1662-S2 AMH TAKK EMER 039
2SHB 1662 - H AMD 324
By Representative Takko
WITHDRAWN 03/04/2011
On page 3, beginning on
line 8, after "1995))" strike all material through "chapter"
on line 12 and insert the following: "Work outside the shoreland area
may commence in advance of the issuance of the shoreline permit if the work
outside the shoreland area does not depend on or require the work proposed
within the shoreland area, and the local government finds that such work will
not interfere with the goals of this chapter. For work inside the shoreland
area, the applicant may file a motion with the board seeking relief from the
automatic stay for specified construction activities. The board may only grant
such relief if the board finds that the applicant has shown by a preponderance
of the evidence that the requested construction:
(i) Is not specifically at issue in the appeal;
(ii) Is not likely to be affected by the outcome of the appeal; and
(iii) Will not adversely affect shoreline ecological functions"
|
EFFECT: Specifies circumstances under which a local government may permit work outside a shoreland area to commence in advance of issuance of a shoreline permit. Provides that, for specified construction activities inside the shoreland area, a permit applicant may petition the Shorelines Hearings Board (Board) for relief from the automatic stay that is effective during review proceedings before the Board.
|