AN ACT Relating to promoting and sustaining investment and employment in economically distressed communities dependent on agricultural or natural resource industries by recognizing certain biomass energy facilities constructed before March 31, 1999, as an eligible renewable resource; amending RCW 19.285.030; and creating new sections.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1 (1) The legislature finds that pulping
liquors are a source of renewable energy, and that paper mills using
these liquors can reduce harmful water emissions and become nearly
energy self-sufficient. The legislature also finds that biomass is a
renewable fuel for generating electricity. The legislature further
finds that biomass facilities and pulp and paper mills are typically
located in communities that are disproportionately affected by economic
downturns.
(2) By promoting the generation of renewable energy from pulping
liquors and biomass in economically distressed communities, the
legislature intends to ensure greater economic stability for these
communities that have suffered heavy job losses and have experienced
chronic unemployment.
Sec. 2 RCW 19.285.030 and 2009 c 565 s 20 are each amended to
read as follows:
The definitions in this section apply throughout this chapter
unless the context clearly requires otherwise.
(1) "Attorney general" means the Washington state office of the
attorney general.
(2) "Auditor" means: (a) The Washington state auditor's office or
its designee for qualifying utilities under its jurisdiction that are
not investor-owned utilities; or (b) an independent auditor selected by
a qualifying utility that is not under the jurisdiction of the state
auditor and is not an investor-owned utility.
(3) "Commission" means the Washington state utilities and
transportation commission.
(4) "Conservation" means any reduction in electric power
consumption resulting from increases in the efficiency of energy use,
production, or distribution.
(5) "Cost-effective" has the same meaning as defined in RCW
80.52.030.
(6) "Council" means the Washington state apprenticeship and
training council within the department of labor and industries.
(7) "Customer" means a person or entity that purchases electricity
for ultimate consumption and not for resale.
(8) "Department" means the department of commerce or its successor.
(9) "Distributed generation" means an eligible renewable resource
where the generation facility or any integrated cluster of such
facilities has a generating capacity of not more than five megawatts.
(10) "Eligible renewable resource" means:
(a) Electricity from a generation facility powered by a renewable
resource other than fresh water that commences operation after March
31, 1999, where: (i) The facility is located in the Pacific Northwest;
or (ii) the electricity from the facility is delivered into Washington
state on a real-time basis without shaping, storage, or integration
services; or
(b) Incremental electricity produced as a result of efficiency
improvements completed after March 31, 1999, to hydroelectric
generation projects owned by a qualifying utility and located in the
Pacific Northwest or to hydroelectric generation in irrigation pipes
and canals located in the Pacific Northwest, where the additional
generation in either case does not result in new water diversions or
impoundments; and
(c) Qualified biomass energy.
(11) "Investor-owned utility" has the same meaning as defined in
RCW 19.29A.010.
(12) "Load" means the amount of kilowatt-hours of electricity
delivered in the most recently completed year by a qualifying utility
to its Washington retail customers.
(13) "Nonpower attributes" means all environmentally related
characteristics, exclusive of energy, capacity reliability, and other
electrical power service attributes, that are associated with the
generation of electricity from a renewable resource, including but not
limited to the facility's fuel type, geographic location, vintage,
qualification as an eligible renewable resource, and avoided emissions
of pollutants to the air, soil, or water, and avoided emissions of
carbon dioxide and other greenhouse gases.
(14) "Pacific Northwest" has the same meaning as defined for the
Bonneville power administration in section 3 of the Pacific Northwest
electric power planning and conservation act (94 Stat. 2698; 16 U.S.C.
Sec. 839a).
(15) "Public facility" has the same meaning as defined in RCW
39.35C.010.
(16) "Qualifying utility" means an electric utility, as the term
"electric utility" is defined in RCW 19.29A.010, that serves more than
twenty-five thousand customers in the state of Washington. The number
of customers served may be based on data reported by a utility in form
861, "annual electric utility report," filed with the energy
information administration, United States department of energy.
(17) "Renewable energy credit" means a tradable certificate of
proof of at least one megawatt-hour of an eligible renewable resource
where the generation facility is not powered by fresh water, the
certificate includes all of the nonpower attributes associated with
that one megawatt-hour of electricity, and the certificate is verified
by a renewable energy credit tracking system selected by the
department.
(18) "Renewable resource" means: (a) Water; (b) wind; (c) solar
energy; (d) geothermal energy; (e) landfill gas; (f) wave, ocean, or
tidal power; (g) gas from sewage treatment facilities; (h) biodiesel
fuel as defined in RCW 82.29A.135 that is not derived from crops raised
on land cleared from old growth or first-growth forests where the
clearing occurred after December 7, 2006; ((and)) or (i) biomass energy
((based on animal waste or solid organic fuels from wood, forest, or
field residues, or dedicated energy crops that do not include (i) wood
pieces that have been treated with chemical preservatives such as
creosote, pentachlorophenol, or copper-chrome-arsenic; (ii) black
liquor by-product from paper production; (iii) wood from old growth
forests; or (iv) municipal solid waste)).
(19) "Rule" means rules adopted by an agency or other entity of
Washington state government to carry out the intent and purposes of
this chapter.
(20) "Year" means the twelve-month period commencing January 1st
and ending December 31st.
(21)(a) "Biomass energy" includes: (i) Organic by-products of
pulping and the wood manufacturing process; (ii) animal waste; (iii)
solid organic fuels from wood; (iv) forest or field residues; (v)
wooden demolition or construction debris; (vi) food waste; (vii)
liquors derived from algae and other sources; (viii) dedicated energy
crops; (ix) biosolids; and (x) yard waste.
(b) "Biomass energy" does not include: (i) Wood pieces that have
been treated with chemical preservatives such as creosote,
pentachlorophenol, or copper-chrome-arsenic; (ii) wood from old growth
forests; or (iii) municipal solid waste.
(22) "Qualified biomass energy" means electricity produced from a
biomass energy facility that:
(a)(i) Commenced commercial operation before March 31, 1999; and
(ii) Is located in an economically distressed community on January
1, 2011.
(b) In addition to the requirements of (a) of this section, in
order for an electric generation facility, which is located on the site
of a pulping or wood manufacturing facility, to generate qualified
biomass energy, the pulping or wood manufacturing facility must: (i)
Supply the energy facility with all or part of its organic by-products
used to produce the electricity; and (ii) take electric service under
a tariff approved either by the commission or by the governing board of
a qualifying utility that is not an investor-owned utility.
(23) "Economically distressed community" means a county in
Washington: (a) That has a three-year average unemployment rate that
is equal to or greater than one hundred twenty percent of the state's
unemployment rate; or (b) adjacent to a county identified in (a) of
this subsection.
NEW SECTION. Sec. 3 The utilities and transportation commission
shall not consider this act in any proceeding concerning a company's
decision to acquire or construct an eligible renewable resource during
the period of January 1, 2011, through December 21, 2013. "Eligible
renewable resource" has the same meaning as defined in RCW 19.285.030.