reappropriation from the Washington housing trust account is provided solely to the city of Burien for housing related purposes.
     (12) The reappropriation in this section shall not be used for the administrative costs of the department. The amount of the appropriation shall be included in the calculation of annual funds available for determining the administrative costs authorized under RCW 43.185.050.
     (13) Within available funding provided in this section, the department shall prepare an inventory of housing assistance programs. The inventory shall include all state funded programs, the housing finance commission programs, all programs funded by local governments and housing authorities, including a description of expenditures from fees and taxes specifically authorized by state law for housing assistance and homeless programs, all property tax and sales tax provisions that are intended to support housing assistance programs, and all federally funded housing assistance programs provided in the state. The inventory shall include a description of the program, biennial appropriation and expenditure levels since the 1999-2001 biennium through the 2007-2009 biennium, a description of eligibility criteria and the amount of benefit provided per unit or per family, and the number of units or families assisted. The department shall coordinate with the joint legislative audit and review committee to reduce duplicative efforts that may be required by legislation.
     (14)(a) Up to $10,000,000 of the reappropriation is provided solely for the department to contract with the Washington state housing finance commission to provide grants or loans to eligible organizations, described under RCW 43.185A.040, to purchase land or real property for affordable housing and community facilities preservation or development in rapidly gentrifying neighborhoods, redevelopment areas, or communities with a significant low-income population that is threatened with displacement by such gentrification. Loans or grants may be made to purchase land or real property for the preservation or development of affordable housing or community facilities, including reasonable costs and fees. The Washington state housing finance commission's review and evaluation of projects for loans and grants must include, but is not limited to the following: (i) Consideration of mobile home parks facing closure; (ii) properties in neighborhoods in King county that are facing gentrification or redevelopment; and (iii) properties located in the city of Spokane that are facing the threat of displacing low-income tenants due to the loss of affordable housing rental units. The Washington state housing finance commission, with approval from the department, may adopt guidelines and requirements that are necessary to administer the affordable housing and community facilities rapid response program. A loan recipient must preserve affordable rental housing acquired or developed under this section as affordable housing for a minimum of thirty years. Interest rates on loans made under this section may be as low as zero percent but may not exceed three percent. All loan repayments must be deposited into the Washington housing trust account and accounted for separately from other funds in the account.
     (b) By December 1, 2009, the Washington state housing finance commission shall report to the department and the appropriate committees of the legislature: (i) The number of loans that were made in the program; (ii) for what purposes the loans were made; (iii) to whom the loans were made; and (iv) when the loans are expected to be paid back.
     (15) Up to $10,000,000 of the reappropriation is for the department to contract with the Washington state housing finance commission to administer the facilitation of nonprofit entities' use of tax-exempt multifamily bonds issued by the Washington state housing finance commission.
     (16)(a) Up to $100,000 of the reappropriation from the Washington housing trust account is provided solely for the department to work in consultation with the affordable housing advisory board and representatives from nonprofit housing development organizations and affordable housing advocacy groups in the state to:
     (i) Identify and analyze all costs associated with affordable housing development projects financed through the Washington housing trust fund under chapters 43.185 and 43.185A RCW, which may include, but are not limited to, costs associated with legal and architectural services, permitting and impact fees, land acquisition, and general construction costs;
     (ii) Make recommendations for strategies, which must include recommendations for changes to public policy and department procedures, to reduce the costs identified in (a)(i) of this subsection; and
     (iii) Make recommendations for potential performance measures appropriate for each strategy identified.
     (b) In developing recommendations for strategies to reduce costs, the department shall analyze and address the fiscal impact of public policies of the state and of local governments, Washington housing trust fund policies, and general market forces on affordable housing development.
     (c) The department shall report its findings and recommendations to the governor and to the appropriate committees of the legislature by September 30, 2009.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $56,700,000
     State Taxable Building Construction Account--State . . . . . . . . . . . . $65,869,000
     Washington Housing Trust Account--State . . . . . . . . . . . . $12,800,000
          Subtotal Reappropriation . . . . . . . . . . . . $135,369,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $624,631,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $760,000,000

NEW SECTION.  Sec. 1022   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Job Development Fund Grants (20074010)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1032, chapter 520, Laws of 2007.

Reappropriation:
     Job Development Account--State . . . . . . . . . . . . $29,354,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,576,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $49,930,000

NEW SECTION.  Sec. 1023   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Economic Revitalization Board (20074015)

     The reappropriation in this section is subject to the following conditions and limitations: A maximum of twenty-five percent of the appropriation may be used for grants.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $9,395,000
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $7,289,000
          Subtotal Reappropriation . . . . . . . . . . . . $16,684,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $27,316,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $44,000,000

NEW SECTION.  Sec. 1024   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Longview Regional Water Treatment Plant Dredging (20081001)

     The reappropriation in this section is subject to the following conditions and limitations: Funding is provided solely for emergency dredging to prevent the sandbars in the Cowlitz river from obstructing the intake facility necessary for the city of Longview to obtain drinking water.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $150,000

NEW SECTION.  Sec. 1025   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Quincy Water Treatment System Phase 1 (20081002)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely to increase the capacity of the water treatment facility in the city of Quincy.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,500,000

NEW SECTION.  Sec. 1026   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Innovation Partnership Zones (20082003)

     The reappropriation in this section is subject to the following conditions and limitations: The state will designate unique areas of the state as innovation partnership zones, where globally competitive companies, research institutions, and advanced training are creating special competitive advantages for the state. From among the innovation partnership zones, using a competitive process based on need, estimated economic impact, geographic diversity, and local matches, six zones or projects will be selected to receive funding. The appropriation in this section is provided solely for shared telecommunications within the zone, shared infrastructure and facilities, long-term capital purchases, and up to 10 percent for zone administration through the locally-designated innovation partnership zone administrator. It is the intent of the legislature that innovation partnership zone grants should consider the commercialization of inventions and innovations.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,731,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $269,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1027   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Washington State Horse Park (20082004)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation in this section shall complete the state's capital obligation for the facility.
     (2) Land provided for the state horse park by the county or city in which the park is located shall remain in the ownership of that county or city unless the county or city determines otherwise. The legislature encourages the county or city to provide a long-term lease of selected property to the Washington state horse park authority at a minimal charge.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,490,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,500,000

NEW SECTION.  Sec. 1028   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local and Community Projects (20084001)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The projects must comply with RCW 43.63A.125 and other requirements for community projects administered by the department.
     (2) The reappropriation is subject to the provisions of section 1008, chapter 328, Laws of 2008.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $73,389,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $61,305,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $134,694,000

NEW SECTION.  Sec. 1029   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Development Fund (20084850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1014, chapter 328, Laws of 2008.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $11,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,166,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $21,166,000

NEW SECTION.  Sec. 1030   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Belfair Sewer Improvements (20084852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,500,000
     Public Works Assistance Account--State . . . . . . . . . . . . $4,800,000
          Subtotal Reappropriation . . . . . . . . . . . . $10,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,300,000

NEW SECTION.  Sec. 1031   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Building Communities Fund Program (20084855)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $50,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 1032   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Schools Program (20084856)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation in this section is provided solely for the acquisition, rehabilitation, expansion, or improvement of surplus school buildings to be converted into community facilities for the delivery of nonresidential coordinated services for children and families.
     (2) Eligible applicants include local governments, nonprofit organizations, nonprofit early learning providers, and tribal governments. Only the following surplus schools may be eligible for grant funding under this section: (a) Allen school; (b) Crown Hill school; (c) Fauntleroy school; (d) University Heights school; (e) Martin Luther King elementary school; and (f) Lincoln high school north wing.
     (3) As part of the grant process, applicants must submit a comprehensive plan for the use of the surplus school that includes information on the following:
     (a) A list of partner entities that will assist the lead eligible applicant to provide or coordinate services for children and families;
     (b) A memorandum of understanding between the lead eligible applicant and each partner; and
     (c) An examination of capital and operating funding sources that applicants intend to apply to the project and coordinated services at each school to be served, whether such funding is derived from grants under this section or from other federal, state, local, or private sources.
     (4) Project applicants must demonstrate that the proposed project is ready to proceed, will make timely use of the funds, and requires state funding to accomplish a discrete, usable phase of the project that may include acquisition.
     (5) If grant funds under this subsection are used for the acquisition of surplus school facilities, the sale proceeds must be used by the local school board disposing of such property for renovation, replacement, or new construction of school facilities in the district, but shall not be used as local match for projects receiving state school construction assistance grants.
     (6) In contracts for grants authorized under this subsection, the department shall include provisions that require that capital improvements must be held by the grantee for a specified period of time appropriate to the amount of the grant and that facilities must be used for the express purpose of the grant. If the grantee is found to be out of compliance with provisions of the contract, the grantee shall repay to the state general fund the principal amount of the grant plus interest calculated at the rate of interest on state of Washington general obligation bonds issued most closely to the date of authorization of the grant.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,152,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,433,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,585,000

NEW SECTION.  Sec. 1033   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Quillayute Valley Wood-Fire Boiler (20084858)

Reappropriation:
     Energy Freedom Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 1034   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Snohomish County Biodiesel (20084859)

Reappropriation:
     Energy Freedom Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 1035   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     2008 Local and Community Projects (20084861)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1019, chapter 328, Laws of 2008.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,479,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,479,000

NEW SECTION.  Sec. 1036   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Grays Harbor Wind Project (20084950)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1037   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Skagit County Digester (20084951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 1038   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Public Works Trust Fund (30000003)

Appropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $396,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,900,000,000
          TOTAL . . . . . . . . . . . . $2,296,000,000

NEW SECTION.  Sec. 1039   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Water System Acquisition and Rehabilitation Program (30000004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 1040   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water State Revolving Fund Loan Program (30000005)

Appropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $8,000,000
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $31,201,000
          Subtotal Appropriation . . . . . . . . . . . . $39,201,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $215,974,000
          TOTAL . . . . . . . . . . . . $255,175,000

NEW SECTION.  Sec. 1041   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Building for the Arts Grants (30000006)

     (1) The appropriation in this section is subject to the following conditions and limitations: Projects must be selected based on their readiness to proceed.
     (2) The appropriation is provided solely for the following list of projects:

Reconstruction of First Stage, Issaquah$400,000
Modular Classrooms for Dance (Gladish)$30,000
Cottage Renovation (Hedgebrook)$20,000
Stage Two (Whidbey)$450,000
Federal Way Performing Arts Center$325,000
Museum Expansion (Maryhill)$1,500,000
New Hands On Children's Museum$1,000,000
Building a Foundation for Discovery$250,000
James Center for the Performing Arts (Sequim)$150,000
Vashon Arts Center$1,115,000
Admiral Theatre-No Theatre Left Behind$140,000
Seattle Opera Center - Phase I Design$650,000
Viva Vera Capital Campaign$70,000
Langston Hughes Performing Arts Center$475,000
WA Hall Acquisition and Rehab$400,000
Visual Arts Education Center (Snohomish County)$1,000,000
Artspace Everett Lofts$1,000,000
Legacy Project (Imagine)$200,000
Convert Key Bank To Everett's Plaza Theatre$500,000
Gateway Center (Lummi)$150,000
Phase II Renovation (Mt. Baker Theatre)$1,000,000
Downstairs at the 5th$800,000
Campus Consolidation (Cornish)$375,000
Total$12,000,000


Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $48,000,000
          TOTAL . . . . . . . . . . . . $60,000,000

NEW SECTION.  Sec. 1042   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Youth Recreational Facilities Grants (30000007)

     (1) The appropriation in this section is subject to the following conditions and limitations: Projects must be selected based on their readiness to proceed.
     (2) The appropriation is provided solely for the following list of projects:

Spokane Central YMCA$800,000
Toutle River Ranch Phase 3$360,000
Grant Central Kitsap Community Campus YMCA$800,000
Kitsap Girl Scout Center$205,000
East Pierce County HOPE Center$800,000
Naval Avenue Boys & Girls Club$80,000
Allen Place$800,000
Auburn Boys & Girls Club$800,000
Highline YMCA$800,000
West Sound Teen Center$305,000
Coal Creek Family YMCA$800,000
Hough Pool Renovation$150,000
Jim Parsley Community Center$800,000
Total$7,500,000


Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $30,000,000
          TOTAL . . . . . . . . . . . . $37,500,000

NEW SECTION.  Sec. 1043   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Building Communities Fund Grants (30000008)

     The appropriation in this section is subject to the following conditions and limitations: Projects must be selected based on their readiness to proceed.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $32,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $128,000,000
          TOTAL . . . . . . . . . . . . $160,000,000

NEW SECTION.  Sec. 1044   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Economic Revitalization Board (30000010)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,000,000
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $6,253,000
          Subtotal Appropriation . . . . . . . . . . . . $19,253,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $109,735,000
          TOTAL . . . . . . . . . . . . $128,988,000

NEW SECTION.  Sec. 1045   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Innovation Partnership Zones (30000012)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 1046   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing Assistance, Weatherization, and Affordable Housing (30000013)

     The appropriations in this section are subject to the following conditions and limitations: $9,000,000 of the appropriations are provided solely for weatherization administered through the energy matchmakers program.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $32,000,000
     State Taxable Building Construction Account--State . . . . . . . . . . . . $68,000,000
          Subtotal Appropriation . . . . . . . . . . . . $100,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $400,000,000
          TOTAL . . . . . . . . . . . . $500,000,000

NEW SECTION.  Sec. 1047   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local and Community Projects (30000019)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Except as otherwise directed before the effective date of this section, the department shall not expend the appropriations in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.
     (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease. This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.
     (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.
     (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.
     (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(2)(c).
     (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay
state prevailing wages.
     (7) The appropriation is provided solely for the following list of projects:

Ready by five$1,000,000
Tri Cities stem school$800,000
Livingston Baker fire & life safety$750,000
Neighborcare health clinic$1,000,000
South Tacoma community center$1,000,000
Dawson place child advocacy center$1,000,000
Zina Linnik Park$950,000
Airway Heights water treatment plant$1,000,000
Columbia waterfront$3,100,000
Connell infrastructure$1,100,000
Pullman Moscow$2,000,000
Snohomish County emergency center$1,000,000
Poulsbo marine center$500,000
Walter Clore wine & culinary center$1,000,000
Carnation farmers market$162,000


Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $16,362,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,362,000

NEW SECTION.  Sec. 1048   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Energy Freedom Program (30000056)

Appropriation:
     Energy Freedom Account--State . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,000,000
          TOTAL . . . . . . . . . . . . $30,000,000

NEW SECTION.  Sec. 1049   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Alternative Energy Investments (30000057)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 1050   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Infrastructure Investments (30000058)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $20,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 1051   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Oversight of State Facilities (20082855)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,532,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,419,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,192,000
          TOTAL . . . . . . . . . . . . $9,143,000

NEW SECTION.  Sec. 1052   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Cowlitz River Dredging (20082856)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $314,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $686,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 1053   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Graving Dock Settlement (20084001)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely to fulfill the state's obligations in the settlement agreement in the case of Lower Elwha Klallam Tribe et al v. State et al, Thurston county superior court, cause no. 05-2-01595-8, and the associated economic development agreement, specifically to the city of Port Angeles for archaeological work as specified in the settlement agreement.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $280,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,480,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $140,000
          TOTAL . . . . . . . . . . . . $15,900,000

NEW SECTION.  Sec. 1054   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Catastrophic Flood Relief (30000022)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $47,775,927

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,224,073
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 1055   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Transportation Building Preservation (20021008)

Reappropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,180,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,706,000
          TOTAL . . . . . . . . . . . . $30,886,000

NEW SECTION.  Sec. 1056   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Highway-License Building Repair and Renewal (20061013)

Reappropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $150,000
Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $2,963,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,299,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,262,000

NEW SECTION.  Sec. 1057   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Natural Resources Building Repairs and Renewal (20061014)

Reappropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $258,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $50,000
          Subtotal Reappropriation . . . . . . . . . . . . $308,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,675,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,520,000
          TOTAL . . . . . . . . . . . . $7,503,000

NEW SECTION.  Sec. 1058   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Minor Works - Infrastructure Preservation (20081004)

Reappropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $712,500
     State Building Construction Account--State . . . . . . . . . . . . $470,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,182,500

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,938,500
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,121,000

NEW SECTION.  Sec. 1059   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     O'Brien Building Improvements (20081007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,671,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,481,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,329,000
          TOTAL . . . . . . . . . . . . $17,981,000

NEW SECTION.  Sec. 1060   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Capitol Campus High Voltage System Improvements (20081010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,204,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,204,000

NEW SECTION.  Sec. 1061   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Legislative Building Improvements (20081011)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $144,908
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $933,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,106,092
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,639,000
          TOTAL . . . . . . . . . . . . $6,823,000

NEW SECTION.  Sec. 1062   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Minor Works - Facility Preservation (20081015)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $560,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $566,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,126,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,179,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,305,000

NEW SECTION.  Sec. 1063   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Infrastructure Relocation (20082028)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,062,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $938,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 1064   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Emergency Newhouse Repairs and South Campus Plan (20082952)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $231,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $519,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $750,000

NEW SECTION.  Sec. 1065   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Capital Lake Plan Completion (20082953)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $350,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 1066   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Campus Monuments Repair and Restoration (20091003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $38,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $288,000

NEW SECTION.  Sec. 1067   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Minor Works Preservation (30000012)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,263,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $650,000
          Subtotal Appropriation . . . . . . . . . . . . $3,913,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $34,986,000
          TOTAL . . . . . . . . . . . . $38,899,000

NEW SECTION.  Sec. 1068   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Temple of Justice: Heating, Ventilation and Air Conditioning Upgrades (30000018)

Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $2,380,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,380,000

NEW SECTION.  Sec. 1069   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Minor Works - Program Projects (30000023)

Appropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $327,000
     State Building Construction Account--State . . . . . . . . . . . . $343,000
          Subtotal Appropriation . . . . . . . . . . . . $670,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,284,000
          TOTAL . . . . . . . . . . . . $7,954,000

NEW SECTION.  Sec. 1070   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     East Plaza Renovation (30000031)

Appropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $765,000
     State Building Construction Account--State . . . . . . . . . . . . $1,549,000
          Subtotal Appropriation . . . . . . . . . . . . $2,314,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,711,000
          TOTAL . . . . . . . . . . . . $15,025,000

NEW SECTION.  Sec. 1071   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Emergency Repairs (30000033)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $65,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $1,125,000
          Subtotal Appropriation . . . . . . . . . . . . $1,190,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,000,000
          TOTAL . . . . . . . . . . . . $8,190,000

NEW SECTION.  Sec. 1072   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Powerhouse: Improvements and Preservation (30000056)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,459,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,459,000

NEW SECTION.  Sec. 1073   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Facility Oversight Program: Staffing (30000063)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for the department of general administration to assist the office of financial management with the development and implementation of RCW 43.82.035 and 43.82.055.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $740,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,597,000
          TOTAL . . . . . . . . . . . . $6,337,000

NEW SECTION.  Sec. 1074   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Heritage Center and Executive Office Building: Construction (30000481)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided in conjunction with the authorized certificates of participation solely for construction of the combined heritage center and executive office building project. The total project cost must not exceed $134,935,000 for the heritage building and $79,981,000 for the executive office building plus financing costs.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $27,920,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $27,920,000

NEW SECTION.  Sec. 1075   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Insurance Building: Exterior Drainage Repairs (30000082)

Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $1,270,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,375,000
          TOTAL . . . . . . . . . . . . $3,645,000

NEW SECTION.  Sec. 1076   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Engineering and Architectural Services: Staffing (30000086)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $150,000
     State Building Construction Account--State . . . . . . . . . . . . $11,650,000
          Subtotal Appropriation . . . . . . . . . . . . $11,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $43,033,000
          TOTAL . . . . . . . . . . . . $54,833,000

NEW SECTION.  Sec. 1077   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Infrastructure Savings (30000480)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1

NEW SECTION.  Sec. 1078   FOR THE LIQUOR CONTROL BOARD
     Minor Works (30000009)

Appropriation:
     Liquor Control Board Construction and Maintenance
          Account--State . . . . . . . . . . . . $315,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $315,000

NEW SECTION.  Sec. 1079   FOR THE MILITARY DEPARTMENT
     Minor Works - Facility Preservation (20081004)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $1,120,000
     State Building Construction Account--State . . . . . . . . . . . . $701,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,821,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,002,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,823,000

NEW SECTION.  Sec. 1080   FOR THE MILITARY DEPARTMENT
     Minor Works - Program (20082003)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $864,000
     State Building Construction Account--State . . . . . . . . . . . . $100,000
          Subtotal Reappropriation . . . . . . . . . . . . $964,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,139,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,103,000

NEW SECTION.  Sec. 1081   FOR THE MILITARY DEPARTMENT
     Flood Warning Systems (20082851)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for the emergency management division in consultation with the department of ecology, the department of community, trade, and economic development, the Washington association of counties, the United States army corps of engineers, the national oceanic and atmospheric association, and the national weather service to develop the following:
     (1) An inventory and description of flood warning systems currently in place in flood hazard areas of the state, including manual systems and electronic systems;
     (2) A needs assessment indication what specific areas of the state could be better served by flood warning systems based on flooding areas mapped under the federal emergency management act. The needs assessment must include recommendations regarding how to make timely notification of flood warnings and how to gather and share data about potential flood areas;
     (3) An information bank of flood warning systems, with descriptions of available and emerging technologies, and estimates of the costs of purchasing, installing, and maintaining these systems;
     (4) Sources of potential federal assistance for local flood warning systems; and
     (5) Recommendations to assist local governments in the financing of capital costs of flood warning systems, including the potential to modify existing state programs.
     The recommendations must be reported to the office of financial management and legislature by December 15, 2009.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 1082   FOR THE MILITARY DEPARTMENT
     Combined Support Maintenance Shop: Design and Construction (20082006)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $22,164,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,519,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,683,000

NEW SECTION.  Sec. 1083   FOR THE MILITARY DEPARTMENT
     Minor Works Preservation (30000002)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $3,069,000
     State Building Construction Account--State . . . . . . . . . . . . $2,209,000
          Subtotal Appropriation . . . . . . . . . . . . $5,278,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,172,000
          TOTAL . . . . . . . . . . . . $24,450,000

NEW SECTION.  Sec. 1084   FOR THE MILITARY DEPARTMENT
     Minor Works Program (30000003)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $679,000
     State Building Construction Account--State . . . . . . . . . . . . $1,193,000
          Subtotal Appropriation . . . . . . . . . . . . $1,872,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,229,000
          TOTAL . . . . . . . . . . . . $12,101,000

NEW SECTION.  Sec. 1085   FOR THE MILITARY DEPARTMENT
     Emergency Repairs (30000059)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $100,000
     State Building Construction Account--State . . . . . . . . . . . . $100,000
          Subtotal Appropriation . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $800,000
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 1086   FOR THE MILITARY DEPARTMENT
     Infrastructure Savings (30000480)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1

NEW SECTION.  Sec. 1087   FOR THE STATE CONVENTION AND TRADE CENTER
     Minor Works Facility Preservation (30000001)

     The appropriation in this section is subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Convention and Trade Center Account--State . . . . . . . . . . . . $6,741,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,741,000

(End of part)


PART 2
HUMAN SERVICES

NEW SECTION.  Sec. 2001   FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
     Minor Works - Preservation (20081002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $122,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $476,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $598,000

NEW SECTION.  Sec. 2002   FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
     Dormitory Construction (30000002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $16,745,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,745,000

NEW SECTION.  Sec. 2003   FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
     Fire Alarm Upgrade/Replacement (30000004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $369,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $369,000

NEW SECTION.  Sec. 2004   FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
     Firing Range Upgrades (30000006)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $309,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $309,000

NEW SECTION.  Sec. 2005   FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
     Firing Range Addition (30000008)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,308,000
          TOTAL . . . . . . . . . . . . $9,608,000

NEW SECTION.  Sec. 2006   FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
     School Mapping (30000011)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $546,000
          TOTAL . . . . . . . . . . . . $746,000

NEW SECTION.  Sec. 2007   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Statewide: Facilities Assessment and Cultural Resources Planning (20061120)

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $150,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,200,000
          TOTAL . . . . . . . . . . . . $1,800,000

NEW SECTION.  Sec. 2008   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Green Hill School: New Inmate Management Unit, Health Center, and Administration (20062202)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,575,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,575,000

NEW SECTION.  Sec. 2009   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Mental Health Division-Eastern Washington: Evaluation and Treatment (20064352)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 2010   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Mental Health Division-Children's Long-Term Inpatient Program Facilities: Preservation (20064353)

