BILL REQ. #: H-1535.1
State of Washington | 63rd Legislature | 2013 Regular Session |
READ FIRST TIME 02/19/13.
AN ACT Relating to creating clean energy jobs in Washington state through renewable energy incentives; amending RCW 82.16.120, 82.16.130, and 82.16.110; adding new sections to chapter 82.16 RCW; adding a new section to chapter 43.180 RCW; creating a new section; providing an effective date; and declaring an emergency.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1 A new section is added to chapter 82.16 RCW
to read as follows:
The legislature seeks to ensure that Washington is positioned to
attract and grow a vibrant clean technology sector, with attendant job
growth that can benefit all residents of the state, by: Modifying a
tax credit providing incentives to encourage energy consumers to meet
their on-site electricity demands by installing renewable energy
systems, establishing a fund to incubate clean energy manufacturing in
Washington by awarding vouchers through a competitive process that
gives preference to systems built in Washington, and establishing
performance milestones to measure the level of success achieved.
Sec. 2 RCW 82.16.120 and 2011 c 179 s 3 are each amended to read
as follows:
(1)(a) Any individual, business, local governmental entity, not in
the light and power business or in the gas distribution business, or a
participant in a community solar project may apply to the light and
power business serving the situs of the system, each fiscal year
beginning on July 1, 2005, and ending June 30, 2013, for an investment
cost recovery incentive for each kilowatt-hour generated from a
customer-generated electricity renewable energy system. No incentive
may be paid under this subsection for kilowatt-hours generated before
July 1, 2005, or after June 30, 2020.
(b) In the case of a community solar project as defined in RCW
82.16.110(((2))) (3)(a)(i), the administrator must apply for the
investment cost recovery incentive on behalf of each of the other
owners. (((c))) In the case of a community solar project as defined in
RCW 82.16.110(((2))) (3)(a)(iii), the company owning the community
solar project must apply for the investment cost recovery incentive on
behalf of each member of the company.
(2)(a) ((Before submitting for the first time the application for
the incentive allowed under subsection (4))) To qualify for the
incentive allowed under subsection (1) of this section, the applicant
must submit to the department of revenue and to the climate and rural
energy development center at the Washington State University,
established under RCW 28B.30.642, ((a certification)) an application in
a form and manner prescribed by the department that includes, but is
not limited to, the following information:
(i) The name and address of the applicant and location of the
renewable energy system.
(A) If the applicant is an administrator of a community solar
project as defined in RCW 82.16.110(((2))) (3)(a)(i), the certification
must also include the name and address of each of the owners of the
community solar project.
(B) If the applicant is a company that owns a community solar
project as defined in RCW 82.16.110(((2))) (3)(a)(iii), the
certification must also include the name and address of each member of
the company;
(ii) The applicant's tax registration number;
(iii) That the electricity produced by the applicant meets the
definition of "customer-generated electricity" and that the renewable
energy system produces electricity with:
(A) Any solar inverters and solar modules manufactured in
Washington state;
(B) A wind generator powered by blades manufactured in Washington
state;
(C) A solar inverter manufactured in Washington state;
(D) A solar module manufactured in Washington state;
(E) A stirling converter manufactured in Washington state; or
(F) Solar or wind equipment manufactured outside of Washington
state;
(iv) That the electricity can be transformed or transmitted for
entry into or operation in parallel with electricity transmission and
distribution systems; ((and))
(v) The date that the renewable energy system received its final
electrical permit from the applicable local jurisdiction; and
(vi) The date that a production meter or other meter capable of
determining the system's electricity production within a ninety-eight
percent degree of accuracy became operable.
(b) Within thirty days of receipt of the ((certification))
application the department of revenue must notify the applicant by
mail, or electronically as provided in RCW 82.32.135, whether the
renewable energy system qualifies for an incentive under this section.
The department may consult with the climate and rural energy
development center to determine eligibility for the incentive. System
((certifications)) applications and the information contained therein
are subject to disclosure under RCW 82.32.330(3)(l).
