BILL REQ. #:  Z-0258.1 



_____________________________________________ 

SENATE BILL 5035
_____________________________________________
State of Washington63rd Legislature2013 Regular Session

By Senators Honeyford, Nelson, and Shin; by request of Governor Gregoire

Read first time 01/15/13.   Referred to Committee on Ways & Means.



     AN ACT Relating to the capital budget; making appropriations and authorizing expenditures for capital improvements; amending RCW 28B.15.210, 28B.20.725, 28B.15.310, 28B.30.750, 28B.35.370, 28B.50.360, 79.17.010, and 79.17.020; reenacting and amending RCW 70.105D.070 and 79.105.150; creating new sections; and declaring an emergency.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

NEW SECTION.  Sec. 1   (1) A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period beginning with the effective date of this act and ending June 30, 2015, out of the several funds specified in this act.
     (2) The definitions in this subsection apply throughout this act unless the context clearly requires otherwise.
     (a) "Fiscal year 2014" or "FY 2014" means the period beginning July 1, 2013, and ending June 30, 2014.
     (b) "Fiscal year 2015" or "FY 2015" means the period beginning July 1, 2014, and ending June 30, 2015.
     (c) "Lapse" or "revert" means the amount shall return to an unappropriated status.
     (d) "Provided solely" means the specified amount may be spent only for the specified purpose.
     (3) Unless otherwise specifically authorized in this act, any portion of an amount provided solely for a specified purpose that is not expended subject to the specified conditions and limitations to fulfill the specified purpose shall lapse.
     (4) The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts. "Prior biennia" typically refers to the immediate prior biennium for reappropriations, but may refer to multiple biennia in the case of specific projects. A "future biennia" amount is an estimate of what may be appropriated for the project or program in the 2013-2015 biennium and the following three biennia; an amount of zero does not necessarily constitute legislative intent to not provide funding for the project or program in the future.
     (5) "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations. Reappropriations shall be limited to the unexpended balances remaining on June 30, 2013, from the 2011-2013 biennial appropriations for each project.

PART 1
GENERAL GOVERNMENT

NEW SECTION.  Sec. 1001   FOR THE OFFICE OF THE SECRETARY OF STATE
     TVW Equipment (30000002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,840,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,840,000

NEW SECTION.  Sec. 1002   FOR THE OFFICE OF THE SECRETARY OF STATE
     Archives Facilities Mechanical Systems Chiller Replacement (30000003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $128,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $128,000

NEW SECTION.  Sec. 1003   FOR THE DEPARTMENT OF COMMERCE
     Rural Washington Loan Fund (19882002)

Reappropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $106,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,259,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,365,000

NEW SECTION.  Sec. 1004   FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects (20064008)

     The reappropriation is subject to the provisions in section 131, chapter 488, Laws of 2005.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,601,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $45,210,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $47,811,000

NEW SECTION.  Sec. 1005   FOR THE DEPARTMENT OF COMMERCE
     Rural Washington Loan Fund (20064010)

Reappropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $2,656,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,471,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,127,000

NEW SECTION.  Sec. 1006   FOR THE DEPARTMENT OF COMMERCE
     Job and Economic Development Grants (20064950)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 107, chapter 371, Laws of 2006.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,406,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $45,051,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $46,457,000

NEW SECTION.  Sec. 1007   FOR THE DEPARTMENT OF COMMERCE
     Jobs in Communities (20064951)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 140, chapter 488, Laws of 2005.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,428,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,823,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,251,000

NEW SECTION.  Sec. 1008   FOR THE DEPARTMENT OF COMMERCE
     Drinking Water Assistance Program (20074004)

Reappropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $2,340,000
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $13,011,000
          Subtotal Reappropriation . . . . . . . . . . . . $15,351,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $16,549,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $31,900,000

NEW SECTION.  Sec. 1009   FOR THE DEPARTMENT OF COMMERCE
     Public Works Trust Fund (20074005)

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $29,993,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $265,007,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $295,000,000

NEW SECTION.  Sec. 1010   FOR THE DEPARTMENT OF COMMERCE
     Rural Washington Loan Fund (20074008)

Reappropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $1,761,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $191,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,952,000

NEW SECTION.  Sec. 1011   FOR THE DEPARTMENT OF COMMERCE
     Housing Assistance, Weatherization, and Affordable Housing (20074009)

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $4,674,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $195,162,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $199,836,000

NEW SECTION.  Sec. 1012   FOR THE DEPARTMENT OF COMMERCE
     Job Development Fund Grants (20074010)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1032, chapter 520, Laws of 2007 and section 1005, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,292,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $44,638,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $48,930,000

NEW SECTION.  Sec. 1013   FOR THE DEPARTMENT OF COMMERCE
     Longview Regional Water Treatment Plant Dredging (20081001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $24,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $126,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $150,000

NEW SECTION.  Sec. 1014   FOR THE DEPARTMENT OF COMMERCE
     Innovation Partnership Zones (20082003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $42,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,959,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,001,000

NEW SECTION.  Sec. 1015   FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects (20084001)

     The reappropriation in this section is subject to the following conditions and limitations: The projects must comply with RCW 43.63A.125 and other requirements for community projects administered by the department.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,941,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $125,093,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $127,034,000

NEW SECTION.  Sec. 1016   FOR THE DEPARTMENT OF COMMERCE
     Community Development Fund (20084850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,426,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,490,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,916,000

NEW SECTION.  Sec. 1017   FOR THE DEPARTMENT OF COMMERCE
     Belfair Sewer Improvements (20084852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $506,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,794,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,300,000

NEW SECTION.  Sec. 1018   FOR THE DEPARTMENT OF COMMERCE
     2008 Local and Community Projects (20084861)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,956,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $16,138,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,094,000

NEW SECTION.  Sec. 1019   FOR THE DEPARTMENT OF COMMERCE
     Drinking Water State Revolving Fund Loan Program (30000005)

Reappropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $10,930,000
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $31,201,000
          Subtotal Reappropriation . . . . . . . . . . . . $42,131,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $42,131,000

NEW SECTION.  Sec. 1020   FOR THE DEPARTMENT OF COMMERCE
     Building for the Arts Grants (30000006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,701,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,374,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,075,000

NEW SECTION.  Sec. 1021   FOR THE DEPARTMENT OF COMMERCE
     Youth Recreational Facilities Grants (30000007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $334,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,544,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,878,000

NEW SECTION.  Sec. 1022   FOR THE DEPARTMENT OF COMMERCE
     Building Communities Fund Grants (30000008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,870,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $27,120,000

NEW SECTION.  Sec. 1023   FOR THE DEPARTMENT OF COMMERCE
     Community Economic Revitalization Board (30000010)

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $6,035,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $218,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,253,000

NEW SECTION.  Sec. 1024   FOR THE DEPARTMENT OF COMMERCE
     Innovation Partnership Zones (30000012)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $750,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 1025   FOR THE DEPARTMENT OF COMMERCE
     Housing Assistance, Weatherization, and Affordable Housing (30000013)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,063,000
     Washington Housing Trust Account--State . . . . . . . . . . . . $1,348,000
     State Taxable Building Construction Account--State . . . . . . . . . . . . $0
          Subtotal Reappropriation . . . . . . . . . . . . $4,411,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $125,589,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $130,000,000

NEW SECTION.  Sec. 1026   FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects (30000019)

     The reappropriation in this section is subject to the following conditions and limitations: The projects must comply with RCW 43.63A.125 and other requirements for community projects administered by the department.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $699,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,446,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,145,000

NEW SECTION.  Sec. 1027   FOR THE DEPARTMENT OF COMMERCE
     2010 Local and Community Projects (30000082)

     The reappropriation in this section is subject to the following conditions and limitations: The projects must comply with RCW 43.63A.125 and other requirements for community projects administered by the department.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,029,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,129,000

NEW SECTION.  Sec. 1028   FOR THE DEPARTMENT OF COMMERCE
     Community Schools (91000002)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1013, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,561,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,345,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,906,000

NEW SECTION.  Sec. 1029   FOR THE DEPARTMENT OF COMMERCE
     Temporary Public Works Grant Program (92000021)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is subject to the provisions of section 6001, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,049,000
     State Taxable Building Construction Account--State . . . . . . . . . . . . $69,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,118,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $38,615,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $39,733,000

NEW SECTION.  Sec. 1030   FOR THE DEPARTMENT OF COMMERCE
     Jobs Act for K-12 Public Schools and Higher Education Institutions (91000085)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1016, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,606,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $40,203,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $44,809,000

NEW SECTION.  Sec. 1031   FOR THE DEPARTMENT OF COMMERCE
     Community Economic Revitalization Board - Export Assistance Grants and Loans (92000069)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1018, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 1032   FOR THE DEPARTMENT OF COMMERCE
     Drinking Water State Revolving Fund Loan Program (30000095)

     The reappropriations in this section are subject to the following conditions and limitations: For projects involving repair, replacement, or improvement of a clean water infrastructure facility or other public works facility for which an investment grade audit is obtainable, the public works board must require as a contract condition that the project sponsor undertake an investment grade audit. The project sponsor may finance the costs of the audit as part of its drinking water state revolving fund program loan.

Reappropriation:
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $92,000,000
     Drinking Water Assistance Account--State . . . . . . . . . . . . $16,000,000
          Subtotal Reappropriation . . . . . . . . . . . . $108,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $108,000,000

NEW SECTION.  Sec. 1033   FOR THE DEPARTMENT OF COMMERCE
     Community Economic Revitalization Board (30000097)

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1034   FOR THE DEPARTMENT OF COMMERCE
     Housing Assistance, Weatherization, Affordable Housing Trust Fund (30000098)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1026, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $16,214,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $33,786,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 1035   FOR THE DEPARTMENT OF COMMERCE
     Youth Recreational Facilities Grants (30000100)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1029, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,554,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,699,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,253,000

NEW SECTION.  Sec. 1036   FOR THE DEPARTMENT OF COMMERCE
     Building for the Arts Grants (30000101)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1030, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,148,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,314,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,462,000

NEW SECTION.  Sec. 1037   FOR THE DEPARTMENT OF COMMERCE
     Building Communities Fund Grants (30000102)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1027, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,143,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,260,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,403,000

NEW SECTION.  Sec. 1038   FOR THE DEPARTMENT OF COMMERCE
     Public Works Assistance Account Program (30000103)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1021, chapter 48, Laws of 2011 1st sp. sess.

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $324,584,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $324,585,000

NEW SECTION.  Sec. 1039   FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects (30000166)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1002, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,597,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,220,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,817,000

NEW SECTION.  Sec. 1040   FOR THE DEPARTMENT OF COMMERCE
     Clean Energy Partnership (30000175)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is provided solely for implementation of the recommendations of the clean energy leadership council by providing state matching funds for projects that:

     (a) Integrate energy efficiency and renewable energy in buildings;
     (b) Integrate renewable energy into the regional electrical grid;
     (c) Advance bioenergy in the state.
     (2) State funding must not exceed fifty percent of the total program or project funds.
     (3) Eligible projects must:
     (a) Involve a majority of companies that are located in Washington state;
     (b) Represent a substantially new solution that is not widely available today; and
     (c) Be designed to generate solutions that are applicable both inside and outside of the state.

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $5,499,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,500,000

NEW SECTION.  Sec. 1041   FOR THE DEPARTMENT OF COMMERCE
     Financing Energy/Water Efficiency (30000180)

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $4,953,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $47,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1042   FOR THE DEPARTMENT OF COMMERCE
     Public Works Assistance Account Program 2013 Loan List (30000184)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for the list of projects in LEAP capital document number 2012-1B, developed February 18, 2012.

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $152,781,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $152,781,000

NEW SECTION.  Sec. 1043   FOR THE DEPARTMENT OF COMMERCE
     Energy Efficiency Grants for Local Governments (91000241)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 301, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $17,948,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $52,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,000,000

NEW SECTION.  Sec. 1044   FOR THE DEPARTMENT OF COMMERCE
     Energy Efficiency Grants for Higher Education (91000242)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 307, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $19,951,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $49,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 1045   FOR THE DEPARTMENT OF COMMERCE
     Weatherization (91000247)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1015, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $9,977,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,023,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 1046   FOR THE DEPARTMENT OF COMMERCE
     Connell Klindworth Water Line Distribution (91000318)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $261,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $279,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $540,000

NEW SECTION.  Sec. 1047   FOR THE DEPARTMENT OF COMMERCE
     Public Works Preconstruction Loan Program (91000319)

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 1048   FOR THE DEPARTMENT OF COMMERCE
     Housing for Families with Children (91000409)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 310, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $8,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,250,000

NEW SECTION.  Sec. 1049   FOR THE DEPARTMENT OF COMMERCE
     Housing for People with Developmental Disabilities (91000410)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1009, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $2,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,900,000

NEW SECTION.  Sec. 1050   FOR THE DEPARTMENT OF COMMERCE
     Housing for Seniors and People with Physical Disabilities (91000411)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 311, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $9,666,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,666,000

NEW SECTION.  Sec. 1051   FOR THE DEPARTMENT OF COMMERCE
     Housing for People with Chronic Mental Illness (91000412)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1010, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $1,125,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,125,000

NEW SECTION.  Sec. 1052   FOR THE DEPARTMENT OF COMMERCE
     Housing for the Homeless (91000413)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1011, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $28,944,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $28,944,000

NEW SECTION.  Sec. 1053   FOR THE DEPARTMENT OF COMMERCE
     Housing for Farmworkers (91000414)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1012, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $6,215,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,215,000

NEW SECTION.  Sec. 1054   FOR THE DEPARTMENT OF COMMERCE
     Housing for People At Risk of Homelessness (91000415)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 312, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 1055   FOR THE DEPARTMENT OF COMMERCE
     Housing for Low-Income Households (91000416)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1013, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $2,982,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,982,000

NEW SECTION.  Sec. 1056   FOR THE DEPARTMENT OF COMMERCE
     2012 Local and Community Projects (91000417)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 302, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,539,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $84,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,623,000

NEW SECTION.  Sec. 1057   FOR THE DEPARTMENT OF COMMERCE
     Housing Competitive Pool (91000432)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1014, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $4,530,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,530,000

NEW SECTION.  Sec. 1058   FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects 2012 (91000437)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 1003, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $31,000
     State Taxable Building Construction Account--State . . . . . . . . . . . . $1,800,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,831,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,004,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,835,000

NEW SECTION.  Sec. 1059   FOR THE DEPARTMENT OF COMMERCE
     Innovation Partnership Zones - Facilities and Infrastructure (92000089)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 309, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,371,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $149,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,520,000

NEW SECTION.  Sec. 1060   FOR THE DEPARTMENT OF COMMERCE
     Community Economic Revitalization Board Administered Economic Development, Innovation, and Export Grants (92000096)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 304, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $16,533,000
     Public Works Assistance Account--State . . . . . . . . . . . . $15,902,000
          Subtotal Reappropriation . . . . . . . . . . . . $32,435,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $163,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $32,598,000

NEW SECTION.  Sec. 1061   FOR THE DEPARTMENT OF COMMERCE
     Main Street Improvement Grants (92000098)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 305, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,997,000
     Public Works Assistance Account--State . . . . . . . . . . . . $797,000
          Subtotal Reappropriation . . . . . . . . . . . . $14,794,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $56,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,850,000

NEW SECTION.  Sec. 1062   FOR THE DEPARTMENT OF COMMERCE
     Brownfield Redevelopment Grants (92000100)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for redevelopment of the Bellingham waterfront.

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $1,496,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 1063   FOR THE DEPARTMENT OF COMMERCE
     Port and Export Related Infrastructure (92000102)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 306, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $32,636,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $514,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $33,150,000

NEW SECTION.  Sec. 1064   FOR THE DEPARTMENT OF COMMERCE
     Youth Recreational Facilities Grants (30000185)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Projects must be selected based on their readiness to proceed.
     (2) The appropriation is provided solely for the following list of projects:

Camp Korey . . . . . . . . . . . . $303,000
Boys and Girls clubs of Bellevue . . . . . . . . . . . . $388,000     
Boys and Girls clubs of King county . . . . . . . . . . . . $140,000
Boys and Girls clubs of Skagit county . . . . . . . . . . . . $100,000
YMCA of greater Seattle . . . . . . . . . . . . $ 69,000
TOTAL . . . . . . . . . . . . $1,000,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1065   FOR THE DEPARTMENT OF COMMERCE
     Building for the Arts Grants (30000186)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Projects must be selected based on their readiness to proceed.
     (2) The appropriation is provided solely for the following list of projects:

Tacoma art museum . . . . . . . . . . . . $2,000,000
TOTAL . . . . . . . . . . . . $2,000,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 1066   FOR THE DEPARTMENT OF COMMERCE
     Housing Trust Fund (30000187)

     The appropriation in this section is subject to the following conditions and limitations: $15,000,000 of the appropriation is provided solely for the development of housing for low-income farmworkers. The department shall work with stakeholders to establish priorities to ensure funds are targeted to the highest identified needs.


Appropriation:
     State Taxable Building Construction
          Account--State . . . . . . . . . . . . $65,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $200,000,000
          TOTAL . . . . . . . . . . . . $265,000,000

NEW SECTION.  Sec. 1067   FOR THE DEPARTMENT OF COMMERCE
     Building Communities Fund Grants (30000188)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Except as otherwise directed before the effective date of this section, the department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project, or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.
     (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease. This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.
     (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.
     (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.
     (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(2)(c).
     (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.
     (7) The appropriation is provided solely for the following list of projects:

Interfaith community health center . . . . . . . . . . . . $559,000
LaCrosse community pride . . . . . . . . . . . . $ 20,000
Gay city health project . . . . . . . . . . . . $ 64,000
YWCA Pierce county . . . . . . . . . . . . $305,000
University Heights center for the community . . . . . . . . . . . . $367,000
Brigit Collins family support center . . . . . . . . . . . . $ 62,000
Safeplace . . . . . . . . . . . . $241,000
Spokane neighborhood action partners . . . . . . . . . . . . $638,000
Associated ministries of Tacoma-Pierce county . . . . . . . . . . . . $105,000
Friends of youth . . . . . . . . . . . . $476,000
Behavioral health resources . . . . . . . . . . . . $163,000
TOTAL . . . . . . . . . . . . $3,000,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 1068   FOR THE DEPARTMENT OF COMMERCE
     Drinking Water State Revolving Fund Loan Program (30000189)

Appropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $10,000,000
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $160,000,000
          Subtotal Appropriation . . . . . . . . . . . . $170,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $680,000,000
          TOTAL . . . . . . . . . . . . $850,000,000

NEW SECTION.  Sec. 1069   FOR THE DEPARTMENT OF COMMERCE
     Community Economic Revitalization Board (30000190)

Appropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $9,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $36,000,000
          TOTAL . . . . . . . . . . . . $45,000,000

NEW SECTION.  Sec. 1070   FOR THE DEPARTMENT OF COMMERCE
     Energy Freedom Program Revolving Loans (30000191)

Appropriation:
     Energy Recovery Act Account--Federal . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $30,000,000
          TOTAL . . . . . . . . . . . . $34,000,000

NEW SECTION.  Sec. 1071   FOR THE DEPARTMENT OF COMMERCE
     Weatherization (30000192)

Appropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 1072   FOR THE DEPARTMENT OF COMMERCE
     Public Works Assistance Account Programs 2013-2015 (30000538)

     The appropriation in this section is subject to the following
conditions and limitations:
     (1) $350,000,000 is provided solely for the list of projects in LEAP capital document number . . ., developed . . . . ., . ., 2013.
     (2) $22,000,000 is provided solely for the public works preconstruction loan program.
     (3) $5,000,000 is provided solely for emergency loans.
     (4) $5,000,000 is provided solely for energy/water efficiency loans.
     (5) $5,000,000 is provided solely for water system acquisitions.

Appropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $387,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $387,000,000

NEW SECTION.  Sec. 1073   FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects 2013-15 (30000539)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriations in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.
     (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease. This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.
     (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.
     (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.
     (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(6).
     (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.
     (7) The appropriation is provided solely for the following list of projects:

Project       Authorized Amount
American lake veterans' golf course       $500,000
Auburn community center at Les Grove park campus       $1,000,000
Chambers creek north dock pier extension       $3,832,000
City of Concrete public safety building       $3,000,000
Everett/Tulalip water pipeline       $1,000,000
Issaquah north roadway network improvement       $5,000,000
Pasco second harvest distribution center       $3,000,000
Pierce county library mobile units       $200,000
Renton aerospace training center       $5,000,000
Renton riverview bridge replacement       $1,100,000
Thurston county food bank       $1,000,000
Total       $24,632,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $23,800,000
     State Toxics Control Account--State . . . . . . . . . . . . $832,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $24,632,000

NEW SECTION.  Sec. 1074   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Cowlitz River Dredging (20082856)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $684,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,184,000

NEW SECTION.  Sec. 1075   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Catastrophic Flood Relief (20084850)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Up to $9,200,000 of the appropriation may be used to identify design alternatives for large capital flood damage reduction projects, including basin-level water retention and interstate 5 protection projects.
     (2) Up to $15,092,000 of the appropriation may be used to construct priority local flood protection projects, including multipurpose projects that reduce flood damage and benefit fish habitat.
     (3) Up to $1,750,000 of the appropriation may be used to reduce damage to residential and other structures in the floodplain, through flood proofing and buyouts.
     (4) Up to $2,160,000 of the appropriation may be used for state agency technical assistance, stakeholder project management, project support, and coordination.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,035,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $28,202,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,450,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $37,687,000

NEW SECTION.  Sec. 1076   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Oversight of State Facilities (30000035)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,080,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,080,000

NEW SECTION.  Sec. 1077   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Aerospace and Manufacturing Training Equipment Pool (91000003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,265,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,265,000

NEW SECTION.  Sec. 1078   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Chehalis River Basin Flood Relief Projects (91000398)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1079   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Emergency Repairs (30000031)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,500,000

NEW SECTION.  Sec. 1080   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Office of Financial Management Capital Staff (30000034)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $800,000

NEW SECTION.  Sec. 1081   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     O'Brien Building Improvements (20081007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,373,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,939,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,312,000

NEW SECTION.  Sec. 1082   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Natural Resource Building Roof Replacement/Exterior Foam Insulation Repairs (30000546)

Reappropriation:
     Capitol Building Construction Account--State . . . . . . . . . . . . $529,000
     State Building Construction Account--State . . . . . . . . . . . . $305,000
          Subtotal Reappropriation . . . . . . . . . . . . $834,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,648,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,482,000

NEW SECTION.  Sec. 1083   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     East Plaza - Water Infiltration and Elevator Repairs (30000548)

Appropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $793,000
     State Building Construction Account--State . . . . . . . . . . . . $2,310,000
          Subtotal Appropriation . . . . . . . . . . . . $3,103,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,444,000
          TOTAL . . . . . . . . . . . . $10,547,000

NEW SECTION.  Sec. 1084   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Minor Works Preservation (30000550)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,027,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $307,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,334,000

NEW SECTION.  Sec. 1085   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Legislative Building Critical Exterior Repairs (30000577)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $37,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $919,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $956,000

NEW SECTION.  Sec. 1086   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Engineering and Architectural Services: Staffing (30000580)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $56,600,000
          TOTAL . . . . . . . . . . . . $69,500,000

NEW SECTION.  Sec. 1087   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Legislative Building Critical Hydronic Loop Repairs (30000584)

Reappropriation:
     Capitol Building Construction Account--State . . . . . . . . . . . . $1,077,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $851,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $102,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,030,000

NEW SECTION.  Sec. 1088   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Reuse General Administration Building for Heritage Center, State Library, and State Patrol (92000003)

Reappropriation:
     Washington State Heritage Center Account--State . . . . . . . . . . . . $91,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $59,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $150,000

NEW SECTION.  Sec. 1089   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Legislative Building Critical Exterior Repairs (92000004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $790,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $610,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,400,000

NEW SECTION.  Sec. 1090   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Critical Campus Steam System Repairs (30000535)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,373,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,373,000

NEW SECTION.  Sec. 1091   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Capitol Lake Dredging (30000571)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 1092   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Natural Resources Building Garage Fire Suppression System Repairs (30000578)

Appropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $477,000
     State Building Construction Account--State . . . . . . . . . . . . $1,962,000
          Subtotal Appropriation . . . . . . . . . . . . $2,439,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,439,000

NEW SECTION.  Sec. 1093   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Natural Resources Building Exterior Wall Cladding (EIFS) and Window Leaking Project (30000605)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,539,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,539,000

NEW SECTION.  Sec. 1094   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Natural Resources Building Roof Project (30000606)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,194,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $1,601,000
          Subtotal Appropriation . . . . . . . . . . . . $4,795,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,795,000

NEW SECTION.  Sec. 1095   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Minor Works Preservation (30000635)

Appropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $897,000
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $3,563,000
          Subtotal Appropriation . . . . . . . . . . . . $7,460,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $19,460,000

NEW SECTION.  Sec. 1096   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Archives Building HVAC Upgrades (30000654)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,077,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,077,000

NEW SECTION.  Sec. 1097   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Powerhouse Chiller Replacement (30000679)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,894,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,894,000

NEW SECTION.  Sec. 1098   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Capitol Campus Emergency Generator Replacement (30000682)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,299,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,299,000

NEW SECTION.  Sec. 1099   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Capitol Campus Security Camera and Key Card Systems Replacement (30000685)

Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $3,220,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,220,000

NEW SECTION.  Sec. 1100   FOR THE DEPARTMENT OF ENTERPRISE SERVICES
     Capitol Campus Underground Utility Repairs (30000687)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,983,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,827,000
          TOTAL . . . . . . . . . . . . $10,810,000

NEW SECTION.  Sec. 1101   FOR THE MILITARY DEPARTMENT
     Minor Works Preservation (30000560)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $2,188,000
     State Building Construction Account--State . . . . . . . . . . . . $449,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,637,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,162,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,799,000

NEW SECTION.  Sec. 1102   FOR THE MILITARY DEPARTMENT
     Minor Works Program (30000561)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $5,970,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,988,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,958,000

NEW SECTION.  Sec. 1103   FOR THE MILITARY DEPARTMENT
     Information Operations Readiness Center-Joint Base Lewis McChord (30000589)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $35,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $35,000,000

NEW SECTION.  Sec. 1104   FOR THE MILITARY DEPARTMENT
     Thurston County Readiness Center (30000594)

Appropriation:
     Military Department Capital Account--State . . . . . . . . . . . . $600,000
     General Fund--Federal . . . . . . . . . . . . $33,637,000
     State Building Construction Account--State . . . . . . . . . . . . $13,412,000
          Subtotal Appropriation . . . . . . . . . . . . $47,649,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $47,649,000

NEW SECTION.  Sec. 1105   FOR THE MILITARY DEPARTMENT
     Minor Works Preservation - 2013-2015 Biennium (30000602)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $3,726,000
     State Building Construction Account--State . . . . . . . . . . . . $3,400,000
          Subtotal Appropriation . . . . . . . . . . . . $7,126,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,121,000
          TOTAL . . . . . . . . . . . . $20,247,000

NEW SECTION.  Sec. 1106   FOR THE MILITARY DEPARTMENT
     Minor Works Program - 2013-2015 Biennium (30000605)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $12,925,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $29,397,000
          TOTAL . . . . . . . . . . . . $42,322,000

NEW SECTION.  Sec. 1107   FOR THE MILITARY DEPARTMENT
     Yakima Training Center Barracks (30000696)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $18,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,000,000

NEW SECTION.  Sec. 1108   FOR THE MILITARY DEPARTMENT
     Thurston County Readiness Center (91000005)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $75,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $75,000

NEW SECTION.  Sec. 1109   FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION
     Heritage Barn Preservation Program (30000005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $180,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 1110   FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION
     Courthouse Preservation (30000006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $690,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $690,000

(End of part)


PART 2
HUMAN SERVICES

NEW SECTION.  Sec. 2001   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works Preservation: Health, Safety, and Code Requirements (30001264)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $531,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,031,000

NEW SECTION.  Sec. 2002   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works Preservation: Infrastructure Preservation (30001290)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $592,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,092,000

NEW SECTION.  Sec. 2003   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works Preservation: Facilities Preservation (30001291)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $495,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,995,000

NEW SECTION.  Sec. 2004   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Hazards Abatement and Demolition (30002221)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $16,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,243,600
          TOTAL . . . . . . . . . . . . $4,759,600

NEW SECTION.  Sec. 2005   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Capacity to Replace Maple Lane School (92000005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $50,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,926,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,976,000

NEW SECTION.  Sec. 2006   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Rainier School: Cottages Remodel and Renovation (91000017)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,506,000

NEW SECTION.  Sec. 2007   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Naselle Youth Camp-Three Cottages: Renovation (20081222)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,900,000

NEW SECTION.  Sec. 2008   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital: New Kitchen and Commissary Building (20081319)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $828,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,028,000

NEW SECTION.  Sec. 2009   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Eastern State Hospital: New Boiler Plant (30000468)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $75,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,200,000
          TOTAL . . . . . . . . . . . . $7,275,000

NEW SECTION.  Sec. 2010   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital-All Wards: Patient Safety Improvements (30002234)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,900,000

NEW SECTION.  Sec. 2011   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works Preservation Projects: Statewide (30002235)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $15,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 2012   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Lakeland Village: Code Required Campus Infrastructure Upgrades (30002238)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $20,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $28,000,000

NEW SECTION.  Sec. 2013   FOR THE DEPARTMENT OF HEALTH
     Drinking Water Assistance Program (30000013)

Reappropriation:
     Drinking Water Assistance Account--Federal . . . . . . . . . . . . $79,680,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $45,005,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $124,685,000

NEW SECTION.  Sec. 2014   FOR THE DEPARTMENT OF HEALTH
     Safe Reliable Drinking Water Grants (92000002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,766,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,777,000

NEW SECTION.  Sec. 2015   FOR THE DEPARTMENT OF HEALTH
     HVAC Systems Upgrade Continuation (30000298)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,809,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,809,000

NEW SECTION.  Sec. 2016   FOR THE DEPARTMENT OF HEALTH
     HVAC Upgrade - Phase II (30000299)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,374,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,374,000

NEW SECTION.  Sec. 2017   FOR THE DEPARTMENT OF HEALTH
     Minor Works - Facility Preservation (30000300)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $958,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,800,000
          TOTAL . . . . . . . . . . . . $2,758,000

NEW SECTION.  Sec. 2018   FOR THE DEPARTMENT OF HEALTH
     Drinking Water Assistance Program (30000323)

Appropriation:
     Drinking Water Assistance Account--Federal . . . . . . . . . . . . $33,146,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $132,584,000
          TOTAL . . . . . . . . . . . . $165,730,000

NEW SECTION.  Sec. 2019   FOR THE DEPARTMENT OF HEALTH
     Shellfish Signage Structures (30000324)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the department to design and construct permanent kiosks at recreational shellfish/fishing sites at Willapa Bay and Coulter creek and for the improvements to existing signage in both the Puget Sound and along the outer coast.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $50,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,000

NEW SECTION.  Sec. 2020   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Minor Works Facilities Preservation (30000094)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 2021   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Walla Walla Nursing Facility (20082008)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $31,200,000
     State Building Construction Account--State . . . . . . . . . . . . $16,053,000
          Subtotal Reappropriation . . . . . . . . . . . . $47,253,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $671,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $47,924,000

NEW SECTION.  Sec. 2022   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Housing Units, Kitchen, and Site Work (30000482)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $14,177,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $33,395,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $47,572,000

NEW SECTION.  Sec. 2023   FOR THE DEPARTMENT OF CORRECTIONS
     SW: Minor Works - Infrastructure Preservation (30000539)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $885,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,615,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 2024   FOR THE DEPARTMENT OF CORRECTIONS
     SW: Minor Works - Facility Preservation (30000540)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,085,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,415,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 2025   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Complex: Close Sewer Lagoon (20082022)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $306,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,091,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,397,000

NEW SECTION.  Sec. 2026   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Transformers and Switches (30000143)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,443,000
          TOTAL . . . . . . . . . . . . $26,743,000

NEW SECTION.  Sec. 2027   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Roof and Equipment Replacement (30000195)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,935,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,935,000

NEW SECTION.  Sec. 2028   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Fire Alarm System Replacement (30000209)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,603,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,603,000

NEW SECTION.  Sec. 2029   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: TRU Reroof Living Units (30000283)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,231,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,231,000

NEW SECTION.  Sec. 2030   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: TRU Replace Support Building Deteriorated Piping Pre-design (30000284)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $198,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,021,000
          TOTAL . . . . . . . . . . . . $8,219,000

NEW SECTION.  Sec. 2031   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: WSR Living Units Fixtures and Plumbing (30000531)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,100,000

NEW SECTION.  Sec. 2032   FOR THE DEPARTMENT OF CORRECTIONS
     SW: Minor Works - Health, Safety, and Code (30000541)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,057,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,543,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,600,000

NEW SECTION.  Sec. 2033   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: WSR Living Units Roofs (30000542)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,917,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,917,000

NEW SECTION.  Sec. 2034   FOR THE DEPARTMENT OF CORRECTIONS
     Airway Heights Correction Center: Heating/Cooling Coil Replacement (phased) (30000561)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $688,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,980,000
          TOTAL . . . . . . . . . . . . $2,668,000

NEW SECTION.  Sec. 2035   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Replace Roofs - Buildings R1, R2 and R3 (30000654)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,496,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,496,000

NEW SECTION.  Sec. 2036   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: HVAC Replacement - WC Warehouse (30000675)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,065,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,065,000

NEW SECTION.  Sec. 2037   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Replace Intensive Management Unit Roof (30000723)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,172,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,172,000

NEW SECTION.  Sec. 2038   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: WSR Replace Fire Alarm System (30000724)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,785,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,785,000

NEW SECTION.  Sec. 2039   FOR THE DEPARTMENT OF CORRECTIONS
     Airway Heights Corrections Center: Replace Fire Alarm System (30000725)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,624,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,624,000

NEW SECTION.  Sec. 2040   FOR THE DEPARTMENT OF CORRECTIONS
     Airway Heights Corrections Center: Security Electronics Renovations (30000726)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,428,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,428,000

NEW SECTION.  Sec. 2041   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center for Women: Replace Fire Alarm System (30000727)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,752,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,752,000

NEW SECTION.  Sec. 2042   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: TRU Living Unit Replace Pipes C Unit (30000732)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,446,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,446,000

NEW SECTION.  Sec. 2043   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: TRU Support Building Repair Fire Detection System (30000733)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,058,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,058,000

NEW SECTION.  Sec. 2044   FOR THE DEPARTMENT OF CORRECTIONS
     SW: Minor Works - Preservation Projects (30000734)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $30,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $51,618,000
          TOTAL . . . . . . . . . . . . $81,618,000

NEW SECTION.  Sec. 2045   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: TRU Roof Industries and Maintenance Building (30000736)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,206,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,206,000

NEW SECTION.  Sec. 2046   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: TRU Roof Inside Administration, Visitors, and E Unit Buildings (30000737)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,052,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,052,000

NEW SECTION.  Sec. 2047   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: SOU Replace Heating Coils and Valves (30000740)

     None

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,330,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,330,000

NEW SECTION.  Sec. 2048   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Replace Facility Locks (30000746)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,970,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,970,000

NEW SECTION.  Sec. 2049   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Security Video System (30000791)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,495,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,495,000

NEW SECTION.  Sec. 2050   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: WSR Security Video System (30000795)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,617,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,617,000

NEW SECTION.  Sec. 2051   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: TRU Security Video System (30000801)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,153,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,153,000

NEW SECTION.  Sec. 2052   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center for Women: Security Video System (30000802)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,667,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,667,000

NEW SECTION.  Sec. 2053   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: SOU IMU Security Video (30000803)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,825,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,825,000

NEW SECTION.  Sec. 2054   FOR THE DEPARTMENT OF CORRECTIONS
     Statewide: Capacity (30000971)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 2055   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: MSU Bathroom Renovation (30000975)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,769,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,769,000

NEW SECTION.  Sec. 2056   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Correctional Complex: Close Sewer Lagoon (30000982)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,059,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,059,000

(End of part)


PART 3
NATURAL RESOURCES

NEW SECTION.  Sec. 3001   FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities (19742006)

Reappropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $581,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,829,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,410,000

NEW SECTION.  Sec. 3002   FOR THE DEPARTMENT OF ECOLOGY
     Low-Level Nuclear Waste Disposal Trench Closure (19972012)

Reappropriation:
     Site Closure Account--State . . . . . . . . . . . . $11,893,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,091,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,984,000

NEW SECTION.  Sec. 3003   FOR THE DEPARTMENT OF ECOLOGY
     Twin Lake Aquifer Recharge Project (20042951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $232,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $518,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $750,000

NEW SECTION.  Sec. 3004   FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities (20044006)

Reappropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $50,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,973,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,023,000

NEW SECTION.  Sec. 3005   FOR THE DEPARTMENT OF ECOLOGY
     Water Conveyance Infrastructure Projects (20052850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions in section 322, chapter 488, Laws of 2005.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,569,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,142,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,711,000

NEW SECTION.  Sec. 3006   FOR THE DEPARTMENT OF ECOLOGY
     Quad Cities Water Right Mitigation (20052852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $421,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,179,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,600,000

NEW SECTION.  Sec. 3007   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (20062003)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions in section 136, chapter 371, Laws of 2006.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $444,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,017,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,461,000

NEW SECTION.  Sec. 3008   FOR THE DEPARTMENT OF ECOLOGY
     Columbia River Basin Water Supply Development Program (20062950)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3008, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:
     Columbia River Basin Water Supply Development
          Account--State . . . . . . . . . . . . $39,844,000
     Columbia River Basin Taxable Bond Water Supply
          Development Account--State . . . . . . . . . . . . $10,404,000
          Subtotal Reappropriation . . . . . . . . . . . . $50,248,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $41,253,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $91,501,000

NEW SECTION.  Sec. 3009   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Account (20064002)

Reappropriation:
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $5,844,000
     Water Pollution Control Revolving Account--Federal . . . . . . . . . . . . $8,453,000
          Subtotal Reappropriation . . . . . . . . . . . . $14,297,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $156,863,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $171,160,000

NEW SECTION.  Sec. 3010   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (20064007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $704,000
     Water Quality Capital Account--State . . . . . . . . . . . . $32,000
          Subtotal Reappropriation . . . . . . . . . . . . $736,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $46,632,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $47,368,000

NEW SECTION.  Sec. 3011   FOR THE DEPARTMENT OF ECOLOGY
     Local Toxics Grants for Cleanup and Prevention (20064008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,860,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $89,681,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $98,541,000

NEW SECTION.  Sec. 3012   FOR THE DEPARTMENT OF ECOLOGY
     Transfer of Water Rights for Cabin Owners (20081951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $305,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $145,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $450,000

NEW SECTION.  Sec. 3013   FOR THE DEPARTMENT OF ECOLOGY
     Remedial Action Grants (20084008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,688,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $78,087,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $91,775,000

NEW SECTION.  Sec. 3014   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (20084010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,470,000
     Water Quality Capital Account--State . . . . . . . . . . . . $432,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,902,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $63,582,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $66,484,000

NEW SECTION.  Sec. 3015   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Loan Program (20084011)

Reappropriation:
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $14,580,000
     Water Pollution Control Revolving
          Account--Federal . . . . . . . . . . . . $20,168,000
          Subtotal Reappropriation . . . . . . . . . . . . $34,748,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $99,776,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $134,524,000

NEW SECTION.  Sec. 3016   FOR THE DEPARTMENT OF ECOLOGY
     Yakima River Basin Water Storage Feasibility Study (20084026)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for completion of the United States bureau of reclamation's Yakima basin storage feasibility study, including the associated joint national environmental policy act, the state environmental policy act, and the environmental impact statement. The reappropriated funds are to be used by the bureau of reclamation and the department of ecology to evaluate potential in basin storage facilities such as the proposed Bumping Lake and Wymer reservoirs and other reasonable alternatives that will enhance water supplies and streamflows in the Yakima Basin.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $83,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,877,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,960,000

NEW SECTION.  Sec. 3017   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (20084029)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,293,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,707,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,000,000

NEW SECTION.  Sec. 3018   FOR THE DEPARTMENT OF ECOLOGY
     Mason County Consortium (20084851)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $164,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $336,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3019   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Fund Program (30000007)

Reappropriation:
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $19,935,000
     Water Pollution Control Revolving
          Account--Federal . . . . . . . . . . . . $18,866,000
     Water Pollution Control Revolving Account--Federal
          Stimulus . . . . . . . . . . . . $3,164,000
          Subtotal Reappropriation . . . . . . . . . . . . $41,965,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $136,734,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $178,699,000

NEW SECTION.  Sec. 3020   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (30000008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,984,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,015,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $29,999,000

NEW SECTION.  Sec. 3021   FOR THE DEPARTMENT OF ECOLOGY
     Upper Columbia River Black Sand Beach Cleanup (30000016)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $258,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $242,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3022   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (30000028)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,308,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,692,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 3023   FOR THE DEPARTMENT OF ECOLOGY
     Kittitas Groundwater Study (30000029)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) Funds may be provided to develop and implement water banking and transfer methods and agreements that are fully protective of senior water rights and that protect domestic groundwater users and improve the profitability of farming operations. The legislature finds such activities to be in the public interest because they can help sustain the viability of the agricultural economy and enhance the certainty of water supplies for domestic groundwater users.
     (2) Funds may be provided to lease or purchase water rights to create a reserve water supply for domestic groundwater users that have a groundwater right with a priority date later than May 10, 1905, as well as for all out-of-priority groundwater users. In securing water for such domestic groundwater users, strong preference shall be given to the use of water banking and transfer methods that provide alternatives to permanent purchase and dry-up of agricultural water rights in the basin, including dry-year options, water banking, long-term water supply lease agreements, long-term agricultural land fallowing agreements, and reduced consumptive use through efficiency or alternative cropping arrangements while maintaining historic return flows.
     (3) A portion of the reappropriation may be used for administrative costs, not to exceed four percent, and other costs associated with leasing or acquiring and transferring the water rights. All costs shall be fully recovered from participating domestic water users for their prorated portion of the cost, including but not limited to the costs of securing a water right or rights for this purpose, costs associated with the development and implementation of alternative agricultural water transfer methods, associated annual operational costs, and federal water service contract costs owed to the United States bureau of reclamation. Funds recovered in this manner shall be deposited in the state and local improvements revolving account and may be used for any purpose provided in this section.

Reappropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $270,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $430,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $700,000

NEW SECTION.  Sec. 3024   FOR THE DEPARTMENT OF ECOLOGY
     Remedial Action Grant Program (30000039)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3006, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $17,815,000
     State Building Construction Account--State . . . . . . . . . . . . $2,844,000
          Subtotal Reappropriation . . . . . . . . . . . . $20,659,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $54,931,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $75,590,000

NEW SECTION.  Sec. 3025   FOR THE DEPARTMENT OF ECOLOGY
     Storm Water Retrofit and Low-Impact Development Grant Program (30000097)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3005, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State and Local Improvements Revolving
          Account--State . . . . . . . . . . . . $1,138,000
     Local Toxics Control Account--State . . . . . . . . . . . . $1,251,000
     State and Local Improvements Revolving
          Account--Waste Facilities 1980--State . . . . . . . . . . . . $325,000
     State Building Construction Account--State . . . . . . . . . . . . $22,215,000
     State Toxics Control Account--State . . . . . . . . . . . . $7,008,000
          Subtotal Reappropriation . . . . . . . . . . . . $31,937,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $22,670,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $54,607,000

NEW SECTION.  Sec. 3026   FOR THE DEPARTMENT OF ECOLOGY
     Reducing Diesel Particle Emissions in Tacoma (30000139)

Reappropriation:
     Air Pollution Control Account--State . . . . . . . . . . . . $525,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $474,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $999,000

NEW SECTION.  Sec. 3027   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Fund Program (30000142)

Reappropriation:
     Water Pollution Control Revolving Account--Federal . . . . . . . . . . . . $9,812,000
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $22,313,000
          Subtotal Reappropriation . . . . . . . . . . . . $32,125,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,025,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $35,150,000

NEW SECTION.  Sec. 3028   FOR THE DEPARTMENT OF ECOLOGY
     Clean Up Toxic Sites - Puget Sound (30000144)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3021, chapter 48, Laws of 2011 1st sp. sess.

Reappropriation:
     Cleanup Settlement Account--State . . . . . . . . . . . . $10,259,000
     State Toxics Control Account--State . . . . . . . . . . . . $6,734,000
          Subtotal Reappropriation . . . . . . . . . . . . $16,993,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,649,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $37,642,000

NEW SECTION.  Sec. 3029   FOR THE DEPARTMENT OF ECOLOGY
     Settlement Funding To Clean Up Toxic Sites (30000145)

Reappropriation:
     Cleanup Settlement Account--State . . . . . . . . . . . . $619,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,449,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,068,000

NEW SECTION.  Sec. 3030   FOR THE DEPARTMENT OF ECOLOGY
     Habitat Mitigation (91000007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,353,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,060,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,413,000

NEW SECTION.  Sec. 3031   FOR THE DEPARTMENT OF ECOLOGY
     Protect Communities from Flood and Drought (92000002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,081,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,781,000

NEW SECTION.  Sec. 3032   FOR THE DEPARTMENT OF ECOLOGY
     Wastewater Treatment and Water Reclamation (92000041)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3016, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,692,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,734,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,426,000

NEW SECTION.  Sec. 3033   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (30000208)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3024, chapter 48, Laws of 2011 1st sp. sess.

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $22,898,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,202,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $34,100,000

NEW SECTION.  Sec. 3034   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Fund Program (30000209)

     The reappropriations in this section are subject to the following conditions and limitations: For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade audit is obtainable, the department of ecology must require as a contract condition that the project sponsor undertake an investment grade audit. The project sponsor may finance the costs of the audit as part of its water pollution control revolving fund program loan.

Reappropriation:
     Water Pollution Control Revolving
          Account--Federal . . . . . . . . . . . . $74,515,000
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $108,191,000
          Subtotal Reappropriation . . . . . . . . . . . . $182,706,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,438,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $192,144,000

NEW SECTION.  Sec. 3035   FOR THE DEPARTMENT OF ECOLOGY
     Waste Tire Pile Prevention and Cleanup (30000210)

Reappropriation:
     Waste Tire Removal Account--State . . . . . . . . . . . . $530,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $470,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3036   FOR THE DEPARTMENT OF ECOLOGY
     Wood Stove Pollution Reduction (30000211)

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $2,335,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $665,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3037   FOR THE DEPARTMENT OF ECOLOGY
     Diesel Emissions Reduction (30000212)

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $4,090,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,910,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,000,000

NEW SECTION.  Sec. 3038   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (30000213)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3030, chapter 49, Laws of 2011 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,863,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,137,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 3039   FOR THE DEPARTMENT OF ECOLOGY
     Hood Canal Regional Septic Repair Loan Program (30000215)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $518,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $232,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $750,000

NEW SECTION.  Sec. 3040   FOR THE DEPARTMENT OF ECOLOGY
     Remedial Action Grant Program (30000216)

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $48,291,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,943,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $56,234,000

NEW SECTION.  Sec. 3041   FOR THE DEPARTMENT OF ECOLOGY
     Eastern Washington Clean Sites Initiative (30000217)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $4,476,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,524,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 3042   FOR THE DEPARTMENT OF ECOLOGY
     Burlington Northern Santa Fe Skykomish Restoration (30000218)

Reappropriation:
     Cleanup Settlement Account--State . . . . . . . . . . . . $284,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $284,000

NEW SECTION.  Sec. 3043   FOR THE DEPARTMENT OF ECOLOGY
     Safe Soils Remediation Program - Central Washington (30000263)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $2,692,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,019,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,711,000

NEW SECTION.  Sec. 3044   FOR THE DEPARTMENT OF ECOLOGY
     Clean Up Toxics Sites - Puget Sound (30000265)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $14,864,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $226,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,090,000

NEW SECTION.  Sec. 3045   FOR THE DEPARTMENT OF ECOLOGY
     Yakima Basin Integrated Water Management Plan Implementation (30000278)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $142,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,858,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3046   FOR THE DEPARTMENT OF ECOLOGY
     ASARCO - Tacoma Smelter Plume and Mines (30000280)

Reappropriation:
     Cleanup Settlement Account--State . . . . . . . . . . . . $16,998,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,689,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,687,000

NEW SECTION.  Sec. 3047   FOR THE DEPARTMENT OF ECOLOGY
     Padilla Bay Boat Launch (30000281)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $196,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $124,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $320,000

NEW SECTION.  Sec. 3048   FOR THE DEPARTMENT OF ECOLOGY
     Padilla Bay Federal Capital Projects (30000282)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $800,000

NEW SECTION.  Sec. 3049   FOR THE DEPARTMENT OF ECOLOGY
     Coastal Wetlands Federal Funds Administration (30000283)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $21,425,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,775,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,200,000

NEW SECTION.  Sec. 3050   FOR THE DEPARTMENT OF ECOLOGY
     Water Irrigation Efficiencies (30000285)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $630,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $370,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3051   FOR THE DEPARTMENT OF ECOLOGY
     Statewide Storm Water Projects (30000294)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for construction projects or design/construction projects statewide that result in the greatest improvements necessary to meet national pollution discharge elimination system requirements for communities least able to pay for those projects or for jurisdictions that are early adopters of new regulations and effective new technology. The department must develop specific evaluative criteria to award grants on a competitive basis to projects that meet the policy objectives in this section, demonstrate readiness to proceed, and have a minimum cash match of twenty-five percent.

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $29,763,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $237,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $30,000,000

NEW SECTION.  Sec. 3052   FOR THE DEPARTMENT OF ECOLOGY
     Green River Flood Levee Improvements (30000295)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3053   FOR THE DEPARTMENT OF ECOLOGY
     Mount Vernon Flood Protection (30000297)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $700,000

NEW SECTION.  Sec. 3054   FOR THE DEPARTMENT OF ECOLOGY
     Clean Up Toxics Sites - Puget Sound (91000032)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3002, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $9,103,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $77,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,180,000

NEW SECTION.  Sec. 3055   FOR THE DEPARTMENT OF ECOLOGY
     Eastern Washington Clean Sites Initiative (91000033)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3003, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $1,545,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,545,000

NEW SECTION.  Sec. 3056   FOR THE DEPARTMENT OF ECOLOGY
     Fiscal Year 2012 Statewide Storm Water Grant Program (91000053)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3004, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $23,645,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $428,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $24,073,000

NEW SECTION.  Sec. 3057   FOR THE DEPARTMENT OF ECOLOGY
     Storm Water Retrofit and Local Improvement District Competitive Grants (91000054)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3005, chapter 2, Laws of 2012 2nd sp. sess.

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $14,463,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,463,000

NEW SECTION.  Sec. 3058   FOR THE DEPARTMENT OF ECOLOGY
     Columbia River Water Management Projects (91000179)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 502, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     Columbia River Basin Water Supply Development
          Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,500,000

NEW SECTION.  Sec. 3059   FOR THE DEPARTMENT OF ECOLOGY
     Skagit Mitigation (91000181)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for the department to develop mitigation options and alternative water sources or tools to make water available for stream flows and for rural domestic permit-exempt uses within the Carpenter/Fisher, East Nookachamps, and Upper Nookachamps subbasins. Up to $100,000 of the amount specified shall be used to develop a rural domestic demonstration project to determine if onsite best management practices, including, but not limited to, rainwater infiltration, water conservation, and low-impact development standards can meet the mitigation requirements of chapter 173-503 WAC and be reasonably and feasibly integrated into rural domestic developments.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,213,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,225,000

NEW SECTION.  Sec. 3060   FOR THE DEPARTMENT OF ECOLOGY
     Flood Levee Improvements (92000057)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations in this section are provided solely for the Mt. Vernon flood protection project.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000
     Local Toxics Control Account--State . . . . . . . . . . . . $7,000,000
          Subtotal Reappropriation . . . . . . . . . . . . $8,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,500,000

NEW SECTION.  Sec. 3061   FOR THE DEPARTMENT OF ECOLOGY
     Ground Water Management Yakima Basin (92000061)

Reappropriation:
     Columbia River Basin Water Supply Development
          Account--State . . . . . . . . . . . . $450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $450,000

NEW SECTION.  Sec. 3062   FOR THE DEPARTMENT OF ECOLOGY
     Coordinated Prevention Grants (30000321)

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $28,240,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $131,520,000
          TOTAL . . . . . . . . . . . . $159,760,000

NEW SECTION.  Sec. 3063   FOR THE DEPARTMENT OF ECOLOGY
     Waste Tire Pile Cleanup and Prevention (30000322)

Appropriation:
     Waste Tire Removal Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3064   FOR THE DEPARTMENT OF ECOLOGY
     Mercury Switch Removal (30000323)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3065   FOR THE DEPARTMENT OF ECOLOGY
     Reducing Toxic Diesel Emissions (30000324)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $4,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $24,500,000

NEW SECTION.  Sec. 3066   FOR THE DEPARTMENT OF ECOLOGY
     Reducing Toxic Wood Stove Emissions (30000325)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 3067   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (30000326)

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $38,500,000
     State Toxics Control Account--State . . . . . . . . . . . . $21,500,000
          Subtotal Appropriation . . . . . . . . . . . . $60,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $240,000,000
          TOTAL . . . . . . . . . . . . $300,000,000

NEW SECTION.  Sec. 3068   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Program (30000327)

Appropriation:
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $131,000,000
     Water Pollution Control Revolving
          Account--Federal . . . . . . . . . . . . $50,000,000
          Subtotal Appropriation . . . . . . . . . . . . $181,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $510,000,000
          TOTAL . . . . . . . . . . . . $691,000,000

NEW SECTION.  Sec. 3069   FOR THE DEPARTMENT OF ECOLOGY
     Coastal Wetlands Federal Funds (30000328)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $9,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $49,800,000

NEW SECTION.  Sec. 3070   FOR THE DEPARTMENT OF ECOLOGY
     Floodplain Management Local Grant Program (30000329)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,000,000
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 3071   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (30000331)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $14,000,000

NEW SECTION.  Sec. 3072   FOR THE DEPARTMENT OF ECOLOGY
     Sunnyside Valley Irrigation District Water Conservation (30000332)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,055,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,900,000
          TOTAL . . . . . . . . . . . . $8,955,000

NEW SECTION.  Sec. 3073   FOR THE DEPARTMENT OF ECOLOGY
     Dungeness Water Supply and Mitigation (30000333)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for the department to develop mitigation options and alternative water sources or tools to make water available for stream flows and to mitigate for rural development within the basin. The department will work with the Dungeness local leaders workgroup to coordinate water supply and mitigation projects for implementation that have been developed in cooperation with local stakeholders.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,050,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,050,000

NEW SECTION.  Sec. 3074   FOR THE DEPARTMENT OF ECOLOGY
     ASARCO Cleanup (30000334)

Appropriation:
     Cleanup Settlement Account--State . . . . . . . . . . . . $25,660,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $103,962,000
          TOTAL . . . . . . . . . . . . $129,622,000

NEW SECTION.  Sec. 3075   FOR THE DEPARTMENT OF ECOLOGY
     Padilla Bay Federal Capital Projects - Programmatic (30000335)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 3076   FOR THE DEPARTMENT OF ECOLOGY
     Padilla Bay Federal Capital Projects - Preservation (30000336)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,100,000

NEW SECTION.  Sec. 3077   FOR THE DEPARTMENT OF ECOLOGY
     Cleanup Toxics Sites - Puget Sound (30000337)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $29,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $35,517,000
          TOTAL . . . . . . . . . . . . $64,517,000

NEW SECTION.  Sec. 3078   FOR THE DEPARTMENT OF ECOLOGY
     Eastern Washington Clean Sites Initiative (30000351)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,047,000
          TOTAL . . . . . . . . . . . . $14,047,000

NEW SECTION.  Sec. 3079   FOR THE DEPARTMENT OF ECOLOGY
     Yakima River Basin Water Supply (30000373)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $23,613,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $85,000,000
          TOTAL . . . . . . . . . . . . $108,613,000

NEW SECTION.  Sec. 3080   FOR THE DEPARTMENT OF ECOLOGY
     Columbia River Water Supply Development Program (30000372)

Appropriation:
     Columbia River Basin Water Supply Development
          Account--State . . . . . . . . . . . . $43,955,000
     Columbia River Basin Taxable Bond Water Supply
          Development Account--State . . . . . . . . . . . . $30,545,000
          Subtotal Appropriation . . . . . . . . . . . . $74,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $41,273,000
          TOTAL . . . . . . . . . . . . $115,773,000

NEW SECTION.  Sec. 3081   FOR THE DEPARTMENT OF ECOLOGY
     Remedial Action Grants (30000374)

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $71,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $260,000,000
          TOTAL . . . . . . . . . . . . $331,500,000

NEW SECTION.  Sec. 3082   FOR THE DEPARTMENT OF ECOLOGY
     Water Irrigation Efficiencies Program (30000389)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is provided solely to provide technical assistance and grants to conservation districts for the purpose of implementing water conservation measures and irrigation efficiencies. The department and the state conservation commission shall give preference in order of priority to projects located in the 16 fish critical basins, other water short basins, and basins with significant water resource and instream flow issues. Projects that are not within basins as described in this subsection are also eligible to receive funding.
     (2) Conservation districts statewide are eligible for grants listed in subsection (1) of this section. A conservation district receiving funds shall manage each grant to ensure that a portion of the water saved by the water conservation measure or irrigation efficiency will be placed as a purchase or a lease in the trust water rights program to enhance instream flows. The proportion of saved water placed in the trust water rights program must be equal to the percentage of the public investment in the conservation measure or irrigation efficiency. The percentage of the public investment may not exceed 85 percent of the total cost of the conservation measure or irrigation efficiency.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,000,000
          TOTAL . . . . . . . . . . . . $17,000,000

NEW SECTION.  Sec. 3083   FOR THE DEPARTMENT OF ECOLOGY
     Storm Water Program Development

     (1) The department must develop a comprehensive, statewide storm water financial assistance program to be implemented no later than the 2015-2017 biennium. The program will provide grants to national pollutant discharge elimination system municipal storm water permit holders for the protection and improvement of statewide water quality and to improve watershed functionality by reducing the transport of toxics and other pollutants through storm water runoff, and by reducing uncontrolled runoff flows.
     (2) The department must collaborate with storm water stakeholders to develop the funding criteria for the storm water financial assistance program, and include the new statewide storm water financial assistance program into the department's integrated water quality funding cycle process. The storm water financial assistance program may include, but not be limited to, funding for retrofit capital improvement projects, green storm water infrastructure or low-impact development, research and development components and investments in learning, pass-through funding for local government storm water permit implementation, education and outreach, prioritized watershed basin retrofit strategies, and preconstruction awards solely for the planning and design of either new storm water facilities or a retrofit of existing storm water facilities.