     The appropriations in this section are subject to the following conditions and limitations: The department shall evaluate options for maximizing federal fund contributions for capital needs of privately owned facilities that contract with the department for children's long-term inpatient program services.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,701,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,701,000

NEW SECTION.  Sec. 2011   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works - Health, Safety, and Code Requirements (20081111)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,200,000

NEW SECTION.  Sec. 2012   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works - Facility Preservation (20081112)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,000,000

NEW SECTION.  Sec. 2013   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works - Infrastructure Preservation (20081113)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,700,000

NEW SECTION.  Sec. 2014   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Hazards Abatement and Demolition (20081119)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000
Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $500,000
     State Building Construction Account--State . . . . . . . . . . . . $500,000
          Subtotal Appropriation . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $3,600,000

NEW SECTION.  Sec. 2015   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital New Kitchen and Commissary Building (20081319)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,463,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,113,000

NEW SECTION.  Sec. 2016   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital Laundry Upgrades (20081325)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,658,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,858,000

NEW SECTION.  Sec. 2017   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Utility Replacements at the Special Commitment Center (20081504)

     The reappropriation and appropriation in this section are subject to the following conditions and limitations: It is the intent of the appropriation and reappropriation to replace essential utilities (sanitary sewer, high voltage electrical, and fiber optic communications) serving the special commitment center and McNeil corrections center on McNeil Island by replacing the Island's electrical feed from the shoreline landing to the McNeil corrections center generator building, and continuing on to the special commitment center. The department shall coordinate the work with the department of corrections for the most cost effective approach to the work.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,950,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,490,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $90,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,530,000

NEW SECTION.  Sec. 2018   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Rainier School Waste Treatment Plant (20082001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,200,000

NEW SECTION.  Sec. 2019   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Special Commitment Center Medium Management Housing Addition (20082505)

     The appropriation and reappropriation in this section are subject to the following conditions and limitations:
     (1) The reappropriation is to add residential space to existing facilities by remodeling existing residential space and converting existing program space to residential space for additional beds.
     (2) Up to $50,000 of the appropriation is provided solely for the update to the predesign for the eighty bed housing unit. This updated predesign must examine alternatives including the use of modular structures.
     (3) The remaining amount of the appropriation is for the design of two forty-bed units to be constructed in two phases.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $700,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $575,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $53,664,000
          TOTAL . . . . . . . . . . . . $56,939,000

NEW SECTION.  Sec. 2020   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Fircrest Campus Master Plan (20082850)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The department shall resume and complete a master plan of the portion of the Fircrest campus that is not utilized by the Fircrest school or the department of health.
     (2) In drafting the master plan, the department shall consult with the following:
     (a) The city of Shoreline;
     (b) The department of natural resources;
     (c) The department of health regarding their master planning effort;
     (d) Representatives of institutions of higher education with whom the department has a partnership; and
     (e) Representatives of the Shoreline community and neighboring communities.
     (3) The master plan must include a plan for the future of the property, including recommendations for alternative uses such as affordable housing and smart growth options. The hybrid option as described in the Fircrest excess property report dated January 14, 2008, must be used for the purposes of the master plan. The development of the master plan must not prohibit the potential future expansion of the public health laboratory by the department of health.
     (4) The department must report to the appropriate committees of the legislature and the office of financial management by December 1, 2010.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $50,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $395,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $445,000

NEW SECTION.  Sec. 2021   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Lakeland Village: Nine Cottages Renovation, Phase 4, 5, and 6 (20061402)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,190,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,063,000
          TOTAL . . . . . . . . . . . . $8,453,000

NEW SECTION.  Sec. 2022   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Echo Glen Children's Center - Housing Units (20081041)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,400,000

NEW SECTION.  Sec. 2023   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works - Health, Safety, and Code Requirements (30000366)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,590,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,458,000
          TOTAL . . . . . . . . . . . . $25,048,000

NEW SECTION.  Sec. 2024   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works - Infrastructure Preservation (30000367)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,110,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,766,306
          TOTAL . . . . . . . . . . . . $19,876,306

NEW SECTION.  Sec. 2025   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works - Facilities Preservation (30000368)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,930,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $30,831,123
          TOTAL . . . . . . . . . . . . $36,761,123

NEW SECTION.  Sec. 2026   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Emergency Repairs (30000485)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $500,000
     State Building Construction Account--State . . . . . . . . . . . . $500,000
          Subtotal Appropriation . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 2027   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Capital Project Management: Staffing (30000486)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,000,000
     State Building Construction Account--State . . . . . . . . . . . . $850,000
          Subtotal Appropriation . . . . . . . . . . . . $1,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $13,850,000

NEW SECTION.  Sec. 2028   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Echo Glen Children's Center: Housing Units Remodel, Phase 3 (30000812)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,355,000
          TOTAL . . . . . . . . . . . . $17,955,000

NEW SECTION.  Sec. 2029   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Eastern State Hospital: Activity Therapy Building Upgrades (30000832)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,150,000

NEW SECTION.  Sec. 2030   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works - Program Projects (30000838)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,954,000
          TOTAL . . . . . . . . . . . . $24,954,000

NEW SECTION.  Sec. 2031   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Lakeland Village: Pavement Replacement (30000840)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $780,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,430,000
          TOTAL . . . . . . . . . . . . $2,210,000

NEW SECTION.  Sec. 2032   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital: Traffic Study Implementation (30000843)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $355,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $996,000
          TOTAL . . . . . . . . . . . . $1,351,000

NEW SECTION.  Sec. 2033   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Echo Glen Childrens Center: Portable Classroom Replacement (30000844)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $743,000
          TOTAL . . . . . . . . . . . . $1,593,000

NEW SECTION.  Sec. 2034   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Eastern State Hospital: Roof Replacements (30000846)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,085,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,088,000
          TOTAL . . . . . . . . . . . . $2,173,000

NEW SECTION.  Sec. 2035   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital: Roof Replacements (30000851)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $620,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,198,000
          TOTAL . . . . . . . . . . . . $3,818,000

NEW SECTION.  Sec. 2036   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Francis Haddon Morgan Center: Main Building Renovation (30000853)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,249,000
          TOTAL . . . . . . . . . . . . $2,499,000

NEW SECTION.  Sec. 2037   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Eastern State Hospital: Westlake Building Renovation (30000852)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $840,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,093,000
          TOTAL . . . . . . . . . . . . $2,933,000

NEW SECTION.  Sec. 2038   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Infrastructure Savings (30000480)

     The appropriation in this section is subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1

NEW SECTION.  Sec. 2039   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory Addition (20082003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,165,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,003,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,168,000

NEW SECTION.  Sec. 2040   FOR THE DEPARTMENT OF HEALTH
     Drinking Water Assistance Program (20064001)

Reappropriation:
     Drinking Water Assistance Account--Federal . . . . . . . . . . . . $21,922,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $169,586,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $191,508,000

NEW SECTION.  Sec. 2041   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory HVAC Systems Upgrades (20081002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $412,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,912,000

NEW SECTION.  Sec. 2042   FOR THE DEPARTMENT OF HEALTH
     Drinking Water Assistance Program (30000013)

Appropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $24,348,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $24,348,000

NEW SECTION.  Sec. 2043   FOR THE DEPARTMENT OF HEALTH
     Minor Works - Facility Preservation (30000015)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $597,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $597,000

NEW SECTION.  Sec. 2044   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     State Veterans Cemetery (20082004)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $6,206,000
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $73,000
          Subtotal Reappropriation . . . . . . . . . . . . $6,279,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,546,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,825,000

NEW SECTION.  Sec. 2045   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Washington Soldiers Home: Nursing Bed Replacement Predesign (30000001)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,755,000
          TOTAL . . . . . . . . . . . . $24,955,000

NEW SECTION.  Sec. 2046   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Minor Works - Facilities Preservation (30000003)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $2,920,000
     State Building Construction Account--State . . . . . . . . . . . . $575,000
          Subtotal Appropriation . . . . . . . . . . . . $3,495,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,585,000
          TOTAL . . . . . . . . . . . . $10,080,000

NEW SECTION.  Sec. 2047   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Minor Works - Program Projects (30000004)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,430,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,463,000
          TOTAL . . . . . . . . . . . . $6,893,000

NEW SECTION.  Sec. 2048   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Emergency Repairs (30000053)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,200,000
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 2049   FOR THE DEPARTMENT OF CORRECTIONS
     Coyote Ridge Corrections Center: Design and Construct Medium Security (19982011)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,280,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $224,620,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $230,900,000

NEW SECTION.  Sec. 2050   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Regional Infrastructure (20042008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,100,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,629,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $19,629,000

NEW SECTION.  Sec. 2051   FOR THE DEPARTMENT OF CORRECTIONS
     McNeil Island Corrections: Replace and Stabilize Housing Unit Siding (20061005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,756,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,816,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,713,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,087,000
          TOTAL . . . . . . . . . . . . $17,372,000

NEW SECTION.  Sec. 2052   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center for Women: Replace Steamlines (20061018)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $319,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $697,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,016,000

NEW SECTION.  Sec. 2053   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: South Close Security Complex (20062021)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $35,950,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $14,276,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $118,578,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $168,804,000

NEW SECTION.  Sec. 2054   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: Health Care Facility (20062043)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $283,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $417,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $89,446,000
          TOTAL . . . . . . . . . . . . $90,146,000

NEW SECTION.  Sec. 2055   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center for Women: Healthcare Center (20062066)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,058,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,058,000

NEW SECTION.  Sec. 2056   FOR THE DEPARTMENT OF CORRECTIONS
     Clallam Bay Corrections Center Install Close Custody Slider Doors (20062070)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,160,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $450,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $18,910,000

NEW SECTION.  Sec. 2057   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Health Care Facility (20062072)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,039,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $161,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,177,000
          TOTAL . . . . . . . . . . . . $25,377,000

NEW SECTION.  Sec. 2058   FOR THE DEPARTMENT OF CORRECTIONS
     Cedar Creek Corrections Center: Add 100 Minimum Security Beds (20062851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,729,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,229,000

NEW SECTION.  Sec. 2059   FOR THE DEPARTMENT OF CORRECTIONS
     Larch Corrections Center: 80-Bed Expansion (20062852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $560,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,512,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,072,000

NEW SECTION.  Sec. 2060   FOR THE DEPARTMENT OF CORRECTIONS
     Airway Heights Heating and Cooling Loop Replacement (20081001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $506,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,419,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,925,000

NEW SECTION.  Sec. 2061   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Barge Slip Pilings at McNeil Island Corrections Center (20081002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,612,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $288,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,900,000

NEW SECTION.  Sec. 2062   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Kitchen Roofs at Monroe Correctional Complex (20081003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $301,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,761,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,062,000

NEW SECTION.  Sec. 2063   FOR THE DEPARTMENT OF CORRECTIONS
     Replace G Building Roof at Washington Corrections Center (20081004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,631,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,431,000

NEW SECTION.  Sec. 2064   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Roofs at Washington Corrections Center (20081005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,566,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,666,000

NEW SECTION.  Sec. 2065   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Roofs at Washington State Penitentiary (20081007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $589,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,789,000

NEW SECTION.  Sec. 2066   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Fire Alarm System at Washington Corrections Center (20081008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $445,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,079,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,524,000

NEW SECTION.  Sec. 2067   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Electrical Distribution Building at Special Offenders Unit (20081009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $680,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $542,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,222,000

NEW SECTION.  Sec. 2068   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Cell Door and Electronics at Washington State Reformatory (20081010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $292,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,253,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,545,000

NEW SECTION.  Sec. 2069   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Telecommunications Infrastructure at Clallam Bay (20081013)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $750,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,045,000
          TOTAL . . . . . . . . . . . . $20,895,000

NEW SECTION.  Sec. 2070   FOR THE DEPARTMENT OF CORRECTIONS
     Minor Works - Infrastructure Preservation (20081018)

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $231,000
     State Building Construction Account--State . . . . . . . . . . . . $311,000
          Subtotal Reappropriation . . . . . . . . . . . . $542,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,458,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 2071   FOR THE DEPARTMENT OF CORRECTIONS
     Minor Works - Health, Safety, and Code Requirements (20081031)

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $658,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,342,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 2072   FOR THE DEPARTMENT OF CORRECTIONS
     Laundry Improvements at Washington State Penitentiary (20081033)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,737,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $314,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,051,000

NEW SECTION.  Sec. 2073   FOR THE DEPARTMENT OF CORRECTIONS
     Expand Reception Center at Washington Corrections Center (20082016)

     The appropriation and reappropriation in this section are subject to the following conditions and limitations: Prior to the allotment of design funds, the office of financial management shall undertake a budget evaluation study of the project.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $73,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $397,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $59,300,000
          TOTAL . . . . . . . . . . . . $64,570,000

NEW SECTION.  Sec. 2074   FOR THE DEPARTMENT OF CORRECTIONS
     100-Bed Expansion at Mission Creek Corrections Center for Women (20082020)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,084,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $543,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,627,000

NEW SECTION.  Sec. 2075   FOR THE DEPARTMENT OF CORRECTIONS
     Close Sewer Lagoon at Monroe Correctional Complex (20082022)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $101,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,162,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $128,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,524,000
          TOTAL . . . . . . . . . . . . $10,915,000

NEW SECTION.  Sec. 2076   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Add 300 Minimum Security Beds (20082026)

     The reappropriation in this section is subject to the following conditions and limitation: The reappropriation in this section is provided solely for design of 300 minimum security beds.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,220,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $198,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,418,000

NEW SECTION.  Sec. 2077   FOR THE DEPARTMENT OF CORRECTIONS
     Sex Offender Treatment Program Building at Airway Heights (20082028)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $650,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,297,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,947,000

NEW SECTION.  Sec. 2078   FOR THE DEPARTMENT OF CORRECTIONS
     300 Minimum Security Bed Expansion - Predesign - Three Locations (20082850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $322,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $155,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,280,000
          TOTAL . . . . . . . . . . . . $5,757,000

NEW SECTION.  Sec. 2079   FOR THE DEPARTMENT OF CORRECTIONS
     Minor Works - Infrastructure Preservation (30000016)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,446,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,664,000
          TOTAL . . . . . . . . . . . . $12,110,000

NEW SECTION.  Sec. 2080   FOR THE DEPARTMENT OF CORRECTIONS
     Minor Works - Health, Safety, and Code Requirements (30000047)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,609,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,194,000
          TOTAL . . . . . . . . . . . . $15,803,000

NEW SECTION.  Sec. 2081   FOR THE DEPARTMENT OF CORRECTIONS
     Minor Works - Facility Preservation (30000086)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,857,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,084,000
          TOTAL . . . . . . . . . . . . $14,941,000

NEW SECTION.  Sec. 2082   FOR THE DEPARTMENT OF CORRECTIONS
     Clallam Bay Corrections Center: Replace 5 Towers and Housing Roofs (30000108)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 2083   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center for Women: Replace Fire Alarm (30000121)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,625,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,625,000

NEW SECTION.  Sec. 2084   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Replace Fire Detection/Suppression (30000123)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,098,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,098,000

NEW SECTION.  Sec. 2085   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: Washington State Reformatory/Minimum Security Unit Water Line Replacements (30000137)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,809,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,809,000

NEW SECTION.  Sec. 2086   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Transformers and Switches (30000143)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $839,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,139,000
          TOTAL . . . . . . . . . . . . $8,978,000

NEW SECTION.  Sec. 2087   FOR THE DEPARTMENT OF CORRECTIONS
     Ahtanum View Work Release: Replace HVAC System (30000148)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,211,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,211,000

NEW SECTION.  Sec. 2088   FOR THE DEPARTMENT OF CORRECTIONS
     McNeil Island Correction Center: Replace Park Road Water Main (30000153)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,854,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,854,000

NEW SECTION.  Sec. 2089   FOR THE DEPARTMENT OF CORRECTIONS
     Stafford Creek Corrections Center: Heat Exchanger Replacement/Repair (30000164)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,304,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,304,000

NEW SECTION.  Sec. 2090   FOR THE DEPARTMENT OF CORRECTIONS
     Minor Works - Programmatic Projects (30000173)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,392,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,157,000
          TOTAL . . . . . . . . . . . . $30,549,000

NEW SECTION.  Sec. 2091   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center for Women: Roof Replacement (30000178)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,832,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,832,000

NEW SECTION.  Sec. 2092   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Complex: Firing Range Realignment (30000291)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,658,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,658,000

NEW SECTION.  Sec. 2093   FOR THE DEPARTMENT OF CORRECTIONS
     New 300 Minimum Security Beds for Women: Land and Predesign (30000331)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,610,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $75,166,000
          TOTAL . . . . . . . . . . . . $76,776,000

NEW SECTION.  Sec. 2094   FOR THE DEPARTMENT OF CORRECTIONS
     Mission Creek Corrections Center - Women: Visiting Expansion (30000335)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,855,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,855,000

NEW SECTION.  Sec. 2095   FOR THE DEPARTMENT OF CORRECTIONS
     Emergency Repairs (30000346)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,500,000
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000
          Subtotal Appropriation . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 2096   FOR THE DEPARTMENT OF CORRECTIONS
     Highest and Best Use Analysis for Aging Prison Facilities (30000347)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $400,000

NEW SECTION.  Sec. 2097   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Kitchen Improvements (20061007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $402,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,387,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,789,000

NEW SECTION.  Sec. 2098   FOR THE DEPARTMENT OF CORRECTIONS
     Infrastructure Savings (30000480)

     The appropriation in this section is subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1

NEW SECTION.  Sec. 2099   FOR THE EMPLOYMENT SECURITY DEPARTMENT
     Maple Park Building (30000001)

     The appropriation in this section is subject to the following conditions and limitations: $1,279,000 is appropriated to the employment security department from the unemployment compensation administration account--federal, from funds made available to the state by Section 903 (d) of the Social Security Act, for the renovation of employment security department headquarters at 212 Maple Park.

Appropriation:
     Unemployment Compensation Administration Account--
          Federal . . . . . . . . . . . . $1,279,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $30,093,000
          TOTAL . . . . . . . . . . . . $31,372,000

(End of part)


PART 3
NATURAL RESOURCES

NEW SECTION.  Sec. 3001   FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities (19742006)

Reappropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $2,287,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,012,674
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,299,674

NEW SECTION.  Sec. 3002   FOR THE DEPARTMENT OF ECOLOGY
     Low-Level Nuclear Waste Disposal Trench Closure (19972012)

     The appropriation in this section is subject to the following conditions and limitations: $9,000,000 of the appropriation is provided solely for design, engineering, and construction of a cover for filled trenches at the commercial low-level radioactive waste disposal facility. The cover must be placed as an interim remedial action in accordance with WAC 173-340-430. The office of financial management shall not authorize expenditure of this funding until the department of ecology and the department of health jointly submit to the office of financial management an updated schedule of actions and funding needed to complete site closure and decommissioning in accordance with the requirements described in the May 28, 2004, final environmental impact statement for the commercial low-level radioactive waste disposal site, located on the Hanford Federal facility site.

Appropriation:
     Site Closure Account--State . . . . . . . . . . . . $9,000,000
Reappropriation:
     Site Closure Account--State . . . . . . . . . . . . $4,500,000
          Subtotal Appropriation . . . . . . . . . . . . $13,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,345,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,845,000

NEW SECTION.  Sec. 3003   FOR THE DEPARTMENT OF ECOLOGY
     Water Measuring Devices (2001H009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $652,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,492,400
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,144,400

NEW SECTION.  Sec. 3004   FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities (20024006)

Reappropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $1,022,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,977,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,999,000

NEW SECTION.  Sec. 3005   FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities (20044006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,600,000
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $392,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,992,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,658,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,626,000

NEW SECTION.  Sec. 3006   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Fund (20044007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,765,000
     Water Quality Capital Account--State . . . . . . . . . . . . $115,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,880,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,872,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,752,000

NEW SECTION.  Sec. 3007   FOR THE DEPARTMENT OF ECOLOGY
     Water Conveyance Infrastructure Projects (20052850)

Reappropriation:
     Water Quality Capital Account--State . . . . . . . . . . . . $87,000
     State Building Construction Account--State . . . . . . . . . . . . $2,788,000
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $438,000
          Subtotal Reappropriation . . . . . . . . . . . . $3,313,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,517,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,830,000

NEW SECTION.  Sec. 3008   FOR THE DEPARTMENT OF ECOLOGY
     Sunnyside Valley Irrigation District Water Conservation (20052851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,800,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,065,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $13,715,000

NEW SECTION.  Sec. 3009   FOR THE DEPARTMENT OF ECOLOGY
     Quad Cities Water Right Mitigation (20052852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,925,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $275,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,200,000

NEW SECTION.  Sec. 3010   FOR THE DEPARTMENT OF ECOLOGY
     State Drought Preparedness (20054009)

Reappropriation:
     State Drought Preparedness Account--State . . . . . . . . . . . . $738,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,591,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,329,000

NEW SECTION.  Sec. 3011   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (20062003)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions in section 136, chapter 371, Laws of 2006.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,198,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,798,000

NEW SECTION.  Sec. 3012   FOR THE DEPARTMENT OF ECOLOGY
     Low Impact Development for Stormwater Management (20062006)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for grants to local governments in Puget Sound to fund innovative, low-impact development storm water management projects to meet critical storm water management needs and protect or restore water quality. Projects may include use of bioretention, rainwater harvest, permeable pavement, vegetated roofs, and other low-impact development techniques. Projects funded in Puget Sound must meet the design guidelines contained in the low-impact development technical guidance manual for Puget Sound, unless the municipality can demonstrate that site conditions warrant a deviation from the design guidelines and the deviations in design provides similar performance. All projects must include performance monitoring.

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $912,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,088,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3013   FOR THE DEPARTMENT OF ECOLOGY
     Columbia River Program (20062010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,300,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,000,000

NEW SECTION.  Sec. 3014   FOR THE DEPARTMENT OF ECOLOGY
     Motor Vehicle Mercury Removal Program (20062850)
Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $498,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $502,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3015   FOR THE DEPARTMENT OF ECOLOGY
     Columbia River Basin Water Supply Development Program (20062950)

Reappropriation:
     Columbia River Basin Water Supply Development
          Account--State . . . . . . . . . . . . $42,874,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $97,126,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $60,000,000
          TOTAL . . . . . . . . . . . . $200,000,000

NEW SECTION.  Sec. 3016   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Account (20064002)


     The reappropriations in this section are subject to the following conditions and limitations:
     (1) The department must give priority loan funding consideration to on-site septic system rehabilitation and replacement programs in Mason, Kitsap, and Jefferson counties for up to $1,000,000 from the water pollution control revolving account--state in the second year of the funding cycle.
     (2) Up to $5,000,000 of the water pollution control revolving account--state reappropriation is for loans for on-site sewage replacement. This reappropriation may be used to: (a) Establish new or expand existing on-site sewage repair and replacement loan programs by county governments or tribes; or (b) develop a pilot program to administer an on-site sewage repair and replacement loan program through a qualified private or nonprofit lending institution. This appropriation must be used in conjunction with water quality capital account--state reappropriation in section 3017 of this act provided for this purpose. The department must work with the department of health, the Puget Sound water quality action team, local governments, and the lending industry in developing and piloting this program.

