HB 1499.E - DIGEST
(AS OF HOUSE 2ND READING 3/5/2009)

Requires a public agency, if the public agency is planning a project that may require a utility facility operator to relocate its utility facilities in or along the right-of-way, to notify each affected utility facility operator as soon as is practicable and include the affected utility facility operator in a preliminary design meeting during the design phase.