NEW SECTION.  Sec. 3084   FOR THE STATE PARKS AND RECREATION COMMISSION
     Bay View Park: Wide Wastewater Treatment System (20082041)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $432,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,755,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,187,000

NEW SECTION.  Sec. 3085   FOR THE STATE PARKS AND RECREATION COMMISSION
     Ike Kinswa State Park: Improvement (20082950)

Reappropriation:
     Parks Renewal and Stewardship Account--Private/Local . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3086   FOR THE STATE PARKS AND RECREATION COMMISSION
     Fort Worden State Park: Building 202 Rehabilitation (30000027)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,363,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,463,000

NEW SECTION.  Sec. 3087   FOR THE STATE PARKS AND RECREATION COMMISSION
     Fish Barrier Removal (30000540)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $258,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,108,000

NEW SECTION.  Sec. 3088   FOR THE STATE PARKS AND RECREATION COMMISSION
     Iron Horse Tunnel Hazard Repair (30000552)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,096,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,896,000

NEW SECTION.  Sec. 3089   FOR THE STATE PARKS AND RECREATION COMMISSION
     Minor Works - Health and Safety (30000667)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3090   FOR THE STATE PARKS AND RECREATION COMMISSION
     Minor Works - Facilities and Infrastructure Preservation (30000766)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $559,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,509,000

NEW SECTION.  Sec. 3091   FOR THE STATE PARKS AND RECREATION COMMISSION
     Facility and Infrastructure Backlog Reduction (30000770)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $417,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $817,000

NEW SECTION.  Sec. 3092   FOR THE STATE PARKS AND RECREATION COMMISSION
     Picnic Shelters (91000018)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $351,000

NEW SECTION.  Sec. 3093   FOR THE STATE PARKS AND RECREATION COMMISSION
     Rocky Reach Trail (91000035)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $393,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $400,000

NEW SECTION.  Sec. 3094   FOR THE STATE PARKS AND RECREATION COMMISSION
     Comfort Stations (91000036)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,324,000

NEW SECTION.  Sec. 3095   FOR THE STATE PARKS AND RECREATION COMMISSION
     Deferred Maintenance (91000030)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $257,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $657,000

NEW SECTION.  Sec. 3096   FOR THE STATE PARKS AND RECREATION COMMISSION
     Energy Conservation (91000040)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $175,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $26,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $201,000

NEW SECTION.  Sec. 3097   FOR THE STATE PARKS AND RECREATION COMMISSION
     Culverts (91000046)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3098   FOR THE STATE PARKS AND RECREATION COMMISSION
     Wallace Falls: Footbridge (91000047)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $420,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $422,000

NEW SECTION.  Sec. 3099   FOR THE STATE PARKS AND RECREATION COMMISSION
     Spencer Spit: Water System Replacement (30000140)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,092,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,092,000

NEW SECTION.  Sec. 3100   FOR THE STATE PARKS AND RECREATION COMMISSION
     Peace Arch: Waterline Replacement and Upgrade (30000375)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,080,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,080,000

NEW SECTION.  Sec. 3101   FOR THE STATE PARKS AND RECREATION COMMISSION
     Dosewallips: Wastewater Treatment System (30000523)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,532,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,532,000

NEW SECTION.  Sec. 3102   FOR THE STATE PARKS AND RECREATION COMMISSION
     Lewis and Clark: Replace Wastewater System (30000544)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,197,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,197,000

NEW SECTION.  Sec. 3103   FOR THE STATE PARKS AND RECREATION COMMISSION
     Potholes: Replace Failed Recreational Vehicle Campsites Electrical Hookups (30000549)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,108,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,108,000

NEW SECTION.  Sec. 3104   FOR THE STATE PARKS AND RECREATION COMMISSION
     Lake Sammamish State Park: Sunset Beach Bathhouse Replacement (30000653)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,316,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,316,000

NEW SECTION.  Sec. 3105   FOR THE STATE PARKS AND RECREATION COMMISSION
     Flaming Geyser State Park: Infrastructure (30000810)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,472,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,472,000

NEW SECTION.  Sec. 3106   FOR THE STATE PARKS AND RECREATION COMMISSION
     Flaming Geyser State Park: Day Use Renovation (30000832)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,113,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,113,000

NEW SECTION.  Sec. 3107   FOR THE STATE PARKS AND RECREATION COMMISSION
     Parkland Acquisition Account (30000838)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for the acquisition of property adjacent to existing state park property and shall not be used to purchase property to establish new parks.

Appropriation:
     Parkland Acquisition Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 3108   FOR THE STATE PARKS AND RECREATION COMMISSION
     Minor Works - Facility and Infrastructure Preservation (30000845)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 3109   FOR THE STATE PARKS AND RECREATION COMMISSION
     Minor Works - Revenue Generation (30000847)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $319,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,566,000
          TOTAL . . . . . . . . . . . . $6,885,000

NEW SECTION.  Sec. 3110   FOR THE STATE PARKS AND RECREATION COMMISSION
     Fish Barrier Removal (30000854)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,164,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,368,000
          TOTAL . . . . . . . . . . . . $5,532,000

NEW SECTION.  Sec. 3111   FOR THE STATE PARKS AND RECREATION COMMISSION
     Rocky Reach - Chelan County Public Utility District Grant (30000855)

Appropriation:
     Parks Renewal and Stewardship Account--Private/Local . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $600,000

NEW SECTION.  Sec. 3112   FOR THE STATE PARKS AND RECREATION COMMISSION
     Clean Vessel Boating Pump-out Grants (30000856)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $2,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,600,000

NEW SECTION.  Sec. 3113   FOR THE STATE PARKS AND RECREATION COMMISSION
     Local Grant Authority (30000857)

Appropriation:
     Parks Renewal and Stewardship Account--Private/Local . . . . . . . . . . . . $1,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,200,000

NEW SECTION.  Sec. 3114   FOR THE STATE PARKS AND RECREATION COMMISSION
     Federal Grant Authority (30000858)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
          TOTAL . . . . . . . . . . . . $3,750,000

NEW SECTION.  Sec. 3115   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife and Recreation Program (19982003)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 158, chapter 371, Laws of 2006.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $60,000
     Habitat Conservation Account--State . . . . . . . . . . . . $280,000
          Subtotal Reappropriation . . . . . . . . . . . . $340,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $177,490,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $177,830,000

NEW SECTION.  Sec. 3116   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (20044001)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,607,000
     State Building Construction Account--State . . . . . . . . . . . . $161,000
          Subtotal Reappropriation . . . . . . . . . . . . $3,768,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $42,407,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $46,175,000

NEW SECTION.  Sec. 3117   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife and Recreation Program (20044002)

     The reappropriations in this section are subject to the following conditions and limitations: Any amount of the reappropriations that are not obligated to a specific project may be used to fund alternate projects approved by the legislature from the same account in biennia succeeding that in which the moneys were originally appropriated.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $674,000
     Habitat Conservation Account--State . . . . . . . . . . . . $652,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,326,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $43,542,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $44,868,000

NEW SECTION.  Sec. 3118   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Youth Athletic Fields (20062952)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 172, chapter 371, Laws of 2006.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $63,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,437,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 3119   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (20064001)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 403, chapter 488, Laws of 2005.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,877,000
     State Building Construction Account--State . . . . . . . . . . . . $969,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,846,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $56,002,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $60,848,000

NEW SECTION.  Sec. 3120   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife and Recreation Program (20064002)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 404, chapter 488, Laws of 2005.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $928,000
     Habitat Conservation Account--State . . . . . . . . . . . . $2,445,000
          Subtotal Reappropriation . . . . . . . . . . . . $3,373,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $46,376,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $49,749,000

NEW SECTION.  Sec. 3121   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Nonhighway and Off-Road Vehicle Activities Program (20064004)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 170, chapter 371, Laws of 2006.

Reappropriation:
     NOVA Program Account--State . . . . . . . . . . . . $437,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,992,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,429,000

NEW SECTION.  Sec. 3122   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Family Forest and Fish Passage Program (20082001)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3138, chapter 520, Laws of 2007.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $283,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,716,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,999,000

NEW SECTION.  Sec. 3123   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Program (20084001)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $469,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,552,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,021,000

NEW SECTION.  Sec. 3124   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Recreation (20084003)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $48,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $424,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $472,000

NEW SECTION.  Sec. 3125   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Restoration and Acquisition (20084004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $783,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $39,967,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $40,750,000

NEW SECTION.  Sec. 3126   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Aquatic Lands Enhancement Account (20084005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $720,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,305,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,025,000

NEW SECTION.  Sec. 3127   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Nonhighway and Off-Road Vehicle Activities Program (20084008)

Reappropriation:
     NOVA Program Account--State . . . . . . . . . . . . $425,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,769,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,194,000

NEW SECTION.  Sec. 3128   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife Recreation Grants (20084011)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3146, chapter 520, Laws of 2007.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $1,587,000
     Habitat Conservation Account--State . . . . . . . . . . . . $7,217,000
          Subtotal Reappropriation . . . . . . . . . . . . $8,804,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $89,599,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $98,403,000

NEW SECTION.  Sec. 3129   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (20084851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,439,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $56,754,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $59,193,000

NEW SECTION.  Sec. 3130   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife Recreation Grants (30000002)

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $619,000
     Habitat Conservation Account--State . . . . . . . . . . . . $7,005,000
     Riparian Protection Account--State . . . . . . . . . . . . $3,790,000
     Farmlands Preservation Account--State . . . . . . . . . . . . $1,633,000
          Subtotal Reappropriation . . . . . . . . . . . . $13,047,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $56,398,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $69,445,000

NEW SECTION.  Sec. 3131   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (30000003)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $10,323,000
     State Building Construction Account--State . . . . . . . . . . . . $265,000
          Subtotal Reappropriation . . . . . . . . . . . . $10,588,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $59,411,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $69,999,000

NEW SECTION.  Sec. 3132   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Land and Water Conservation Fund (30000005)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $1,166,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,834,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3133   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Aquatic Lands Enhancement Account (30000007)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are provided solely for the list of projects in LEAP capital document number 2009-3, developed March 9, 2009.

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $397,000
     State Building Construction Account--State . . . . . . . . . . . . $324,000
          Subtotal Reappropriation . . . . . . . . . . . . $721,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,954,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,675,000

NEW SECTION.  Sec. 3134   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Recreation (30000009)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $217,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $278,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $495,000

NEW SECTION.  Sec. 3135   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Acquisition and Restoration (30000080)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,369,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $28,631,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $33,000,000

NEW SECTION.  Sec. 3136   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Estuary and Salmon Restoration Program (30000081)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,101,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,899,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,000,000

NEW SECTION.  Sec. 3137   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Program (30000138)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $4,301,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,699,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 3138   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife Recreation Grants (30000139)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are provided solely for the list of projects in LEAP capital document number 2011-3A, developed May 24, 2011.

Reappropriation:
     Riparian Protection Account--State . . . . . . . . . . . . $650,000
     Farmlands Preservation Account--State . . . . . . . . . . . . $679,000
     Outdoor Recreation Account--State . . . . . . . . . . . . $8,330,000
     Habitat Conservation Account--State . . . . . . . . . . . . $7,567,000
          Subtotal Reappropriation . . . . . . . . . . . . $17,226,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,548,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $41,774,000

NEW SECTION.  Sec. 3139   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (30000140)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $50,121,000
     State Building Construction Account--State . . . . . . . . . . . . $7,363,000
          Subtotal Reappropriation . . . . . . . . . . . . $57,484,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,527,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $70,011,000

NEW SECTION.  Sec. 3140   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Nonhighway and Off-Road Vehicle Activities Program (30000141)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3067, chapter 48, Laws of 2011 1st sp. sess.

Reappropriation:
     NOVA Program Account--State . . . . . . . . . . . . $3,347,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,153,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,500,000

NEW SECTION.  Sec. 3141   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Land and Water Conservation Fund (30000142)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,798,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $202,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3142   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Aquatic Lands Enhancement Account (30000143)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for the list of projects in LEAP capital document number 2011-3B, developed April 6, 2011.

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $2,946,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,860,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,806,000

NEW SECTION.  Sec. 3143   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Recreation (30000144)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $50,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $315,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $365,000

NEW SECTION.  Sec. 3144   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Improvement Grants (30000145)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $359,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,741,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,100,000

NEW SECTION.  Sec. 3145   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Recreational Trails Program (30000146)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,968,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,032,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3146   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Estuary and Salmon Restoration Program (30000148)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation shall not be expended on the acquisition of lands by state agencies.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,455,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $699,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,154,000

NEW SECTION.  Sec. 3147   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Family Forest Fish Passage Program (91000001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $208,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,792,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3148   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Restoration (30000147)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation shall not be expended on the acquisition of lands by state agencies.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,684,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,316,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 3149   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Family Forest Fish Passage Program (30000203)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $367,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,633,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3150   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Family Forest Fish Passage Program (91000097)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $8,981,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,019,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 3151   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife Recreation Grants (30000205)

     The appropriations in this section are subject to the following conditions and limitations: The appropriations are provided solely for the list of projects in LEAP capital document number XXXX, developed MMMM, DD, 2013.

Appropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $27,000,000
     Habitat Conservation Account--State . . . . . . . . . . . . $27,000,000
     Riparian Protection Account--State . . . . . . . . . . . . $7,450,000
     Farmlands Preservation Account--State . . . . . . . . . . . . $4,000,000
          Subtotal Appropriation . . . . . . . . . . . . $65,450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $360,000,000
          TOTAL . . . . . . . . . . . . $425,450,000

NEW SECTION.  Sec. 3152   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (30000206)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $60,000,000
     State Building Construction Account--State . . . . . . . . . . . . $15,000,000
          Subtotal Appropriation . . . . . . . . . . . . $75,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $400,000,000
          TOTAL . . . . . . . . . . . . $475,000,000

NEW SECTION.  Sec. 3153   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Program (30000207)

Appropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $6,363,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $38,000,000
          TOTAL . . . . . . . . . . . . $44,363,000

NEW SECTION.  Sec. 3154   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Nonhighway Off-Road Vehicle Activities (30000208)

Appropriation:
     NOVA Program Account--State . . . . . . . . . . . . $8,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $34,000,000
          TOTAL . . . . . . . . . . . . $42,500,000

NEW SECTION.  Sec. 3155   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Aquatic Lands Enhancement Account (30000210)

     The appropriations in this section are subject to the following conditions and limitations: The appropriations are provided solely for the list of projects in LEAP capital document number XXXX, developed MMMM, DD, 2013.

Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,400,000
          TOTAL . . . . . . . . . . . . $32,400,000

NEW SECTION.  Sec. 3156   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Acquisition and Restoration (30000211)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $80,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $140,000,000
          TOTAL . . . . . . . . . . . . $220,000,000

NEW SECTION.  Sec. 3157   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Estuary and Salmon Restoration Program (30000212)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $25,000,000
          TOTAL . . . . . . . . . . . . $35,000,000

NEW SECTION.  Sec. 3158   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Recreation (30000213)

Appropriation:
     Firearms Range Account--State . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,750,000
          TOTAL . . . . . . . . . . . . $2,550,000

NEW SECTION.  Sec. 3159   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Recreational Trails Program (30000214)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 3160   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Infrastructure Grants (30000215)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $2,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,800,000
          TOTAL . . . . . . . . . . . . $11,000,000

NEW SECTION.  Sec. 3161   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Land and Water Conservation (30000216)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 3162   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Family Forest Fish Passage Program (30000218)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,540,000
          TOTAL . . . . . . . . . . . . $16,540,000

NEW SECTION.  Sec. 3163   FOR THE STATE CONSERVATION COMMISSION
     Conservation Reserve Enhancement Program (91000007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $877,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,277,000

NEW SECTION.  Sec. 3164   FOR THE STATE CONSERVATION COMMISSION
     CREP Riparian Cost Share - State Match (30000009)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,590,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $11,000,000
          TOTAL . . . . . . . . . . . . $13,590,000

NEW SECTION.  Sec. 3165   FOR THE STATE CONSERVATION COMMISSION
     Natural Resources Investment for the Economy and Environment (30000010)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for grants to complete natural resource enhancement projects necessary to improve water quality in shellfish growing areas.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $54,253,000
          TOTAL . . . . . . . . . . . . $59,253,000

NEW SECTION.  Sec. 3166   FOR THE STATE CONSERVATION COMMISSION
     CREP PIP Loan Program (30000011)

Appropriation:
     Conservation Assistance Revolving Account--State . . . . . . . . . . . . $180,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $720,000
          TOTAL . . . . . . . . . . . . $900,000

NEW SECTION.  Sec. 3167   FOR THE STATE CONSERVATION COMMISSION
     Conservation Reserve Enhancement Program Riparian Contract Funding (30000012)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,231,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,924,000
          TOTAL . . . . . . . . . . . . $11,155,000

NEW SECTION.  Sec. 3168   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Voights Creek Hatchery (20081003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,795,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,295,000

NEW SECTION.  Sec. 3169   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Spokane Region One Office (20082008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $180,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,890,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,612,000
          TOTAL . . . . . . . . . . . . $9,682,000

NEW SECTION.  Sec. 3170   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Stemilt Basin Acquisition (20082029)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $152,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $48,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 3171   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Facility Preservation (30000300)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,144,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $646,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,790,000

NEW SECTION.  Sec. 3172   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Road Maintenance and Abandonment Plan (30000295)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,585,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $174,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,759,000

NEW SECTION.  Sec. 3173   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Access Areas Preservation (30000296)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $426,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $601,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,027,000

NEW SECTION.  Sec. 3174   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Dam and Dike (30000297)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $197,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $947,000

NEW SECTION.  Sec. 3175   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Migratory Waterfowl Habitat (30000653)

Appropriation:
     State Wildlife Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,800,000
          TOTAL . . . . . . . . . . . . $2,400,000

NEW SECTION.  Sec. 3176   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Lab Equipment (30000656)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the department to purchase lab equipment for the Manchester and Mukilteo research stations as specified by the national oceanic and atmospheric administration to support the Washington state shellfish initiative.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $100,000

NEW SECTION.  Sec. 3177   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Leque Island Highway 532 Road Protection (92000019)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $394,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $286,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $680,000

NEW SECTION.  Sec. 3178   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Mitchell Act Federal Grant (91000021)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $2,416,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $584,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3179   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Mitigation Projects and Dedicated Funding (20082048)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $12,778,000
     Special Wildlife Account--Federal . . . . . . . . . . . . $300,000
     Special Wildlife Account--Private/Local . . . . . . . . . . . . $203,000
          Subtotal Reappropriation . . . . . . . . . . . . $13,281,000

Appropriation:
     Special Wildlife Account--Federal . . . . . . . . . . . . $800,000
     Special Wildlife Account--Private/Local . . . . . . . . . . . . $1,600,000
     State Wildlife Account--State . . . . . . . . . . . . $1,500,000
     General Fund--Private/Local . . . . . . . . . . . . $2,500,000
     General Fund--Federal . . . . . . . . . . . . $29,600,000
          Subtotal Appropriation . . . . . . . . . . . . $36,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $45,064,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $90,750,000
          TOTAL . . . . . . . . . . . . $185,095,000

NEW SECTION.  Sec. 3180   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Health Safety and Code Requirements (30000284)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $841,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,241,000

NEW SECTION.  Sec. 3181   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Infrastructure Preservation (30000298)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $828,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,175,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,003,000

NEW SECTION.  Sec. 3182   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Fish Passage Barrier Corrections (30000372)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $880,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,280,000

NEW SECTION.  Sec. 3183   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Beebe Springs Development (92000026)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $960,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $931,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,891,000

NEW SECTION.  Sec. 3184   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Fishway Improvements/Diversions (91000033)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $155,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,955,000

NEW SECTION.  Sec. 3185   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Hatchery Improvements (91000036)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $30,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,775,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $34,775,000

NEW SECTION.  Sec. 3186   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Dry Forest Restoration (91000039)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $635,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $161,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $796,000

NEW SECTION.  Sec. 3187   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Dam and Dike (91000042)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 3188   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Access Sites (91000044)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,125,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $292,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,417,000

NEW SECTION.  Sec. 3189   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Fish Passage Barriers (Culverts) (91000045)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,110,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,124,000

NEW SECTION.  Sec. 3190   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Road Maintenance and Abandonment Plan (91000046)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $498,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $516,000

NEW SECTION.  Sec. 3191   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Acquire Dryden Gravel Pit from Washington DOT (92000028)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $251,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $251,000