(3)(a) ((By August 1st of each year application for the incentive
must be made to the light and power business serving the situs of the
system by certification in a form and manner prescribed by the
department that includes, but is not limited to, the following
information:))
An applicant, who has qualified to receive the incentive provided in
subsection (1) of this section, is a certified participant. Except as
provided pursuant to a waiver under (c) of this subsection, by August
1st of each year, in order to receive an annual incentive payment, the
certified participant must submit to the light and power business
serving the situs of the system a statement of the kilowatt-hours
generated by the renewable energy system in the prior fiscal year.
(i) The name and address of the applicant and location of the
renewable energy system.
(A) If the applicant is an administrator of a community solar
project as defined in RCW 82.16.110(2)(a)(i), the application must also
include the name and address of each of the owners of the community
solar project.
(B) If the applicant is a company that owns a community solar
project as defined in RCW 82.16.110(2)(a)(iii), the application must
also include the name and address of each member of the company;
(ii) The applicant's tax registration number;
(iii) The date of the notification from the department of revenue
stating that the renewable energy system is eligible for the incentives
under this section; and
(iv) A statement of the amount of kilowatt-hours generated by the
renewable energy system in the prior fiscal year.
(b) Within sixty days of receipt of the incentive certification the
light and power business serving the situs of the system must notify
the applicant in writing whether the incentive payment will be
authorized or denied. The business may consult with the climate and
rural energy development center to determine eligibility for the
incentive payment. Incentive certifications and the information
contained therein are subject to disclosure under RCW 82.32.330(3)(l)
(i) The statement must be in the form of a sworn affidavit signed
by the system owners or, in the case of a community solar project,
system administrators.
(ii) The amount of kilowatt-hours generated by the system over the
course of the year may be determined by reading a production meter, or
any other meter that is ninety-eight percent accurate, including a
meter that reads an inverter connected to the system.
(b) Incentive certifications and the information contained therein
are subject to disclosure under RCW 82.32.330(3)(l).
(c) If the light and power business serving the situs of the system
has the ability to remotely read the kilowatt-hours generated by the
renewable energy system, it may apply for a waiver excusing a certified
participant from filing the annual statement required in (a) of this
subsection.
(i) The light and power business must submit an application for the
waiver in the form and manner prescribed by the department.
(ii) The application must state the meter reading methods that will
be used by the light and power business and state the estimated
accuracy of such methods. If the stated accuracy of the meter reading
method is ninety-eight percent or greater, the waiver must be granted
unless the department proves a less accurate read rate.
(iii) Upon notice that the department has granted the waiver, the
light and power business must notify the certified participant that it
is excused from the reporting requirement established in (a) of this
subsection.
(d) Within sixty days of receipt of the sworn statement described
in (a) of this subsection, or, when a waiver is in place, by August 1st
of each year, the light and power business serving the situs of the
system must notify the applicant in writing whether the incentive
payment will be authorized or denied.
(((c))) (e)(i) Persons, administrators of community solar projects,
and companies receiving incentive payments must keep and preserve, for
a period of five years, suitable records as may be necessary to
determine the amount of incentive applied for and received. Such
records must be open for examination at any time upon notice by the
light and power business that made the payment or by the department.
If upon examination of any records or from other information obtained
by the business or department it appears that an incentive has been
paid in an amount that exceeds the correct amount of incentive payable,
the business may assess against the person for the amount found to have
been paid in excess of the correct amount of incentive payable and must
add thereto interest on the amount. Interest is assessed in the manner
that the department assesses interest upon delinquent tax under RCW
82.32.050.
(ii) If it appears that the amount of incentive paid is less than
the correct amount of incentive payable the business may authorize
additional payment.
(4) Except for community solar projects, the investment cost
recovery incentive may be paid fifteen cents per economic development
kilowatt-hour unless requests exceed the amount authorized for credit
to the participating light and power business. For community solar
projects, the investment cost recovery incentive may be paid thirty
cents per economic development kilowatt-hour unless requests exceed the
amount authorized for credit to the participating light and power
business. For the purposes of this section, the rate paid for the
investment cost recovery incentive may be multiplied by the following
factors:
(a) For customer-generated electricity produced using solar modules
manufactured in Washington state or a solar stirling converter
manufactured in Washington state, two and four-tenths;
(b) For customer-generated electricity produced using a solar or a
wind generator equipped with an inverter manufactured in Washington
state, one and two-tenths;
(c) For customer-generated electricity produced using an anaerobic
digester, or by other solar equipment or using a wind generator
equipped with blades manufactured in Washington state, one; and
(d) For all other customer-generated electricity produced by wind,
eight-tenths.