Reappropriation:
     Water Pollution Control Revolving
          Account--Federal . . . . . . . . . . . . $29,045,000
     Water Pollution Control Revolving
          Account--State . . . . . . . . . . . . $47,004,000
          Subtotal Reappropriation . . . . . . . . . . . . $76,049,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $163,568,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $239,617,000

NEW SECTION.  Sec. 3017   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (20064007)

Reappropriation:
     Water Quality Capital Account--State . . . . . . . . . . . . $4,034,000
     State Toxics Control Account--State . . . . . . . . . . . . $1,483,000
     State Building Construction Account--State . . . . . . . . . . . . $3,418,000
          Subtotal Reappropriation . . . . . . . . . . . . $8,935,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $47,489,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $56,424,000

NEW SECTION.  Sec. 3018   FOR THE DEPARTMENT OF ECOLOGY
     Local Toxics Grants for Cleanup and Prevention (20064008)

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $29,583,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $69,317,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $98,900,000

NEW SECTION.  Sec. 3019   FOR THE DEPARTMENT OF ECOLOGY
     Transfer of Water Rights for Cabin Owners (20081951)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for the purchase of water for domestic water users in the Yakima Basin (Water Resource Inventory Areas 37, 38, and 39) that have a surface water right with a priority date later than May 10, 1905, as well as for all out-of-priority surface water users in the Yakima Basin. A portion of the appropriation may be used for administrative and other costs associated with acquiring and transferring the water rights. The department must recover all costs from participating domestic water users for their prorated portion of the cost of securing a water right or rights for this purpose and associated annual operational costs owed to the United States bureau of reclamation. Funds recovered in this manner shall be placed in the drought preparedness account.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $450,000

NEW SECTION.  Sec. 3020   FOR THE DEPARTMENT OF ECOLOGY
     Puget Sound Stormwater Projects (20082002)

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $4,489,000
     State Building Construction Account--State . . . . . . . . . . . . $12,920,000
          Subtotal Reappropriation . . . . . . . . . . . . $17,409,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $57,191,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $74,600,000

NEW SECTION.  Sec. 3021   FOR THE DEPARTMENT OF ECOLOGY
     Stormwater Projects (20082003)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $2,647,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $353,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3022   FOR THE DEPARTMENT OF ECOLOGY
     Breazeale Interpretive Center (20082856)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $125,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $370,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $495,000

NEW SECTION.  Sec. 3023   FOR THE DEPARTMENT OF ECOLOGY
     Reclaimed Water (20084002)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for grants to local governments in Puget Sound to complete reclaimed water projects. Priority must be given to projects in water short areas where reclaimed water can be used to replace other water sources and where reclaimed water can be used to restore important ecosystem functions in Puget Sound.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,719,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $25,056,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $29,775,000

NEW SECTION.  Sec. 3024   FOR THE DEPARTMENT OF ECOLOGY
     Puget Sound Aquatic Cleanup and Restoration (20084004)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $2,931,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $25,689,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $28,620,000

NEW SECTION.  Sec. 3025   FOR THE DEPARTMENT OF ECOLOGY
     Cleanup Toxic Sites in Puget Sound (20084005)

     The reappropriation in this section is subject to the following conditions and limitations: Funding is provided solely for the clean-up of contaminated sites that lie adjacent to and are within one-half mile of Puget Sound. Clean-ups must include orphaned and abandoned sites that pose a threat to Puget Sound with the highest priority sites being cleaned up first. The department must provide the Puget Sound partnership, as created by chapter 341, Laws of 2007, the opportunity to review and provide comment on proposed projects and activities recommended for funding. This review must be consistent with the funding schedule for the program.

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $5,431,372

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,335,628
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,767,000

NEW SECTION.  Sec. 3026   FOR THE DEPARTMENT OF ECOLOGY
     Remedial Action Grants (20084008)

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $45,816,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $47,059,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $92,875,000

NEW SECTION.  Sec. 3027   FOR THE DEPARTMENT OF ECOLOGY
     Safe Soils Remediation Grants (20084009)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $2,334,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,166,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,500,000

NEW SECTION.  Sec. 3028   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (20084010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $25,120,000
     Water Quality Capital Account--State . . . . . . . . . . . . $4,947,000
     State Toxics Control Account--State . . . . . . . . . . . . $18,837,000
          Subtotal Reappropriation . . . . . . . . . . . . $48,904,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $17,979,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $66,883,000

NEW SECTION.  Sec. 3029   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Loan Program (20084011)

Reappropriation:
     Water Pollution Control Revolving
          Account--Federal . . . . . . . . . . . . $49,473,000
     Water Pollution Control Revolving
          Account--State . . . . . . . . . . . . $83,995,000
          Subtotal Reappropriation . . . . . . . . . . . . $133,468,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,532,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $140,000,000

NEW SECTION.  Sec. 3030   FOR THE DEPARTMENT OF ECOLOGY
     On-Site Septic Replacement Program (20084012)

Reappropriation:
     Water Quality Capital Account--State . . . . . . . . . . . . $2,429,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $571,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3031   FOR THE DEPARTMENT OF ECOLOGY
     Coordinated Prevention Grants (20084015)

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $13,699,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $125,801,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $139,500,000

NEW SECTION.  Sec. 3032   FOR THE DEPARTMENT OF ECOLOGY
     Reduce Public Health Risks from Wood Stove Pollution (20084019)

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,650,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3033   FOR THE DEPARTMENT OF ECOLOGY
     Skykomish Cleanup (20084020)

Reappropriation:
     Cleanup Settlement Account--State . . . . . . . . . . . . $3,000,000
     State Toxics Control Account--State . . . . . . . . . . . . $5,792,000
          Subtotal Reappropriation . . . . . . . . . . . . $8,792,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,208,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 3034   FOR THE DEPARTMENT OF ECOLOGY
     Waste Tire Pile Cleanup (20084022)

Reappropriation:
     Waste Tire Removal Account--State . . . . . . . . . . . . $2,458,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,542,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3035   FOR THE DEPARTMENT OF ECOLOGY
     Reduce Health Risks from Toxic Diesel Pollution (20084024)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) Up to $5,380,000 of the reappropriation is provided solely for clean diesel school bus projects for local school districts, that the department may use for the purposes of RCW 28A.160.205.
     (2) Up to $4,830,000 of the reappropriation is provided solely for clean diesel projects, other than for school buses, as described in RCW 70.94.017(2)(a) and may be distributed through grants to air pollution control authorities.

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $3,449,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,761,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,210,000

NEW SECTION.  Sec. 3036   FOR THE DEPARTMENT OF ECOLOGY
     Yakima River Basin Water Storage Feasibility Study (20084026)

     The appropriations in this section are subject to the following conditions and limitations: The appropriation is provided solely for
completion of the United States bureau of reclamation's Yakima Basin storage feasibility study, including the associated joint national environmental policy act, the state environmental policy act, and environmental impact statement. The appropriated funds are to be used by the bureau of reclamation and the department of ecology to evaluate potential in basin storage facilities such as the proposed Black Rock and Wymer reservoirs and other reasonable alternatives that will enhance water supply in the Yakima Basin.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,750,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,250,000

NEW SECTION.  Sec. 3037   FOR THE DEPARTMENT OF ECOLOGY
     Water Irrigation Efficiencies (20084028)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3038   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (20084029)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for grants for projects that improve water supplies and help achieve instream flows by implementing watershed plans, as follows:
     (1) Surface or ground water storage projects, where such projects are consistent with the recommendations of the water storage task force. The department shall consult the departments of agriculture and fish and wildlife before issuing water storage grants.
     (2) Infrastructure or water management projects that resolve conflicts among water needs for municipal, agricultural, rural, and fish restoration purposes. The stream flow improvements and other public benefits secured from these projects must be commensurate with the investment of state funds.
     (3) Agricultural water supply projects that improve water conservation and water use efficiency.
     (4) Purchase and installation of water measuring devices in salmon critical basins and areas participating in the department of fish and wildlife fish screening and cooperative compliance program, and basins where watershed plans call for additional water use measurement.
     (5) Acquisition of water to achieve instream flows or to establish water banks. The department must give priority to acquisitions in salmon critical basins. The department must place acquired water into the state's trust water rights program (chapters 90.38 and 90.42 RCW).
     (6) Up to $200,000 of the appropriation is provided for a portion of the costs of the Ahtanum creek watershed restoration program, including construction of the Pine Hollow reservoir, provided there is agreement among the Yakama nation, Ahtanum irrigation district, and other jurisdictional federal, state, and local agencies and entities to proceed with the environmental impact statement.
     (7) Up to $560,000 is provided solely for the Chehalis watershed.
     (8) Up to $300,000 is provided solely for a grant to the Nisqually river foundation to support the watershed conservation plan, low-impact development program, and Nisqually river education program.
     (9) Up to $1,200,000 of the appropriation is provided solely for grants to lead local government entities for planning unit administrative support to watershed planning units. Such grants must be provided only to those entities that have completed, approved plans that are actively being implemented. Grant amounts will range from $30,000 to $60,000, based on criteria to be developed by the department. Criteria should consider factors including complexity of water issues, geographical size, population growth pressure, rate of plan implementation, and others issues to be determined by the department.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,000,000

NEW SECTION.  Sec. 3039   FOR THE DEPARTMENT OF ECOLOGY
     Mason County Consortium (20084851)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3040   FOR THE DEPARTMENT OF ECOLOGY
     Flood Protection Study (20082855)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for the department to conduct a study to determine the number of decertified levees in the state and to identify strategies for recertifying the levees so that they provide optimum protection for the communities protected by the levees. The department must prioritize areas to include in the study based on population and the economic impact of potential flood damage.
     The study must include the following components:
     (1) A working group of levee managers to advise and inform the study;
     (2) A technical review of the structural integrity of levee systems;
     (3) An inventory, map, and rate the effectiveness of existing levee systems; and
     (4) The development of strategies and actions needed to improve the existing levee system and to ensure certification by the United States army corps of engineers for one-hundred year flood protection.
     The study must be completed and a report provided to the appropriate legislative committees by July 1, 2010.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $280,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $280,000

NEW SECTION.  Sec. 3041   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Fund Program (30000007)

Appropriation:
     Water Pollution Control Revolving
          Account--State . . . . . . . . . . . . $65,000,000
     Water Pollution Control Revolving
          Account--Federal . . . . . . . . . . . . $45,000,000
          Subtotal Appropriation . . . . . . . . . . . . $110,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $285,000,000
          TOTAL . . . . . . . . . . . . $395,000,000

NEW SECTION.  Sec. 3042   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (30000008)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $15,000,000
     State Taxable Building Construction Account--State . . . . . . . . . . . . $20,000,000
          Subtotal Appropriation . . . . . . . . . . . . $35,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $240,000,000
          TOTAL . . . . . . . . . . . . $275,000,000

NEW SECTION.  Sec. 3043   FOR THE DEPARTMENT OF ECOLOGY
     Reducing Health Threats from Woodstove Pollution (30000010)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $9,000,000

NEW SECTION.  Sec. 3044   FOR THE DEPARTMENT OF ECOLOGY
     Padilla Bay Reserve Boat Garage (30000011)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $265,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $265,000

NEW SECTION.  Sec. 3045   FOR THE DEPARTMENT OF ECOLOGY
     Cleanup and Prevention of Waste Tire Piles (30000012)

Appropriation:
     Waste Tire Removal Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3046   FOR THE DEPARTMENT OF ECOLOGY
     Coordinated Prevention Grants (30000013)

     The appropriation in this section is subject to the following conditions and limitations: $4,270,000 of the appropriation is provided solely for grants to local governments for local waste and pollution prevention projects. Grants must fund new organics composting and conversion, green building, and moderate risk waste initiatives described in the state "beyond waste" plan, including backyard burning of organic materials.

Appropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $25,060,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $125,680,000
          TOTAL . . . . . . . . . . . . $150,740,000

NEW SECTION.  Sec. 3047   FOR THE DEPARTMENT OF ECOLOGY
     Swift Creek Natural Asbestos Cleanup (30000015)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,800,000
          TOTAL . . . . . . . . . . . . $15,800,000

NEW SECTION.  Sec. 3048   FOR THE DEPARTMENT OF ECOLOGY
     Upper Columbia River Black Sand Beach Cleanup (30000016)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3049   FOR THE DEPARTMENT OF ECOLOGY
     Orphaned and Abandoned Site Cleanup Initiative (30000018)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,900,000
     Cleanup Settlement Account--State . . . . . . . . . . . . $277,000
          Subtotal Appropriation . . . . . . . . . . . . $3,177,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,600,000
          TOTAL . . . . . . . . . . . . $10,777,000

NEW SECTION.  Sec. 3050   FOR THE DEPARTMENT OF ECOLOGY
     Safe Soils Remediation Program (30000019)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3051   FOR THE DEPARTMENT OF ECOLOGY
     Burlington Northern Santa Fe Skykomish Cleanup and Restoration (30000020)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,300,000
     Cleanup Settlement Account--State . . . . . . . . . . . . $2,050,000
          Subtotal Appropriation . . . . . . . . . . . . $4,350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,350,000

NEW SECTION.  Sec. 3052   FOR THE DEPARTMENT OF ECOLOGY
     Reclaimed Water Grants Program (30000021)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 3053   FOR THE DEPARTMENT OF ECOLOGY
     Protect Communities from Flood Hazards (30000023)

     Flood damage reduction measures

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $17,000,000

NEW SECTION.  Sec. 3054   FOR THE DEPARTMENT OF ECOLOGY
     Protect Coastal Beaches in Southwest Washington (30000024)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,700,000

NEW SECTION.  Sec. 3055   FOR THE DEPARTMENT OF ECOLOGY
     Water Irrigation Efficiencies (30000027)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 3056   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (30000028)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for grants for projects that improve water supplies and help achieve instream flows by implementing watershed plans, as follows:
     (1) Surface or groundwater storage feasibility projects, where such projects are consistent with the recommendations of the water storage task force report to the Legislature, February 2001 (department of ecology publication# 01-11-2002). The department shall consult the departments of agriculture and fish and wildlife before issuing water storage grants.
     (2) Infrastructure or water management projects that resolve conflicts among water needs for municipal, agricultural, rural, and fish restoration purposes. The stream flow improvements and other public benefits secured from these projects must be commensurate with the investment of state funds.
     (3) Water supply projects for public agriculture water supply facilities that improve water conservation and water use efficiency.
     (4) Purchase and installation of water measuring devices in salmon critical basins and areas participating in the department of fish and wildlife fish screening and cooperative compliance program, and basins where watershed plans call for additional water use or stream flow measurement.
     (5) Acquisition of water to achieve instream flows or to establish water banks, water exchanges or similar tools. The department of ecology must give priority to water acquisitions in salmon critical basins and in basins with approved watershed plans. The department of ecology must place acquired water into the state's trust water rights program (chapters 90.38 and 90.42 RCW).

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $48,000,000

NEW SECTION.  Sec. 3057   FOR THE DEPARTMENT OF ECOLOGY
     Kittitas Groundwater Study (30000029)

Appropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $700,000

NEW SECTION.  Sec. 3058   FOR THE DEPARTMENT OF ECOLOGY
     Remedial Action Grant Program (30000039)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $37,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $180,000,000
          TOTAL . . . . . . . . . . . . $217,700,000

NEW SECTION.  Sec. 3059   FOR THE DEPARTMENT OF ECOLOGY
     Stormwater Retrofit and Low Impact Development Implementation Grant Program (30000097)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3060   FOR THE DEPARTMENT OF ECOLOGY
     Wetland Mitigation Banking Pilot (30000098)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3061   FOR THE STATE PARKS AND RECREATION COMMISSION
     Rocky Reach - Chelan County Public Utility District (20061023)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely to construct and surface the northern mile of Rocky Reach trail, and partially fund installation of signs, interpretive panels, and bridges related to the 5.1 mile project.

Reappropriation:
     Parks Renewal and Stewardship Account--Private/Local . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3062   FOR THE STATE PARKS AND RECREATION COMMISSION
     Cama Beach Donation (20062853)

Reappropriation:
     General Fund--Private/Local . . . . . . . . . . . . $1,630,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $86,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,716,000

NEW SECTION.  Sec. 3063   FOR THE STATE PARKS AND RECREATION COMMISSION
     Hood Canal Wastewater (20061850)

Reappropriation:
     Hood Canal Aquatic Rehabilitation Bond Account--
          State . . . . . . . . . . . . $4,030,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,772,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,802,000

NEW SECTION.  Sec. 3064   FOR THE STATE PARKS AND RECREATION COMMISSION
     Puget Sound Wastewater (20061851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,895,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,195,000

NEW SECTION.  Sec. 3065   FOR THE STATE PARKS AND RECREATION COMMISSION
     Minor Works - Facility Preservation (20081001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,800,000
     State Toxics Control Account--State . . . . . . . . . . . . $50,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,000,000

NEW SECTION.  Sec. 3066   FOR THE STATE PARKS AND RECREATION COMMISSION
     Historic Preservation (20081002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $830,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,271,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,101,000

NEW SECTION.  Sec. 3067   FOR THE STATE PARKS AND RECREATION COMMISSION
     Cape Disappointment Major Park Upgrade (20081012)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3068   FOR THE STATE PARKS AND RECREATION COMMISSION
     Lake Sammamish Major Park Upgrade (20081014)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $783,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,033,000

NEW SECTION.  Sec. 3069   FOR THE STATE PARKS AND RECREATION COMMISSION
     Storm Water Improvements (20081027)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $371,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $571,000

NEW SECTION.  Sec. 3070   FOR THE STATE PARKS AND RECREATION COMMISSION
     Road Preservation (20081036)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,700,000

NEW SECTION.  Sec. 3071   FOR THE STATE PARKS AND RECREATION COMMISSION
     Ft. Flagler - Parkwide Sewage Treatment System (20081044)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,973,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,773,000

NEW SECTION.  Sec. 3072   FOR THE STATE PARKS AND RECREATION COMMISSION
     Visible Park Improvements (20081951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,070,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,930,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 3073   FOR THE STATE PARKS AND RECREATION COMMISSION
     Nisqually Mashel State Park (20081953)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $21,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $479,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,618,000
          TOTAL . . . . . . . . . . . . $2,118,000

NEW SECTION.  Sec. 3074   FOR THE STATE PARKS AND RECREATION COMMISSION
     Pearrygin Lake Major Park Upgrade (20082016)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $967,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,367,000

NEW SECTION.  Sec. 3075   FOR THE STATE PARKS AND RECREATION COMMISSION
     Bay View Park Wide Wastewater Treatment System (20082041)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $487,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,187,000

NEW SECTION.  Sec. 3076   FOR THE STATE PARKS AND RECREATION COMMISSION
     Bigelow House (20082850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for capital improvements to the Bigelow house. The state parks and recreation commission must accept the donation of the Bigelow house museum, the grounds, and the contents of the Bigelow house museum from the Bigelow house preservation association if the Bigelow house preservation association agrees to continue to provide staff and programming for the museum.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $100,000

NEW SECTION.  Sec. 3077   FOR THE STATE PARKS AND RECREATION COMMISSION
     Ike Kinswa State Park Improvement (20082950)

Reappropriation:
     Parks Renewal and Stewardship Account--Private/Local . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3078   FOR THE STATE PARKS AND RECREATION COMMISSION
     Clean Vessel Boating Pumpout Grants (20084035)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $300,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3079   FOR THE STATE PARKS AND RECREATION COMMISSION
     Minor Works Preservation (30000001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,533,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,641,000
          TOTAL . . . . . . . . . . . . $48,174,000

NEW SECTION.  Sec. 3080   FOR THE STATE PARKS AND RECREATION COMMISSION
     Trail Development (30000003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,634,000
          TOTAL . . . . . . . . . . . . $2,434,000

NEW SECTION.  Sec. 3081   FOR THE STATE PARKS AND RECREATION COMMISSION
     Facility and Infrastructure Backlog Reduction (30000005)

     The appropriation in this section is subject to the following conditions and limitations: Based on the plan developed during the 2007-09 biennium that addressed the key findings in the 2006 study of the commission's capital development, execution, and monitoring process, the commission shall, prior to allotment of funds, provide the office of financial management a comprehensive list of deferred maintenance projects that when completed will reduce the commission's backlog of preservation projects. All projects included in the list should range between $25,000 and $200,000 in total cost.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,000,000
          TOTAL . . . . . . . . . . . . $15,500,000

NEW SECTION.  Sec. 3082   FOR THE STATE PARKS AND RECREATION COMMISSION
     Federal Grant Authority (30000006)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $990,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $4,990,000

NEW SECTION.  Sec. 3083   FOR THE STATE PARKS AND RECREATION COMMISSION
     Local Grant Authority (30000007)

Appropriation:
     Parks Renewal and Stewardship Account--Private/Local . . . . . . . . . . . . $990,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $4,990,000

NEW SECTION.  Sec. 3084   FOR THE STATE PARKS AND RECREATION COMMISSION
     Parkland Acquisition (30000008)

     The appropriation in this section is subject to the following conditions and limitations: The state parks and recreation commission shall provide lists of potential purchases and sales to the office of financial management and the appropriate policy and fiscal committees of the legislature prior to committing the state parks and recreation commission to any sale or purchase of land or buildings and prior to any allotments made for those purchases. The list must include any potential operating or capital cost impacts known to the state parks and recreation commission.

Appropriation:
     Parkland Acquisition Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 3085   FOR THE STATE PARKS AND RECREATION COMMISSION
     Emergency Repairs (30000010)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,400,000
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3086   FOR THE STATE PARKS AND RECREATION COMMISSION
     Clean Vessel Boating Pumpout Grants (30000021)

     The appropriation in this section is subject to the following conditions and limitations: The state parks and recreation commission shall provide lists of potential purchases and sales to the office of financial management and the appropriate policy and fiscal committees of the legislature prior to committing the state parks and recreation commission to any sale or purchase of land or buildings and prior to any allotments made for those purchases. The list must include any potential operating or capital cost impacts known to the state parks and recreation commission.

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $3,465,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,200,000
          TOTAL . . . . . . . . . . . . $10,665,000

NEW SECTION.  Sec. 3087   FOR THE STATE PARKS AND RECREATION COMMISSION
     Fort Worden State Park Maintenance Shop (30000024)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,188,500

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,188,500

NEW SECTION.  Sec. 3088   FOR THE STATE PARKS AND RECREATION COMMISSION
     Puget Sound Initiative Projects (30000050)

     None

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,626,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,698,000
          TOTAL . . . . . . . . . . . . $30,324,000

NEW SECTION.  Sec. 3089   FOR THE STATE PARKS AND RECREATION COMMISSION
     Twanoh State Park Storm Water Improvements (30000054)

     None

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,374,000
          TOTAL . . . . . . . . . . . . $2,624,000

NEW SECTION.  Sec. 3090   FOR THE STATE PARKS AND RECREATION COMMISSION
     Kitsap Memorial State Park Park-wide Sewer System (30000055)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $177,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,456,000
          TOTAL . . . . . . . . . . . . $1,633,000

NEW SECTION.  Sec. 3091   FOR THE STATE PARKS AND RECREATION COMMISSION
     Cape Disappointment State Park Infrastructure Improvements (30000085)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,930,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $4,930,000

NEW SECTION.  Sec. 3092   FOR THE STATE PARKS AND RECREATION COMMISSION
     Cama Beach State Park Phase 2C Development (30000101)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,265,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,265,000

NEW SECTION.  Sec. 3093   FOR THE STATE PARKS AND RECREATION COMMISSION
     Rocky Reach State Park Trail Development (30000169)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $168,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,412,000
          TOTAL . . . . . . . . . . . . $2,580,000

NEW SECTION.  Sec. 3094   FOR THE STATE PARKS AND RECREATION COMMISSION
     Mount Spokane State Park Maintenance Facility Relocation (30000171)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $144,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,138,000
          TOTAL . . . . . . . . . . . . $2,282,000

NEW SECTION.  Sec. 3095   FOR THE STATE PARKS AND RECREATION COMMISSION
     Flaming Geyser State Park Park-wide Infrastructure Redevelopment (30000173)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,332,500

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,332,500

NEW SECTION.  Sec. 3096   FOR THE STATE PARKS AND RECREATION COMMISSION
     Fort Casey State Park Parkwide Wastewater Improvement Project (30000221)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $279,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,481,000
          TOTAL . . . . . . . . . . . . $2,760,000

NEW SECTION.  Sec. 3097   FOR THE STATE PARKS AND RECREATION COMMISSION
     Iron Horse State Park Repairs (30000230)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,989,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,989,000

NEW SECTION.  Sec. 3098   FOR THE STATE PARKS AND RECREATION COMMISSION
     Dash Point State Park Sanitary Sewer Collection System (30000269)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,820,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,820,000

NEW SECTION.  Sec. 3099   FOR THE STATE PARKS AND RECREATION COMMISSION
     Deception Pass State Park Visitor Orientation Center (30000289)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $925,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,840,000
          TOTAL . . . . . . . . . . . . $3,765,000

NEW SECTION.  Sec. 3100   FOR THE STATE PARKS AND RECREATION COMMISSION
     Cape Disappointment State Parks Trails (30000306)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,620,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,620,000

NEW SECTION.  Sec. 3101   FOR THE STATE PARKS AND RECREATION COMMISSION
     Kiket Island Acquisition (30000431)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 3102   FOR THE STATE PARKS AND RECREATION COMMISSION
     Admirality Inlet Heritage Forest Acquisition (30000432)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3103   FOR THE STATE PARKS AND RECREATION COMMISSION
     Fort Worden State Park Housing Areas Exterior Improvements (30000433)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $746,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,476,000
          TOTAL . . . . . . . . . . . . $3,222,000

NEW SECTION.  Sec. 3104   FOR THE STATE PARKS AND RECREATION COMMISSION
     Illahee State Park Wastewater Treatment Upgrade (30000447)

     None

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,850,000

NEW SECTION.  Sec. 3105   FOR THE STATE PARKS AND RECREATION COMMISSION
     Infrastructure Savings (30000480)

