BILL REQ. #: S-3587.1
State of Washington | 63rd Legislature | 2014 Regular Session |
READ FIRST TIME 02/07/14.
AN ACT Relating to voter approval of assumptions of water-sewer districts by cities and towns; adding new sections to chapter 35.13A RCW; and creating a new section.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1 A new section is added to chapter 35.13A RCW
to read as follows:
(1) A city or town may not assume, under this chapter, the
jurisdiction of all or part of a water-sewer district serving a
population greater than one thousand residents unless voters of the
entire water-sewer district approve a ballot proposition authorizing
the assumption under general election law. The cost of the election
must be borne by the city or town seeking approval to assume
jurisdiction of a water-sewer district.
(2) A city or town may assume jurisdiction over a water-sewer
district located entirely within its boundaries without seeking
approval of the voters, as required under subsection (1) of this
section, if the board of commissioners of the water-sewer district
consent to the assumption of jurisdiction by the city or town. The
feasibility study required under subsection (3) of this section is not
required if the board of commissioners of the water-sewer district
consents to the assumption of jurisdiction by the city or town.
(3) Following the passage of a resolution by a city or town to
assume all or part of a special purpose water-sewer district under this
chapter, a feasibility study of the assumption must be conducted,
unless the board of commissioners of the water-sewer district consents
to the assumption of jurisdiction by the city or town as provided under
subsection (2) of this section. The study must be jointly and equally
funded by the city or town and the district through a mutually agreed
contract with a qualified independent consultant with professional
expertise involving public water and sewer systems. The study must
address the impact of the proposed assumption on both the city or town
and district. Issues to be considered must be mutually agreed to by
the city or town and the district and must include, but not be limited
to, engineering and operational impacts, costs of the assumption to the
city or town and the district including potential impacts on future
water-sewer rates, bond ratings and future borrowing costs, status of
existing water rights, and other issues jointly agreed to. The
findings of the joint study must be presented as a public record that
is available to the registered voters of the district, both within and
without the boundary of the city or town conducting the assumption,
prior to a vote on the proposed assumption by all the voters in the
district. The study must be completed within six months of the passage
of the resolution to assume the district. No vote may take place until
the study has been completed and the results have been made available
to the registered voters of the district.
(4) Once the voters in a water-sewer district have approved or
disapproved an assumption through the ballot proposition process
required under subsection (1) of this section, a boundary review board
does not have jurisdiction, under chapter 36.93 RCW, to conduct a
review of the assumption where the attempted or completed assumption
involves not more than one city or town.
NEW SECTION. Sec. 2 A new section is added to chapter 35.13A RCW
to read as follows:
(1) If a city or town assumes jurisdiction over a water-sewer
district without seeking approval of the voters pursuant to section 1
of this act, the assumption is subject to referendum for forty-five
days after its approval by a boundary review board or the superior
court under chapter 36.93 RCW or, in those counties without a boundary
review board, a petition to dissolve the district has been filed in
superior court under RCW 35.13A.080. Upon the filing of a timely and
sufficient referendum petition with the board of commissioners, signed
by registered voters in number equal to not less than ten percent of
the registered voters in the area to be assumed who voted in the last
municipal general election, the question of assumption must be
submitted to the voters of the area in a general election if one is to
be held within ninety days or at a special election called for that
purpose by the board of commissioners in accordance with RCW
29A.04.330. The election must be conducted in accordance with the
general election laws of the state. The assumption is deemed approved
by the voters unless a majority of the votes cast on the proposition
are in opposition thereto.
(2) After the expiration of the forty-fifth day from but excluding
the date the assumption has been approved by a boundary review board or
the superior court under chapter 36.93 RCW or, in those counties
without a boundary review board, a petition to dissolve the district
has been filed in superior court under RCW 35.13A.080, if no timely and
sufficient referendum petition has been filed, the city or town may
proceed to assume jurisdiction over the water-sewer district.
NEW SECTION. Sec. 3 This act is applicable to assumptions of
jurisdiction of water-sewer districts by cities or towns that have been
initiated prior to the effective date of this section and that are
pending as of that date, as well as those assumptions of jurisdiction
that are initiated on or after the effective date of this section.
Nothing in this act may be construed to preempt or modify any existing
interlocal agreement, franchise, or contract between a city or town and
a water-sewer district in effect on the effective date of this section.