(5)(a) No individual, household, business, or local governmental
entity is eligible for incentives provided under subsection (((4))) (1)
of this section for more than five thousand dollars per year.
(b) Except as provided in (c) through (e) of this subsection (5),
each applicant in a community solar project is eligible for up to five
thousand dollars per year.
(c) Where the applicant is an administrator of a community solar
project as defined in RCW 82.16.110(((2))) (3)(a)(i), each owner is
eligible for an incentive but only in proportion to the ownership share
of the project, up to five thousand dollars per year.
(d) Where the applicant is a company owning a community solar
project that has applied for an investment cost recovery incentive on
behalf of its members, each member of the company is eligible for an
incentive that would otherwise belong to the company but only in
proportion to each ownership share of the company, up to five thousand
dollars per year. The company itself is not eligible for incentives
under this section.
(e) In the case of a utility-owned community solar project, each
ratepayer that contributes to the project is eligible for an incentive
in proportion to the contribution, up to five thousand dollars per
year.
(6) If requests for the investment cost recovery incentive exceed
the amount of funds available for credit to the participating light and
power business, the incentive payments must be reduced proportionately.
(7) The climate and rural energy development center at Washington
State University energy program may establish guidelines and standards
for technologies that are identified as Washington manufactured and
therefore most beneficial to the state's environment.
(8) The environmental attributes of the renewable energy system
belong to the applicant, and do not transfer to the state or the light
and power business upon receipt of the investment cost recovery
incentive.
(((9) No incentive may be paid under this section for kilowatt-hours generated before July 1, 2005, or after June 30, 2020.))
NEW SECTION. Sec. 3 A new section is added to chapter 82.16 RCW
to read as follows:
(1) Beginning July 1, 2013, any person, as defined in RCW
82.04.030, not in the light and power business may apply to the
commission to receive a voucher entitling it to receive annual
incentive payments for a term of ten years for each kilowatt-hour of
electricity generated by a customer-generated electricity renewable
energy system, from the utility serving the situs of the system. The
annual incentive payment is limited as follows:
(a) No incentive may be paid for any kilowatt-hours generated in
excess of the net kilowatt-hours consumed at the metered location;
(b) No incentive may be paid for a system that has already received
incentive payments under RCW 82.16.120; and
(c) The annual incentive payment that a system may receive is
capped at twenty-five thousand dollars.
(2) To be eligible to receive a voucher, the applicant must be:
(a) A customer of a light and power business that has chosen to
participate in the incentive program established in this section, and
which participated in the investment cost recovery incentive program
established in RCW 82.16.120 by claiming an investment cost recovery
credit against taxes due; and
(b) The meter holder, meaning the party responsible to the utility
for paying for electricity transmitted to the situs of a customer-generated electricity renewable energy system.
(3) Beginning July 1, 2013, to receive incentive payments under
this section, an applicant must submit to the commission a completed
application using the form established by the department in RCW
82.16.120(2), or a form later established by the commission. The
commission is authorized to develop and implement an application form
different from the one developed by the department, but the form must
at a minimum include the information required in RCW 82.16.120(2).
(4)(a) Within thirty days of receipt of the application, the
commission must notify the applicant by mail, or electronically as
provided in RCW 82.32.135, whether the renewable energy system
qualifies for the voucher under this section. If the commission has
determined that the system qualifies for a voucher, within five days of
notifying the applicant, the commission must transmit the voucher to
the utility serving the situs of the system.
(b) The voucher must state the first day of the ten-year term and
the last day for which the system qualifies to receive incentive
payments from the utility. The term must begin on the interconnection
date. For the purposes of this subsection, "interconnection date"
means the first day that the customer-generated electricity renewable
energy system begins producing energy at a meter connected to the power
grid.
(5) Applications, vouchers, and the information contained therein
are subject to disclosure under RCW 82.32.330(3)(l).
(6) The utility, upon receiving the voucher, must make incentive
payments for each kilowatt-hour of electricity generated, at the rate
established in subsection (12) or (13) of this section. In return, the
utility must receive tax credits equal in value to the incentive
payments, as provided in RCW 82.16.130(2).