     The appropriation in this section is subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1

NEW SECTION.  Sec. 3106   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Projects (19982001)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $359,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,197,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,556,000

NEW SECTION.  Sec. 3107   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife and Recreation Program (19982003)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions in section 158, chapter 371, Laws of 2006.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $596,000
     Habitat Conservation Account--State . . . . . . . . . . . . $687,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,283,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $76,318,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $77,601,000

NEW SECTION.  Sec. 3108   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Program (19982004)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $13,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $561,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $574,000

NEW SECTION.  Sec. 3109   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Program (20020001)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $21,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $379,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $400,000

NEW SECTION.  Sec. 3110   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Program (20024001)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $158,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,775,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,933,000

NEW SECTION.  Sec. 3111   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife and Recreation Program (20024003)

     The reappropriations in this section are subject to the following conditions and limitations: Any amount of the reappropriations that is not obligated to a specific project may be used to fund projects in the following order: (1) The department of natural resources Cypress Island project; and (2) alternate projects approved by the legislature from the same account in biennia succeeding that in which the funds were originally appropriated.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $158,000
     Habitat Conservation Account--State . . . . . . . . . . . . $479,000
          Subtotal Reappropriation . . . . . . . . . . . . $637,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $44,363,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $45,000,000

NEW SECTION.  Sec. 3112   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (20024007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $253,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $74,740,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $74,993,000

NEW SECTION.  Sec. 3113   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Fund Board Programs (20044001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,613,000
     General Fund--Federal . . . . . . . . . . . . $9,540,000
          Subtotal Reappropriation . . . . . . . . . . . . $12,153,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $34,222,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $46,375,000

NEW SECTION.  Sec. 3114   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife and Recreation Program (20044002)

     The reappropriations in this section are subject to the following conditions and limitations: Any amount of the reappropriations that is not obligated to a specific project may be used to fund alternate projects approved by the legislature from the same account in biennia succeeding that in which the moneys were originally appropriated.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $1,699,000
     Habitat Conservation Account--State . . . . . . . . . . . . $4,989,000
          Subtotal Reappropriation . . . . . . . . . . . . $6,688,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $38,312,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $45,000,000

NEW SECTION.  Sec. 3115   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Program (20044003)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $325,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,182,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,507,000

NEW SECTION.  Sec. 3116   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Nonhighway and Off-Road Vehicle Activities Program (20044004)

Reappropriation:
     NOVA Program Account--State . . . . . . . . . . . . $1,032,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,895,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,927,000

NEW SECTION.  Sec. 3117   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Program (20044006)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $28,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $223,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $251,000

NEW SECTION.  Sec. 3118   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Land and Water Conservation Fund (20044007)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $542,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,193,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,735,000

NEW SECTION.  Sec. 3119   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Infrastructure Grant (20044009)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $262,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,738,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3120   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Youth Athletic Fields (20062952)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for competitive grants for acquisition, development, and renovation of youth athletic fields. The committee shall follow the applicable rules of the youth athletic facilities program, except that grants for maintenance are not eligible and the amount of a grant need not be in proportion to the population of the city or county where the community outdoor athletic facility is located, and if there are not enough project applications submitted in a category within the account to meet the requirement of equal distribution of funds to each category, the recreation and conservation funding board may distribute any remaining funds to other categories within the account.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,971,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $529,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 3121   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Fund Board Programs (20064001)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are provided solely for grants for salmon recovery efforts. These grants may include a grant to any regional recovery board and/or may include grants for additional restoration projects, monitoring activities, or other salmon recovery actions.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $21,012,000
     State Building Construction Account--State . . . . . . . . . . . . $6,522,000
          Subtotal Reappropriation . . . . . . . . . . . . $27,534,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $34,466,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $62,000,000

NEW SECTION.  Sec. 3122   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife and Recreation Program (20064002)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) The reappropriation is provided for the approved list of projects in LEAP capital document No. 2005-14 as developed on April 9, 2005.
     (2) Funds reappropriated for distribution according to RCW 79A.15.050 must fulfill the uses and restrictions of each category whether the funds are distributed according to the statutory allotment, the unallocated distribution, or a reassignment of reappropriations. If the cumulative total for acquisition projects is less than the statutory requirement, the difference may be allocated to the remaining development projects.
     (3) Funds reappropriated for distribution according to the provisions of RCW 79A.15.040(1)(c) must be allocated forty percent to local government projects and sixty percent to state agency projects. If the cumulative total of local government projects is less than forty percent of the total distribution to this category, the difference may be allocated to state agency projects.

Reappropriation:
     Habitat Conservation Account--State . . . . . . . . . . . . $9,071,000
     Outdoor Recreation Account--State . . . . . . . . . . . . $6,859,000
          Subtotal Reappropriation . . . . . . . . . . . . $15,930,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $34,070,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 3123   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Program (20064003)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $654,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,617,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,271,000

NEW SECTION.  Sec. 3124   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Nonhighway and Off-Road Vehicle Program (20064004)

     The reappropriation in this section is subject to the following conditions and limitations: Up to $100,000 of the reappropriation is for the following studies:
     (1) The board must prepare cost estimates for creating a database of motorized and nonmotorized off-road trails and facilities in Washington state. The cost estimate shall consider the possibility of a database that allows the downloading of maps formatted for the most widely used global positioning system devices, including the feasibility and cost to make global positioning system maps readily available for all users of Washington recreational lands and facilities. For this purpose, available global positioning system maps shall include global positioning system maps developed by state agencies, by federal agencies, and proprietary maps offered by private companies.
     (2) The board must recommend a program for enhanced education and enforcement regarding excessive noise from off-road vehicles. The study must include a review of relevant existing laws and regulations. The recommendations must address the appropriate equipment needed for enforcement, model ordinances, enhanced educational strategies, and a proposed grant program to assist local governments to more effectively reduce the impact of excessive off-road vehicle noise in rural residential neighborhoods and nonresidential areas, including consideration of grant programs for planning departments, code enforcement departments, health departments, or other entities of local government.

Reappropriation:
     NOVA Program Account--State . . . . . . . . . . . . $3,464,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,115,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,579,000

NEW SECTION.  Sec. 3125   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearm and Archery Range Program (20064006)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $18,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $204,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $222,000

NEW SECTION.  Sec. 3126   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Land and Water Conservation Fund (20064007)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $2,080,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,420,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,500,000

NEW SECTION.  Sec. 3127   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     National Recreation Trails Program (20064008)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $501,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,299,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,800,000

NEW SECTION.  Sec. 3128   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Aquatic Lands Enhancement Account (20064018)

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $972,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,053,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,025,000

NEW SECTION.  Sec. 3129   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Family Forest and Fish Passage Program (20082001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,859,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $27,141,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $30,000,000

NEW SECTION.  Sec. 3130   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Program (20084001)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $7,723,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $35,986,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $43,709,000

NEW SECTION.  Sec. 3131   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Improvement Grants (20084002)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $158,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $642,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $800,000

NEW SECTION.  Sec. 3132   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Recreation (20084003)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $358,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,121,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,479,000

NEW SECTION.  Sec. 3133   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Restoration and Acquisition (20084004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $29,083,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,667,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $40,750,000

NEW SECTION.  Sec. 3134   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Aquatic Lands Enhancement Account (20084005)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation in this section is provided solely for the list of projects in LEAP capital document No. 2007-1, developed March 17, 2007.
     (2) The board shall submit a list of recommended projects to be funded from the aquatic lands enhancement account in the 2009-2011 capital budget to the office of financial management and the appropriate legislative committees. The list must result from a competitive grants program developed by the board based upon, at a minimum: (a) Uniform criteria for selecting projects and awarding grants for up to fifty percent of the total projects cost; (b) local community support for the projects; and (c) environmental benefits to be derived from projects.

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $3,326,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,699,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,025,000

NEW SECTION.  Sec. 3135   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Hatchery Reform Program (20084006)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 3136   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Land and Water Conservation (20084007)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $830,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $170,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3137   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Nonhighway Off-Road Vehicle Activities (20084008)

     The reappropriation in this section is subject to the following conditions and limitations: Up to $450,000 of the reappropriation is provided solely for grants to local law enforcement and noise enforcement agencies for the enforcement of existing state noise laws and regulations. Grants may be used to acquire noise monitoring equipment and to compensate law enforcement agencies for staff overtime and administrative expenses. Funds for noise enforcement grants shall come from amounts allocated for the purposes specified in RCW 46.09.170(2)(d).

Reappropriation:
     NOVA Program Account--State . . . . . . . . . . . . $7,184,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,852,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,036,000

NEW SECTION.  Sec. 3138   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     National Recreational Trails Program (20084009)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $2,606,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $894,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,500,000

NEW SECTION.  Sec. 3139   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife Recreation Grants (20084011)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) The reappropriations are provided solely for the approved list of projects in LEAP capital document No. 2007-3 as developed on March 17, 2007, and LEAP capital document No. 2008-1 as developed on February 13, 2008.
     (2) If additional funds are available after funding the farmlands preservation account projects approved in subsection (1) of this section, the committee may: Provide one-time grants of up to $25,000 each to counties requesting assistance in developing farmlands preservation strategies for the purpose of seeking grants from the farmlands preservation account in future grant cycles.
     (3) Funds reappropriated for distribution according to the provisions of RCW 79A.15.040(1)(c) must be allocated forty percent to local government projects and sixty percent to state agency projects. If the cumulative total of local government projects is less than forty percent of the total distribution to this category, the difference may be allocated to state agency projects.
     (4) Up to $627,299 of the reappropriation from the riparian protection account is provided solely for the Chehalis river surge plain natural area preserve. This amount may not be expended for the project until the department of natural resources has completed a management plan for the preserve that maintains recreational access and that management plan is presented to the house of representatives capital budget and senate ways and means committees.

Reappropriation:
     Farmlands Preservation Account--State . . . . . . . . . . . . $5,300,000
     Riparian Protection Account--State . . . . . . . . . . . . $12,500,000
     Habitat Conservation Account--State . . . . . . . . . . . . $24,106,000
     Outdoor Recreation Account--State . . . . . . . . . . . . $22,994,000
          Subtotal Reappropriation . . . . . . . . . . . . $64,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $35,100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $100,000,000

NEW SECTION.  Sec. 3140   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Fund Board Programs (20084851)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) The reappropriations in this section are provided solely for grants for salmon recovery efforts. These grants may include grants to any regional recovery board and/or may include grants for additional restoration projects, monitoring activities, or other salmon recovery actions.
     (2) The administrative funding currently provided by the salmon recovery funding board for the regional salmon recovery organization in Puget Sound shall be redirected to the Puget Sound partnership created in chapter 341, Laws of 2007.
     (3) Prior to awarding project grants for projects in Puget Sound, the salmon recovery funding board must submit the list of proposed projects to the Puget Sound partnership for their review. The Puget Sound partnership must provide their comments back to the salmon recovery funding board within forty-five days of receiving the proposed list of projects.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $25,616,000
     State Building Construction Account--State . . . . . . . . . . . . $11,681,000
          Subtotal Reappropriation . . . . . . . . . . . . $37,297,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $22,703,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $60,000,000

NEW SECTION.  Sec. 3141   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Program (30000001)

Appropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $9,802,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $38,080,000
          TOTAL . . . . . . . . . . . . $47,882,000

NEW SECTION.  Sec. 3142   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife Recreation Grants (30000002)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) The appropriations are provided solely for the approved list of projects to be submitted to the legislature by the governor.
     (2) Funds appropriated for distribution according to RCW 79A.15.050 must fulfill the uses and restrictions of each category whether the funds are distributed according to the statutory allotment, the unallocated distribution, or a reassignment of reappropriations. If the cumulative total for acquisition projects is less than the statutory requirement, the difference may be allocated to the remaining development projects.
     (3) Funds appropriated for distribution according to the provisions of RCW 79A.15.040(1)(c) must be allocated forty percent to local government projects and sixty percent to state agency projects. If the cumulative total of local government projects is less than forty percent of the total distribution to this category, the difference may be allocated to state agency projects.

Appropriation:
     Riparian Protection Account--State . . . . . . . . . . . . $4,000,000
     Habitat Conservation Account--State . . . . . . . . . . . . $21,000,000
     Outdoor Recreation Account--State . . . . . . . . . . . . $21,000,000
     Farmlands Preservation Account--State . . . . . . . . . . . . $4,000,000
          Subtotal Appropriation . . . . . . . . . . . . $50,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $200,000,000
          TOTAL . . . . . . . . . . . . $250,000,000

NEW SECTION.  Sec. 3143   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Fund Board Programs (30000003)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $50,000,000
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000
          Subtotal Appropriation . . . . . . . . . . . . $60,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $240,000,000
          TOTAL . . . . . . . . . . . . $300,000,000

NEW SECTION.  Sec. 3144   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Nonhighway Off-Road Vehicle Activities (NOVA) (30000004)

Appropriation:
     NOVA Program Account--State . . . . . . . . . . . . $9,560,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $41,858,000
          TOTAL . . . . . . . . . . . . $51,418,000

NEW SECTION.  Sec. 3145   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Land and Water Conservation (30000005)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 3146   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Aquatic Lands Enhancement Account (30000007)

Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $5,025,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,100,000
          TOTAL . . . . . . . . . . . . $25,125,000

NEW SECTION.  Sec. 3147   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Recreation (30000009)

Appropriation:
     Firearms Range Account--State . . . . . . . . . . . . $495,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,412,000
          TOTAL . . . . . . . . . . . . $1,907,000

NEW SECTION.  Sec. 3148   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Improvement Grants (30000010)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3149   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     National Recreational Trails Program (30000012)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 3150   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Acquisition and Restoration (30000080)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Prior to awarding project grants, the salmon recovery funding board shall submit the list of proposed projects to the Puget Sound partnership for its review. The Puget Sound partnership shall provide its comments back to the salmon recovery funding board within forty-five days of receiving the proposed list of projects.
     (2) All estuary projects must be submitted for review and
coordination with the executive committee of the Puget Sound nearshore partnership between the department of fish and wildlife and the United States army corps of engineers.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $33,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $33,000,000

NEW SECTION.  Sec. 3151   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Estuary and Salmon Restoration Program (30000081)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Prior to awarding project grants, the salmon recovery funding board shall submit the list of proposed projects to the Puget Sound partnership for its review. The Puget Sound partnership shall provide its comments back to the salmon recovery funding board within forty-five days of receiving the proposed list of projects.
     (2) All estuary projects must be submitted for review and coordination with the executive committee of the Puget Sound nearshore partnership between the department of fish and wildlife and the United States army corps of engineers.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,000,000

NEW SECTION.  Sec. 3152   FOR THE STATE CONSERVATION COMMISSION
     Livestock Nutrient Program (20084001)

Reappropriation:
     Water Quality Capital Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3153   FOR THE STATE CONSERVATION COMMISSION
     Conservation Reserve Enhancement Program Water Quality (20084002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $322,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $387,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $709,000

NEW SECTION.  Sec. 3154   FOR THE STATE CONSERVATION COMMISSION
     Conservation Reserve Enhancement Program Cost Share (20084005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $535,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $635,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,170,000

NEW SECTION.  Sec. 3155   FOR THE STATE CONSERVATION COMMISSION
     Flood Assistance for Farm Communities (20084850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely to restore agricultural infrastructure and equipment necessary to repair, replace, or maintain infrastructure that provides public health and safety, water quality, and fish and wildlife habitat protection, including debris removal, fencing, replacing manure lagoons, and properly functioning equipment and facilities.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 3156   FOR THE STATE CONSERVATION COMMISSION
     Livestock Nutrient Program (30000001)

Appropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 3157   FOR THE STATE CONSERVATION COMMISSION
     Conservation Reserve Enhancement Program (30000003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,910,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,200,000
          TOTAL . . . . . . . . . . . . $9,110,000

NEW SECTION.  Sec. 3158   FOR THE STATE CONSERVATION COMMISSION
     Practice Incentive Payment Loan Program (30000005)

Appropriation:
     Conservation Assistance Revolving Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,400,000

NEW SECTION.  Sec. 3159   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Facility, Infrastructure, Lands, and Access Condition Improvements (20061002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $240,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,970,687
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,210,687

NEW SECTION.  Sec. 3160   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Puget Sound Initiative - Nearshore Salmon Restoration (20062001)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) The reappropriations in this section are provided solely for efforts to restore nearshore habitat and estuaries in Puget Sound. The department of fish and wildlife must focus on restoring natural nearshore processes, including protection and restoration of beach sediments and removal of existing bulkheads.
     (2) The department of fish and wildlife shall provide the Puget Sound partnership, as created by chapter 341, Laws of 2007 the opportunity to review and provide comment on proposed projects and activities recommended for funding. This review must be consistent with the funding schedule for the program.
     (3) Funded projects require a nonstate match or in-kind contributions. The department of fish and wildlife must seek to maximize the amount of nonstate match from local, state, tribal, and federal partners. Individual projects require a minimum 33 percent cash or in-kind match.
     (4) Eligible projects must be within Puget Sound and identified by a salmon recovery lead entity or marine resource committee and identified in a current salmon recovery, watershed, or nearshore habitat restoration and protection plan.
     (5) Project evaluation criteria must be developed by the Puget Sound nearshore steering committee. The criteria must be consistent with the technical guidance developed by the Puget Sound nearshore science team and shall be coordinated with the salmon recovery funding board to ensure that project funding and matching requirements are maximized to the greatest extent possible.
     (6) The department of fish and wildlife must not utilize any amount of this reappropriation to support administration or overhead. Funding to support the administration of the funds and the implementation of selected projects must be obtained from the department of fish and wildlife's operating budget.
     (7) In recognition of the urgent need to complete the Puget Sound nearshore ecosystem restoration project general investigation, up to $723,000 of this reappropriation may be used to match federal funds implementing the cost-share agreement between the department and the United States army corps of engineers.
     (8) Up to $2,698,735 of the reappropriation is provided solely for the following projects:

Project       Amount
Carpenter creek estuary phase 1 (South Kingston road)       $637,000
Duwamish Garden estuary restoration       $300,000
Seahurst Park bulkhead phase II       $1,100,000
Lower Dosewallips floodplain       $609,875
Titlow Beach pocket estuary restoration       $51,860

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,910,134
     General Fund--Federal . . . . . . . . . . . . $600,000
          Subtotal Reappropriation . . . . . . . . . . . . $8,510,134

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,189,866
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,700,000

NEW SECTION.  Sec. 3161   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Health Safety and Code Requirements (20081001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,850,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,100,000

NEW SECTION.  Sec. 3162   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Voights Creek Hatchery (20081003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,445,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $355,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,749,000
          TOTAL . . . . . . . . . . . . $15,699,000

NEW SECTION.  Sec. 3163   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Statewide Fencing Renovation and Replacement (20081009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,231,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,431,000

NEW SECTION.  Sec. 3164   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Facility Preservation (20081013)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,025,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,525,000

NEW SECTION.  Sec. 3165   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Infrastructure Preservation (20081014)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 3166   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Wiley Slough Restoration (20081028)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $265,000
     General Fund--Federal . . . . . . . . . . . . $500,000
          Subtotal Reappropriation . . . . . . . . . . . . $765,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,030,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $297,000
          TOTAL . . . . . . . . . . . . $3,092,000

NEW SECTION.  Sec. 3167   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Bee Be Property (20081029)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $252,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,373,000
          TOTAL . . . . . . . . . . . . $5,875,000

NEW SECTION.  Sec. 3168   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Issaquah Hatchery Gravity Intake (20081850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $462,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $562,000

NEW SECTION.  Sec. 3169   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Spokane Region One Office Phase 2 (20082008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $180,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,611,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,258,000
          TOTAL . . . . . . . . . . . . $10,049,000

NEW SECTION.  Sec. 3170   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Skookumchuck Hatchery Renovation (20082015)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $50,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,728,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $478,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,256,000

NEW SECTION.  Sec. 3171   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Stemilt Basin Acquisition (20082029)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 3172   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Mitigation Projects and Dedicated Funding (20082048)

     The reappropriations and appropriations in this section are subject to the following conditions and limitations: $2,300,000 of the reappropriations and appropriations are provided solely for capital projects and engineering to pay the total cost of labor and materials provided by the department of fish and wildlife.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $10,500,000
     General Fund--Private/Local . . . . . . . . . . . . $1,000,000
          Subtotal Reappropriation . . . . . . . . . . . . $11,500,000

Appropriation:
     Wildlife Account--State . . . . . . . . . . . . $1,200,000
     General Fund--Private/Local . . . . . . . . . . . . $2,500,000
     Game Special Wildlife Account--Federal . . . . . . . . . . . . $600,000
     Game Special Wildlife Account--Private/Local . . . . . . . . . . . . $900,000
     General Fund--Federal . . . . . . . . . . . . $25,000,000
          Subtotal Appropriation . . . . . . . . . . . . $30,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $16,625,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $114,800,000
          TOTAL . . . . . . . . . . . . $173,125,000

NEW SECTION.  Sec. 3173   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Facility Preservation (30000149)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $677,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
          TOTAL . . . . . . . . . . . . $10,677,000

NEW SECTION.  Sec. 3174   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Soos Creek Hatchery (20081002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,683,000
          TOTAL . . . . . . . . . . . . $11,483,000

NEW SECTION.  Sec. 3175   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Methow Culverts Replacement (20081027)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $370,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $384,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $450,000
          TOTAL . . . . . . . . . . . . $1,204,000

NEW SECTION.  Sec. 3176   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Migratory Waterfowl Habitat (20082045)

Appropriation:
     Wildlife Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
          TOTAL . . . . . . . . . . . . $4,450,000

NEW SECTION.  Sec. 3177   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Road Maintenance and Abandonment Plan (30000022)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,551,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,050,000
          TOTAL . . . . . . . . . . . . $5,601,000

NEW SECTION.  Sec. 3178   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Access Areas Preservation (30000086)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $408,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,067,000
          TOTAL . . . . . . . . . . . . $9,575,000

NEW SECTION.  Sec. 3179   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Skamania Hatchery Intake Replacement (30000088)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $824,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,900,000
          TOTAL . . . . . . . . . . . . $9,724,000

NEW SECTION.  Sec. 3180   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Grays River Hatchery Intake Replacement (30000089)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $549,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,499,000
          TOTAL . . . . . . . . . . . . $4,048,000

NEW SECTION.  Sec. 3181   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Washougal Hatchery Pond Renovation (30000094)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,236,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,236,000

NEW SECTION.  Sec. 3182   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Beaver Creek Fish Passage (30000103)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,462,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,462,000

NEW SECTION.  Sec. 3183   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Johns River Fish Passage and Estuary Restoration (30000104)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $1,200,000
     State Building Construction Account--State . . . . . . . . . . . . $893,000
          Subtotal Appropriation . . . . . . . . . . . . $2,093,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,093,000

NEW SECTION.  Sec. 3184   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Cherry Valley Fish Passage and Stream Restoration (30000105)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,269,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,269,000

NEW SECTION.  Sec. 3185   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     McDonald Road Access Dike Setback and Riparian Restoration (30000107)

Appropriation:
     General Fund--Private/Local . . . . . . . . . . . . $200,000
     State Building Construction Account--State . . . . . . . . . . . . $600,000
          Subtotal Appropriation . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $713,000
          TOTAL . . . . . . . . . . . . $1,513,000

NEW SECTION.  Sec. 3186   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Health Safety and Code Requirements (30000135)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,665,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
          TOTAL . . . . . . . . . . . . $11,665,000

NEW SECTION.  Sec. 3187   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Dam and Dike (30000145)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $943,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,780,000
          TOTAL . . . . . . . . . . . . $4,723,000

NEW SECTION.  Sec. 3188   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Infrastructure Preservation (30000147)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,182,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,122,267
          TOTAL . . . . . . . . . . . . $20,304,267

NEW SECTION.  Sec. 3189   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Emergency Projects (30000161)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
          TOTAL . . . . . . . . . . . . $3,750,000

NEW SECTION.  Sec. 3190   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Fish Passage Barrier Corrections (30000173)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,209,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,250,000
          TOTAL . . . . . . . . . . . . $10,459,000

NEW SECTION.  Sec. 3191   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Programmatic (30000179)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,500,000
          TOTAL . . . . . . . . . . . . $5,900,000

NEW SECTION.  Sec. 3192   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Lake Rufus Woods Fishing Access (30000241)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3193   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Deschutes Watershed Center (20062008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $979,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,216,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $38,315,000
          TOTAL . . . . . . . . . . . . $41,510,000

NEW SECTION.  Sec. 3194   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Chambers Creek Adult Trap (20081004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $240,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,544,000
          TOTAL . . . . . . . . . . . . $6,796,000