NEW SECTION.  Sec. 3192   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Deschutes Watershed Center (20062008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $979,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,976,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,800,000
          TOTAL . . . . . . . . . . . . $23,755,000

NEW SECTION.  Sec. 3193   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works Preservation (30000479)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $135,900,000
          TOTAL . . . . . . . . . . . . $140,900,000

NEW SECTION.  Sec. 3194   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Wooten Wildlife Area Improve Flood Plain (30000481)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $2,600,000
     State Building Construction Account--State . . . . . . . . . . . . $1,800,000
          Subtotal Appropriation . . . . . . . . . . . . $4,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $18,197,000
          TOTAL . . . . . . . . . . . . $22,597,000

NEW SECTION.  Sec. 3195   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Replace Fire Damaged Fencing (30000655)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,619,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,619,000

NEW SECTION.  Sec. 3196   FOR THE PUGET SOUND PARTNERSHIP
     Community Partnership Restoration Grants (30000007)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $1,155,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $50,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,205,000

NEW SECTION.  Sec. 3197   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Land Acquisition Grants (20052021)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $2,500,000
Appropriation:
     General Fund--Federal . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $40,453,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $62,953,000

NEW SECTION.  Sec. 3198   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Marine Station (20081015)

Reappropriation:
     Resources Management Cost Account--State . . . . . . . . . . . . $340,000
     State Building Construction Account--State . . . . . . . . . . . . $339,000
          Subtotal Reappropriation . . . . . . . . . . . . $679,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $757,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,436,000

NEW SECTION.  Sec. 3199   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Legacy (30000060)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,500,000
Appropriation:
     General Fund--Federal . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,480,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $28,000,000
          TOTAL . . . . . . . . . . . . $40,980,000

NEW SECTION.  Sec. 3200   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Hazardous Fuels Reduction, Forest Health, and Ecosystem Improvements (91000001)

Reappropriation:
     General Fund--Federal Stimulus . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,029,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,129,000

NEW SECTION.  Sec. 3201   FOR THE DEPARTMENT OF NATURAL RESOURCES
     National Coastal Wetland Conservation Program Lands Acquisition (91000007)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $550,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $144,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $694,000

NEW SECTION.  Sec. 3202   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Replacing State Forest Lands with Productive Forests (91000029)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The total reappropriation is provided solely to the department to transfer from state forest land status to natural resources conservation area status certain state forest lands in counties with a population of 25,000 or less that are subject to timber harvest deferrals greater than thirty years due to the presence of wildlife species listed as endangered or threatened under the federal endangered species act. The approved list of properties for transfer is identified in the LEAP capital document number 2011-5A, developed March 24, 2011.
     (2) Property transferred under this section must be appraised and transferred at fair market value, without consideration of management or regulatory encumbrances associated with wildlife species listed under the federal endangered species act. The value of the timber and other valuable materials transferred must be distributed as provided in RCW 79.64.110, in the same manner as valuable material revenues from other state forest lands in the applicable counties. The value of the land transferred must be deposited in the park land trust revolving account and be solely used to buy replacement state forest land within the same county as the property transferred, consistent with RCW 79.22.060.
     (3) Prior to or concurrent with conveyance of these properties, the department shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section. Transfer agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose.
     (4) The department and applicable counties shall work in good faith to carry out the intent of this section. However, the department or applicable counties may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the state forest trust or the natural resources conservation area program.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $640,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,140,000

NEW SECTION.  Sec. 3203   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Puget SoundCorps (91000046)

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $3,000,000
     State Building Construction Account--State . . . . . . . . . . . . $4,600,000
          Subtotal Reappropriation . . . . . . . . . . . . $7,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,000,000

NEW SECTION.  Sec. 3204   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Derelict Vessel Removal and Disposal (91000049)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $550,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,213,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,763,000

NEW SECTION.  Sec. 3205   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Urban Forest Restoration (Puget Sound Basin) (91000051)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $225,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $225,000

NEW SECTION.  Sec. 3206   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Large Debris Removal (91000052)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $185,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 3207   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Secret Harbor Estuary Restoration - Cypress Island (91000053)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $403,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $132,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $535,000

NEW SECTION.  Sec. 3208   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Restoration Projects to Improve Natural Resources (91000054)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,360,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,560,000

NEW SECTION.  Sec. 3209   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Point Ruston Sediment Capping/Shoreline Restoration Stabilization (91000065)

Reappropriation:
     Cleanup Settlement Account--State . . . . . . . . . . . . $7,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,200,000

NEW SECTION.  Sec. 3210   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Hazard Reduction and Safety (91000066)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,487,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,138,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,625,000

NEW SECTION.  Sec. 3211   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Shoreline Restoration Projects (92000011)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,214,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,752,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,966,000

NEW SECTION.  Sec. 3212   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Creosote Piling Removal (92000014)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $880,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $890,000

NEW SECTION.  Sec. 3213   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Riparian Easement Program (30000198)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $159,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $41,336,000
          TOTAL . . . . . . . . . . . . $44,495,000

NEW SECTION.  Sec. 3214   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Trust Land Transfer (30000200)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The total appropriation is provided solely to the department to transfer from trust status, or enter into fifty year leases for, certain trust lands of statewide significance deemed appropriate for state park, fish and wildlife habitat, natural area preserve, natural resources conservation area, open space, or recreation purposes. The approved list of properties for lease or transfer adopted by the board of natural resources November 2012.
     (2) Property transferred under this section must be appraised and transferred at fair market value. By September 30, 2013, the department must deposit in the common school construction account the portion of the appropriation in this section that represents the estimated value of the timber on the transferred properties. This transfer must be made in the same manner as timber revenues from other common school trust lands. No deduction may be made for the resource management cost account under RCW 79.64.040. The portion of the appropriation in this section that represents the value of the land transferred must be deposited in the natural resources real property replacement account.
     (3) Property subject to lease agreements under this section must be appraised at fair market value. Lease terms must be fifty years with options to renew for an additional fifty years. Lease payments must be lump sum payments for the entire term of the lease at the beginning of the lease. The department shall calculate such lump sum payments using professional appraisal standards. These lease payments may not exceed the fee simple purchase price based on current fair market value and must be deposited by the department to the common school construction account in the same manner as lease revenues from other common school trust lands. No deduction may be made for the resource management cost account under RCW 79.64.040. No later than September 30, 2013, the department must transfer to the common school construction account the portion of the appropriation in this section that is attributable to receipts from lease payments.
     (4) All reasonable costs incurred by the department to implement this section are authorized to be paid out of the appropriations. Authorized costs include the actual cost of appraisals, staff time, environmental reviews, surveys, and other similar costs and shall not exceed one and nine-tenths percent of the appropriation.
     (5) Intergrant exchanges between common school and other trust lands of equal value may occur if the exchange is in the interest of each trust, as determined by the board of natural resources.
     (6) Prior to or concurrent with conveyance of these properties, the department, with full cooperation of the receiving agencies, shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section. Transfer and lease agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose. Transfer and lease agreements may include provisions for receiving agencies to request alternative uses of the property, provided the alternative uses are compatible with the originally intended public purpose and the department and legislature approves such uses.
     (7) The department and receiving agencies shall work in good faith to carry out the intent of this section. However, the department or receiving agencies may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the common school trust or the receiving agency.
     (8) $39,232,000 of the appropriation must be deposited in the common school construction account by September 30, 2013. The department shall execute trust land transfers so that after the deduction of reasonable costs as provided in subsection (4) of this section on an aggregate basis eighty percent of the total value of transferred property is timber value or lease payments and is deposited in the common school construction account. To achieve the eighty percent requirement, the department may choose to lease properties originally intended as transfers or transfer properties originally intended as leases.
     (9) By June 30, 2015, the state treasurer shall transfer to the common school construction account any unexpended balance of the appropriation in this section.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $56,045,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $58,197,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $240,000,000
          TOTAL . . . . . . . . . . . . $354,242,000

NEW SECTION.  Sec. 3215   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Sustainable Recreation (30000207)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $308,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,308,000

NEW SECTION.  Sec. 3216   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Road Maintenance and Abandonment Plans (RMAP) (30000211)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3217   FOR THE DEPARTMENT OF NATURAL RESOURCES
     2013-2015 Minor Works Preservation (30000213)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000
     Resources Management Cost Account--State . . . . . . . . . . . . $743,000
     Forest Development Account--State . . . . . . . . . . . . $517,000
          Subtotal Appropriation . . . . . . . . . . . . $2,260,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $10,260,000

NEW SECTION.  Sec. 3218   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Mobile Modular Kitchens for Firefighting (30000214)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 3219   FOR THE DEPARTMENT OF NATURAL RESOURCES
     2013-2015 Minor Works Programmatic (30000216)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $255,000
     Forest Development Account--State . . . . . . . . . . . . $442,000
     Resources Management Cost Account--State . . . . . . . . . . . . $961,000
          Subtotal Appropriation . . . . . . . . . . . . $1,658,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $31,700,000
          TOTAL . . . . . . . . . . . . $33,358,000

NEW SECTION.  Sec. 3220   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Natural Areas Preservation, Access, and Road Maintenance and Abandonment Plans (RMAP) (30000218)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3221   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Rivers and Habitat Open Space Program (30000221)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 3222   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Trust Land Replacement (30000222)

Appropriation:
     Resources Management Cost Account--State . . . . . . . . . . . . $25,000,000
     Natural Resources Real Property
          Replacement--State . . . . . . . . . . . . $25,000,000
     Community and Technical College Forest Reserve
          Account--State . . . . . . . . . . . . $500,000
          Subtotal Appropriation . . . . . . . . . . . . $50,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $202,000,000
          TOTAL . . . . . . . . . . . . $252,500,000

NEW SECTION.  Sec. 3223   FOR THE DEPARTMENT OF NATURAL RESOURCES
     State Forest Land Replacement (30000223)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 3224   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Hazard Reduction (30000224)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for forest health hazard reduction treatments on state and private lands. The appropriation shall not be used for forest health hazard reduction treatments on federal lands. The department shall provide a report to the governor and the legislature by October 1, 2014, on its work to reduce forest health hazards from fiscal year 2010 through fiscal year 2014. This report must include an estimate of work needed through fiscal year 2020 on state, federal, and private lands and recommended mechanisms to fund this work.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $28,000,000
          TOTAL . . . . . . . . . . . . $36,000,000

NEW SECTION.  Sec. 3225   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Road Maintenance and Abandonment Plan (RMAP) (91000040)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,234,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,834,000

(End of part)


PART 4
TRANSPORTATION

NEW SECTION.  Sec. 4001   FOR THE WASHINGTON STATE PATROL
     Emergency Repairs (30000031)

Appropriation:
     Fire Service Training Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $800,000
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 4002   FOR THE WASHINGTON STATE PATROL
     Burn Building Repair (30000032)

Appropriation:
     Fire Service Training Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $300,000
          TOTAL . . . . . . . . . . . . $600,000

NEW SECTION.  Sec. 4003   FOR THE WASHINGTON STATE PATROL
     Fire Training Academy Burn Building Replacement (30000071)

Appropriation:
     Fire Service Training Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,000,000
          TOTAL . . . . . . . . . . . . $14,500,000

(End of part)


PART 5
EDUCATION

NEW SECTION.  Sec. 5001   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2007-2009 School Construction Assistance Grant Program (20084200)

     The reappropriation in this section is subject to the following conditions and limitations: For school construction projects funded through the school construction assistance grant program, the superintendent of public instruction shall require mapping the design of new facilities and remapping the design of facilities to be remodeled.

Reappropriation:
     Common School Construction Account--State . . . . . . . . . . . . $653,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $759,753,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $760,406,000

NEW SECTION.  Sec. 5002   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Vocational Skills Centers (20084300)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $70,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $70,324,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $70,394,000

NEW SECTION.  Sec. 5003   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Northeast King County Skills Center (20084855)

Reappropriation:
     School Construction and Skill Centers Building
          Account--State . . . . . . . . . . . . $41,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,306,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,347,000

NEW SECTION.  Sec. 5004   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Pierce County Skills Center (20084856)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,192,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $16,694,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,886,000

NEW SECTION.  Sec. 5005   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2009-2011 School Construction Assistance Grant Program (30000031)

Reappropriation:
     Common School Construction Account--State . . . . . . . . . . . . $17,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $379,037,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $396,937,000

NEW SECTION.  Sec. 5006   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Energy Efficiency and Small Repair Grants (91000007)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 5007, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,521,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $66,213,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $69,734,000

NEW SECTION.  Sec. 5007   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2011-2013 School Construction Assistance Program (30000071)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $107,454,000
     Common School Construction Account--State . . . . . . . . . . . . $284,500,000
          Subtotal Reappropriation . . . . . . . . . . . . $391,954,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $141,605,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $533,559,000

NEW SECTION.  Sec. 5008   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Yakima Valley Technical Skills Center (30000076)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $20,401,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,042,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,443,000

NEW SECTION.  Sec. 5009   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     SEA-Tech Branch Campus of Tri-Tech Skills Center (30000078)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,594,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $925,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,519,000

NEW SECTION.  Sec. 5010   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Grant County Branch Campus of Wenatchee Valley Skills Center (30000091)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $19,408,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,408,000

NEW SECTION.  Sec. 5011   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Clark County Skills Center (30000093)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $650,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $750,000

NEW SECTION.  Sec. 5012   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Energy Operational Savings Project Grants (30000097)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is provided solely for energy operational cost savings improvements to school facilities.
     (2) Grants shall be awarded for projects using the energy savings performance contracting method under chapter 39.35C RCW or an equivalent method of evaluating and delivering energy operational costs savings improvements. Projects that do not use energy savings performance contracting must: (a) Verify energy and operational cost savings for ten years or until the energy and operational costs savings pay for the project, whichever is shorter; (b) follow the department of general administration's energy savings performance contracting method guidelines; and (c) employ a licensed engineer for the energy audit, design, and construction. The office of the superintendent of public instruction may require third-party verification of savings if a project is not implemented by an energy savings performance contracting method as outlined in chapter 39.35C RCW. If required, third-party verification must be conducted either by an energy savings performance contractor qualified by the department of enterprise services, or a licensed engineer that is a certified energy manager.
     (3) Projects must be weighted and prioritized based on the following criteria and in the following order:
     (a) Prior grant award: Priority consideration shall be given to applicants that did not receive grant awards from appropriations provided in sections 1016 and 5007, chapter 36, Laws of 2010 1st sp. sess.;
     (b) Leverage ratio: The higher the leverage ratio of guaranteed energy savings and utility or other incentives to state grant, the higher the project ranking;
     (c) Energy savings: The higher the simple payback for energy savings, not to exceed the useful life of the energy conservation measure, the higher the project ranking; and
     (d) Persistence: The more extensively a project ensures the persistence of energy operational cost savings through ongoing measurement, verification, and reporting over the life of a project, the higher the project ranking.
     (4) In order to be eligible for energy cost savings grants under this section, school districts must complete an investment grade audit prior to application, or have completed an audit in the 2009-2011 or in the 2011-2013 biennium.
     (5)(a) The superintendent of public instruction must use bond proceeds to pay one-half of the preliminary audit, up to five cents per square foot, if the project does not meet the school district's predetermined cost-effectiveness criteria. Public school districts must pay the other one-half of the cost of the preliminary audit if the project does not meet their predetermined cost-effectiveness criteria.
     (b) The energy savings performance contractor shall not charge for an investment grade audit if the project does not meet the school district's predetermined cost-effectiveness criteria. Public school districts must pay the full price of an investment grade audit if they do not proceed with a project that meets the school district's predetermined cost-effectiveness criteria.
     (6) Applicants must submit documentation that demonstrates energy and operational cost savings resulting from the installation of the energy equipment and improvements. The energy savings analysis shall be performed by a licensed engineer and the documentation must include, but is not limited to, the following:
     (a) A description of the energy equipment and improvements; and
     (b) A description of the energy and operational cost savings.
     (7) Each school district is limited to one grant award and no more than $1,000,000.
     (8) The office of the superintendent of public instruction may charge projects administrative fees.
     (9) The superintendent of public instruction must report to the appropriate committees of the legislature and the office of financial management on the timing and use of the funds by the end of each fiscal year, until the funds are fully expended.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,614,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,386,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 5013   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Energy Efficiency Grants for K-12 Schools (91000017)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $38,890,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,110,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $40,000,000

NEW SECTION.  Sec. 5014   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Wenatchee Valley Skills Center (92000004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,500,000

NEW SECTION.  Sec. 5015   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Spokane Area Professional - Technical Skills Center (92000005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,800,000

NEW SECTION.  Sec. 5016   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     WA-NIC (Washington Network for Innovative Careers) Skills Center - Snoqualmie Valley School District/Bellevue Community College (92000006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,715,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,715,000

NEW SECTION.  Sec. 5017   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Puget Sound Skills Center (92000007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 5018   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Distressed Schools (92000009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $25,596,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,804,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $27,400,000

NEW SECTION.  Sec. 5019   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Yakima Valley Technical Skills Center Sunnyside Satellite (92000013)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,225,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,225,000

NEW SECTION.  Sec. 5020   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Capital Program Administration (30000128)

Appropriation:
     Common School Construction Account--State . . . . . . . . . . . . $3,854,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,246,000
          TOTAL . . . . . . . . . . . . $20,100,000

NEW SECTION.  Sec. 5021   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Small Repair Grants (30000129)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is provided solely for nonrecurring costs associated with school facility repairs and renovations necessary for unforeseen health and safety needs.
     (2) The office of the superintendent of public instruction, after consulting with maintenance and operations administrators of school districts, shall develop criteria for providing funding for specific projects to stay within the appropriation level provided in this section. The criteria must include, but are not limited to, the following: (a) Limiting district applications to two hundred thousand dollars; (b) assigning highest priority to those projects that address health and safety deficiencies; (c) giving priority consideration to applicants that did not receive grant awards in the prior biennium; and (d) requiring any district receiving funding provided in this section to demonstrate a consistent commitment to addressing school facilities needs.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $30,000,000

NEW SECTION.  Sec. 5022   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2013-2015 School Construction Assistance Program - Maintenance (30000145)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) $1,340,000 of the common school construction account--state appropriation is provided solely for study and survey grants and for completing inventory and building condition assessments for all public school districts once every six years.
     (2) $933,000 of the common school construction account--state appropriation is provided solely for mapping the design of new facilities and remapping the design of facilities to be remodeled, for school construction projects funded through the school construction assistance program.
     (3) Funds from this appropriation may be used to match federal dollars provided by the office of economic adjustment for school replacement facilities located on military bases.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $496,669,000
     Common School Construction Account--State . . . . . . . . . . . . $177,100,000
     Common School Construction Account--Federal . . . . . . . . . . . . $1,500,000
          Subtotal Appropriation . . . . . . . . . . . . $675,269,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,099,270,000
          TOTAL . . . . . . . . . . . . $3,774,539,000

NEW SECTION.  Sec. 5023   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Kindergarten Facilities Grant (30000150)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) The appropriations are provided solely for providing space to support full-day kindergarten enrollment to those school districts with a demonstrated need. Grants may be applied to new construction, portable classrooms, or retrofits to existing facilities to accommodate kindergarten enrollment.
     (2) The office of the superintendent of public instruction shall develop criteria for providing funding for specific projects to stay within the appropriation level provided in this section. The criteria must include, but are not limited to, the following: (a) Prioritizing districts eligible to receive the grant to those who have a lower ending fund balance; (b) considering a district's ability to raise funds through levies or bonds in the prior ten year period; (c) prioritizing projects that will provide full-day kindergarten at high poverty schools; and (d) requiring any district receiving funding provided in this section to demonstrate an inability to provide space for full-day kindergarten enrollment within existing school facilities.
     (3) Portable classrooms funded through this grant program shall not count against a district's eligibility for the school construction assistance program.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000
     Common School Construction Account--State . . . . . . . . . . . . $9,500,000
          Subtotal Appropriation . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 5024   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Emergency Repair Pool (30000151)