(a) A utility that chooses to participate in the voucher program
created in this section may cease to accept vouchers for new systems at
any time, but must continue to make payments pursuant to any existing
voucher for its entire term.
(b) If, during the ten-year term of the voucher, there is a change
in the meter holder and a new party becomes financially responsible to
the utility, the voucher must be transferrable to the new meter holder,
provided that the new meter holder is also an individual, business, or
local governmental entity eligible to receive payments under this
section.
(c) Throughout the duration of the voucher, the incentive must be
paid at the same rate that is in effect on the first date of the ten-year term.
(7) On or before July 1st of each year, the utility must provide a
statement to the commission and to the department with the
interconnection dates for any new systems that sought incentive
payments pursuant to this section, as well as the names of the meter
holders for those systems.
(8) In order to receive incentive payments from the utility, by
August 1st, a customer must submit to the utility a statement of the
kilowatt-hours generated by the renewable energy system in the prior
fiscal year.
(a) The statement must be in the form of a sworn affidavit signed
by the meter holder.
(b) The amount of kilowatt-hours generated by the system over the
course of the year may be determined by reading a production meter, or
any other meter that is ninety-eight percent accurate, including a
meter that reads an inverter connected to the system.
(9) If the utility serving the situs of the system has the ability
to remotely read the kilowatt-hours generated by the renewable energy
system, it may apply to the commission for a waiver excusing a customer
from filing the annual statement required in subsection (8) of this
section.
(a) The utility must submit an application in the form and manner
prescribed by the commission, stating the meter reading methods that
will be used by the utility and the estimated accuracy of such methods.
(b) If the commission grants the waiver, it must notify the utility
and the customer that it is excused from the reporting requirement
established in subsection (8) of this section.
(10) Within sixty days of receipt of the sworn statement described
in subsection (8) of this section, or, when a waiver is in place, by
October 1st of each year, the utility must transmit the incentive
payment to the customer, or inform the customer that the payment is
denied, describing the basis for denial of the payment.
(11) Customers receiving incentive payments and utilities making
payments must keep and preserve, for a period of five years, suitable
records as may be necessary to determine the amount of incentive
applied for and received.
(a) Such records must be open for examination at any time upon
notice by the utility that made the payment, the commission, or the
department.
(b) If upon examination of any records or from other information
obtained by the utility, commission, or department it appears that an
incentive has been paid in an amount that exceeds the correct amount of
incentive payable, the utility may assess against the person for the
amount found to have been paid in excess of the correct amount of
incentive payable and must add thereto interest on the amount.
Interest is assessed in the manner that the department assesses
interest upon delinquent tax under RCW 82.32.050.
(c) If it appears that the amount of incentive paid is less than
the correct amount of incentive payable, the utility may authorize
additional payment.
(12) Beginning July 1, 2013, and until at least June 30, 2018, the
incentive must be paid at a base rate of fifteen cents per economic
development kilowatt-hour. The base rate paid for the investment cost
recovery incentive may be multiplied by the following factors:
(a) For customer-generated electricity produced using solar modules
manufactured in Washington state or a solar stirling converter
manufactured in Washington state, two and four-tenths;
(b) For customer-generated electricity produced using a solar or a
wind generator equipped with an inverter manufactured in Washington
state, one and two-tenths;
(c) For customer-generated electricity produced using an anaerobic
digester, or by other solar equipment or using a wind generator
equipped with blades manufactured in Washington state, one; and
(d) For all other customer-generated electricity produced by wind,
eight-tenths.
(13) The commission is authorized to adjust the base rate and
multipliers, effective July 1, 2018, and applicable to any vouchers
awarded after that date. The rate may be adjusted to reflect decreases
in the capital costs of purchasing and installing a renewable energy
system, changes in the levelized costs of such systems, or other
factors that the commission deems relevant to fulfilling the purpose of
incentivizing job growth and the environmental and economic benefits of
renewable energy in the state.