NEW SECTION.  Sec. 3195   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Tokul Creek Hatchery (20081005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $90,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $345,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,902,000
          TOTAL . . . . . . . . . . . . $3,337,000

NEW SECTION.  Sec. 3196   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Blanchard Mountain (20081951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,998,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3197   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Road Maintenance and Abandonment Projects (30000071)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,800,000
          TOTAL . . . . . . . . . . . . $2,800,000

NEW SECTION.  Sec. 3198   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Natural Areas Facilities Preservation and Access (30000079)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,499,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,923,000
          TOTAL . . . . . . . . . . . . $15,422,000

NEW SECTION.  Sec. 3199   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Recreation Capital Renovations (30000109)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $816,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,682,000
          TOTAL . . . . . . . . . . . . $33,498,000

NEW SECTION.  Sec. 3200   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Land Bank (30000050)

Appropriation:
     Resources Management Cost Account--State . . . . . . . . . . . . $25,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $100,000,000
          TOTAL . . . . . . . . . . . . $125,000,000

NEW SECTION.  Sec. 3201   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Natural Resources Real Property Replacement (30000051)

Appropriation:
     Natural Resources Real Property Replacement
          Account--State . . . . . . . . . . . . $50,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $200,000,000
          TOTAL . . . . . . . . . . . . $250,000,000

NEW SECTION.  Sec. 3202   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Family Forest Fish Passage Program (30000052)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $18,000,000
          TOTAL . . . . . . . . . . . . $24,000,000

NEW SECTION.  Sec. 3203   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Legacy (30000060)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $9,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $41,000,000
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 3204   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Land Acquisition Grants (30000061)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,000,000
          TOTAL . . . . . . . . . . . . $38,000,000

NEW SECTION.  Sec. 3205   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Statewide Aquatic Restoration Projects (30000062)

Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,535,000
          TOTAL . . . . . . . . . . . . $1,835,000

NEW SECTION.  Sec. 3206   FOR THE DEPARTMENT OF NATURAL RESOURCES
     State Lands Maintenance (30000063)

Appropriation:
     Resources Management Cost Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,732,050
          TOTAL . . . . . . . . . . . . $14,732,050

NEW SECTION.  Sec. 3207   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Riparian Open Space Program (30000064)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $4,500,000

NEW SECTION.  Sec. 3208   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Community and Technical College Trust Land Acquisition (30000065)

Appropriation:
     Community and Technical College Forest
          Reserve Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,050,000
          TOTAL . . . . . . . . . . . . $1,250,000

NEW SECTION.  Sec. 3209   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Trust Land Transfer (30000066)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) The total appropriation is provided to the department solely to transfer from trust status, or enter into fifty year leases for, certain trust lands of statewide significance deemed appropriate for state park, fish and wildlife habitat, natural area preserve, natural resources conservation area, open space, housing and essential government services, or recreation purposes.
     (2) Property transferred under this section must be appraised and transferred at fair market value. The value of the timber transferred must be deposited by the department to the common school construction account in the same manner as timber revenues from other common school trust lands. No deduction may be made for the resource management cost account under RCW 79.64.040. The value of the land transferred must be deposited in the natural resources real property replacement account.
     (3) Property subject to lease agreements under this section must be appraised at fair market value. Lease terms must be fifty years with options to renew for an additional fifty years. Lease payments must be lump sum payments for the entire term of the lease at the beginning of the lease. The department shall calculate such lump sum payments using professional appraisal standards. These lease payments may not exceed the fee simple purchase price based on current fair market value and must be deposited by the department to the common school construction account in the same manner as lease revenues from other common school trust lands. No deduction may be made for the resource management cost account under RCW 79.64.040.
     (4) All reasonable costs incurred by the department to implement this section are authorized to be paid out of the appropriations. Authorized costs include the actual cost of appraisals, staff time, environmental reviews, surveys, and other similar costs.
     (5) Intergrant exchanges between common school and other trust lands of equal value may occur if the exchange is in the interest of each trust, as determined by the board of natural resources.
     (6) Prior to or concurrent with conveyance of these properties, the department, with full cooperation of the receiving agencies, shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section. Transfer and lease agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose. Transfer and lease agreements may include provisions for receiving agencies to request alternative uses of the property, provided the alternative uses are compatible with the original intended public purpose and the department and legislature approves such uses.
     (7) The department and receiving agencies shall work in good faith to carry out the intent of this section. However, the department or receiving agencies may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the common school trust or the receiving agency.
     (8) The department shall execute trust land transfers that, after the deduction of reasonable costs as provided in subsection (4) of this section, eighty percent of the total value of transferred property is timber value and is deposited in the common school construction account. To achieve the eighty percent requirement, the department may choose to lease properties originally intended as transfers.
     (9) On June 30, 2011, the state treasurer shall transfer all remaining uncommitted funds from this appropriation to the common school construction account and the appropriations in this section shall be reduced by an equivalent amount.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $97,428,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $400,000,000
          TOTAL . . . . . . . . . . . . $497,428,000

NEW SECTION.  Sec. 3210   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Minor Works - Programmatic (30000067)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $143,000
     Resources Management Cost Account--State . . . . . . . . . . . . $142,000
          Subtotal Appropriation . . . . . . . . . . . . $285,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,100,000
          TOTAL . . . . . . . . . . . . $13,385,000

NEW SECTION.  Sec. 3211   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Right-of-Way Acquisition (30000069)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $150,000
     Resources Management Cost Account--State . . . . . . . . . . . . $350,000
          Subtotal Appropriation . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,450,000
          TOTAL . . . . . . . . . . . . $2,950,000

NEW SECTION.  Sec. 3212   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Riparian Easement Program (30000070)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $41,968,000
          TOTAL . . . . . . . . . . . . $46,968,000

NEW SECTION.  Sec. 3213   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Minor Works - Preservation (30000098)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $201,000
     Forest Development Account--State . . . . . . . . . . . . $134,000
     Resources Management Cost Account--State . . . . . . . . . . . . $144,000
          Subtotal Appropriation . . . . . . . . . . . . $479,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,600,000
          TOTAL . . . . . . . . . . . . $10,079,000

NEW SECTION.  Sec. 3214   FOR THE DEPARTMENT OF AGRICULTURE
     Fair Improvements (30000001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $400,000

(End of part)


PART 4
TRANSPORTATION

NEW SECTION.  Sec. 4001   FOR THE WASHINGTON STATE PATROL
     Minor Works - Preservation (20081001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $80,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,480,000

NEW SECTION.  Sec. 4002   FOR THE WASHINGTON STATE PATROL
     Fire Training Academy Sanitary System (20082002)

Reappropriation:
     Fire Service Training Account--State . . . . . . . . . . . . $663,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,837,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,500,000

NEW SECTION.  Sec. 4003   FOR THE WASHINGTON STATE PATROL
     Replace Existing Dormitory (20082003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $131,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,229,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,360,000

NEW SECTION.  Sec. 4004   FOR THE WASHINGTON STATE PATROL
     Seattle Crime Laboratory Expansion (20092102)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,377,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $565,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,942,000

NEW SECTION.  Sec. 4005   FOR THE WASHINGTON STATE PATROL
     Minor Works Projects (30000015)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $375,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $570,000
          TOTAL . . . . . . . . . . . . $945,000

NEW SECTION.  Sec. 4006   FOR THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
     Columbia River Dredging (2003H001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,977,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,723,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,700,000

NEW SECTION.  Sec. 4007   FOR THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
     Culvert Replacements (20081001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

(End of part)


PART 5
EDUCATION

NEW SECTION.  Sec. 5001   FOR THE HIGHER EDUCATION COORDINATING BOARD
     Higher Education Preservation Information (30000001)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely to refresh preservation information that resides in the state's comparable framework for higher education buildings including any necessary revisions or adjustments that will enable more direct translation of information, updates for last renewal or replacement of major systems, and quality assurance field sampling. In executing this continued capital study, the higher education coordinating board shall consult the office of financial management and the legislative fiscal committees about its workplan to ensure timely delivery of assembled facilities information and related capital models in an easy to understand format. As a general condition, upon appropriations provided to higher education agencies in this act, the state board for community and technical colleges and each state baccalaureate institution shall provide requested facilities information in a timely manner to enable the higher education coordinating board to complete the tasks and oversight assigned in this section.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $300,000

NEW SECTION.  Sec. 5002   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2001-03 School Construction Assistance Grant Program (20024001)

Reappropriation:
     Common School Construction Account--State . . . . . . . . . . . . $2,007,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,993,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,000,000

NEW SECTION.  Sec. 5003   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2003-05 School Construction Assistance Grant Program (20044001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,346,000
     Common School Construction Account--State . . . . . . . . . . . . $6,074,000
          Subtotal Reappropriation . . . . . . . . . . . . $12,420,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $169,371,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $194,211,000

NEW SECTION.  Sec. 5004   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2005-07 School Construction Assistance Grant Program (20064100)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $272,000
     Common School Construction Account--State . . . . . . . . . . . . $95,975,000
          Subtotal Reappropriation . . . . . . . . . . . . $0

     Prior Biennia (Expenditures) . . . . . . . . . . . . $545,519,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $641,766,000

NEW SECTION.  Sec. 5005   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2005-07 Apple Achievement Awards (20064850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions in section 196, chapter 371, Laws of 2006.


Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $4,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $496,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 5006   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2005-07 High Performance School Building Grants (20064852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,795,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,308,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,103,000

NEW SECTION.  Sec. 5007   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Aviation High School (20081002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $275,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,175,000

NEW SECTION.  Sec. 5008   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Regional School Construction Assistance Program (20082857)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $1,040,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $60,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,100,000

NEW SECTION.  Sec. 5009   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     School Construction Assistance Grants (20084200)

Reappropriation:
     Common School Construction Account--State . . . . . . . . . . . . $352,207,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $63,202,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $376,350,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $791,759,000

NEW SECTION.  Sec. 5010   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Vocational Skills Centers (20084300)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $46,650,300

     Prior Biennia (Expenditures) . . . . . . . . . . . . $27,056,700
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $73,707,000

NEW SECTION.  Sec. 5011   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Pierce County Skills Center (20084856)

Reappropriation:
     School Construction and Skill Centers Building
          Account--State . . . . . . . . . . . . $2,204,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $866,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $25,370,000
          TOTAL . . . . . . . . . . . . $28,440,000

NEW SECTION.  Sec. 5012   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Small Repair Grants (30000036)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 5013   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Capital Project Administration (30000037)

Appropriation:
     Common School Construction Account--State . . . . . . . . . . . . $3,337,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,097,000
          TOTAL . . . . . . . . . . . . $17,434,000

NEW SECTION.  Sec. 5014   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Vocational Skills Center Minor Capital Projects (30000002)

Appropriation:
     School Construction and Skill Centers Building
          Account--State . . . . . . . . . . . . $3,694,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,694,000

NEW SECTION.  Sec. 5015   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2009-11 School Construction Assistance Grant Program-Maintenance (30000031)

     The appropriation in this section is subject to the following conditions and limitations: In calculating square foot eligibility for state assistance grants, kindergarten student headcount shall not be reduced by fifty percent.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $430,992,000
     Common School Construction Account--State . . . . . . . . . . . . $311,702,000
     Common School Construction Account--Federal . . . . . . . . . . . . $2,500,000
     School Construction and Skill Centers Building
          Account--State . . . . . . . . . . . . $81,806,000
          Subtotal Appropriation . . . . . . . . . . . . $827,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,921,000,000
          TOTAL . . . . . . . . . . . . $4,748,000,000

NEW SECTION.  Sec. 5016   FOR THE STATE SCHOOL FOR THE BLIND
     Minor Works Preservation (30000002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $820,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,290,000
          TOTAL . . . . . . . . . . . . $3,110,000

NEW SECTION.  Sec. 5017   FOR THE STATE SCHOOL FOR THE DEAF
     Vocational Education, Cafeteria, and Maintenance Support Building (20082002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,713,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,187,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,900,000

NEW SECTION.  Sec. 5018   FOR THE STATE SCHOOL FOR THE DEAF
     Minor Works Preservation (30000001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,794,000
          TOTAL . . . . . . . . . . . . $3,794,000

NEW SECTION.  Sec. 5019   FOR THE UNIVERSITY OF WASHINGTON
     UW Bothell and Cascadia Community College - State Route 522 Off Ramp (20022014)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $55,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,695,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,750,000

NEW SECTION.  Sec. 5020   FOR THE UNIVERSITY OF WASHINGTON
     Computing and Communications Upgrades and Data Center (20082004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $20,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $45,000,000

NEW SECTION.  Sec. 5021   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Facility Preservation (20061002)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $21,200,000

NEW SECTION.  Sec. 5022   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Health, Safety, and Code Requirements (20061003)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $1,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,000,000

NEW SECTION.  Sec. 5023   FOR THE UNIVERSITY OF WASHINGTON
     Savery Hall Renovation (20061005)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $57,510,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $61,510,000

NEW SECTION.  Sec. 5024   FOR THE UNIVERSITY OF WASHINGTON
     Clark Hall Renovation (20061007)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $16,054,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,054,000

NEW SECTION.  Sec. 5025   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Facility Preservation (20081001)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $16,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,000,000

NEW SECTION.  Sec. 5026   FOR THE UNIVERSITY OF WASHINGTON
     Denny Hall Renovation (20081002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5027   FOR THE UNIVERSITY OF WASHINGTON
     Balmer Hall Reconstruction (20081004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5028   FOR THE UNIVERSITY OF WASHINGTON
     Intermediate Student Service and Classroom Improvements (20081005)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $7,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,781,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,281,000

NEW SECTION.  Sec. 5029   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Program (20082001)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $3,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 5030   FOR THE UNIVERSITY OF WASHINGTON
     Interdisciplinary Academic Building (20082003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $53,554,000
     Higher Education Non-Proprietary Local
          Capital Accounts--Private/Local . . . . . . . . . . . . $16,000,000
          Subtotal Appropriation . . . . . . . . . . . . $69,554,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $74,554,000

NEW SECTION.  Sec. 5031   FOR THE UNIVERSITY OF WASHINGTON
     UW Tacoma Phase 3 (20082005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $34,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $17,044,000
          TOTAL . . . . . . . . . . . . $57,194,000

NEW SECTION.  Sec. 5032   FOR THE UNIVERSITY OF WASHINGTON
     UW Bothell Phase 3 - Predesign (20082006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $70,013,000
          TOTAL . . . . . . . . . . . . $70,163,000

NEW SECTION.  Sec. 5033   FOR THE UNIVERSITY OF WASHINGTON
     Burke Museum Renovation (20082850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $300,000

NEW SECTION.  Sec. 5034   FOR THE UNIVERSITY OF WASHINGTON
     UW Tacoma - Soils Remediation (20082852)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5035   FOR THE UNIVERSITY OF WASHINGTON
     Miller Hall Renovation (20091001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $42,981,000
          TOTAL . . . . . . . . . . . . $43,481,000

NEW SECTION.  Sec. 5036   FOR THE UNIVERSITY OF WASHINGTON
     Anderson Hall Renovation (20091002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $21,225,000
          TOTAL . . . . . . . . . . . . $21,425,000

NEW SECTION.  Sec. 5037   FOR THE UNIVERSITY OF WASHINGTON
     UW Tacoma - Land Acquisition (20092003)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $474,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,526,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5038   FOR THE UNIVERSITY OF WASHINGTON
     UW Tacoma Phase 4 (20102002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $75,225,000
          TOTAL . . . . . . . . . . . . $75,725,000

NEW SECTION.  Sec. 5039   FOR THE UNIVERSITY OF WASHINGTON
     Global Public Health and Pharmacy Building (30000019)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $75,205,000
          TOTAL . . . . . . . . . . . . $75,705,000

NEW SECTION.  Sec. 5040   FOR THE UNIVERSITY OF WASHINGTON
     House of Knowledge Longhouse (30000021)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $11,757,000
          TOTAL . . . . . . . . . . . . $12,057,000

NEW SECTION.  Sec. 5041   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Facility Preservation (30000027)

Appropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $34,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $136,000,000
          TOTAL . . . . . . . . . . . . $170,000,000

NEW SECTION.  Sec. 5042   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Program (30000110)

Appropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 5043   FOR THE UNIVERSITY OF WASHINGTON
     Preventative Facility Maintenance and Building System Repairs (30000287)

Appropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $25,825,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $103,300,000
          TOTAL . . . . . . . . . . . . $129,125,000

NEW SECTION.  Sec. 5044   FOR THE UNIVERSITY OF WASHINGTON
     Infrastructure Savings (30000289)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5045   FOR THE WASHINGTON STATE UNIVERSITY
     WSU Pullman - Biomedical Sciences Facility (20042009)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $88,380,000
          TOTAL . . . . . . . . . . . . $96,030,000

NEW SECTION.  Sec. 5046   FOR THE WASHINGTON STATE UNIVERSITY
     WSU Pullman - Biotechnology and Life Sciences 2 (20042085)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $5,710,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $66,940,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $72,650,000

NEW SECTION.  Sec. 5047   FOR THE WASHINGTON STATE UNIVERSITY
     WSU Spokane - Nursing Building at Riverpoint (20042941)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $33,600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $34,600,000

NEW SECTION.  Sec. 5048   FOR THE WASHINGTON STATE UNIVERSITY
     WSU Vancouver - Applied Technology and Classroom Building (20062950)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,707,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $38,676,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,213,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $43,596,000

NEW SECTION.  Sec. 5049   FOR THE WASHINGTON STATE UNIVERSITY
     WSU Vancouver - Undergraduate Classroom Building (20062951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,977,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $22,023,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $28,000,000

NEW SECTION.  Sec. 5050   FOR THE WASHINGTON STATE UNIVERSITY
     Utilities Extension (20081100)

Reappropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,036,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,536,000

NEW SECTION.  Sec. 5051   FOR THE WASHINGTON STATE UNIVERSITY
     University-wide Infrastructure (20081701)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 5052   FOR THE WASHINGTON STATE UNIVERSITY
     Library Road Infrastructure (20081703)

Reappropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $1,666,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,334,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 5053   FOR THE WASHINGTON STATE UNIVERSITY
     Minor Works - Program (20082002)

Reappropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $1,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,000,000

NEW SECTION.  Sec. 5054   FOR THE WASHINGTON STATE UNIVERSITY
     Minor Works - Facility Preservation (20081001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,200,000
     Washington State University Building Account--State . . . . . . . . . . . . $2,045,000
          Subtotal Reappropriation . . . . . . . . . . . . $3,245,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $35,655,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $38,900,000

NEW SECTION.  Sec. 5055   FOR THE WASHINGTON STATE UNIVERSITY
     Animal Diagnostic and Research Biocontainment, Phase 1 (20082046)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $53,909,000
          TOTAL . . . . . . . . . . . . $54,109,000

NEW SECTION.  Sec. 5056   FOR THE WASHINGTON STATE UNIVERSITY
     WSU Spokane - Riverpoint Biomedical & Health Sciences (20162953)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $43,865,000
          TOTAL . . . . . . . . . . . . $44,115,000

NEW SECTION.  Sec. 5057   FOR THE WASHINGTON STATE UNIVERSITY
     Minor Works - Preservation (30000065)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $17,628,000
     Washington State University Building Account--
          State . . . . . . . . . . . . $10,000,000
          Subtotal Appropriation . . . . . . . . . . . . $27,628,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $27,628,000

NEW SECTION.  Sec. 5058   FOR THE WASHINGTON STATE UNIVERSITY
     Minor Works - Program (30000066)

Appropriation:
     Washington State University Building Account--
          State . . . . . . . . . . . . $20,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,600,000

NEW SECTION.  Sec. 5059   FOR THE WASHINGTON STATE UNIVERSITY
     Preventative Facility Maintenance and Building System Repairs (30000287)

Appropriation:
     State Taxable Building Construction Account--
          State . . . . . . . . . . . . $10,115,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,460,000
          TOTAL . . . . . . . . . . . . $50,575,000

NEW SECTION.  Sec. 5060   FOR THE WASHINGTON STATE UNIVERSITY
     Infrastructure Savings (30000421)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5061   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (20081001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $1,500,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $17,700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,450,000

NEW SECTION.  Sec. 5062   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works - Health, Safety, and Code Requirements (20081002)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5063   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (20081003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5064   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works - Program (20082001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $2,300,000
          Subtotal Reappropriation . . . . . . . . . . . . $3,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,000,000

NEW SECTION.  Sec. 5065   FOR THE EASTERN WASHINGTON UNIVERSITY
     Patterson Hall Remodel (20062002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $28,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,800,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $34,416,000
          TOTAL . . . . . . . . . . . . $64,616,000

NEW SECTION.  Sec. 5066   FOR THE EASTERN WASHINGTON UNIVERSITY
     Biology Chemistry Science Center (30000001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $59,491,000
          TOTAL . . . . . . . . . . . . $59,891,000

NEW SECTION.  Sec. 5067   FOR THE EASTERN WASHINGTON UNIVERSITY
     Preventive Maintenance and Building System Repairs (30000044)

Appropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $2,217,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,868,000
          TOTAL . . . . . . . . . . . . $11,085,000

NEW SECTION.  Sec. 5068   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works - Health, Safety and Code Compliance (30000053)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
          TOTAL . . . . . . . . . . . . $12,500,000

NEW SECTION.  Sec. 5069   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (30000054)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 5070   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (30000055)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,000,000
          TOTAL . . . . . . . . . . . . $7,500,000

NEW SECTION.  Sec. 5071   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works - Program (30000056)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $6,600,000
          Subtotal Appropriation . . . . . . . . . . . . $8,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $27,200,000
          TOTAL . . . . . . . . . . . . $35,800,000

NEW SECTION.  Sec. 5072   FOR THE EASTERN WASHINGTON UNIVERSITY
     Infrastructure Savings (30000421)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5073   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Dean Hall Renovation (20061004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $25,200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $26,700,000

NEW SECTION.  Sec. 5074   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (20081001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,375,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,875,000

NEW SECTION.  Sec. 5075   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Health, Safety, and Code Requirements (20081009)

Reappropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,035,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,335,000

NEW SECTION.  Sec. 5076   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (20081010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $100,000
          Subtotal Reappropriation . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,690,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,290,000

NEW SECTION.  Sec. 5077   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Combined Utilities (20081011)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,850,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,800,000

NEW SECTION.  Sec. 5078   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Program (20082002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $500,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,800,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,800,000

NEW SECTION.  Sec. 5079   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Hogue Hall Renovation and Addition (20082003)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $750,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $18,202,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $29,688,000
          TOTAL . . . . . . . . . . . . $50,890,000

NEW SECTION.  Sec. 5080   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Health Safety and Code Requirements (30000002)

     none

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $950,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $700,000
          Subtotal Appropriation . . . . . . . . . . . . $1,650,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $13,650,000

NEW SECTION.  Sec. 5081   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (30000009)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $690,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $2,050,000
          Subtotal Appropriation . . . . . . . . . . . . $2,740,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $14,740,000

NEW SECTION.  Sec. 5082   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (30000016)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,610,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $14,610,000

NEW SECTION.  Sec. 5083   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Program (30000025)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,500,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $3,600,000
          Subtotal Appropriation . . . . . . . . . . . . $7,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $28,000,000
          TOTAL . . . . . . . . . . . . $35,100,000

NEW SECTION.  Sec. 5084   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Samuelson Hall Renovation (30000048)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $166,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $65,139,000
          TOTAL . . . . . . . . . . . . $65,305,000

NEW SECTION.  Sec. 5085   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Preventative Facility Maintenance and Building System Repairs (30000287)

Appropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $2,422,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,688,000
          TOTAL . . . . . . . . . . . . $12,110,000

NEW SECTION.  Sec. 5086   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Science Phase 2 (30000045)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $55,870,000
          TOTAL . . . . . . . . . . . . $56,470,000

NEW SECTION.  Sec. 5087   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Infrastructure Savings (30000421)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5088   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Preservation (20081001)

Reappropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $925,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,375,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,300,000

NEW SECTION.  Sec. 5089   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Health, Safety, and Code Requirements (20081002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 5090   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Infrastructure Preservation (20081004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $215,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $485,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $700,000

NEW SECTION.  Sec. 5091   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Program (20082003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $80,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $850,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $930,000

NEW SECTION.  Sec. 5092   FOR THE EVERGREEN STATE COLLEGE
     Longhouse Expansion (20082007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $760,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $940,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,700,000

NEW SECTION.  Sec. 5093   FOR THE EVERGREEN STATE COLLEGE
     College Activities Building Renovation (20082009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,120,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $780,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,900,000

