6001-S AMS BAUM JOHN 199
SSB 6001 - S AMD 590
By Senators Baumgartner, Padden, Dansel
WITHDRAWN 03/04/2014
On page 43, line 11, after "(8)" insert "(a)"
On page 43, after line 17, insert the following:
"(b) Any delays that result in cost overruns that exceed the total
project cost for the SR 99/Alaskan Way Viaduct - Replacement project (809936Z)
as listed in LEAP Transportation Document 2014-1 as developed February 24,
2014, that cannot be recovered from the contractors must be paid for by the
responsible parties as listed in RCW 47.01.402 (6)(b)."
|
EFFECT: Provides that any cost overruns on the SR 99/Alaskan Way Viaduct - Replacement project (809936Z) that are not the responsibility of the contractor must be borne by the property owners in Seattle who benefitted from the replacement of the viaduct with a tunnel.
|
--- END ---