(14) The commission must award vouchers under this section on a
first-come, first-served basis. The total cap on credits that may be
awarded pursuant to RCW 82.16.120 and this section, combined, is
established in RCW 82.16.130(7) as 0.4 percent of the participating
utilities' annual taxable sales. Consequently, in determining the
dollar amount of vouchers that may be awarded under this section, the
commission must first estimate the phase I allocation, which is the
number of credits that are allocated to utilities in exchange for
payments made under RCW 82.16.120, setting aside additional credits to
account for possible fluctuations, such as year-to-year differences in
the annual sun regimen.
(a) The commission is authorized to award phase II vouchers for an
annual amount that is the difference between the 0.4 percent credit cap
and the phase I allocation.
(b) Furthermore, it is the intent of the legislature that enough
credits be allocated to the phase II program to allow for full
development of the systems eligible for the phase II credit.
Therefore, to ensure the availability of phase II credits, the
commission may increase the amount allocated in (a) of this subsection
to a light and power business by transferring additional credits back
from the competitive pool, in the manner described in section 5(4) of
this act.
(15) For the purposes of this section, "utility" means a light and
power business.
Sec. 4 RCW 82.16.130 and 2010 c 202 s 3 are each amended to read
as follows:
(1) A light and power business ((shall be)) is allowed a credit
against taxes due under this chapter in an amount equal to the
investment cost recovery incentive payments made in any fiscal year
under RCW 82.16.120. The credit shall be taken in a form and manner as
required by the department. ((The credit under this section for the
fiscal year may not exceed one-half percent of the businesses' taxable
power sales due under RCW 82.16.020(1)(b) or one hundred thousand
dollars, whichever is greater.))
(2) A light and power business is allowed a credit against taxes
due under this chapter in an amount equal to the investment cost
recovery incentive payments made in any fiscal year under section 3 of
this act.
(3) A light and power business is allowed a credit against taxes
due under this chapter in an amount equal to payments made in any
fiscal year under the green jobs competitive pool program established
in section 5 of this act.
(4) No entity may claim double credit by seeking or retaining
payment or credit for the same electricity generation pursuant to more
than one of the programs established in RCW 82.16.120 and section 3 and
5 of this act.
(5) Incentive payments to participants in a utility-owned community
solar project as defined in RCW 82.16.110(((2))) (3)(a)(ii) may only
account for up to twenty-five percent of the total allowable credit.
Incentive payments to participants in a company-owned community solar
project as defined in RCW 82.16.110(((2))) (3)(a)(iii) may only account
for up to five percent of the total allowable credit.
(6) The total credit claimed under this section may not exceed the
tax that would otherwise be due under this chapter. Refunds ((shall))
may not be granted in the place of credits. Expenditures not used to
earn a credit in one fiscal year may not be used to earn a credit in
subsequent years.
(((2))) (7) The total credit available to a light and power
business under RCW 82.16.120 and section 3 of this act is capped at 0.4
percent of participating utilities' annual taxable power sales, except
as otherwise provided in sections 3(14) and 5(4) of this act.
(8) For any light and power business that has claimed credit for
amounts that exceed the correct amount of the incentive payable under
RCW 82.16.120((,)) or, section 3 or 5 of this act the amount of tax
against which credit was claimed for the excess payments ((shall be))
is immediately due and payable. The department ((shall)) must assess
interest but not penalties on the taxes against which the credit was
claimed. Interest ((shall be)) is assessed at the rate provided for
delinquent excise taxes under chapter 82.32 RCW, retroactively to the
date the credit was claimed, and ((shall)) accrues until the taxes
against which the credit was claimed are repaid.
(((3) The right to earn tax credits under this section expires June
30, 2020. Credits may not be claimed after June 30, 2021.)) (9) For
incentive payments made pursuant to RCW 82.16.120, the right to earn
tax credits under this section expires June 30, 2020, and credits may
not be claimed after June 30, 2021. For incentive payments made
pursuant to sections 3 and 5 of this act, the right to earn tax credits
under this section expires June 30, 2030, and credits may not be
claimed after June 30, 2031.
NEW SECTION. Sec. 5 A new section is added to chapter 43.180 RCW
to read as follows:
(1) There is hereby created within the sustainable energy trust
program a green jobs competitive pool program. The purpose of the
green jobs competitive pool is to award incentive payments by a
competitive process that will promote installation of renewable energy
systems in the state of Washington, giving preference to systems that
present the highest economic and environmental value to the state.