NEW SECTION.  Sec. 5094   FOR THE EVERGREEN STATE COLLEGE
     Communications Building Preservation and Renovation (30000002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,821,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,835,000
          TOTAL . . . . . . . . . . . . $10,656,000

NEW SECTION.  Sec. 5095   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Preservation (30000003)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $4,525,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,525,000

NEW SECTION.  Sec. 5096   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Health, Safety, Code Compliance (30000016)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,515,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,515,000

NEW SECTION.  Sec. 5097   FOR THE EVERGREEN STATE COLLEGE
     Laboratory and Art Annex Building Renovation (30000026)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $514,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,335,000
          TOTAL . . . . . . . . . . . . $4,849,000

NEW SECTION.  Sec. 5098   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Program (30000031)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,550,000
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $520,000
          Subtotal Appropriation . . . . . . . . . . . . $2,070,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,070,000

NEW SECTION.  Sec. 5099   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Infrastructure (30000046)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,380,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,380,000

NEW SECTION.  Sec. 5100   FOR THE EVERGREEN STATE COLLEGE
     Lecture Hall - Predesign (30000126)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,500,000
          TOTAL . . . . . . . . . . . . $6,800,000

NEW SECTION.  Sec. 5101   FOR THE EVERGREEN STATE COLLEGE
     Preventative Facility Maintenance and Building System Repairs (30000287)

Appropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $760,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,040,000
          TOTAL . . . . . . . . . . . . $3,800,000

NEW SECTION.  Sec. 5102   FOR THE EVERGREEN STATE COLLEGE
     Infrastructure Savings (30000421)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5103   FOR THE WESTERN WASHINGTON UNIVERSITY
     Academic Instructional Center (20022026)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $400,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $62,844,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $64,244,000

NEW SECTION.  Sec. 5104   FOR THE WESTERN WASHINGTON UNIVERSITY
     Miller Hall Renovation (20041953)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $57,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,773,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $63,273,000

NEW SECTION.  Sec. 5105   FOR THE WESTERN WASHINGTON UNIVERSITY
     Carver Academic Renovation (20081060)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,676,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $58,130,000
          TOTAL . . . . . . . . . . . . $66,206,000

NEW SECTION.  Sec. 5106   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works - Health, Safety, and Code Requirements (20081090)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,533,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,933,000

NEW SECTION.  Sec. 5107   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (20081091)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,351,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,051,000

NEW SECTION.  Sec. 5108   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (20081092)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,116,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,016,000

NEW SECTION.  Sec. 5109   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works - Program (20082093)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $2,500,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 5110   FOR THE WESTERN WASHINGTON UNIVERSITY
     Academic Facilities Modernization Projects (20082099)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,000,000

NEW SECTION.  Sec. 5111   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works - Health, Safety, and Code Requirements (30000004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,572,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
          TOTAL . . . . . . . . . . . . $12,572,000

NEW SECTION.  Sec. 5112   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works - Facilities Preservation (30000005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,911,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,000,000
          TOTAL . . . . . . . . . . . . $17,911,000

NEW SECTION.  Sec. 5113   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works - Infrastructure (30000006)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,781,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $9,781,000

NEW SECTION.  Sec. 5114   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works - Program (30000007)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $6,213,000
          Subtotal Appropriation . . . . . . . . . . . . $9,213,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $36,000,000
          TOTAL . . . . . . . . . . . . $45,213,000

NEW SECTION.  Sec. 5115   FOR THE WESTERN WASHINGTON UNIVERSITY
     College of Fine and Performing Arts Armory Renovation (30000008)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $37,053,000
          TOTAL . . . . . . . . . . . . $37,303,000

NEW SECTION.  Sec. 5116   FOR THE WESTERN WASHINGTON UNIVERSITY
     Preventative Facility Maintenance and Building System Repairs (30000287)

Appropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $3,614,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,456,000
          TOTAL . . . . . . . . . . . . $18,070,000

NEW SECTION.  Sec. 5117   FOR THE WESTERN WASHINGTON UNIVERSITY
     Infrastructure Savings (30000421)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5118   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Pacific-Lewis and Clark Station Camp Park Project (2002S001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,265,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,221,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,486,000

NEW SECTION.  Sec. 5119   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Lewis and Clark Trail Interpretive Infrastructure Grant (20024001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $918,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $809,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,727,000

NEW SECTION.  Sec. 5120   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Projects (20044004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $690,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,310,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5121   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Statewide - Washington Heritage Project Grants (20064004)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 733, chapter 488, Laws of 2005.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,318,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,346,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,664,000

NEW SECTION.  Sec. 5122   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Tacoma State History Museum Building Preservation (20071001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $75,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $425,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 5123   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Grants (20074004)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the project list in section 5137, chapter 520, Laws of 2007.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,630,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,370,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 5124   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Project Capital Grants (30000011)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is subject to the provisions of RCW 27.34.330.
     (2) The appropriation is provided solely for the following list of projects.
     (3) The 2011-13 projects must be selected based on their readiness to proceed.

ProjectRecommended
Wenatchee Valley Museum$150,000
West Point Light Station$300,000
Des Moines Field House$420,000
Washington Hall$381,000
Percival Landing$567,000
Roslyn City Hall & Library$194,000
Spokane County courthouse$500,000
Snoqualmie Chapel car #5$125,000
Edmonds Carnegie Library museum$48,000
Ilwaco museum collections$41,000
Minkler Mansion$200,000
Cheney house for a museum$87,000
Longview Columbia theatre$1,000,000
Chinook School$350,000
Territorial Courthouse of 1858$167,000
Hanford Interpretive Center$147,000
Carnegie Library Museum$883,000
Dynamite Train Canopy$50,000
King Street Station$750,000
Lakewood Carriage House$110,000
Lincoln School$175,000
Quincy Pioneer Church$195,000
Ezra Meeker Mansion$100,000
Port Townsend Storage Facility$450,000
Puyallup Church Spire$17,000
Morris House and Washington Harbor School$27,000
Kalama Interpretive Center$212,000
Foss Waterway Seaport Building$750,000
Pioneer State Bank Building$201,000
Kirkman House$32,000
Malo Sawmill$70,000
Stimson-Green Mansion$23,000
Lightship #83$335,000
Masonic Temple Building$350,000
Wilkeson Centennial Monument$10,000
Eddon Boatyard ways and dock$243,000
Commencement Restoration$86,000
Vessel Shenandoah$179,000
Walt's Mill$75,000
TOTAL$10,000,000


Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 5125   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Minor Works - Preservation (30000093)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,000,000
          TOTAL . . . . . . . . . . . . $11,250,000

NEW SECTION.  Sec. 5126   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Museum System Repair and Upgrades/Preservation (20081013)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $857,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,857,000

NEW SECTION.  Sec. 5127   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Minor Works - Health, Safety, and Code Requirements (30000001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,250,000
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 5128   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Minor Works - Facility Preservation (30000004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $534,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,534,000

NEW SECTION.  Sec. 5129   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Minor Works - Program (30000008)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $298,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $400,000
          TOTAL . . . . . . . . . . . . $698,000

NEW SECTION.  Sec. 5130   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Historical Courthouse Rehabilitation (20082851)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is provided solely for courthouse protection and preservation, including character defining architectural features, general repairs, system upgrades, payments for renovation completed since January 1, 2006, and improvements to access and accommodations for persons with disabilities. All rehabilitation work must comply with the secretary of interior's standards for rehabilitation. Grants may not be used for expenditures for courthouse maintenance. Only counties with historic courthouses that continue to maintain county functions are eligible for grants. Counties receiving grants shall provide an equal amount of matching funds from public or private sources. The department shall use up to two percent of the appropriation for program administration.
     (2) The society shall continue to use the revised eligibility criteria and grant application process that includes the review of projects selected for funding by the courthouse advisory committee. Those projects chosen for funding shall undergo a review by the department of general administration's barrier free program to ensure that they meet Americans with disabilities act standards and accessibility and all other Americans with disabilities act requirements are maintained during the construction. The existing historic courthouse advisory committee shall continue to review grant applications and make funding recommendations to the state historic preservation officer.
     (3) The society and the courthouse advisory committee shall include readiness to proceed when developing the priority list of projects to fund.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 5131   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Historic Barn Preservation (20084851)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for implementation of the heritage barn preservation program created in chapter 333, Laws of 2007.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $158,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $342,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 5132   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Historic Barn Preservation (30000098)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for implementation of the heritage barn preservation program created in chapter 333, Laws of 2007. Projects must be selected based on their readiness to proceed.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 5133   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Courthouse Preservation (30000099)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is provided solely for courthouse protection and preservation, including character defining architectural features, general repairs, system upgrades, payments for renovation completed since January 1, 2006, and improvements to access and accommodations for persons with disabilities. All rehabilitation work must comply with the secretary of interior's standards for rehabilitation. Grants may not be used for expenditures for courthouse maintenance. Only counties with historic courthouses that continue to maintain county functions are eligible for grants. Counties receiving grants shall provide an equal amount of matching funds from public or private sources. The department shall use up to two percent of the appropriation for program administration.
     (2) The society shall continue to use the revised eligibility criteria and grant application process that includes the review of projects selected for funding by the courthouse advisory committee. Those projects chosen for funding shall undergo a review by the department of general administration's barrier free program to ensure that they meet the Americans with disabilities act standards and that all other Americans with disabilities act requirements are maintained during the construction. The existing historic courthouse advisory committee shall continue to review grant applications and make funding recommendations to the state historic preservation officer.
     (3) The society and the courthouse advisory committee shall include readiness to proceed when developing the priority list of projects to fund.
     (4) Projects must be selected based on their readiness to proceed.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 5134   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Puyallup - Phase III Expansion (20002676)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $84,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $25,251,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,335,000

NEW SECTION.  Sec. 5135   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College - Science Building (20012687)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $29,996,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $31,996,000

NEW SECTION.  Sec. 5136   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College - Science Building (20012688)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $28,804,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $29,804,000

NEW SECTION.  Sec. 5137   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College - Glenn Anthon Hall - Replacement (20041207)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $27,045,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $28,645,000

NEW SECTION.  Sec. 5138   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College - Replacement Science and Technology Building (20041208)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $37,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $23,603,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,640,000

NEW SECTION.  Sec. 5139   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Skagit Valley College - Science Building Replacement (20041209)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $38,000
     State Building Construction Account--State . . . . . . . . . . . . $8,999,000
          Subtotal Reappropriation . . . . . . . . . . . . $9,037,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $22,073,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $31,110,000

NEW SECTION.  Sec. 5140   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Community College - Science Building Replacement (20041212)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $727,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,995,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,722,000

NEW SECTION.  Sec. 5141   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellingham Technical College - Welding and Auto Collision Replacement (20041213)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $179,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $16,659,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,038,000

NEW SECTION.  Sec. 5142   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lower Columbia College - Instructional Fine Arts Building (20041214)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,362,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $24,662,000

NEW SECTION.  Sec. 5143   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College - East County Satellite (20041689)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $26,576,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $29,576,000

NEW SECTION.  Sec. 5144   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College - Computer Technology Center (20042682)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,799,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,999,000

NEW SECTION.  Sec. 5145   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellevue Community College - Science and Technology (20042690)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $34,285,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $38,285,000

NEW SECTION.  Sec. 5146   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Puyallup - Communication Arts and Health Building (20042691)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $16,263,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,987,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $27,250,000

NEW SECTION.  Sec. 5147   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College - University Center at North Puget Sound (20042692)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,999,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $47,813,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $51,812,000

NEW SECTION.  Sec. 5148   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Cascadia - Center for Arts, Technology, Communication (20042693)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $23,063,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,604,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $35,667,000

NEW SECTION.  Sec. 5149   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College, Fort Steilacoom - Science and Technology (20042694)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $14,376,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,018,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $32,394,000

NEW SECTION.  Sec. 5150   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Puget Sound Community College - Science Complex (20042695)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $250,000
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $27,870,500
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $29,120,500

NEW SECTION.  Sec. 5151   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Centralia Community College - Science Building (20042850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $3,000,000
          Subtotal Reappropriation . . . . . . . . . . . . $3,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $28,863,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $32,113,000

NEW SECTION.  Sec. 5152   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls - Business and Social Science Building (20051853)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,313,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,313,000

NEW SECTION.  Sec. 5153   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College - Training Facility (20051854)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $51,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,701,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,752,000

NEW SECTION.  Sec. 5154   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works Preservation (Repairs and Minor Improvements) (20061001)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $474,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,526,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,000,000

NEW SECTION.  Sec. 5155   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Roof Repairs (20061010)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,340,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,840,000

NEW SECTION.  Sec. 5156   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Facility Repairs (20061050)

Reappropriation:
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $21,327,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $22,327,000

NEW SECTION.  Sec. 5157   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Site Repairs (20061090)

Reappropriation:
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $1,320,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,517,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,837,000

NEW SECTION.  Sec. 5158   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College - Humanities and Student Services (20061204)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $19,284,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $22,104,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $41,388,000

NEW SECTION.  Sec. 5159   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College - Humanities and Classroom Building (20061205)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,054,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $27,928,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,827,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $30,809,000

NEW SECTION.  Sec. 5160   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College - Vocational Education Renovation (20061303)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $230,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,142,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,372,000

NEW SECTION.  Sec. 5161   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College - Information Technologies and Visual Communications (20061304)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $220,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,876,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,096,000

NEW SECTION.  Sec. 5162   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College - Library Renovation (20061305)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $40,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,960,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,000,000

NEW SECTION.  Sec. 5163   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Edmonds Community College - Brier Hall Renovation (20061307)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,604,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,304,000

NEW SECTION.  Sec. 5164   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lake Washington Technical College - Science Lab Renovation (20061308)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $62,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,697,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,759,000

NEW SECTION.  Sec. 5165   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Shoreline Community College - Annex Renovation (20061312)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $180,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,559,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,739,000

NEW SECTION.  Sec. 5166   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College - Physical Education Renovation (20061313)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,395,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,295,000

NEW SECTION.  Sec. 5167   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College - Raymond Hall Renovation (20061325)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,019,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,169,000

NEW SECTION.  Sec. 5168   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Fort Steilacoom - Cascade Core Phase I (20061326)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $500,000
          Subtotal Reappropriation . . . . . . . . . . . . $5,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $16,453,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $21,953,000

NEW SECTION.  Sec. 5169   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     North Seattle Community College - Wellness Center Repairs (20061330)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $295,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,705,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 5170   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College - Water System Replacement (20061501)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1,943,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,951,000

NEW SECTION.  Sec. 5171   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College - Maritime Academy Repairs (20061502)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1,740,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $216,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,956,000

NEW SECTION.  Sec. 5172   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Infrastructure Savings (20061751)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $539,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,177,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,716,000

NEW SECTION.  Sec. 5173   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Program (20062130)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $920,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,343,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,263,000

NEW SECTION.  Sec. 5174   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College - Greenhouse/Educational Center (20062410)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $206,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $44,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 5175   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College - Campus Classrooms (20062696)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $802,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,082,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,884,000

NEW SECTION.  Sec. 5176   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lake Washington Technical College - Allied Health Building (20062697)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $597,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,332,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,929,000

NEW SECTION.  Sec. 5177   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Puget Sound Community College - Learning Resource Center (20062698)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,256,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $209,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,465,000

NEW SECTION.  Sec. 5178   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clover Park Technical College - Allied Health Care Facility (20062699)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,040,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,405,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,445,000

NEW SECTION.  Sec. 5179   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     North Seattle Community College - Employment Resource Center (20062851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,090,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,490,000

NEW SECTION.  Sec. 5180   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Shoreline Community College - Automotive Building (Phase I) (20062951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $807,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $193,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5181   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Preservation - Repairs and Minor Improvements (20081001)

     The reappropriation in this section is subject to the following conditions and limitations: $1,663,000 of the reappropriation is provided solely for emergency repairs to the L Building at Bellevue Community College. Repairs include water leaks, mold, and other related damage and will restore the building and eliminate the potential for future problems.

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 5182   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Facility Preservation - Roof Repairs (20081010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000
     Education Construction Account--State . . . . . . . . . . . . $1,455,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,455,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,221,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,676,000

NEW SECTION.  Sec. 5183   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Facility Preservation (20081050)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $12,103,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,140,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $21,243,000

NEW SECTION.  Sec. 5184   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Infrastructure Preservation (20081090)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $924,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,158,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,082,000

NEW SECTION.  Sec. 5185   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College - Wood Construction Center (20081216)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,111,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $25,942,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,438,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $28,491,000

NEW SECTION.  Sec. 5186   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Columbia Basin College - Vocational Building (20081217)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $892,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $21,204,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $910,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,006,000

NEW SECTION.  Sec. 5187   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College - Business and Humanities Center (20081218)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,200,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $35,397,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $37,697,000

NEW SECTION.  Sec. 5188   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College - Chemistry and Life Science Building (20081219)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,200,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $29,263,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,320,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $31,783,000

NEW SECTION.  Sec. 5189   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Community College - Technical Education Building (20081220)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,600,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $32,335,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $793,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $34,728,000

NEW SECTION.  Sec. 5190   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College - Index Hall Replacement (20081221)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,150,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,301,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,650,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,205,000
          TOTAL . . . . . . . . . . . . $45,306,000

NEW SECTION.  Sec. 5191   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College - Trades and Industry Building (20081222)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $138,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,625,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $28,737,000
          TOTAL . . . . . . . . . . . . $31,500,000

NEW SECTION.  Sec. 5192   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellingham Technical College - Instructional Resource Center (20081223)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $737,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $29,103,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,087,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $30,927,000

NEW SECTION.  Sec. 5193   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Skagit Valley College - Academic and Student Services Building (20081224)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $35,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,116,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $101,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $28,949,000
          TOTAL . . . . . . . . . . . . $31,201,000

NEW SECTION.  Sec. 5194   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lower Columbia College - Health and Science Building (20081225)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,969,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $36,405,000
          TOTAL . . . . . . . . . . . . $41,874,000

NEW SECTION.  Sec. 5195   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College - Science and Math Building (20081226)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $45,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,583,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $231,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,478,000
          TOTAL . . . . . . . . . . . . $44,337,000

NEW SECTION.  Sec. 5196   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College - Edison North Renovation (20081314)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $16,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,284,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,284,000

NEW SECTION.  Sec. 5197   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Columbia Basin College - Business Education Building (20081315)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,420,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,020,000

NEW SECTION.  Sec. 5198   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Puget Sound Community College - Building 22 Renovation (20081316)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,013,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,002,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,346,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,361,000

NEW SECTION.  Sec. 5199   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College - Brown Dental Hygiene Building (20081317)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,175,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,675,000

NEW SECTION.  Sec. 5200   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Edmonds Community College - Meadowdale Hall Renovation (20081318)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,006,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,256,000

NEW SECTION.  Sec. 5201   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Community College - Building 7 Renovation (20081319)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $650,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,748,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $359,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,757,000

NEW SECTION.  Sec. 5202   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College - Music Building 15 Renovation (20081320)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $481,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,806,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $661,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,948,000

NEW SECTION.  Sec. 5203   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Fort Steilacoom - Cascade Core Phase II (20081321)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $902,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $15,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,340,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,400,000
          TOTAL . . . . . . . . . . . . $23,641,000

NEW SECTION.  Sec. 5204   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College - Primary Electrical Replacement (20081506)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,620,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,870,000

NEW SECTION.  Sec. 5205   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Edmonds Community College - Primary Electrical Replacement (20081508)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $666,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,466,000

NEW SECTION.  Sec. 5206   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellevue Community College - L Building Emergency Repairs (20081850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,360,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $303,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,663,000

NEW SECTION.  Sec. 5207   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Program (20082130)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 5208   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Shoreline Community College - Automotive Training Center (20082413)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $994,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5209   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Centralia College - Health and Wellness Education Center (20082414)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $921,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $79,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5210   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College - Magnuson Building Remodel (20082415)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $940,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $941,000

NEW SECTION.  Sec. 5211   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College - Child Care Facility (20082416)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5212   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College - Child and Family Studies Center (20082417)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $991,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5213   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College - Early Childhood Education and Child Care Center (20082418)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $30,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $970,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5214   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Walla Walla Community College - Culinary Arts/Student Development Center (20082419)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5215   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College - Health Careers Center (20082701)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $15,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,946,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $240,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $35,565,000
          TOTAL . . . . . . . . . . . . $38,766,000

NEW SECTION.  Sec. 5216   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellevue Community College - Health Science Building (20082702)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $144,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $36,506,000
          TOTAL . . . . . . . . . . . . $41,000,000

NEW SECTION.  Sec. 5217   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bates Technical College - Mohler Communications Technology Center (20082703)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $20,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,755,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $153,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $23,398,000
          TOTAL . . . . . . . . . . . . $25,326,000

NEW SECTION.  Sec. 5218   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Columbia Basin College - Social Science Center (20082704)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $21,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,413,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $90,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,041,000
          TOTAL . . . . . . . . . . . . $15,565,000

NEW SECTION.  Sec. 5219   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College - Health and Advanced Technologies Building (20082705)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $25,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,506,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $225,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $33,598,000
          TOTAL . . . . . . . . . . . . $36,354,000

NEW SECTION.  Sec. 5220   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Higher Education Cost Escalation (20082850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for the state board for community and technical colleges to assist public community and technical colleges to manage unanticipated cost escalation for projects bid during the 2007-09 biennium. Not more than $750,000 shall be made available to any single project and amounts provided for this purpose must be matched equally from other resources. The state board for community and technical colleges shall manage the distribution of funds to ensure that the requesting college has managed its project within the current appropriation through preparation of bid documents and that the scope of the project is no greater than was originally specified in the design. Prior to the office of financial management approving use of a minor works appropriation as a match, and its transfer to the project with unanticipated cost escalation, the state board for community and technical colleges shall require the college to describe what it has done to identify and develop alternative resources for a match, and the specific minor works projects that would be deferred as a result of the transfer. The state board for community and technical colleges will report to the office of financial management and the appropriate fiscal committees of the legislature on the use of these funds.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,796,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $442,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,238,000

NEW SECTION.  Sec. 5221   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Roof Repairs "A" (30000010)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $9,493,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,000,000
          TOTAL . . . . . . . . . . . . $33,493,000

NEW SECTION.  Sec. 5222   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Site Repairs "A" (30000036)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $2,710,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $18,710,000

NEW SECTION.  Sec. 5223   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Facility Repairs "A" (30000048)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $18,535,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $80,000,000
          TOTAL . . . . . . . . . . . . $98,535,000

NEW SECTION.  Sec. 5224   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Program (30000078)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,858,000
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $9,714,000
          Subtotal Appropriation . . . . . . . . . . . . $19,572,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $80,000,000
          TOTAL . . . . . . . . . . . . $99,572,000

NEW SECTION.  Sec. 5225   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College - College and City Library (30000113)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5226   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College - Sophia Bremer Child Development Center (30000115)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5227   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellingham Technical College - Fisheries Program (30000117)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5228   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lower Columbia College - Myklebust Gymnasium (30000118)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5229   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Wenatchee Valley College - Music and Arts Center (30000119)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5230   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College - Seattle Maritime Academy (30000120)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,839,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $15,483,000
          TOTAL . . . . . . . . . . . . $18,322,000

NEW SECTION.  Sec. 5231   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College - Palmer Martin Building (30000121)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,464,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,509,000
          TOTAL . . . . . . . . . . . . $14,973,000

NEW SECTION.  Sec. 5232   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College - College Instruction Center (30000122)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $55,759,000
          TOTAL . . . . . . . . . . . . $56,009,000

NEW SECTION.  Sec. 5233   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Centralia College - Student Services (30000123)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,583,000
          TOTAL . . . . . . . . . . . . $40,833,000

NEW SECTION.  Sec. 5234   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College - Photography and Fine Arts (30000124)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,736,000
          TOTAL . . . . . . . . . . . . $32,986,000

NEW SECTION.  Sec. 5235   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clover Park Technical College - Hospitality Institute (30000125)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $41,919,000
          TOTAL . . . . . . . . . . . . $42,169,000

NEW SECTION.  Sec. 5236   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College - Allied Health and Early Childhood Development Center (30000126)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $25,642,000
          TOTAL . . . . . . . . . . . . $25,892,000

NEW SECTION.  Sec. 5237   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor - Student Services and Instructional Building (30000127)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $372,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $43,065,000
          TOTAL . . . . . . . . . . . . $43,437,000

NEW SECTION.  Sec. 5238   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College - Cascade Court (30000128)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $33,850,000
          TOTAL . . . . . . . . . . . . $34,100,000

NEW SECTION.  Sec. 5239   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     North Seattle Community College - Technology Building Renewal (30000129)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,976,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,337,000
          TOTAL . . . . . . . . . . . . $25,313,000

NEW SECTION.  Sec. 5240   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College - Science Math and Technology Building (30000130)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $15,545,000
          TOTAL . . . . . . . . . . . . $17,245,000

NEW SECTION.  Sec. 5241   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bates Technical College - West Wing Renovation (30000131)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,407,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,077,000
          TOTAL . . . . . . . . . . . . $15,484,000

NEW SECTION.  Sec. 5242   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College - Shop Building Renovation (30000132)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,459,000
          TOTAL . . . . . . . . . . . . $13,709,000

NEW SECTION.  Sec. 5243   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College - Automotive Technology Building (30000133)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,141,000
          TOTAL . . . . . . . . . . . . $16,391,000

NEW SECTION.  Sec. 5244   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Renton Technical College - Automotive Complex Renovation (30000134)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $365,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $18,160,000
          TOTAL . . . . . . . . . . . . $18,525,000

NEW SECTION.  Sec. 5245   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College - North County Satellite (30000135)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $38,087,000
          TOTAL . . . . . . . . . . . . $38,337,000

NEW SECTION.  Sec. 5246   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College - Learning Resource Center (30000136)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $330,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $59,616,000
          TOTAL . . . . . . . . . . . . $59,946,000

NEW SECTION.  Sec. 5247   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College - Infrastructure (30000190)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,061,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,061,000

NEW SECTION.  Sec. 5248   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Preservation (30000210)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $15,116,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,116,000

NEW SECTION.  Sec. 5249   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Preventative Facility Maintenance and Building System Repairs (30000287)

Appropriation:
     State Taxable Building Construction Account--
          State . . . . . . . . . . . . $22,802,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $91,208,000
          TOTAL . . . . . . . . . . . . $114,010,000

NEW SECTION.  Sec. 5250   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Infrastructure Savings (30000421)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6004 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

(End of part)


PART 6
MISCELLANEOUS AND SUPPLEMENTAL PROVISIONS

NEW SECTION.  Sec. 6001   (1) Allotments for appropriations in this act shall be provided in accordance with the capital project review requirements adopted by the office of financial management and in compliance with RCW 43.88.110. Projects that will be employing alternative public works construction procedures under chapter 39.10 RCW are subject to the allotment procedures defined in this section and RCW 43.88.110.
     (2) Each project is defined as proposed in the legislative budget notes or in the governor's budget document.

