2417 AMH SHEA PFUN 094
HB 2417 - H AMD 876
By Representative Shea
ADOPTED 01/30/2012
On page 5, beginning on line 12, after "RCW" strike everything through "(d)" on line 13 and insert "90.58.020."
On page 5, at the beginning of line 17, strike "(((d)))
(e)" and insert "(d)"
On page 5, at the beginning of line 19, strike
"(((e))) (f)" and insert "(e)"
On
page 6, line 34, after "dollars" strike everything through
"construction," at the beginning of line 37 and insert "((,
but if subsequent construction having a fair market value exceeding two
thousand five hundred dollars occurs within five years of completion of the
prior construction,)) . However, if subsequent construction occurs
within five years of completion of the prior construction, and the combined
fair market value of the subsequent and prior construction exceeds the amount
specified in either (A) or (B) of this subsection (3)(e)(vii),"
|
EFFECT: Specifies that if subsequent construction on a dock occurs within 5 years of completion of the prior construction, and the combined fair market value of the construction exceeds $2,500 for a dock in salt waters and $20,000 for a dock in fresh waters, the subsequent construction shall be considered a substantial development under the Shoreline Management Act. Makes technical changes.
|
--- END ---