(2) Beginning July 1, 2014, any person, as defined in RCW
82.04.030, who owns a renewable energy system with a generating
capacity of up to one hundred kilowatts may apply to the commission to
be awarded a voucher, entitling that person to receive payments from
the light and power business serving that system for a term of ten
years. Renewable energy systems, for which any person has already
received incentive payments pursuant to RCW 82.16.120 or section 3 of
this act, are not eligible to be awarded a voucher.
(a) By November 1, 2013, the commission must establish objective,
competitive criteria for awarding the voucher. The identity of the
light and power business serving the applicant may not be given weight
in the award of applications. The commission must give weight and
preference to applicants that are a nonprofit, educational, charitable,
or other entity that is exempt from taxation under Title 26 U.S.C. Sec.
501(c)(3) of the federal internal revenue code of 1986, as amended, as
of the effective date of this section. A preference must also be given
to community projects that encourage a large number of community
members to participate in ownership of the system. In priority order,
the criteria must include, but are not limited to:
(i) The amount of payment, in cents per kilowatt-hour, the
applicant is seeking;
(ii) Whether the system contains Washington-manufactured components
or components manufactured in compliance with state environmental and
labor laws;
(iii) The system's estimated levelized cost per kilowatt-hour
generated;
(iv) The degree to which installation of the system or type of
system contributes to verifiable job creation in the state of
Washington; and
(v) The degree to which the state investment of green job tax
credits pursuant to the voucher leverages nonstate funds.
(b) The commission must develop a form to be used by applicants for
the green jobs voucher. The form must include, but is not limited to,
the following information:
(i) The name and address of the applicant;
(ii) The location, capacity, and anticipated power generation of
the renewable energy system;
(iii) The name and address of each of the legal owners of the
system, if different from the applicant;
(iv) The owners' tax registration numbers;
(v) Specifications for the system, including the extent to which
the system includes:
(A) Any solar inverters and solar modules manufactured in
Washington state;
(B) A wind generator powered by blades manufactured in Washington
state;
(C) A stirling converter manufactured in Washington state;
(D) Other components manufactured in Washington state; and
(E) Solar, wind, or other equipment manufactured outside of
Washington state;
(vi) A certification that the electricity can be transformed or
transmitted for entry into or operation in parallel with electricity
transmission and distribution systems;
(vii) A list of any nonstate incentives that the applicant is
planning to seek to further subsidize the system costs;
(viii) The date that the renewable energy system received or
expects to receive its final electrical permit from the applicable
local jurisdiction and the date that a production meter or other meter
capable of determining the system's electricity production within a
ninety-eight percent degree of accuracy became or is expected to become
operable; and
(ix) The amount of payment, in cents per kilowatt-hour, the
applicant is seeking.
(c) Upon determining that a person is to be awarded the voucher
provided in this section, the commission must notify the applicant that
the system has been certified to receive the incentive for a ten-year
term. The term must begin on the day after the date that the system
has been certified by the commission, or the day that the system is
interconnected with the utility and a production meter or other
accurate meter becomes operable on site, whichever date is later. The
commission must also present a certificate to the light and power
business serving the situs of the system, informing the light and power
business of:
(i) The amount of incentive payment, in cents per kilowatt-hour of
electricity produced by that system, that the light and power business
must make to the system owner for a term of ten years; and
(ii) The first day of the ten-year term for which the utility must
make incentive payments pursuant to the voucher.
(3) No new vouchers may be awarded pursuant to this section after
June 30, 2024.
(4)(a) Each year, the commission must calculate the amount of
voucher credits available to be disbursed.
(b) The upper limit of the amount available to the competitive pool
each year must be determined by aggregating 0.1 percent of the taxable
sales due in the prior fiscal year under RCW 82.16.020(1)(b) for each
of the utilities who participated in the investment cost recovery
program established in RCW 82.16.120. However, the commission must
remove credits available under this 0.1 percent aggregate cap from the
competitive pool and reallocate them, as necessary, to a utility that
is reaching the limit established for phase II credits under section 3
of this act.
(i) By July 1, 2014, the commission must establish and publicize a
process and objective standards by which it will determine if a light
and power business is approaching the limit, established in RCW
82.16.130(7), for credits available under the phase II program.