NEW SECTION.  Sec. 6002   To ensure that major construction projects are carried out in accordance with legislative and executive intent, appropriations in this act in excess of $5,000,000 shall not be expended or encumbered until the office of financial management has reviewed and approved the agency's predesign. The predesign document shall include but not be limited to program, site, and cost analysis in accordance with the predesign manual adopted by the office of financial management. To improve monitoring of major construction projects, progress reports shall be submitted by the agency administering the project to the office of financial management and to the fiscal committees of the house of representatives and senate. Reports will be submitted on July 1st and December 31st each year in a format to be developed by the office of financial management.

NEW SECTION.  Sec. 6003   (1) To ensure minor works appropriations are carried out in accordance with legislative intent, funds appropriated in this act shall not be allotted until project lists are on file at the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee. All projects must meet the criteria included in subsection (2)(a) of this section. Revisions to the lists must be filed with the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee and include an explanation of variances from the prior lists before funds may be expended on the revisions.
     (2)(a) Minor works projects are single line appropriations that include multiple projects of a similar nature and that are valued between $25,000 and $1,000,000 each, with the exception of higher education minor works projects that may be valued up to $2,000,000. These projects can generally be completed within two years of the appropriation with the funding provided. Agencies are prohibited from including projects on their minor works lists that are a phase of a larger project, and that if combined over a continuous period of time, would exceed $1,000,000, or $2,000,000 for higher education minor works projects. Improvements for accessibility in compliance with the Americans with disabilities act may be included in any of the above minor works categories.
     (b) Minor works appropriations shall not be used for, among other things: Studies, except for technical or engineering reviews or designs that lead directly to and support a project on the same minor works list; planning; design outside the scope of work on a minor works list; moveable, temporary, and traditionally funded operating equipment not in compliance with the equipment criteria established by the office of financial management; software not dedicated to control of a specialized system; moving expenses; land or facility acquisition; or to supplement funding for projects with funding shortfalls unless expressly authorized elsewhere in this act. The office of financial management may make an exception to the limitations described in this subsection (2)(b) for exigent circumstances after notifying the legislative fiscal committees and waiting ten days for comments by the legislature regarding the proposed exception.
     (3) It is generally not the intent of the legislature to make future appropriations for capital expenditures or for maintenance and operating expenses for an acquisition project or a significant expansion project that is initiated through the minor works process and therefore does not receive a policy and fiscal analysis by the legislature. Minor works projects are intended to be one-time expenditures that do not require future state resources to complete.

NEW SECTION.  Sec. 6004   (1) The office of financial management may authorize a transfer of appropriation authority provided for a capital project that is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient. No such transfer may be used to expand the capacity of any facility beyond that intended in making the appropriation. Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects that are funded from the same fund or account. No transfers may occur between projects to local government agencies except where the grants are provided within a single omnibus appropriation and where such transfers are specifically authorized by the implementing statutes that govern the grants.
     (2) The office of financial management may find that an amount is in excess of the amount required for the completion of a project only if: (a) The project as defined in the notes to the budget document is substantially complete and there are funds remaining; or (b) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated in this act.
     (3) For the purposes of this section, the intent is that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.
     (4) Transfers of funds to an agency's infrastructure savings appropriation are subject to review and approval by the office of financial management. Expenditures from an infrastructure savings appropriation are limited to projects that have a primary purpose to correct infrastructure deficiencies or conditions that: (a) Adversely affect the ability to utilize the infrastructure for its current programmatic use; (b) reduce the life expectancy of the infrastructure; or (c) increase the operating costs of the infrastructure for its current programmatic use. Eligible infrastructure projects may include structures and surface improvements, site amenities, utility systems outside building footprints and natural environmental changes or requirements as part of an environmental regulation, a declaration of emergency for an infrastructure issue in conformance with RCW 43.88.250, or infrastructure planning as part of a facility master plan.
     (5) A report of any transfer effected under this section, except emergency projects or any transfer under $250,000, shall be filed with the legislative fiscal committees of the senate and house of representatives by the office of financial management at least thirty days before the date the transfer is effected. The office of financial management shall report all emergency or smaller transfers within thirty days from the date of transfer.

NEW SECTION.  Sec. 6005   (1) It is expected that projects be ready to proceed in a timely manner depending on the type or phase of the project or program that is the subject of the appropriation in this act. Except for major projects that customarily may take more than two biennia to complete from predesign to the end of construction, or large infrastructure grant or loan programs supporting projects that often take more than two biennia to complete, the legislature generally does not intend to reappropriate funds more than once, particularly for smaller grant programs, local/community projects, and minor works.
     (2) Agencies shall expedite the expenditure of reappropriations and appropriations in this act in order to: (a) Rehabilitate infrastructure resources; (b) accelerate environmental rehabilitation and restoration projects for the improvement of the state's natural environment; (c) reduce additional costs associated with acquisition and construction inflationary pressures; and (d) provide additional employment opportunities associated with capital expenditures.
     (3) To the extent feasible, agencies are directed to accelerate expenditure rates at their current level of permanent employees and shall use contracted design and construction services wherever necessary to meet the goals of this section.

NEW SECTION.  Sec. 6006   State agencies, including institutions of higher education, shall allot and report full-time equivalent staff for capital projects in a manner comparable to staff reporting for operating expenditures.

NEW SECTION.  Sec. 6007   The department of general administration shall not charge the facility depreciation component of lease charges for nonprofit tenants in the building adjoining Capitol Way and 11th avenue during the 2009-2011 biennium.

NEW SECTION.  Sec. 6008   Executive Order No. 05-05, archaeological and cultural resources, was issued effective November 10, 2005. Agencies and higher education institutions shall comply with the requirements set forth in this executive order.

NEW SECTION.  Sec. 6009   ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS. The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW. When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation. Expenditures made by an agency for one of the indicated purposes before the issue date of the authorized financial contract and any certificates of participation therein are intended to be reimbursed from proceeds of the financial contract and any certificates of participation therein to the extent provided in the agency's financing plan approved by the state finance committee.
     State agencies may enter into agreements with the department of general administration and the state treasurer's office to develop requests to the legislature for acquisition of properties and facilities through financial contracts. The agreements may include charges for services rendered.
     Those noninstructional facilities of higher education institutions authorized in this section to enter into financial contracts are not eligible for state funded maintenance and operations. Instructional space that is available for regularly scheduled classes for academic transfer, basic skills, and workforce training programs may be eligible for state funded maintenance and operations.
     (1) Department of general administration: Enter into a financing contract for up to $685,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the preservation of the transportation building.
     (2) Department of corrections: Enter into a financing contract for up to $17,958,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to provide additional work release beds.
     (3) Parks and recreation commission: Enter into a financing contract in an amount not to exceed $2,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop Cama Beach state park.
     (4) University of Washington: Enter into a financing contract for up to $86,526,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for campus projects.
     (5) Washington State University: Enter into a financing contract for up to $15,750,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for campus projects. If funds in this subsection are used to finance the wastewater reclamation project, all treated effluent may be used only for the domestic water requirements of the Pullman energy plant and chilled water facilities and irrigating general university grounds, excluding the golf course.
     (6) Central Washington University: Enter into a financing contract for up to $7,788,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for campus projects.
     (7) Eastern Washington University: Enter into a financing contract for up to $5,500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for campus projects.
     (8) Community and technical colleges:
     (a) Enter into a financing contract on behalf of Walla Walla Community College for up to $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase up to 40 acres of land.
     (b) Enter into a financing contract for up to $109,804,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for various campus projects.
     (c) Enter into a financing contract on behalf of North Seattle Community College for up to $23,721,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop an employment resource center.
     (d) Enter into a financing contract on behalf of Bellingham Technical College for up to $1,390,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop an instructional resource center.
     (e) Enter into a financing contract on behalf of Lower Columbia College for up to $2,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop the Myklebust gymnasium.
     (f) Enter into a financing contract on behalf of Edmonds Community College for up to $5,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to provide space for allied health and construction industry.
     (g) Enter into a financing contract on behalf of Spokane Community College for up to $3,400,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase the Riverpoint One building.
     (h) Enter into a financing contract on behalf of Everett Community College for up to $25,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop a student fitness and health center.
     (i) Enter into a financing contract on behalf of Wenatchee Valley Community College for up to $2,700,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase a music and art center.
     (j) Enter into a financing contract on behalf of Highline Community College for up to $6,900,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase the Federal Way towne center.
     (k) Enter into a financing contract on behalf of Walla Walla Community College for up to $6,900,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to acquire up to forty acres for campus expansion.
     (l) Enter into a financing contract on behalf of Green River Community College for up to $20,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop a 40,000 square foot addition to Green River Kent station.
     (9) Washington state convention and trade center: Enter into a financing contract for up to $5,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to renovate the museum condominium unit located adjacent to the state convention center.
     (10) Office of the secretary of state: Enter into a financing contract for up to $134,935,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct the heritage center. The heritage center is one part of a combined facility of the heritage center and executive office building, authorized in subsection (11) of this section.
     (11) Department of general administration:
     (a) Enter into a financing contract for up to $79,981,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct the executive office building. The executive office building is one part of a combined facility of the executive office building and the heritage center authorized in subsection (9) of this section.
     (b) Enter into a financing contract for up to $10,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the rehabilitation of the John L. O'Brien building, subject to approval of the project scope by the speaker of the house of representatives and the chief clerk of the house of representatives.

NEW SECTION.  Sec. 6010   FOR THE ARTS COMMISSION--ART WORK ALLOWANCE POOLING. (1) One-half of one percent of moneys appropriated in this act for original construction of school plant facilities is provided solely for the purposes of RCW 28A.335.210. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the superintendent of public instruction and representatives of school district boards.
     (2) One-half of one percent of moneys appropriated in this act for original construction or any major renovation or remodel work exceeding two hundred thousand dollars by colleges or universities is provided solely for the purposes of RCW 28B.10.027. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the board of regents or trustees.
     (3) One-half of one percent of moneys appropriated in this act for original construction of any public building by a state agency as defined in RCW 43.17.020 is provided solely for the purposes of RCW 43.17.200. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the state agency.
     (4) At least eighty-five percent of the moneys spent by the Washington state arts commission during the 2009-2011 biennium for the purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 must be expended solely for direct acquisition of works of art. The commission may use up to $100,000 of this amount to conserve or maintain existing pieces in the state art collection pursuant to chapter 36, Laws of 2005.

NEW SECTION.  Sec. 6011   The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts. "Prior biennia" typically refers to the immediate prior biennium for reappropriations, but may refer to multiple biennia in the case of specific projects. A "future biennia" amount is an estimate of what may be appropriated for the project or program in the 2011-2013 biennium and the following three biennia; an amount of zero does not necessarily constitute legislative intent to not provide funding for the project or program in the future.

NEW SECTION.  Sec. 6012   (1) "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations. Reappropriations shall be limited to the unexpended balances remaining on June 30, 2009, from the 2007-2009 biennial appropriations for each project.
     (2) "Reappropriations" in sections 5126, 5130, and 5131 of this act shall be reduced in this act to the unexpended balance remaining as of the end of fiscal year 2009 for the 2007-09 biennial appropriations in sections 1085, 1086, and 5145, chapter 520, Laws of 2007.

NEW SECTION.  Sec. 6013   To carry out the provisions of this act, the governor may assign responsibility for predesign, design, construction, and other related activities to any appropriate agency.

NEW SECTION.  Sec. 6014   If any federal moneys appropriated by this act for capital projects are not received by the state, the department or agency to which the moneys were appropriated may replace the federal moneys with funds available from private or local sources. No replacement may occur under this section without the prior approval of the director of financial management in consultation with the senate ways and means committee and the house of representatives capital budget committee.

NEW SECTION.  Sec. 6015   (1) Unless otherwise stated, for all appropriations under this act that require a match of nonstate money or in-kind contributions, the following requirement, consistent with RCW 43.88.150, shall apply: Expenditures of state money shall be timed so that the state share of project expenditures never exceeds the intended state share of total project costs.
     (2) Provision of the full amount of required matching funds is not required to permit the expenditure of capital budget appropriations for phased projects if a proportional amount of the required matching funds is provided for each distinct, identifiable phase of the project.

NEW SECTION.  Sec. 6016   NONTAXABLE AND TAXABLE BOND PROCEEDS. Portions of the appropriation authority granted by this act from the state building construction account, or any other account receiving bond proceeds, may be transferred to the state taxable building construction account as deemed necessary by the state finance committee to comply with the federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds. Portions of the general obligation bond proceeds authorized by chapter . . ., Laws of 2009 for deposit into the state taxable building construction account that are in excess of amounts required to comply with the federal internal revenue service rules and regulations shall be deposited into the state building construction account. The state treasurer shall submit written notification to the director of financial management if it is determined that a shift of appropriation authority between the state building construction account, or any other account receiving bond proceeds, and the state taxable building construction account is necessary.

NEW SECTION.  Sec. 6017   The office of financial management, in consultation with the fiscal committees of the legislature, may select capital projects that have completed predesign to undergo a budget evaluation study. The budget evaluation study team approach using value engineering techniques must be utilized by the office of financial management in conducting the studies. The office of financial management shall select the budget evaluation team members, contract for the study, and report the results to the legislature and agencies in a timely manner following the study. Funds from the project appropriation must be used by the office of financial management through an interagency agreement with the affected agencies to cover the cost of the study.

NEW SECTION.  Sec. 6018   FOR THE STATE TREASURER--TRANSFERS
Education Savings Account: For transfer to the
     Common School Construction Account, an
     amount not to exceed . . . . . . . . . . . . $46,000,000

Sec. 6019   RCW 43.155.050 and 2008 c 328 s 6002 are each amended to read as follows:
     (1) The public works assistance account is hereby established in the state treasury. Money may be placed in the public works assistance account from the proceeds of bonds when authorized by the legislature or from any other lawful source. Money in the public works assistance account shall be used to make loans and to give financial guarantees to local governments for public works projects. Moneys in the account may also be appropriated to provide for state match requirements under federal law for projects and activities conducted and financed by the board under the drinking water assistance account. Not more than fifteen percent of the biennial capital budget appropriation to the public works board from this account may be expended or obligated for preconstruction loans, emergency loans, or loans for capital facility planning under this chapter; of this amount, not more than ten percent of the biennial capital budget appropriation may be expended for emergency loans and not more than one percent of the biennial capital budget appropriation may be expended for capital facility planning loans. For the ((2007-2009)) 2009-2011 biennium, moneys in the account may be used for grants for projects identified in section 138, chapter 488, Laws of 2005 ((, for the infrastructure investment system implementation plan identified in section 1022, chapter 328, Laws of 2008)); for the interest rate buy-down pilot program identified in section 1004, chapter 328, Laws of 2008; and for the housing assistance, weatherization, and affordable housing program identified in section 1005, chapter 328, Laws of 2008.
     (2) The job development fund is hereby established in the state treasury. Up to fifty million dollars each biennium from the public works assistance account may be transferred into the job development fund. Money in the job development fund may be used solely for job development fund program grants, administrative expenses related to the administration of the job development fund program created in *RCW 43.160.230, and for the report prepared by the joint legislative audit and review committee pursuant to *RCW 44.28.801(2). Moneys in the job development fund may be spent only after appropriation. The board shall prepare a prioritized list of proposed projects of up to fifty million dollars as part of the department's 2007-09 biennial budget request. The board may provide an additional alternate job development fund project list of up to ten million dollars. ((The legislature may remove projects from the list recommended by the board. The legislature may not change the prioritization of projects recommended for funding by the board, but may add projects from the alternate list in order of priority, as long as the total funding does not exceed fifty million dollars.))

Sec. 6020   RCW 43.155.068 and 2001 c 131 s 4 are each amended to read as follows:
     (1) The board may make low-interest or interest-free loans to local governments for preconstruction activities on public works projects before ((the legislature approves)) the construction phase of the project. Preconstruction activities include design, engineering, bid-document preparation, environmental studies, right-of-way acquisition, and other preliminary phases of public works projects as determined by the board. The purpose of the loans authorized in this section is to accelerate the completion of public works projects by allowing preconstruction activities to be performed before the approval of the construction phase of the project ((by the legislature)).
     (2) Projects receiving loans for preconstruction activities under this section must be evaluated using the priority process and factors in RCW 43.155.070(((2)))(4). The receipt of a loan for preconstruction activities does not ensure the receipt of a construction loan for the project under this chapter. Construction loans for projects receiving a loan for preconstruction activities under this section are subject to ((legislative approval under RCW 43.155.070 (4) and (5))) the board's priority and selection process pursuant to this chapter. The board shall adopt a single application process for local governments seeking both a loan for preconstruction activities under this section and a construction loan for the project.

Sec. 6021   RCW 43.155.070 and 2008 c 299 s 25 are each amended to read as follows:
     (1) To qualify for loans or pledges under this chapter the board must determine that a local government meets all of the following conditions:
     (a) The city or county must be imposing a tax under chapter 82.46 RCW at a rate of at least one-quarter of one percent;
     (b) The local government must have developed a capital facility plan; and
     (c) The local government must be using all local revenue sources which are reasonably available for funding public works, taking into consideration local employment and economic factors.
     (2) Except where necessary to address a public health need or substantial environmental degradation, a county, city, or town planning under RCW 36.70A.040 must have adopted a comprehensive plan, including a capital facilities plan element, and development regulations as required by RCW 36.70A.040. This subsection does not require any county, city, or town planning under RCW 36.70A.040 to adopt a comprehensive plan or development regulations before requesting or receiving a loan or loan guarantee under this chapter if such request is made before the expiration of the time periods specified in RCW 36.70A.040. A county, city, or town planning under RCW 36.70A.040 which has not adopted a comprehensive plan and development regulations within the time periods specified in RCW 36.70A.040 is not prohibited from receiving a loan or loan guarantee under this chapter if the comprehensive plan and development regulations are adopted as required by RCW 36.70A.040 before submitting a request for a loan or loan guarantee.
     (3) In considering awarding loans for public facilities to special districts requesting funding for a proposed facility located in a county, city, or town planning under RCW 36.70A.040, the board shall consider whether the county, city, or town planning under RCW 36.70A.040 in whose planning jurisdiction the proposed facility is located has adopted a comprehensive plan and development regulations as required by RCW 36.70A.040.
     (4) The board shall develop a priority process for public works projects as provided in this section. The intent of the priority process is to maximize the value of public works projects accomplished with assistance under this chapter. The board shall attempt to assure a geographical balance in assigning priorities to projects. The board shall consider at least the following factors in assigning a priority to a project:
     (a) Whether the local government receiving assistance has experienced severe fiscal distress resulting from natural disaster or emergency public works needs;
     (b) Except as otherwise conditioned by RCW 43.155.110, whether the entity receiving assistance is a Puget Sound partner, as defined in RCW 90.71.010;
     (c) Whether the project is referenced in the action agenda developed by the Puget Sound partnership under RCW 90.71.310;
     (d) Whether the project is critical in nature and would affect the health and safety of a great number of citizens;
     (e) Whether the applicant has developed and adhered to guidelines regarding its permitting process for those applying for development permits consistent with section 1(2), chapter 231, Laws of 2007;
     (f) The cost of the project compared to the size of the local government and amount of loan money available;
     (g) The number of communities served by or funding the project;
     (h) Whether the project is located in an area of high unemployment, compared to the average state unemployment;
     (i) Whether the project is the acquisition, expansion, improvement, or renovation by a local government of a public water system that is in violation of health and safety standards, including the cost of extending existing service to such a system;
     (j) Except as otherwise conditioned by RCW 43.155.120, and effective one calendar year following the development of model evergreen community management plans and ordinances under RCW 35.105.050, whether the entity receiving assistance has been recognized, and what gradation of recognition was received, in the evergreen community recognition program created in RCW 35.105.030;
     (k) The relative benefit of the project to the community, considering the present level of economic activity in the community and the existing local capacity to increase local economic activity in communities that have low economic growth; and
     (l) Other criteria that the board considers advisable.
     (5) Existing debt or financial obligations of local governments shall not be refinanced under this chapter. Each local government applicant shall provide documentation of attempts to secure additional local or other sources of funding for each public works project for which financial assistance is sought under this chapter.
     (6) Before November 1st of each year, the board shall develop and submit to the appropriate fiscal committees of the senate and house of representatives a description of the loans made under ((RCW 43.155.065, 43.155.068, and subsection (9) of this section)) this chapter during the preceding fiscal year ((and a prioritized list of projects which are recommended for funding by the legislature,)) including one copy to the staff of each of the committees. The ((list)) description shall include, but not be limited to, a ((description)) summary of each project and ((recommended)) its financing, the terms and conditions of the loan or financial guarantee, the local government jurisdiction and unemployment rate, demonstration of the jurisdiction's critical need for the project and documentation of local funds being used to finance the public works project. The ((list)) description shall also include measures of fiscal capacity for each jurisdiction ((recommended for)) to receive financial assistance, compared to authorized limits and state averages, including local government sales taxes; real estate excise taxes; property taxes; and charges for or taxes on sewerage, water, garbage, and other utilities.
     (7) The board shall not sign contracts or otherwise financially obligate funds from the public works assistance account ((before the legislature has appropriated funds for a specific list of public works projects. The legislature may remove projects from the list recommended by the board. The legislature shall not change the order of the priorities recommended for funding by the board)) unless the project has been considered under the priority process provided in this section.
     (8) Subsection (7) of this section does not apply to loans made under RCW 43.155.065, 43.155.068, and subsection (9) of this section.
     (9) Loans made for the purpose of capital facilities plans shall be exempted from subsection (7) of this section.
     (10) To qualify for loans or pledges for solid waste or recycling facilities under this chapter, a city or county must demonstrate that the solid waste or recycling facility is consistent with and necessary to implement the comprehensive solid waste management plan adopted by the city or county under chapter 70.95 RCW.
     (11) After January 1, 2010, any project designed to address the effects of storm water or wastewater on Puget Sound may be funded under this section only if the project is not in conflict with the action agenda developed by the Puget Sound partnership under RCW 90.71.310.