     The appropriation in this section is subject to the following conditions and limitations: The office of the superintendent of public instruction shall administer emergency repair pool funds in accordance with WAC 392-343-600 through 392-343-615.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 5025   FOR THE STATE SCHOOL FOR THE BLIND
     General Campus Preservation (30000033)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,215,000
          TOTAL . . . . . . . . . . . . $2,915,000

NEW SECTION.  Sec. 5026   FOR THE WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS
     Minor Public Works (30000023)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5027   FOR THE UNIVERSITY OF WASHINGTON
     UW Bothell (20082006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,907,000
     University of Washington Building Account--State . . . . . . . . . . . . $12,963,000
          Subtotal Reappropriation . . . . . . . . . . . . $15,870,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,740,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,610,000

NEW SECTION.  Sec. 5028   FOR THE UNIVERSITY OF WASHINGTON
     House of Knowledge Longhouse (30000021)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $420,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,920,000

NEW SECTION.  Sec. 5029   FOR THE UNIVERSITY OF WASHINGTON
     Odegaard Undergraduate Learning Center (30000370)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,897,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,797,000

NEW SECTION.  Sec. 5030   FOR THE UNIVERSITY OF WASHINGTON
     High Voltage Infrastructure Improvement Project (30000371)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $220,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,486,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,706,000

NEW SECTION.  Sec. 5031   FOR THE UNIVERSITY OF WASHINGTON
     University of Washington Minor Capital Repairs (30000372)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $550,000
     University of Washington Building Account--State . . . . . . . . . . . . $2,000,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,550,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $17,090,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,640,000

NEW SECTION.  Sec. 5032   FOR THE UNIVERSITY OF WASHINGTON
     Preventive Facility Maintenance and Building System Repairs (30000480)

Appropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $25,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,884,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $77,475,000
          TOTAL . . . . . . . . . . . . $118,359,000

NEW SECTION.  Sec. 5033   FOR THE UNIVERSITY OF WASHINGTON
     University of Washington Tacoma Campus Development and Soil Remediation (92000002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,300,000
     State Toxics Control Account--State . . . . . . . . . . . . $700,000
          Subtotal Reappropriation . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 5034   FOR THE UNIVERSITY OF WASHINGTON
     Denny Hall Renovation (20081002)

     The appropriation in this section is subject to the following conditions and limitations: In conjunction with the appropriation in this section, the University of Washington is authorized to issue a bond or bonds in an amount not to exceed $20,000,000 in value for the renovation of Denny hall identified in this section. The bond shall be financed from building fee and trust land revenues deposited into the university's bond retirement account, in accordance with RCW 28B.20.700 through 28B.20.740.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $34,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,302,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $36,902,000

NEW SECTION.  Sec. 5035   FOR THE UNIVERSITY OF WASHINGTON
     Lewis Hall Renovation (20081003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,650,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,478,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,095,000
          TOTAL . . . . . . . . . . . . $24,223,000

NEW SECTION.  Sec. 5036   FOR THE UNIVERSITY OF WASHINGTON
     Burke Museum Renovation (20082850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,580,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $300,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,000,000
          TOTAL . . . . . . . . . . . . $16,880,000

NEW SECTION.  Sec. 5037   FOR THE UNIVERSITY OF WASHINGTON
     University of Washington Tacoma - Soils Remediation (20082852)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $143,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $20,643,000

NEW SECTION.  Sec. 5038   FOR THE UNIVERSITY OF WASHINGTON
     University of Washington Magnuson Health Sciences Center Roofing Replacement Project (30000483)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,529,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,529,000

NEW SECTION.  Sec. 5039   FOR THE UNIVERSITY OF WASHINGTON
     Minor Capital Repairs - Preservation (30000494)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $11,754,000
     University of Washington Building Account--State . . . . . . . . . . . . $35,000,000
          Subtotal Appropriation . . . . . . . . . . . . $46,754,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $208,000,000
          TOTAL . . . . . . . . . . . . $254,754,000

NEW SECTION.  Sec. 5040   FOR THE UNIVERSITY OF WASHINGTON
     University of Washington Tower Building Chilled Water System Replacement Project (30000484)

Appropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $7,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,500,000

NEW SECTION.  Sec. 5041   FOR THE WASHINGTON STATE UNIVERSITY
     Washington State University Spokane - Riverpoint Biomedical and Health Sciences (20162953)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000
     Washington State University Building Account--State . . . . . . . . . . . . $1,000,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,332,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $22,332,000

NEW SECTION.  Sec. 5042   FOR THE WASHINGTON STATE UNIVERSITY
     Minor Works - Preservation (30000525)

Reappropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $4,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,809,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,209,000

NEW SECTION.  Sec. 5043   FOR THE WASHINGTON STATE UNIVERSITY
     Preventive Maintenance and Building System Repairs (30000823)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,181,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $30,345,000
          TOTAL . . . . . . . . . . . . $46,526,000

NEW SECTION.  Sec. 5044   FOR THE WASHINGTON STATE UNIVERSITY
     Washington State University Pullman - Troy Hall Renovation (20061030)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $34,550,000
          TOTAL . . . . . . . . . . . . $38,900,000

NEW SECTION.  Sec. 5045   FOR THE WASHINGTON STATE UNIVERSITY
     Clean Technology Laboratory (30000069)

     The appropriation in this section is subject to the following conditions and limitations: In conjunction with the appropriation in this section, the Washington State University is authorized to issue a bond or bonds in an amount not to exceed $20,000,000 in value for construction of the clean technology laboratory identified in this section. The bond shall be financed from building fee and trust land revenues deposited into the university's bond retirement account, in accordance with RCW 28B.30.700 through 28B.30.780.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $33,053,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $552,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $33,605,000

NEW SECTION.  Sec. 5046   FOR THE WASHINGTON STATE UNIVERSITY
     Washington State University Prosser - Viticulture and Enology Facility (30000500)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $3,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,500,000

NEW SECTION.  Sec. 5047   FOR THE WASHINGTON STATE UNIVERSITY
     Washington State University Prosser - Agriculture Technology Building Addition (30000518)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 5048   FOR THE WASHINGTON STATE UNIVERSITY
     Washington State University Pullman - Plant Sciences Building (REC#5) (30000519)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $65,500,000
          TOTAL . . . . . . . . . . . . $66,000,000

NEW SECTION.  Sec. 5049   FOR THE WASHINGTON STATE UNIVERSITY
     Plant Growth (Greenhouse) Facilities, Phase 1 (30000835)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $225,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,775,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 5050   FOR THE WASHINGTON STATE UNIVERSITY
     2013-2015 Minor Works - Preservation, Safety, and Infrastructure (30000849)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $16,914,000
     Washington State University Building Account--State . . . . . . . . . . . . $15,000,000
          Subtotal Appropriation . . . . . . . . . . . . $31,914,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $31,914,000

NEW SECTION.  Sec. 5051   FOR THE EASTERN WASHINGTON UNIVERSITY
     Patterson Hall Remodel (20062002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,885,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $31,156,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $45,041,000

NEW SECTION.  Sec. 5052   FOR THE EASTERN WASHINGTON UNIVERSITY
     Upgrade/Repair Campus Water System (30000422)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,511,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,511,000

NEW SECTION.  Sec. 5053   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works - Preservation (30000427)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,320,000
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $3,855,000
          Subtotal Reappropriation . . . . . . . . . . . . $5,175,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,835,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,010,000

NEW SECTION.  Sec. 5054   FOR THE EASTERN WASHINGTON UNIVERSITY
     University Science Center - Science II (30000466)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $86,970,000
          TOTAL . . . . . . . . . . . . $87,320,000

NEW SECTION.  Sec. 5055   FOR THE EASTERN WASHINGTON UNIVERSITY
     Eastern Washington University Minor Works Preservation (30000468)

Appropriation:
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $8,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,800,000

NEW SECTION.  Sec. 5056   FOR THE EASTERN WASHINGTON UNIVERSITY
     Preventive Maintenance and Building System Repairs (30000500)

Appropriation:
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $2,130,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,130,000

NEW SECTION.  Sec. 5057   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Science Building (30000045)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,100,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $65,447,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,405,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $67,952,000

NEW SECTION.  Sec. 5058   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works Preservation (30000444)

Reappropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $3,211,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,212,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,423,000

NEW SECTION.  Sec. 5059   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Combined Utilities (30000448)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $0
          Subtotal Reappropriation . . . . . . . . . . . . $500,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,962,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,600,000
          TOTAL . . . . . . . . . . . . $31,062,000

NEW SECTION.  Sec. 5060   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Samuelson Communication and Technology Center (SCTC) (30000451)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,127,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $65,481,000
          TOTAL . . . . . . . . . . . . $70,408,000

NEW SECTION.  Sec. 5061   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Nutrition Science (30000456)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,960,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $281,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $44,000,000
          TOTAL . . . . . . . . . . . . $48,241,000

NEW SECTION.  Sec. 5062   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Peterson Hall Replacement (30000529)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,900,000

NEW SECTION.  Sec. 5063   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Brooks Library Learning Commons (30000530)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,900,000

NEW SECTION.  Sec. 5064   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works Preservation (30000615)

Appropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,000,000

NEW SECTION.  Sec. 5065   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Preventive Maintenance and Building System Repairs (30000677)

Appropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,688,000
          TOTAL . . . . . . . . . . . . $12,188,000

NEW SECTION.  Sec. 5066   FOR THE EVERGREEN STATE COLLEGE
     Communications Laboratory Building Preservation and Renovation (30000002)

Reappropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $275,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,472,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,747,000

NEW SECTION.  Sec. 5067   FOR THE EVERGREEN STATE COLLEGE
     Facilities Preservation (30000051)

Reappropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $275,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,229,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,504,000

NEW SECTION.  Sec. 5068   FOR THE EVERGREEN STATE COLLEGE
     Science Center - Lab I, 2nd Floor Renovation (30000116)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $762,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $912,000

NEW SECTION.  Sec. 5069   FOR THE EVERGREEN STATE COLLEGE
     Minor Works Preservation (30000084)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $4,700,000
          Subtotal Appropriation . . . . . . . . . . . . $6,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $212,000
          TOTAL . . . . . . . . . . . . $6,912,000

NEW SECTION.  Sec. 5070   FOR THE EVERGREEN STATE COLLEGE
     Science Center - Lab II, 2nd Floor Renovation (30000117)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,800,000
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $1,150,000
          Subtotal Appropriation . . . . . . . . . . . . $4,950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,950,000

NEW SECTION.  Sec. 5071   FOR THE EVERGREEN STATE COLLEGE
     Science Center - Lab I Basement Renovation (30000118)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,950,000

NEW SECTION.  Sec. 5072   FOR THE EVERGREEN STATE COLLEGE
     Preventive Facility Maintenance and Building System Repair (30000503)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $768,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $768,000

NEW SECTION.  Sec. 5073   FOR THE WESTERN WASHINGTON UNIVERSITY
     Carver Academic Renovation (20081060)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,365,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $73,531,000
          TOTAL . . . . . . . . . . . . $80,896,000

NEW SECTION.  Sec. 5074   FOR THE WESTERN WASHINGTON UNIVERSITY
     Classroom and Lab Upgrades (30000425)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $69,000
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $480,000
          Subtotal Reappropriation . . . . . . . . . . . . $549,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,243,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,792,000

NEW SECTION.  Sec. 5075   FOR THE WESTERN WASHINGTON UNIVERSITY
     Fraser Hall Renovation (30000427)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $598,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,098,000

NEW SECTION.  Sec. 5076   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works - Preservation (30000431)

Reappropriation:
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $2,508,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,932,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,440,000

NEW SECTION.  Sec. 5077   FOR THE WESTERN WASHINGTON UNIVERSITY
     Preventive Maintenance and Building System Repairs (30000510)

Appropriation:
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $3,629,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,386,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,842,000
          TOTAL . . . . . . . . . . . . $16,857,000

NEW SECTION.  Sec. 5078   FOR THE WESTERN WASHINGTON UNIVERSITY
     North Campus Utility Upgrade (30000426)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,764,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,764,000

NEW SECTION.  Sec. 5079   FOR THE WESTERN WASHINGTON UNIVERSITY
     Classroom and Lab Upgrades Phase 2 (30000518)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,984,000
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $916,000
          Subtotal Appropriation . . . . . . . . . . . . $4,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,900,000

NEW SECTION.  Sec. 5080   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works - Preservation (30000524)

Appropriation:
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $7,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $30,000,000
          TOTAL . . . . . . . . . . . . $37,500,000

NEW SECTION.  Sec. 5081   FOR THE WESTERN WASHINGTON UNIVERSITY
     Performing Arts Exterior Renewal (30000428)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,082,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,082,000

NEW SECTION.  Sec. 5082   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Pacific-Lewis and Clark Station Camp Park Project (2002S001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,972,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,422,000

NEW SECTION.  Sec. 5083   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Grants (20074004)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation in this section is subject to the provisions of RCW 27.34.330.
     (2) The reappropriation in this section is subject to the project list in section 5137, chapter 520, Laws of 2007.
     (3) The reappropriation in this section is subject to the provisions of section 5044, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,057,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,807,000

NEW SECTION.  Sec. 5084   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Project Capital Grants (30000011)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation in this section is subject to the provisions of section 5120, chapter 497, Laws of 2009.
     (2) The reappropriation in this section is subject to the provisions of section 5045, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,425,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,425,000

NEW SECTION.  Sec. 5085   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Building Preservation (30000111)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $112,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $180,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $292,000

NEW SECTION.  Sec. 5086   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Grants (30000117)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation in this section is subject to the provisions of RCW 27.34.330.
     (2) The reappropriation in this section is subject to the provisions of section 622, chapter 1, Laws of 2012 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,704,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $654,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,358,000

NEW SECTION.  Sec. 5087   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Facilities Preservation - Minor Works Projects 2013-2015 (30000164)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,240,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,240,000

NEW SECTION.  Sec. 5088   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Stadium Way Research Center Renovation and Addition (30000183)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $248,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $21,003,000
          TOTAL . . . . . . . . . . . . $21,251,000

NEW SECTION.  Sec. 5089   FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
     Minor Works - Campbell House Preservation (30000021)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $240,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $124,000
          TOTAL . . . . . . . . . . . . $364,000

NEW SECTION.  Sec. 5090   FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
     Minor Works - Northwest Museum of Arts and Culture (30000026)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $55,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $193,000
          TOTAL . . . . . . . . . . . . $248,000

NEW SECTION.  Sec. 5091   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Fort Steilacoom: Science and Technology (20042694)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $18,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $32,376,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $32,394,000

NEW SECTION.  Sec. 5092   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College: Humanities and Student Services (20061204)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $274,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $41,114,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $41,388,000

NEW SECTION.  Sec. 5093   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College: Campus Classrooms (20062696)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $15,560,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,056,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,616,000

NEW SECTION.  Sec. 5094   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Puget Sound Community College: Learning Resource Center (20062698)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $22,392,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,269,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $33,661,000

NEW SECTION.  Sec. 5095   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clover Park Technical College: Allied Health Care Facility (20062699)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $14,346,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,107,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $22,453,000

NEW SECTION.  Sec. 5096   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Wood Construction Center (20081216)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,557,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,752,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $22,309,000

NEW SECTION.  Sec. 5097   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Community College: Technical Education Building (20081220)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,384,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $21,045,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $26,429,000

NEW SECTION.  Sec. 5098   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College: Index Hall Replacement (20081221)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $15,752,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,562,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $36,314,000

NEW SECTION.  Sec. 5099   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Trades and Industry Building (20081222)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $618,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $29,129,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,226,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $30,973,000

NEW SECTION.  Sec. 5100   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College: Science and Math Building (20081226)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $44,662,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,568,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $47,230,000

NEW SECTION.  Sec. 5101   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Fort Steilacoom: Cascade Core (20081321)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,022,000
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $546,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,568,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $22,273,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,841,000

NEW SECTION.  Sec. 5102   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Health Careers Center (20082701)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $36,577,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,596,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $41,173,000

NEW SECTION.  Sec. 5103   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellevue Community College: Health Science Building (20082702)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $170,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $30,966,000
     Institutions of Higher Education Plant Accounts
          Nonappropriated . . . . . . . . . . . . $2,000,000
          Subtotal Appropriation . . . . . . . . . . . . $32,966,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,883,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $36,019,000

NEW SECTION.  Sec. 5104   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bates Technical College: Mohler Communications Technology Center (20082703)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $219,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $25,942,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,709,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $27,870,000

NEW SECTION.  Sec. 5105   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Columbia Basin College: Social Science Center (20082704)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $109,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,758,000
          TOTAL . . . . . . . . . . . . $16,117,000

NEW SECTION.  Sec. 5106   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College: Health and Advanced Technologies Building (20082705)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,371,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $36,910,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,203,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $39,484,000

NEW SECTION.  Sec. 5107   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College: Fort Worden Building 202 (30000114)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,862,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $138,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5108   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellingham Technical College: Fisheries Program (30000117)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,754,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $246,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5109   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lower Columbia College: Myklebust Gymnasium (30000118)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,808,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $192,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5110   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Seattle Maritime Academy (30000120)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $234,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $16,890,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,103,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,227,000

NEW SECTION.  Sec. 5111   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College: Palmer Martin Building (30000121)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $40,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $20,834,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $957,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $21,831,000

NEW SECTION.  Sec. 5112   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College: College Instruction Center (30000122)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,296,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $328,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,624,000

NEW SECTION.  Sec. 5113   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Centralia Community College: Student Services (30000123)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,397,000
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $3,000,000
          Subtotal Appropriation . . . . . . . . . . . . $4,397,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $33,075,000
          TOTAL . . . . . . . . . . . . $37,472,000

NEW SECTION.  Sec. 5114   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College: Allied Health and Early Childhood Development Center (30000126)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,189,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,756,000
          TOTAL . . . . . . . . . . . . $28,945,000

NEW SECTION.  Sec. 5115   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     North Seattle Community College: Technology Building Renewal (30000129)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $23,631,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,788,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,419,000

NEW SECTION.  Sec. 5116   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Science, Math, and Technology Building (30000130)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $11,309,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,569,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,878,000

NEW SECTION.  Sec. 5117   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Renton Technical College: Automotive Complex Renovation (30000134)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,910,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,716,000
          TOTAL . . . . . . . . . . . . $18,626,000

NEW SECTION.  Sec. 5118   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Edmonds Community College: Science Engineering Technology Building (30000137)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,291,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $30,000,000
          TOTAL . . . . . . . . . . . . $38,291,000

NEW SECTION.  Sec. 5119   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Whatcom Community College: Learning Commons (30000138)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,127,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $29,802,000
          TOTAL . . . . . . . . . . . . $31,929,000

NEW SECTION.  Sec. 5120   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Site Repairs "A" (30000504)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,731,000
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $2,496,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,227,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $818,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,045,000

NEW SECTION.  Sec. 5121   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Facility Repairs "A" (30000505)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $9,671,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,158,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,829,000

NEW SECTION.  Sec. 5122   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College: Stadium and Athletic Fields (30000116)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $37,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $721,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $758,000

NEW SECTION.  Sec. 5123   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College: Cascade Court (30000128)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,437,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,684,000
          TOTAL . . . . . . . . . . . . $35,121,000

NEW SECTION.  Sec. 5124   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Roof Repairs "A" (30000434)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $4,568,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,557,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,125,000

NEW SECTION.  Sec. 5125   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Preservation (30000461)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $11,708,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,293,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,001,000

NEW SECTION.  Sec. 5126   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Program (30000674)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,489,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,511,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 5127   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Preventive Maintenance and Building System Repairs (30000709)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $22,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,270,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $91,200,000
          TOTAL . . . . . . . . . . . . $126,270,000

NEW SECTION.  Sec. 5128   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Program (30000723)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $19,893,000
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $2,107,000
     Institutions of Higher Education Plant Accounts
          Nonappropriated . . . . . . . . . . . . $3,208,000
          Subtotal Appropriation . . . . . . . . . . . . $25,208,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,208,000

NEW SECTION.  Sec. 5129   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Preservation (30000779)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $17,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,600,000

NEW SECTION.  Sec. 5130   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Roof Repairs (30000844)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $7,785,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,785,000

NEW SECTION.  Sec. 5131   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Facility Repairs (30000897)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $22,134,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $22,134,000

NEW SECTION.  Sec. 5132   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Site Repairs (30000941)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $2,574,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,574,000

(End of part)


PART 6
MISCELLANEOUS AND SUPPLEMENTAL PROVISIONS

NEW SECTION.  Sec. 6001   (1) Allotments for appropriations in this act shall be provided in accordance with the capital project review requirements adopted by the office of financial management and in compliance with RCW 43.88.110. Projects that will be employing alternative public works construction procedures under chapter 39.10 RCW are subject to the allotment procedures defined in this section and RCW 43.88.110.
     (2) Each project is defined as proposed in the legislative budget notes or in the governor's budget document.