(ii) If the commission determines that a light and power business
is approaching this limit and as a result, there is a negative impact
on the growth and development of new renewable energy systems served by
that utility, the commission must transfer credits from the green jobs
competitive pool back to that utility.
(iii) By December 1st of each year, beginning in 2015, the
commission must announce whether it is reserving and making available
additional credits to any light and power business for the phase II
incentive program established in section 3 of this act.
(5) The commission is authorized to fix, revise, and collect fees
and charges in connection with the creation and implementation of the
green jobs competitive pool, in addition to exercising any general
power already set forth in RCW 43.180.080(6).
NEW SECTION. Sec. 6 A new section is added to chapter 82.16 RCW
to read as follows:
(1) The legislature finds that accountability and the effectiveness
of attempts to foster job creation and retention are important aspects
of setting tax policy. In order to make policy choices regarding the
best use of limited state resources, the legislature needs to know how
the incentives are used, and the degree to which they meet the
legislature's intent.
(2) The "national solar jobs census 2011" produced by the solar
foundation states that there were 2,301.37 solar-related jobs in
Washington in 2011, and ranks Washington twelfth of the fifty states
for solar-related employment. The "national solar jobs census 2011"
also states that Washington has 3.42 solar-related jobs per ten
thousand residents, and ranks Washington tenth of the fifty states for
per capita solar-related employment.
(3) The performance milestones to be reached by 2021 as a result of
the tax credits awarded under RCW 82.16.120, 82.16.130, and 43.180.260
are as follows:
(a) As measured by the "national solar jobs census" or other
equivalent study of solar-related employment:
(i) An increase in the total number and per capita rate of solar-related jobs in Washington; and
(ii) Achievement of a top ten ranking for solar-related employment
and a top nine ranking for per capita solar-related employment;
(b) A one hundred percent increase in the utilization of the tax
credits awarded under this chapter, from the 3,119 installed solar
systems in 2012 to 6,238 installed solar systems;
(c) A one hundred percent increase in the amount of installed solar
system megawatts, from 1.6093 megawatts to 3.22 megawatts; and
(d) Increases in renewable-related employment and utilization of
the other renewable generating resources covered in this act, from a
baseline, to be determined by the commission.
(4) The commission, in consultation with the Washington State
University energy program, must measure the amount of progress towards
achieving the outcomes described in subsection (3) of this section.
Subject to data availability, the measures must include, but are not
limited to:
(a) The total number and per capita rate of solar-related jobs in
Washington;
(b) Washington's national ranking for solar-related employment and
per capita solar-related employment;
(c) The number of installed solar systems;
(d) The amount of installed solar system electricity generation
capacity, as measured in megawatts;
(e) The levels of renewable-related employment and utilization of
the other renewable generating resources covered in this act as
determined by the commission;
(f) The average efficiency rate of the conversion of natural energy
into electricity;
(g) The average price per kilowatt-hour generated; and
(h) The degree to which the state investment leverages nonstate
funds as measured by:
(i) The total amount of tax credits awarded in Washington and
within each county; and
(ii) The total amount of nonstate funds leveraged in Washington and
within each county.
(5) All recipients of tax credits awarded under this chapter must
provide the commission with any data requested for reporting purposes.
Failure to comply may result in the loss of a tax credit award in the
following year.
(6) By December 31st each year, beginning in 2014, and in
compliance with RCW 43.01.036, the commission must submit a report to
the legislature that details the progress achieved in reaching the
intended outcomes specified in this section.
Sec. 7 RCW 82.16.110 and 2011 c 179 s 2 are each amended to read
as follows:
The definitions in this section apply throughout this chapter
unless the context clearly requires otherwise.
(1) "Administrator" means an owner and assignee of a community
solar project as defined in subsection (((2))) (3)(a)(i) of this
section that is responsible for applying for the investment cost
recovery incentive on behalf of the other owners and performing such
administrative tasks on behalf of the other owners as may be necessary,
such as receiving investment cost recovery incentive payments, and
allocating and paying appropriate amounts of such payments to the other
owners.
(2) "Commission" means the Washington state housing finance
commission as defined in RCW 43.180.020.