Sec. 6022   RCW 40.14.024 and 2008 c 328 s 6005 are each amended to read as follows:
     The local government archives account is created in the state treasury. All receipts collected by the county auditors under RCW 40.14.027 and 36.22.175 for local government services, such as providing records scheduling, security microfilm inspection and storage, archival preservation, cataloging, and indexing for local government records and digital data and access to those records and data through the regional branch archives of the division of archives and records management, must be deposited into the account, and expenditures from the account may be used only for these purposes. During the ((2007-2009)) 2009-2011 biennium, the legislature may transfer from the local government archives account to the Washington state heritage center account such amounts as reflect the excess fund balance in the account.

Sec. 6023   RCW 43.09.282 and 2008 c 328 s 6007 are each amended to read as follows:
     For the purposes of centralized funding, accounting, and distribution of the costs of the audits performed on local governments by the state auditor, there is hereby created an account entitled the municipal revolving account. The state treasurer shall be custodian of the account. All moneys received by the state auditor or by any officer or employee thereof shall be deposited with the state treasurer and credited to the municipal revolving account. Only the state auditor or the auditor's designee may authorize expenditures from the account. No appropriation is required for expenditures. The state auditor shall keep such records as are necessary to detail the auditing costs attributable to the various types of local governments. During the ((2007-2009)) 2009-2011 fiscal biennium, the legislature may transfer from the municipal revolving account to the Washington state heritage center account such amounts as reflect excess fund balance in the account.

Sec. 6024   RCW 67.40.040 and 2008 c 329 s 917 are each amended to read as follows:
     (1) The proceeds from the sale of the bonds authorized in RCW 67.40.030, proceeds of the taxes imposed under RCW 67.40.090 and 67.40.130, and all other moneys received by the state convention and trade center from any public or private source which are intended to fund the acquisition, design, construction, expansion, exterior cleanup and repair of the Eagles building, conversion of various retail and other space to meeting rooms, purchase of the land and building known as the McKay Parcel, development of low-income housing, or renovation of the center, and those expenditures authorized under RCW 67.40.170 shall be deposited in the state convention and trade center account hereby created in the state treasury and in such subaccounts as are deemed appropriate by the directors of the corporation.
     (2) Moneys in the account, including unanticipated revenues under RCW 43.79.270, shall be used exclusively for the following purposes in the following priority:
     (a) For reimbursement of the state general fund under RCW 67.40.060;
     (b) After appropriation by statute:
     (i) For payment of expenses incurred in the issuance and sale of the bonds issued under RCW 67.40.030;
     (ii) For expenditures authorized in RCW 67.40.170, and during the ((2007-2009)) 2009-2011 biennium, the legislature may transfer from the state convention and trade center account to the Washington housing trust account such amounts as reflect the excess fund balance in the account; and during the ((2007-2009)) 2009-2011 biennium, the legislature may transfer from the state convention and trade center account to the general fund such amounts as reflect the excess fund balance in the account;
     (iii) For acquisition, design, and construction of the state convention and trade center;
     (iv) For debt service for the acquisition, design, and construction and retrofit of the museum of history and industry museum property or other future expansions of the convention center as approved by the legislature; and
     (v) For reimbursement of any expenditures from the state general fund in support of the state convention and trade center; and
     (c) For transfer to the state convention and trade center operations account.
     (3) The corporation shall identify with specificity those facilities of the state convention and trade center that are to be financed with proceeds of general obligation bonds, the interest on which is intended to be excluded from gross income for federal income tax purposes. The corporation shall not permit the extent or manner of private business use of those bond-financed facilities to be inconsistent with treatment of such bonds as governmental bonds under applicable provisions of the Internal Revenue Code of 1986, as amended.
     (4) In order to ensure consistent treatment of bonds authorized under RCW 67.40.030 with applicable provisions of the Internal Revenue Code of 1986, as amended, and notwithstanding RCW 43.84.092, investment earnings on bond proceeds deposited in the state convention and trade center account in the state treasury shall be retained in the account, and shall be expended by the corporation for the purposes authorized under chapter 386, Laws of 1995 and in a manner consistent with applicable provisions of the Internal Revenue Code of 1986, as amended.
     (5) Subject to the conditions in subsection (6) of this section, starting in fiscal year 2008, the state treasurer shall transfer:
     (a) The sum of four million dollars, or as much as may be available pursuant to conditions set forth in this section, from the state convention and trade center account to the tourism enterprise account, with the maximum transfer being four million dollars per fiscal year; and
     (b) The sum of five hundred thousand dollars, or as much as may be available pursuant to conditions set forth in this section, from the state convention and trade center account to the tourism development and promotion account, with the maximum transfer being five hundred thousand dollars per fiscal year.
     (6)(a) Funds required for debt service payments and reserves for bonds issued under RCW 67.40.030; for debt service authorized under RCW 67.40.170; and for the issuance and sale of financial instruments associated with the acquisition, design, construction, and retrofit of the museum of history and industry museum property or for other future expansions of the center, as approved by the legislature, shall be maintained within the state convention and trade center account.
     (b) No less than six million one hundred fifty thousand dollars per year shall be retained in the state convention and trade center account for funding capital maintenance as required by the center's long-term capital plan, facility enhancements, unanticipated replacements, and operating reserves for the convention center operation. This amount shall be escalated annually as follows:
     (i) Four percent for annual inflation for capital maintenance, repairs, and replacement;
     (ii) An additional two percent for enhancement to the facility; and
     (iii) An additional three percent for growth in expenditure due to aging of the facility and the need to maintain an operating reserve.
     (c) Sufficient funds shall be reserved within the state convention and trade center account to fund operating appropriations for the annual operation of the convention center.

Sec. 6025   RCW 79.17.010 and 2008 c 328 s 6012 are each amended to read as follows:
     (1) The department, with the approval of the board, may exchange any state land and any timber thereon for any land of equal value in order to:
     (a) Facilitate the marketing of forest products of state lands;
     (b) Consolidate and block-up state lands;
     (c) Acquire lands having commercial recreational leasing potential;
     (d) Acquire county-owned lands;
     (e) Acquire urban property which has greater income potential or which could be more efficiently managed by the department in exchange for state urban lands as defined in RCW 79.19.100; or
     (f) Acquire any other lands when such exchange is determined by the board to be in the best interest of the trust for which the state land is held.
     (2) Land exchanged under this section shall not be used to reduce the publicly owned forest land base.
     (3) The board shall determine that each land exchange is in the best interest of the trust for which the land is held prior to authorizing the land exchange.
     (4) During the biennium ending June 30, ((2009)) 2011, for the purposes of maintaining working farm and forest landscapes or acquiring natural resource lands at risk of development, the department, with approval of the board of natural resources, may exchange any state land and any timber thereon for any land and proceeds of equal value, when it can be demonstrated that the trust fiduciary obligations can be better fulfilled after an exchange is completed. Proceeds may be in the form of cash or services in order to achieve the purposes established in this section. Any cash received as part of an exchange transaction shall be deposited in the resource management cost account to pay for administrative expenses incurred in carrying out an exchange transaction. The amount of proceeds received from the exchange partner may not exceed five percent of the total value of the exchange. The receipt of proceeds shall not change the character of the transaction from an exchange to a sale.
     (5) Prior to executing an exchange under this section, and in addition to the public notice requirements set forth in RCW 79.17.050, the department shall consult with legislative members, other state and federal agencies, local governments, tribes, local stakeholders, conservation groups, and any other interested parties to identify and address cultural resource issues and the potential of the state lands proposed for exchange to be used for open space, park, school, or critical habitat purposes.

Sec. 6026   RCW 79.17.020 and 2008 c 328 s 6013 are each amended to read as follows:
     (1) The board of county commissioners of any county and/or the mayor and city council or city commission of any city or town and/or the board shall have authority to exchange, each with the other, or with the federal forest service, the federal government or any proper agency thereof and/or with any private landowner, county land of any character, land owned by municipalities of any character, and state forest land owned by the state under the jurisdiction of the department, for real property of equal value for the purpose of consolidating and blocking up the respective land holdings of any county, municipality, the federal government, or the state of Washington or for the purpose of obtaining lands having commercial recreational leasing potential.
     (2) During the biennium ending June 30, ((2009)) 2011, for the purposes of maintaining working farm and forest landscapes or acquiring natural resource lands at risk of development, the department, with approval of the board of natural resources, may exchange any state land and any timber thereon for any land and proceeds of equal value, when it can be demonstrated that the trust fiduciary obligations can be better fulfilled after an exchange is completed. Proceeds may be in the form of cash or services in order to achieve the purposes established in this section. Any cash received as part of an exchange transaction shall be deposited in the forest development account to pay for administrative expenses incurred in carrying out an exchange transaction. The amount of proceeds received from the exchange partner may not exceed five percent of the total value of the exchange. The receipt of proceeds shall not change the character of the transaction from an exchange to a sale.
     (3) Prior to executing an exchange under this section, and in addition to the public notice requirements set forth in RCW 79.17.050, the department shall consult with legislative members, other state and federal agencies, local governments, tribes, local stakeholders, conservation groups, and any other interested parties to identify and address cultural resource issues, and the potential of the state lands proposed for exchange to be used for open space, park, school, or critical habitat purposes.

Sec. 6027   RCW 43.19.501 and 2008 c 328 s 6016 are each amended to read as follows:
     The Thurston county capital facilities account is created in the state treasury. The account is subject to the appropriation and allotment procedures under chapter 43.88 RCW. Moneys in the account may be expended for capital projects in facilities owned and managed by the department of general administration in Thurston county. For the ((2007-2009)) 2009-2011 biennium, moneys in the account may be used for predesign identified in section 1037, chapter 328, Laws of 2008.

Sec. 6028   RCW 43.99N.060 and 2008 c 328 s 6017 are each amended to read as follows:
     (1) The stadium and exhibition center account is created in the custody of the state treasurer. All receipts from the taxes imposed under RCW 82.14.0494 and distributions under RCW 67.70.240(5) shall be deposited into the account. Only the director of the office of financial management or the director's designee may authorize expenditures from the account. The account is subject to allotment procedures under chapter 43.88 RCW. An appropriation is not required for expenditures from this account.
     (2) Until bonds are issued under RCW 43.99N.020, up to five million dollars per year beginning January 1, 1999, shall be used for the purposes of subsection (3)(b) of this section, all remaining moneys in the account shall be transferred to the public stadium authority, created under RCW 36.102.020, to be used for public stadium authority operations and development of the stadium and exhibition center.
     (3) After bonds are issued under RCW 43.99N.020, all moneys in the stadium and exhibition center account shall be used exclusively for the following purposes in the following priority:
     (a) On or before June 30th of each year, the office of financial management shall accumulate in the stadium and exhibition center account an amount at least equal to the amount required in the next succeeding twelve months for the payment of principal of and interest on the bonds issued under RCW 43.99N.020;
     (b) An additional reserve amount not in excess of the expected average annual principal and interest requirements of bonds issued under RCW 43.99N.020 shall be accumulated and maintained in the account, subject to withdrawal by the state treasurer at any time if necessary to meet the requirements of (a) of this subsection, and, following any withdrawal, reaccumulated from the first tax revenues and other amounts deposited in the account after meeting the requirements of (a) of this subsection; and
     (c) The balance, if any, shall be transferred to the youth athletic facility account under subsection (4) of this section.
     Any revenues derived from the taxes authorized by RCW 36.38.010(5) and 36.38.040 or other amounts that if used as provided under (a) and (b) of this subsection would cause the loss of any tax exemption under federal law for interest on bonds issued under RCW 43.99N.020 shall be deposited in and used exclusively for the purposes of the youth athletic facility account and shall not be used, directly or indirectly, as a source of payment of principal of or interest on bonds issued under RCW 43.99N.020, or to replace or reimburse other funds used for that purpose.
     (4) Any moneys in the stadium and exhibition center account not required or permitted to be used for the purposes described in subsection (3)(a) and (b) of this section shall be deposited in the youth athletic facility account hereby created in the state treasury. Expenditures from the account may be used only for purposes of grants or loans to cities, counties, and qualified nonprofit organizations for community outdoor athletic facilities. ((For the 2005-2007 biennium, moneys in the account may also be used for a recreation level of service study for local and regional active recreation facilities.)) Only the director of the recreation and conservation office or the director's designee may authorize expenditures from the account. The account is subject to allotment procedures under chapter 43.88 RCW, but an appropriation is not required for expenditures. The athletic facility grants or loans may be used for acquiring, developing, equipping, maintaining, and improving community outdoor athletic facilities. Funds shall be divided equally between the development of new community outdoor athletic facilities, the improvement of existing community outdoor athletic facilities, and the maintenance of existing community outdoor athletic facilities. Cities, counties, and qualified nonprofit organizations must submit proposals for grants or loans from the account. To the extent that funds are available, cities, counties, and qualified nonprofit organizations must meet eligibility criteria as established by the director of the recreation and conservation office. The grants and loans shall be awarded on a competitive application process and the amount of the grant or loan shall be in proportion to the population of the city or county for where the community outdoor athletic facility is located. Grants or loans awarded in any one year need not be distributed in that year. In the ((2007–2009)) 2009-2011 biennium, if there are not enough project applications submitted in a category within the account to meet the requirement of equal distribution of funds to each category, the director of the recreation and conservation office may distribute any remaining funds to other categories within the account. The director of the recreation and conservation office may expend up to one and one-half percent of the moneys deposited in the account created in this subsection for administrative purposes.

NEW SECTION.  Sec. 6029   FOR THE WASHINGTON STATE PATROL
     Self-Contained Breathing Apparatus Building Completion (30000014)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $60,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $55,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $115,000

Sec. 6030   2008 c 328 s 5001 (uncodified) is amended to read as follows:
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     School Construction Assistance Grants (08-4-200)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) For state assistance grants for purposes of calculating square foot eligibility, kindergarten student headcount shall not be reduced by fifty percent.
     (2) The legislature has made a commitment to phase in all-day kindergarten programs beginning with the 2007-08 school year. However, the legislature finds that one potential barrier to successful expansion of all-day kindergarten programs may be a lack of facilities that meet the requirements of an all-day kindergarten program. The office of the superintendent of public instruction, in consultation with the school facilities citizen advisory panel, shall examine alternatives for addressing school facilities needs for all-day kindergarten programs, including adapting existing unused space, creating innovative public-private partnerships and partnerships with early learning providers, shifting the location of current programs within a district or a school, and temporary, limited use of portables. The office of the superintendent of public instruction shall submit a report to the capital budget committee of the house of representatives and the ways and means committee of the senate by September 1, 2007, with recommendations on preferred alternatives and an analysis of the feasibility and cost of implementing the alternatives.
     (3) Within the amounts appropriated in this section, the office of the superintendent of public instruction shall review and evaluate the cost and other implications of changing the current annual release cycle for the school construction assistance program. The office of the superintendent of public instruction shall prepare a report resulting from their review and evaluation by December 1, 2008. This report must include a specific plan for implementing the change in the 2009-2011 biennium.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($22,394,000))
       $152,394,000
     Common School Construction Account--State . . . . . . . . . . . . (($769,185,000))
       $639,185,000
     Common School Reimbursable Construction
          Account--State . . . . . . . . . . . . $180,000
          Subtotal Appropriation . . . . . . . . . . . . $791,759,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,495,689,000
          TOTAL . . . . . . . . . . . . $4,287,448,000

Sec. 6031   2007 c 520 s 6013 (uncodified) is amended to read as follows:
ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS. The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW. When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation. Expenditures made by an agency for one of the indicated purposes before the issue date of the authorized financial contract and any certificates of participation therein are intended to be reimbursed from proceeds of the financial contract and any certificates of participation therein to the extent provided in the agency's financing plan approved by the state finance committee.
     State agencies may enter into agreements with the department of general administration and the state treasurer's office to develop requests to the legislature for acquisition of properties and facilities through financial contracts. The agreements may include charges for services rendered.
     Those noninstructional facilities of higher education institutions authorized in this section to enter into financial contracts are not eligible for state funded maintenance and operations. Instructional space that is available for regularly scheduled classes for academic transfer, basic skills, and workforce training programs may be eligible for state funded maintenance and operations.
     (1) Washington state patrol: Enter into a financing contract for up to $1,360,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to replace the dormitory facility at the Washington state patrol fire training academy in North Bend, Washington.
     (2) Department of general administration: Enter into a financing contract for up to $685,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the preservation of the transportation building.
     (3) Department of corrections: Enter into a financing contract for up to $17,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to provide additional work release beds.
     (4) Parks and recreation commission: Enter into a financing contract in an amount not to exceed $2,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop Cama Beach state park.
     (5) Community and technical colleges:
     (a) Enter into a financing contract on behalf of Green River Community College for up to $20,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase Kent Station phase 2.
     (b) Enter into a financing contract on behalf of Tacoma Community College for up to $3,600,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an early childhood education and learning center.
     (c) Enter into a financing contract on behalf of Walla Walla Community College for up to $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase up to 40 acres of land.
     (d) Enter into a financing contract on behalf of Columbia Basin College for up to $300,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop an academic support and achievement center.
     (6) Evergreen State College: Enter into a financing contract for up to $16,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the college activities building renovation.
     (7) Washington state convention and trade center: Enter into a financing contract for up to $58,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase and renovate the museum condominium unit located adjacent to the state convention center. The purchase price shall not exceed fair market value. A purchase agreement with the owner of the unit on the effective date of this section shall include the following requirements: (a) Upon completion of the purchase of the property, the seller shall retain $5,750,000 of the sale proceeds in a restricted investment account, reserving such funds for capital costs associated with development of its principal heritage center to be located within the city of Seattle. Principal and accrued earnings in such an account shall be available for expenditure by the seller when the seller or the city of Seattle has executed a construction contract for either a new facility or improvements to an existing structure to serve as the principal heritage center to be operated by the seller within the city; and (b) in the event that the conditions of (a) of this subsection are not met by June 30, 2017, the entire amount in the restricted account shall be transferred to the state general fund and shall represent a recovery of the state's contribution towards the development of the museum. In the event of such a transfer, the rightful ownership of the property by the Washington state convention and trade center shall not be impaired.
     (8) Department of information services: Enter into a financing contract for an amount approved by the office of financial management for costs and financing expenses and required reserves pursuant to chapter 39.94 RCW to lease develop or lease purchase a state ((general)) data center and an office building ((and facilities)) for the department of information services on the state-owned property called "the Wheeler block" in Olympia. The office building((s)) shall be constructed and financed so that agencies occupancy costs per gross square foot or per employee will not exceed 110 percent of comparable private market rental rates per gross square foot or per employee. The comparable ((general)) office space rate shall be calculated based on recent Thurston county leases of new space of at least 100,000 rentable square feet ((adjusted for known escalation clauses, expected inflation, and differences in the level of service provided by the comparable leases as determined by the department in consultation with the department of general administration. In addition to the department of information services, state agency tenants shall include the consolidation of state patrol offices and general office facilities for small agencies and offices. The department of information services shall design and operate the general office facilities for small agencies and offices as a demonstration of the efficiencies gained from the integration of office space and telecommunications and computer technology. The demonstration project shall provide office space, furniture, telecommunications, and computer technology as a single package. The facility shall be designed so that small agencies and offices can move in and out of the facility without the typical moving expenses that result from individual agency ownership of furniture and technology. The facility for small agencies and offices shall also provide for staffing and space efficiencies resulting from central reception, support services, and spaces. The office of financial management shall certify to the state treasurer: (a) The project description and dollar amount; and (b) that all requirements of this subsection (8) have been met)). Such comparable leases shall be for typical office space with typical office tenant improvements adjusted for known escalation clauses, expected inflation, nontypical tenant improvements or code requirements, leadership in energy and environmental design requirements, nontypical on and off site requirements, infrastructure upgrades, market conditions and differences in the level of service provided by the comparable leases as determined by the department in consultation with the office of financial management. The department of information services shall design and operate the facilities. Should the department of information services choose to use a financing contract that does not provide for the issuance of certificates of participation, the financing contract shall be subject to approval by the state finance committee as required by RCW 39.94.010. ((In approving a financing contract not providing for the use of certificates of participation, the state finance committee should be reasonably certain that the contract is excluded from the computation of indebtedness, particularly that the contract is not backed by the full faith and credit of the state and the legislature is expressly not obligated to appropriate funds to make payments. For purposes of this section, "financing contract" includes but is not limited to a certificate of participation and tax exempt financing similar to that authorized in RCW 47.79.140.))
     (9) Office of the secretary of state: Enter into a financing contract for up to $112,942,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct the heritage center. The heritage center is one part of a combined facility of the heritage center and executive office building, authorized in subsection (10) of this section. The authorization for financing under this subsection (9) shall lapse unless chapter ... (Substitute Senate Bill No. 5882, providing funding for the heritage building project), Laws of 2007 is enacted by June 30, 2007.
     (10) Department of general administration: Enter into a financing contract for up to $75,863,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct the executive office building. The executive office building is one part of a combined facility of the executive office building and the heritage center authorized in subsection (9) of this section. The authorization for financing under this subsection (10) shall lapse unless chapter ... (Substitute Senate Bill No. 5882, providing funding for the heritage building project), Laws of 2007 is enacted by June 30, 2007.

NEW SECTION.  Sec. 6032   Eastern Washington University is authorized to sell its Spokane center. Proceeds from the sale must be deposited into the Eastern Washington University capital projects account. Proceeds may be used to acquire or design a facility on or adjacent to the Riverpoint higher education campus for the university's Spokane-based program offerings. Eastern Washington University must report to the office of financial management and the appropriate fiscal committees of the legislature upon the sale of the center and with regard to expenditure of the proceeds.

NEW SECTION.  Sec. 6033   Section 6002 of this act expires June 30, 2011.

NEW SECTION.  Sec. 6034   Sections 6022 and 6023 of this act expire June 30, 2011.

NEW SECTION.  Sec. 6035   2007 c 520 s 6006 (uncodified) is repealed.

NEW SECTION.  Sec. 6036   Part headings in this act are not any part of the law.

NEW SECTION.  Sec. 6037   If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.

NEW SECTION.  Sec. 6038   This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately, except for sections 6020, 6021, and 6024 through 6028 of this act which take effect July 1, 2009.

(End of Part)



     INDEX       PAGE #


CENTRAL WASHINGTON UNIVERSITY . . . . . . . . . . . . 159
COMMUNITY AND TECHNICAL COLLEGE SYSTEM . . . . . . . . . . . . 178
CRIMINAL JUSTICE TRAINING COMMISSION . . . . . . . . . . . . 41
DEPARTMENT OF AGRICULTURE . . . . . . . . . . . . 137
DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT . . . . . . . . . . . . 2
DEPARTMENT OF CORRECTIONS . . . . . . . . . . . . 55
DEPARTMENT OF ECOLOGY . . . . . . . . . . . . 69
DEPARTMENT OF FISH AND WILDLIFE . . . . . . . . . . . . 120
DEPARTMENT OF GENERAL ADMINISTRATION . . . . . . . . . . . . 30
DEPARTMENT OF HEALTH . . . . . . . . . . . . 53
DEPARTMENT OF NATURAL RESOURCES . . . . . . . . . . . . 131
DEPARTMENT OF SOCIAL AND HEALTH SERVICES . . . . . . . . . . . . 42
DEPARTMENT OF VETERANS AFFAIRS . . . . . . . . . . . . 54
EASTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . 156
EMPLOYMENT SECURITY DEPARTMENT . . . . . . . . . . . . 68
HIGHER EDUCATION COORDINATING BOARD . . . . . . . . . . . . 140
LIQUOR CONTROL BOARD . . . . . . . . . . . . 36
MILITARY DEPARTMENT . . . . . . . . . . . . 37
OFFICE OF FINANCIAL MANAGEMENT . . . . . . . . . . . . 28
RECREATION AND CONSERVATION FUNDING BOARD . . . . . . . . . . . . 102
STATE CONSERVATION COMMISSION . . . . . . . . . . . . 119
STATE CONVENTION AND TRADE CENTER . . . . . . . . . . . . 40
STATE PARKS AND RECREATION COMMISSION . . . . . . . . . . . . 89
STATE SCHOOL FOR THE BLIND . . . . . . . . . . . . 144
STATE SCHOOL FOR THE DEAF . . . . . . . . . . . . 145
SUPERINTENDENT OF PUBLIC INSTRUCTION . . . . . . . . . . . . 140, 236
THE EVERGREEN STATE COLLEGE . . . . . . . . . . . . 163
UNIVERSITY OF WASHINGTON . . . . . . . . . . . . 145
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION . . . . . . . . . . . . 139
WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . . . . . 171
WASHINGTON STATE PATROL . . . . . . . . . . . . 138
WASHINGTON STATE UNIVERSITY . . . . . . . . . . . . 152
WESTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . 167

--- END ---