NEW SECTION.  Sec. 6002   To ensure that major construction projects are carried out in accordance with legislative and executive intent, appropriations in this act in excess of $5,000,000 shall not be expended or encumbered until the office of financial management has reviewed and approved the agency's predesign. The predesign document shall include but not be limited to program, site, and cost analysis in accordance with the predesign manual adopted by the office of financial management. To improve monitoring of major construction projects, progress reports shall be submitted by the agency administering the project to the office of financial management and to the fiscal committees of the house of representatives and senate. Reports will be submitted on July 1st and December 31st each year in a format to be developed by the office of financial management.

NEW SECTION.  Sec. 6003   (1) To ensure minor works appropriations are carried out in accordance with legislative intent, funds appropriated in this act shall not be allotted until project lists are on file at the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee. All projects must meet the criteria included in subsection (2)(a) of this section. Revisions to the lists must be filed with the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee and include an explanation of variances from the prior lists before funds may be expended on the revisions.
     (2)(a) Minor works projects are single line appropriations that include multiple projects of a similar nature and that are valued between $25,000 and $1,000,000 each, with the exception of higher education minor works projects that may be valued up to $2,000,000. These projects can generally be completed within two years of the appropriation with the funding provided. Agencies are prohibited from including projects on their minor works lists that are a phase of a larger project, and that if combined over a continuous period of time, would exceed $1,000,000, or $2,000,000 for higher education minor works projects. Improvements for accessibility in compliance with the Americans with disabilities act may be included in any of the above minor works categories.
     (b) Minor works appropriations shall not be used for, among other things: Studies, except for technical or engineering reviews or designs that lead directly to and support a project on the same minor works list; planning; design outside the scope of work on a minor works list; moveable, temporary, and traditionally funded operating equipment not in compliance with the equipment criteria established by the office of financial management; software not dedicated to control of a specialized system; moving expenses; land or facility acquisition; or to supplement funding for projects with funding shortfalls unless expressly authorized elsewhere in this act. The office of financial management may make an exception to the limitations described in this subsection (2)(b) for exigent circumstances after notifying the legislative fiscal committees and waiting ten days for comments by the legislature regarding the proposed exception.
     (c) Minor works preservation projects may include program improvements of no more than twenty-five percent of the individual minor works preservation project cost.
     (3) Minor works projects are intended to be one-time expenditures that do not require future state resources to complete.

NEW SECTION.  Sec. 6004   (1) The office of financial management may authorize a transfer of appropriation authority provided for a capital project that is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient. No such transfer may be used to expand the capacity of any facility beyond that intended in making the appropriation. Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects that are funded from the same fund or account. No transfers may occur between projects to local government agencies except where the grants are provided within a single omnibus appropriation and where such transfers are specifically authorized by the implementing statutes that govern the grants.
     (2) The office of financial management may find that an amount is in excess of the amount required for the completion of a project only if: (a) The project as defined in the notes to the budget document is substantially complete and there are funds remaining; or (b) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated in this act.
     (3) For the purposes of this section, the intent is that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.
     (4) A report of any transfer effected under this section, except emergency projects or any transfer under $250,000, shall be filed with the legislative fiscal committees of the senate and house of representatives by the office of financial management at least thirty days before the date the transfer is effected. The office of financial management shall report all emergency or smaller transfers within thirty days from the date of transfer.

NEW SECTION.  Sec. 6005   (1) It is expected that projects be ready to proceed in a timely manner depending on the type or phase of the project or program that is the subject of the appropriation in this act. Except for major projects that customarily may take more than two biennia to complete from predesign to the end of construction, or large infrastructure grant or loan programs supporting projects that often take more than two biennia to complete, the legislature generally does not intend to reappropriate funds more than once, particularly for smaller grant programs, local/community projects, and minor works.
     (2) Agencies shall expedite the expenditure of reappropriations and appropriations in this act in order to: (a) Rehabilitate infrastructure resources; (b) accelerate environmental rehabilitation and restoration projects for the improvement of the state's natural environment; (c) reduce additional costs associated with acquisition and construction inflationary pressures; and (d) provide additional employment opportunities associated with capital expenditures.
     (3) To the extent feasible, agencies are directed to accelerate expenditure rates at their current level of permanent employees and shall use contracted design and construction services wherever necessary to meet the goals of this section.

NEW SECTION.  Sec. 6006   State agencies, including institutions of higher education, shall allot and report full-time equivalent staff for capital projects in a manner comparable to staff reporting for operating expenditures.

NEW SECTION.  Sec. 6007   The department of enterprise services shall not charge the facility depreciation component of lease charges for nonprofit tenants in the building adjoining Capitol Way and 11th avenue during the 2013-2015 biennium.

NEW SECTION.  Sec. 6008   Executive Order No. 05-05, archaeological and cultural resources, was issued effective November 10, 2005. Agencies and higher education institutions shall comply with the requirements set forth in this executive order.

NEW SECTION.  Sec. 6009   ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS. The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW. When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation. Expenditures made by an agency for one of the indicated purposes before the issue date of the authorized financial contract and any certificates of participation therein are intended to be reimbursed from proceeds of the financial contract and any certificates of participation therein to the extent provided in the agency's financing plan approved by the state finance committee.
     State agencies may enter into agreements with the department of enterprise services and the state treasurer's office to develop requests to the legislature for acquisition of properties and facilities through financial contracts. The agreements may include charges for services rendered.
     Those noninstructional facilities of higher education institutions authorized in this section to enter into financial contracts are not eligible for state funded maintenance and operations. Instructional space that is available for regularly scheduled classes for academic transfer, basic skills, and workforce training programs may be eligible for state funded maintenance and operations.
     (1) Community and technical colleges:
     (a) Enter into a financing contract on behalf of Peninsula College for up to $2,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to renovate or replace the Forks satellite building.
     (b) Enter into a financing contract on behalf of South Puget Sound Community College for up to $5,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to renovate the downtown Lacey campus.
     (c) Enter into a financing contract on behalf of Walla Walla Community College for up to $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase up to forty acres of land.
     (d) Enter into a financing contract on behalf of Green River Community College for up to $15,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a replacement facility for the student life center.
     (e) Enter into a financing contract on behalf of Whatcom Community College for up to $6,451,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a health professions building.
     (f) Enter into a financing contract on behalf of Whatcom Community College for up to $11,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a student recreation center.
     (g) Enter into a financing contract on behalf of Spokane Community College for up to $3,100,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an addition to the student services building.
     (2) Department of enterprise services: Enter into a financing contract for up to $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the modifications to the Yakima office building in preparation for the department of social and health services use of the building.

NEW SECTION.  Sec. 6010   PUGET SOUND PROTECTION AND RESTORATION. Consistent with RCW 90.71.340, when expending appropriations under this act that contribute to Puget Sound protection and recovery, agencies shall consult with the Puget Sound partnership to ensure that projects and expenditures are either in, or consistent with the 2020 action agenda. These consultations shall include the exchange of information on specific actions, projects, associated funding, performance measures, and other information necessary to track project implementation and ensure alignment with the action agenda. In situations where the Puget Sound partnership finds that a project is not in, or is not consistent with the action agenda Puget Sound partnership shall document this finding and report back to the governor and legislative fiscal committees.

NEW SECTION.  Sec. 6011   FOR THE ARTS COMMISSION--ART WORK ALLOWANCE POOLING. (1) One-half of one percent of moneys appropriated in this act for original construction of school plant facilities is provided solely for the purposes of RCW 28A.335.210. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the superintendent of public instruction and representatives of school district boards.
     (2) One-half of one percent of moneys appropriated in this act for original construction or any major renovation or remodel work exceeding two hundred thousand dollars by colleges or universities is provided solely for the purposes of RCW 28B.10.027. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the board of regents or trustees.
     (3) One-half of one percent of moneys appropriated in this act for original construction of any public building by a state agency as defined in RCW 43.17.020 is provided solely for the purposes of RCW 43.17.200. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the state agency.
     (4) At least eighty-five percent of the moneys spent by the Washington state arts commission during the 2013-2015 biennium for the purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 must be expended solely for direct acquisition of works of art. The commission may use up to $100,000 of this amount to conserve or maintain existing pieces in the state art collection pursuant to chapter 36, Laws of 2005.

NEW SECTION.  Sec. 6012   The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts. "Prior biennia" typically refers to the immediate prior biennium for reappropriations, but may refer to multiple biennia in the case of specific projects. A "future biennia" amount is an estimate of what may be appropriated for the project or program in the 2015-2017 biennium and the following three biennia; an amount of zero does not necessarily constitute legislative intent to not provide funding for the project or program in the future.

NEW SECTION.  Sec. 6013   To carry out the provisions of this act, the governor may assign responsibility for predesign, design, construction, and other related activities to any appropriate agency.

NEW SECTION.  Sec. 6014   If any federal moneys appropriated by this act for capital projects are not received by the state, the department or agency to which the moneys were appropriated may replace the federal moneys with funds available from private or local sources. No replacement may occur under this section without the prior approval of the director of financial management in consultation with the senate ways and means committee and the house of representatives capital budget committee.

NEW SECTION.  Sec. 6015   (1) Unless otherwise stated, for all appropriations under this act that require a match of nonstate money or in-kind contributions, the following requirement, consistent with RCW 43.88.150, shall apply: Expenditures of state money shall be timed so that the state share of project expenditures never exceeds the intended state share of total project costs.
     (2) Provision of the full amount of required matching funds is not required to permit the expenditure of capital budget appropriations for phased projects if a proportional amount of the required matching funds is provided for each distinct, identifiable phase of the project.

NEW SECTION.  Sec. 6016   NONTAXABLE AND TAXABLE BOND PROCEEDS. Portions of the appropriation authority granted by this act from the state building construction account, or any other account receiving bond proceeds, may be transferred to the state taxable building construction account as deemed necessary by the state finance committee to comply with the federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds. Portions of the general obligation bond proceeds authorized by chapter . . ., Laws of 2013 (Z-0198.1/13, the general obligation bond bill) for deposit into the state taxable building construction account that are in excess of amounts required to comply with the federal internal revenue service rules and regulations shall be deposited into the state building construction account. The state treasurer shall submit written notification to the director of financial management if it is determined that a shift of appropriation authority between the state building construction account, or any other account receiving bond proceeds, and the state taxable building construction account is necessary, or that a shift of appropriation authority from the state taxable building construction account to the state building construction account may be made.

NEW SECTION.  Sec. 6017   The office of financial management, in consultation with the fiscal committees of the legislature, may select capital projects that have completed predesign to undergo a budget evaluation study. The budget evaluation study team approach using value engineering techniques must be utilized by the office of financial management in conducting the studies. The office of financial management shall select the budget evaluation team members, contract for the study, and report the results to the legislature and agencies in a timely manner following the study. Funds from the project appropriation must be used by the office of financial management through an interagency agreement with the affected agencies to cover the cost of the study.

Sec. 6018   RCW 28B.15.210 and 2011 1st sp.s. c 48 s 7022 are each amended to read as follows:
     Within thirty-five days from the date of collection thereof, all building fees at the University of Washington, including building fees to be charged students registering in the schools of medicine and dentistry, shall be paid into the state treasury and credited as follows:
     One-half or such larger portion as may be necessary to prevent a default in the payments required to be made out of the bond retirement fund to the "University of Washington bond retirement fund" and the remainder thereof to the "University of Washington building account." The sum so credited to the University of Washington building account shall be used exclusively for the purpose of erecting, altering, maintaining, equipping, or furnishing buildings, and for certificates of participation under chapter 39.94 RCW, except for any sums transferred as authorized in RCW 28B.20.725(3). The sum so credited to the University of Washington bond retirement fund shall be used for the payment of principal of and interest on bonds outstanding as provided by chapter 28B.20 RCW except for any sums transferred as authorized in RCW 28B.20.725(5). ((During the 2011-2013 biennium, sums credited to the University of Washington building account shall also be used for routine facility maintenance and utility costs.)) During the 2013-2015 biennium, sums credited to the University of Washington building account shall also be used for routine facility maintenance, utility costs, and facility condition assessments.

Sec. 6019   RCW 28B.20.725 and 2011 1st sp.s. c 48 s 7020 are each amended to read as follows:
     The board is hereby empowered:
     (1) To reserve the right to issue bonds later on a parity with any bonds being issued;
     (2) To authorize the investing of moneys in the bond retirement fund and any reserve account therein;
     (3) To authorize the transfer of money from the University of Washington building account to the bond retirement fund when necessary to prevent a default in the payments required to be made out of such fund;
     (4) To create a reserve account or accounts in the bond retirement fund to secure the payment of the principal of and interest on any bonds;
     (5) To authorize the transfer to the University of Washington building account of any money on deposit in the bond retirement fund in excess of debt service for a period of three years from the date of such transfer on all outstanding bonds payable out of such fund. ((However, during the 2009-2011 fiscal biennium, the legislature may transfer to the University of Washington building account moneys that are in excess of the debt service due within one year of the date of transfer on all outstanding bonds payable out of the bond retirement fund.)) However, during the 2011-2013 fiscal biennium, the legislature may transfer to the University of Washington building account moneys that are in excess of the debt service due within one year of the date of transfer on all outstanding bonds payable out of the bond retirement fund. However, during the 2013-2015 fiscal biennium, the legislature may transfer to the University of Washington building account moneys that are in excess of the debt service due within the 2013-2015 fiscal biennium from the date of such transfer on all outstanding bonds payable out of the bond retirement fund.

Sec. 6020   RCW 28B.15.310 and 2011 1st sp.s. c 48 s 7023 are each amended to read as follows:
     Within thirty-five days from the date of collection thereof, all building fees shall be paid and credited as follows: To the Washington State University bond retirement fund, one-half or such larger portion as may be necessary to prevent a default in the payments required to be made out of such bond retirement fund; and the remainder thereof to the Washington State University building account.
     The sum so credited to the Washington State University building account shall be expended by the board of regents for buildings, equipment, or maintenance on the campus of Washington State University as may be deemed most advisable and for the best interests of the university, and for certificates of participation under chapter 39.94 RCW, except for any sums transferred as authorized by law. During the 2011-2013 biennium, sums credited to the Washington State University building account shall also be used for routine facility maintenance and utility costs. During the 2013-2015 biennium, sums credited to the Washington State University building account shall also be used for routine facility maintenance, utility costs, and facility condition assessments. Expenditures so made shall be accounted for in accordance with existing law and shall not be expended until appropriated by the legislature.
     The sum so credited to the Washington State University bond retirement fund shall be used to pay and secure the payment of the principal of and interest on building bonds issued by the university, except for any sums which may be transferred out of such fund as authorized by law.

Sec. 6021   RCW 28B.30.750 and 2011 1st sp.s. c 48 s 7021 are each amended to read as follows:
     The board is hereby empowered:
     (1) To reserve the right to issue bonds later on a parity with any bonds being issued;
     (2) To authorize the investing of moneys in the bond retirement fund and any reserve account therein;
     (3) To authorize the transfer of money from the Washington State University building account to the bond retirement fund when necessary to prevent a default in the payments required to be made out of such fund;
     (4) To create a reserve account or accounts in the bond retirement fund to secure the payment of the principal of and interest on any bonds;
     (5) To authorize the transfer to the Washington State University building account of any money on deposit in the bond retirement fund in excess of debt service for a period of three years from the date of such transfer on all outstanding bonds payable out of such fund. ((However, during the 2009-2011 fiscal biennium, the legislature may transfer to the Washington State University building account moneys that are in excess of the debt service due within one year of the date of transfer on all outstanding bonds payable out of the bond retirement fund.)) However, during the 2011-2013 fiscal biennium, the legislature may transfer to the Washington State University building account moneys that are in excess of the debt service due within one year of the date of transfer on all outstanding bonds payable out of the bond retirement fund. However, during the 2013-2015 fiscal biennium, the legislature may transfer to the Washington State University building account moneys that are in excess of the debt service due within the 2013-2015 fiscal biennium from the date of such transfer on all outstanding bonds payable out of the bond retirement fund.

Sec. 6022   RCW 28B.35.370 and 2011 1st sp.s. c 48 s 7024 are each amended to read as follows:
     Within thirty-five days from the date of collection thereof all building fees of each regional university and The Evergreen State College shall be paid into the state treasury and these together with such normal school fund revenues as provided in RCW 28B.35.751 as are received by the state treasury shall be credited as follows:
     (1) On or before June 30th of each year the board of trustees of each regional university and The Evergreen State College, if issuing bonds payable out of its building fees and above described normal school fund revenues, shall certify to the state treasurer the amounts required in the ensuing twelve months to pay and secure the payment of the principal of and interest on such bonds. The amounts so certified by each regional university and The Evergreen State College shall be a prior lien and charge against all building fees and above described normal school fund revenues of such institution. The state treasurer shall thereupon deposit the amounts so certified in the Eastern Washington University capital projects account, the Central Washington University capital projects account, the Western Washington University capital projects account, or The Evergreen State College capital projects account respectively, which accounts are hereby created in the state treasury. The amounts deposited in the respective capital projects accounts shall be used to pay and secure the payment of the principal of and interest on the building bonds issued by such regional universities and The Evergreen State College as authorized by law. If in any twelve month period it shall appear that the amount certified by any such board of trustees is insufficient to pay and secure the payment of the principal of and interest on the outstanding building and above described normal school fund revenue bonds of its institution, the state treasurer shall notify the board of trustees and such board shall adjust its certificate so that all requirements of moneys to pay and secure the payment of the principal of and interest on all such bonds then outstanding shall be fully met at all times.
     (2) All normal school fund revenue pursuant to RCW 28B.35.751 shall be deposited in the Eastern Washington University capital projects account, the Central Washington University capital projects account, the Western Washington University capital projects account, or The Evergreen State College capital projects account respectively, which accounts are hereby created in the state treasury. The sums deposited in the respective capital projects accounts shall be appropriated and expended to pay and secure the payment of the principal of and interest on bonds payable out of the building fees and normal school revenue and for the construction, reconstruction, erection, equipping, maintenance, demolition and major alteration of buildings and other capital assets, and the acquisition of sites, rights-of-way, easements, improvements or appurtenances in relation thereto except for any sums transferred therefrom as authorized by law. During the 2011-2013 biennium, sums in the respective capital accounts shall also be used for routine facility maintenance and utility costs. During the 2013-2015 biennium, sums in the respective capital accounts shall also be used for routine facility maintenance, utility costs, and facility condition assessments.
     (3) Funds available in the respective capital projects accounts may also be used for certificates of participation under chapter 39.94 RCW.