(3)(a) "Community solar project" means:
(i) A solar energy system that is capable of generating up to
seventy-five kilowatts of electricity and is owned by local
individuals, households, nonprofit organizations, or nonutility
businesses that is placed on the property owned by a cooperating local
governmental entity that is not in the light and power business or in
the gas distribution business;
(ii) A utility-owned solar energy system that is capable of
generating up to seventy-five kilowatts of electricity and that is
voluntarily funded by the utility's ratepayers where, in exchange for
their financial support, the utility gives contributors a payment or
credit on their utility bill for the value of the electricity produced
by the project; or
(iii) A solar energy system, placed on the property owned by a
cooperating local governmental entity that is not in the light and
power business or in the gas distribution business, that is capable of
generating up to seventy-five kilowatts of electricity, and that is
owned by a company whose members are each eligible for an investment
cost recovery incentive for the same customer-generated electricity as
provided in RCW 82.16.120.
(b) For the purposes of "community solar project" as defined in (a)
of this subsection:
(i) "Company" means an entity that is:
(A)(I) A limited liability company;
(II) A cooperative formed under chapter 23.86 RCW; or
(III) A mutual corporation or association formed under chapter
24.06 RCW; and
(B) Not a "utility" as defined in this subsection (((2))) (3)(b);
and
(ii) "Nonprofit organization" means an organization exempt from
taxation under 26 U.S.C. Sec. 501(c)(3) of the federal internal revenue
code of 1986, as amended, as of January 1, 2009; and
(iii) "Utility" means a light and power business, an electric
cooperative, or a mutual corporation that provides electricity service.
(((3))) (4) "Customer-generated electricity" means a community
solar project or the alternating current electricity that is generated
from a renewable energy system located in Washington and installed on
an individual's, businesses', or local government's real property that
is also provided electricity generated by a light and power business.
Except for community solar projects, a system located on a leasehold
interest does not qualify under this definition. Except for utility-owned community solar projects, "customer-generated electricity" does
not include electricity generated by a light and power business with
greater than one thousand megawatt hours of annual sales or a gas
distribution business.
(((4))) (5) "Economic development kilowatt-hour" means the actual
kilowatt-hour measurement of customer-generated electricity multiplied
by the appropriate economic development factor.
(((5))) (6) "Local governmental entity" means any unit of local
government of this state including, but not limited to, counties,
cities, towns, municipal corporations, quasi-municipal corporations,
special purpose districts, and school districts.
(((6))) (7) "Photovoltaic cell" means a device that converts light
directly into electricity without moving parts.
(((7))) (8) "Renewable energy system" means a solar energy system,
an anaerobic digester as defined in RCW 82.08.900, or a wind generator
used for producing electricity.
(((8))) (9) "Solar energy system" means any device or combination
of devices or elements that rely upon direct sunlight as an energy
source for use in the generation of electricity.
(((9))) (10) "Solar inverter" means the device used to convert
direct current to alternating current in a solar energy system.
(((10))) (11) "Solar module" means the smallest nondivisible self-contained physical structure housing interconnected photovoltaic cells
and providing a single direct current electrical output.
(((11))) (12) "Stirling converter" means a device that produces
electricity by converting heat from a solar source utilizing a stirling
engine.
NEW SECTION. Sec. 8 If any provision of this act or its
application to any person or circumstance is held invalid, the
remainder of the act or the application of the provision to other
persons or circumstances is not affected.
NEW SECTION. Sec. 9 If a state, federal, or international
tribunal determines that substantive criteria established in this act
for awarding incentives violate statutory or treaty law, the housing
finance commission must not use those criteria but instead must
substitute new criteria, adopted after notice and in consultation with
stakeholders and state agencies. These criteria must be chosen in
light of the legislature's intent to increase the wage level of jobs in
our state, inure to our state the environmental benefits of clean
energy, and minimize the state's carbon footprint. Consequently, the
new criteria must award systems that were manufactured in compliance
with state environmental standards and occupational health and safety
regulations to the fullest extent feasible under law.
NEW SECTION. Sec. 10 This act is necessary for the immediate
preservation of the public peace, health, or safety, or support of the
state government and its existing public institutions, and takes effect
July 1, 2013.