Sec. 6023   RCW 28B.50.360 and 2011 1st sp.s. c 48 s 7025 are each amended to read as follows:
     Within thirty-five days from the date of start of each quarter all collected building fees of each such community and technical college shall be paid into the state treasury, and shall be credited as follows:
     (1) On or before June 30th of each year the college board if issuing bonds payable out of building fees shall certify to the state treasurer the amounts required in the ensuing twelve-month period to pay and secure the payment of the principal of and interest on such bonds. The state treasurer shall thereupon deposit the amounts so certified in the community and technical college capital projects account. Such amounts of the funds deposited in the community and technical college capital projects account as are necessary to pay and secure the payment of the principal of and interest on the building bonds issued by the college board as authorized by this chapter shall be devoted to that purpose. If in any twelve-month period it shall appear that the amount certified by the college board is insufficient to pay and secure the payment of the principal of and interest on the outstanding building bonds, the state treasurer shall notify the college board and such board shall adjust its certificate so that all requirements of moneys to pay and secure the payment of the principal and interest on all such bonds then outstanding shall be fully met at all times.
     (2) The community and technical college capital projects account is hereby created in the state treasury. The sums deposited in the capital projects account shall be appropriated and expended to pay and secure the payment of the principal of and interest on bonds payable out of the building fees and for the construction, reconstruction, erection, equipping, maintenance, demolition and major alteration of buildings and other capital assets owned by the state board for community and technical colleges in the name of the state of Washington, and the acquisition of sites, rights-of-way, easements, improvements or appurtenances in relation thereto, engineering and architectural services provided by the department of ((general administration)) enterprise services, and for the payment of principal of and interest on any bonds issued for such purposes. During the 2011-2013 biennium, sums in the capital projects account shall also be used for routine facility maintenance and utility costs. During the 2013-2015 biennium, sums in the capital projects account shall also be used for routine facility maintenance and utility costs.
     (3) Funds available in the community and technical college capital projects account may also be used for certificates of participation under chapter 39.94 RCW.

NEW SECTION.  Sec. 6024   FOR THE OFFICE OF FINANCIAL MANAGEMENT. The office of financial management shall administer a single contract to conduct facility condition assessments at each of the six four-year higher education institutions for facilities that will be considered for funding for renovation or replacement in the 2015-2017 biennium. Facility condition assessments shall follow the methodology established in the state's comparable framework for higher education buildings. The cost of the assessments shall be paid through each of the four-year institutions appropriations for preventive maintenance and building repairs, based on a pro rata basis of square feet inspected.

Sec. 6025   RCW 70.105D.070 and 2012 2nd sp.s. c 7 s 920 and 2012 2nd sp.s. c 2 s 6005 are each reenacted and amended to read as follows:
     (1) The state toxics control account and the local toxics control account are hereby created in the state treasury.
     (2) The following moneys shall be deposited into the state toxics control account: (a) Those revenues which are raised by the tax imposed under RCW 82.21.030 and which are attributable to that portion of the rate equal to thirty-three one-hundredths of one percent; (b) the costs of remedial actions recovered under this chapter or chapter 70.105A RCW; (c) penalties collected or recovered under this chapter; and (d) any other money appropriated or transferred to the account by the legislature. Moneys in the account may be used only to carry out the purposes of this chapter, including but not limited to the following activities:
     (i) The state's responsibility for hazardous waste planning, management, regulation, enforcement, technical assistance, and public education required under chapter 70.105 RCW;
     (ii) The state's responsibility for solid waste planning, management, regulation, enforcement, technical assistance, and public education required under chapter 70.95 RCW;
     (iii) The hazardous waste cleanup program required under this chapter;
     (iv) State matching funds required under the federal cleanup law;
     (v) Financial assistance for local programs in accordance with chapters 70.95, 70.95C, 70.95I, and 70.105 RCW;
     (vi) State government programs for the safe reduction, recycling, or disposal of hazardous wastes from households, small businesses, and agriculture;
     (vii) Hazardous materials emergency response training;
     (viii) Water and environmental health protection and monitoring programs;
     (ix) Programs authorized under chapter 70.146 RCW;
     (x) A public participation program, including regional citizen advisory committees;
     (xi) Public funding to assist potentially liable persons to pay for the costs of remedial action in compliance with cleanup standards under RCW 70.105D.030(2)(e) but only when the amount and terms of such funding are established under a settlement agreement under RCW 70.105D.040(4) and when the director has found that the funding will achieve both (A) a substantially more expeditious or enhanced cleanup than would otherwise occur, and (B) the prevention or mitigation of unfair economic hardship;
     (xii) Development and demonstration of alternative management technologies designed to carry out the hazardous waste management priorities of RCW 70.105.150;
     (xiii) During the 2009-2011 and 2011-2013 fiscal biennia, shoreline update technical assistance;
     (xiv) During the 2009-2011 fiscal biennium, multijurisdictional permitting teams;
     (xv) During the 2011-2013 fiscal biennium, actions for reducing public exposure to toxic air pollution, and actions taken through the family forest fish passage program to correct barriers to fish passage on privately owned small forest lands; ((and))
     (xvi) During the 2011-2013 fiscal biennium, the department of ecology's water quality, shorelands and environmental assessment, hazardous waste, waste to resources, nuclear waste, and air quality programs; and
     (xvii) During the 2013-2015 fiscal biennium the state toxics control account may also be used for reducing public exposure to toxic air pollution
.
     (3) The following moneys shall be deposited into the local toxics control account: Those revenues which are raised by the tax imposed under RCW 82.21.030 and which are attributable to that portion of the rate equal to thirty-seven one-hundredths of one percent.
     (a) Moneys deposited in the local toxics control account shall be used by the department for grants or loans to local governments for the following purposes in descending order of priority:
     (i) Remedial actions;
     (ii) Hazardous waste plans and programs under chapter 70.105 RCW;
     (iii) Solid waste plans and programs under chapters 70.95, 70.95C, 70.95I, and 70.105 RCW;
     (iv) Funds for a program to assist in the assessment and cleanup of sites of methamphetamine production, but not to be used for the initial containment of such sites, consistent with the responsibilities and intent of RCW 69.50.511; and
     (v) Cleanup and disposal of hazardous substances from abandoned or derelict vessels, defined for the purposes of this section as vessels that have little or no value and either have no identified owner or have an identified owner lacking financial resources to clean up and dispose of the vessel, that pose a threat to human health or the environment.
     (b) Funds for plans and programs shall be allocated consistent with the priorities and matching requirements established in chapters 70.105, 70.95C, 70.95I, and 70.95 RCW, except that any applicant that is a Puget Sound partner, as defined in RCW 90.71.010, along with any project that is referenced in the action agenda developed by the Puget Sound partnership under RCW 90.71.310, shall, except as conditioned by RCW 70.105D.120, receive priority for any available funding for any grant or funding programs or sources that use a competitive bidding process. During the 2007-2009 fiscal biennium, moneys in the account may also be used for grants to local governments to retrofit public sector diesel equipment and for storm water planning and implementation activities.
     (c) To expedite cleanups throughout the state, the department shall partner with local communities and liable parties for cleanups. The department is authorized to use the following additional strategies in order to ensure a healthful environment for future generations:
     (i) The director may alter grant-matching requirements to create incentives for local governments to expedite cleanups when one of the following conditions exists:
     (A) Funding would prevent or mitigate unfair economic hardship imposed by the clean-up liability;
     (B) Funding would create new substantial economic development, public recreational, or habitat restoration opportunities that would not otherwise occur; or
     (C) Funding would create an opportunity for acquisition and redevelopment of vacant, orphaned, or abandoned property under RCW 70.105D.040(5) that would not otherwise occur;
     (ii) The use of outside contracts to conduct necessary studies;
     (iii) The purchase of remedial action cost-cap insurance, when necessary to expedite multiparty clean-up efforts.
     (d) To facilitate and expedite cleanups using funds from the local toxics control account, during the 2009-2011 fiscal biennium the director may establish grant-funded accounts to hold and disperse local toxics control account funds and funds from local governments to be used for remedial actions.
     (4) Except for unanticipated receipts under RCW 43.79.260 through 43.79.282, moneys in the state and local toxics control accounts may be spent only after appropriation by statute.
     (5) Except during the 2011-2013 fiscal biennium, one percent of the moneys deposited into the state and local toxics control accounts shall be allocated only for public participation grants to persons who may be adversely affected by a release or threatened release of a hazardous substance and to not-for-profit public interest organizations. The primary purpose of these grants is to facilitate the participation by persons and organizations in the investigation and remedying of releases or threatened releases of hazardous substances and to implement the state's solid and hazardous waste management priorities. No grant may exceed sixty thousand dollars. Grants may be renewed annually. Moneys appropriated for public participation from either account which are not expended at the close of any biennium shall revert to the state toxics control account.
     (6) No moneys deposited into either the state or local toxics control account may be used for solid waste incinerator feasibility studies, construction, maintenance, or operation, or, after January 1, 2010, for projects designed to address the restoration of Puget Sound, funded in a competitive grant process, that are in conflict with the action agenda developed by the Puget Sound partnership under RCW 90.71.310.
     (7) The department shall adopt rules for grant or loan issuance and performance.
     (8) During the 2011-2013 fiscal biennium, the legislature may transfer from the local toxics control account to the state toxics control account such amounts as reflect excess fund balance in the account.
     (9) During the 2011-2013 fiscal biennium, the local toxics control account may also be used for local government shoreline update grants and actions for reducing public exposure to toxic air pollution; funding to local governments for flood levee improvements; and grants to local governments for brownfield redevelopment.
     (10) During the 2013-2015 fiscal biennium the local toxics control account may also be used for the centennial clean water program.

Sec. 6026   RCW 79.105.150 and 2012 2nd sp.s. c 7 s 929 and 2012 2nd sp.s. c 2 s 6008 are each reenacted and amended to read as follows:
     (1) After deduction for management costs as provided in RCW 79.64.040 and payments to towns under RCW 79.115.150(2), all moneys received by the state from the sale or lease of state-owned aquatic lands and from the sale of valuable material from state-owned aquatic lands shall be deposited in the aquatic lands enhancement account which is hereby created in the state treasury. After appropriation, these funds shall be used solely for aquatic lands enhancement projects; for the purchase, improvement, or protection of aquatic lands for public purposes; for providing and improving access to the lands; and for volunteer cooperative fish and game projects. During the 2011-2013 fiscal biennium, the aquatic lands enhancement account may also be used for scientific research as part of the adaptive management process and for developing a planning report for McNeil Island. During the 2011-2013 fiscal biennium, the legislature may transfer from the aquatic lands enhancement account to the state general fund such amounts as reflect excess fund balance of the account. During the 2011-2013 fiscal biennium, the aquatic lands enhancement account may be used to support the shellfish program, the ballast water program, parks, hatcheries, and the Puget Sound toxic sampling program at the department of fish and wildlife, the knotweed program at the department of agriculture, and the Puget SoundCorps program. During the 2011-2013 fiscal biennium, the legislature may transfer from the aquatic lands enhancement account to the marine resources stewardship trust account funds for the purposes of RCW 43.372.070. During the 2013-2015 fiscal biennium, the legislature may transfer from the aquatic lands enhancement account to the state general fund such amounts as reflect excess fund balance of the account. During the 2013-2015 fiscal biennium, the aquatic lands enhancement account may be used to support the shellfish program, the ballast water program, parks, hatcheries, and the Puget Sound toxic sampling program at the department of fish and wildlife, the knotweed program at the department of agriculture, and the Puget SoundCorps program. During the 2013-2015 fiscal biennium, the legislature may transfer from the aquatic lands enhancement account to the marine resources stewardship trust account funds for the purposes of RCW 43.372.070.
     (2) In providing grants for aquatic lands enhancement projects, the recreation and conservation funding board shall:
     (a) Require grant recipients to incorporate the environmental benefits of the project into their grant applications;
     (b) Utilize the statement of environmental benefits, consideration, except as provided in RCW 79.105.610, of whether the applicant is a Puget Sound partner, as defined in RCW 90.71.010, whether a project is referenced in the action agenda developed by the Puget Sound partnership under RCW 90.71.310, and except as otherwise provided in RCW 79.105.630, and effective one calendar year following the development and statewide availability of model evergreen community management plans and ordinances under RCW 35.105.050, whether the applicant is an entity that has been recognized, and what gradation of recognition was received, in the evergreen community recognition program created in RCW 35.105.030 in its prioritization and selection process; and
     (c) Develop appropriate outcome-focused performance measures to be used both for management and performance assessment of the grants.
     (3) To the extent possible, the department should coordinate its performance measure system with other natural resource-related agencies as defined in RCW 43.41.270.
     (4) The department shall consult with affected interest groups in implementing this section.
     (5) After January 1, 2010, any project designed to address the restoration of Puget Sound may be funded under this chapter only if the project is not in conflict with the action agenda developed by the Puget Sound partnership under RCW 90.71.310.

Sec. 6027   RCW 79.17.010 and 2012 2nd sp.s. c 2 s 6006 are each amended to read as follows:
     (1) The department, with the approval of the board, may exchange any state land and any timber thereon for any land of equal value in order to:
     (a) Facilitate the marketing of forest products of state lands;
     (b) Consolidate and block-up state lands;
     (c) Acquire lands having commercial recreational leasing potential;
     (d) Acquire county-owned lands;
     (e) Acquire urban property which has greater income potential or which could be more efficiently managed by the department in exchange for state urban lands as defined in RCW 79.19.100; or
     (f) Acquire any other lands when such exchange is determined by the board to be in the best interest of the trust for which the state land is held.
     (2) Land exchanged under this section shall not be used to reduce the publicly owned forest land base.
     (3) The board shall determine that each land exchange is in the best interest of the trust for which the land is held prior to authorizing the land exchange.
     (4)(a) During the biennium ending June 30, 2013, for the purposes of maintaining working farm and forest landscapes or acquiring natural resource lands at risk of development, the department, with approval of the board of natural resources, may exchange any state land and any timber thereon for any land and proceeds of equal value, when it can be demonstrated that the trust fiduciary obligations can be better fulfilled after an exchange is completed. Proceeds may be in the form of cash or services in order to achieve the purposes established in this section. Any cash received as part of an exchange transaction shall be deposited in the resource management cost account to pay for administrative expenses incurred in carrying out an exchange transaction. These administrative expenses include road maintenance and abandonment expenses. The amount of proceeds received from the exchange partner may not exceed five percent of the total value of the exchange. The receipt of proceeds shall not change the character of the transaction from an exchange to a sale.
     (b) During the biennium ending June 30, 2015, for the purposes of maintaining working farm and forest landscapes or acquiring natural resource lands at risk of development, the department, with approval of the board of natural resources, may exchange any state land and any timber thereon for any land and proceeds of equal value, when it can be demonstrated that the trust fiduciary obligations can be better fulfilled after an exchange is completed. Proceeds may be in the form of cash or services in order to achieve the purposes established in this section. Any cash received as part of an exchange transaction shall be deposited in the resource management cost account to pay for administrative expenses incurred in carrying out an exchange transaction. These administrative expenses include road maintenance and abandonment expenses. The amount of proceeds received from the exchange partner may not exceed five percent of the total value of the exchange. The receipt of proceeds shall not change the character of the transaction from an exchange to a sale.
     (5) Prior to executing an exchange under this section, and in addition to the public notice requirements set forth in RCW 79.17.050, the department shall consult with legislative members, other state and federal agencies, local governments, tribes, local stakeholders, conservation groups, and any other interested parties to identify and address cultural resource issues and the potential of the state lands proposed for exchange to be used for open space, park, school, or critical habitat purposes.

Sec. 6028   RCW 79.17.020 and 2012 2nd sp.s. c 2 s 6007 are each amended to read as follows:
     (1) The board of county commissioners of any county and/or the mayor and city council or city commission of any city or town and/or the board shall have authority to exchange, each with the other, or with the federal forest service, the federal government or any proper agency thereof and/or with any private landowner, county land of any character, land owned by municipalities of any character, and state forest land owned by the state under the jurisdiction of the department, for real property of equal value for the purpose of consolidating and blocking up the respective land holdings of any county, municipality, the federal government, or the state of Washington or for the purpose of obtaining lands having commercial recreational leasing potential.
     (2)(a) During the biennium ending June 30, 2013, for the purposes of maintaining working farm and forest landscapes or acquiring natural resource lands at risk of development, the department, with approval of the board of natural resources, may exchange any state land and any timber thereon for any land and proceeds of equal value, when it can be demonstrated that the trust fiduciary obligations can be better fulfilled after an exchange is completed. Proceeds may be in the form of cash or services in order to achieve the purposes established in this section. Any cash received as part of an exchange transaction shall be deposited in the forest development account to pay for administrative expenses incurred in carrying out an exchange transaction. These administrative expenses include road maintenance and abandonment expenses. The amount of proceeds received from the exchange partner may not exceed five percent of the total value of the exchange. The receipt of proceeds shall not change the character of the transaction from an exchange to a sale.
     (b) During the biennium ending June 30, 2015, for the purposes of maintaining working farm and forest landscapes or acquiring natural resource lands at risk of development, the department, with approval of the board of natural resources, may exchange any state land and any timber thereon for any land and proceeds of equal value, when it can be demonstrated that the trust fiduciary obligations can be better fulfilled after an exchange is completed. Proceeds may be in the form of cash or services in order to achieve the purposes established in this section. Any cash received as part of an exchange transaction shall be deposited in the forest development account to pay for administrative expenses incurred in carrying out an exchange transaction. These administrative expenses include road maintenance and abandonment expenses. The amount of proceeds received from the exchange partner may not exceed five percent of the total value of the exchange. The receipt of proceeds shall not change the character of the transaction from an exchange to a sale.
     (3) Prior to executing an exchange under this section, and in addition to the public notice requirements set forth in RCW 79.17.050, the department shall consult with legislative members, other state and federal agencies, local governments, tribes, local stakeholders, conservation groups, and any other interested parties to identify and address cultural resource issues, and the potential of the state lands proposed for exchange to be used for open space, park, school, or critical habitat purposes.

NEW SECTION.  Sec. 6029   This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately.

(End of bill)



     INDEX       PAGE #


CENTRAL WASHINGTON UNIVERSITY . . . . . . . . . . . . 137
COMMUNITY AND TECHNICAL COLLEGE SYSTEM . . . . . . . . . . . . 146
DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION . . . . . . . . . . . . 36
DEPARTMENT OF COMMERCE . . . . . . . . . . . . 3
DEPARTMENT OF CORRECTIONS . . . . . . . . . . . . 42
DEPARTMENT OF ECOLOGY . . . . . . . . . . . . 52
DEPARTMENT OF ENTERPRISE SERVICES . . . . . . . . . . . . 29
DEPARTMENT OF FISH AND WILDLIFE . . . . . . . . . . . . 100
DEPARTMENT OF HEALTH . . . . . . . . . . . . 40
DEPARTMENT OF NATURAL RESOURCES . . . . . . . . . . . . 107
DEPARTMENT OF SOCIAL AND HEALTH SERVICES . . . . . . . . . . . . 37
DEPARTMENT OF VETERANS AFFAIRS . . . . . . . . . . . . 42
EASTERN WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . . . . . 146
EASTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . 135
MILITARY DEPARTMENT . . . . . . . . . . . . 34
OFFICE OF FINANCIAL MANAGEMENT . . . . . . . . . . . . 27
OFFICE OF THE SECRETARY OF STATE . . . . . . . . . . . . 2
PUGET SOUND PARTNERSHIP . . . . . . . . . . . . 107
RECREATION AND CONSERVATION FUNDING BOARD . . . . . . . . . . . . 84
STATE CONSERVATION COMMISSION . . . . . . . . . . . . 99
STATE PARKS AND RECREATION COMMISSION . . . . . . . . . . . . 76
STATE SCHOOL FOR THE BLIND . . . . . . . . . . . . 129
SUPERINTENDENT OF PUBLIC INSTRUCTION . . . . . . . . . . . . 119
THE EVERGREEN STATE COLLEGE . . . . . . . . . . . . 139
UNIVERSITY OF WASHINGTON . . . . . . . . . . . . 129
WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS . . . . . . . . . . . . 129
WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . . . . . 143
WASHINGTON STATE PATROL . . . . . . . . . . . . 118
WASHINGTON STATE UNIVERSITY . . . . . . . . . . . . 133
WESTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . 141

--- END ---