BILL REQ. #: S-3119.4
State of Washington | 63rd Legislature | 2014 Regular Session |
Read first time 01/16/14. Referred to Committee on Transportation.
AN ACT Relating to permits for state transportation corridor projects; amending RCW 70.95.030; adding a new section to chapter 36.70A RCW; adding a new section to chapter 47.01 RCW; adding new sections to chapter 35.21 RCW; adding new sections to chapter 36.01 RCW; adding new sections to chapter 35A.21 RCW; adding a new section to chapter 90.58 RCW; and adding a new section to chapter 43.21C RCW.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1 A new section is added to chapter 36.70A RCW
to read as follows:
(1) As used in this section, "transportation corridor project"
means a transportation project that is part of a state highway corridor
improvement program.
(2) For transportation corridor projects, if the project is
permitted under critical areas development regulations adopted under
this chapter, permits may be appealed to a local hearing officer or
through any other local appeal process if the department of
transportation consents, but if the department of transportation does
not consent, permits must be appealed directly to superior court and
local agencies may not require that such permits be first appealed to
a local hearing examiner or through any other local appeal process.
NEW SECTION. Sec. 2 A new section is added to chapter 47.01 RCW
to read as follows:
It is the intent of the legislature to clarify existing law such
that, when exercising its authority under RCW 47.01.260, the department
is not required to obtain local government master use permits,
conditional use permits, special use permits, or other similar local
zoning permits for staging areas related to the construction of state
highways. This section may not be construed as changing or otherwise
altering existing law.
NEW SECTION. Sec. 3 A new section is added to chapter 35.21 RCW
to read as follows:
If a building permit is issued by a city or town as part of a
transportation corridor project, as defined in section 1 of this act,
for a building that is temporary in nature and will be removed when no
longer necessary to facilitate the project, the building permit may not
be appealed by any party other than the permittee or the department of
transportation. If an appeal is filed, a third party may intervene in
such proceedings by petition.
NEW SECTION. Sec. 4 A new section is added to chapter 36.01 RCW
to read as follows:
If a building permit is issued by a county as part of a
transportation corridor project, as defined in section 1 of this act,
for a building that is temporary in nature and will be removed when no
longer necessary to facilitate the project, the building permit may not
be appealed by any party other than the permittee or the department of
transportation. If an appeal is filed, a third party may intervene in
such proceedings by petition.
NEW SECTION. Sec. 5 A new section is added to chapter 35A.21 RCW
to read as follows:
If a building permit is issued by a code city as part of a
transportation corridor project, as defined in section 1 of this act,
for a building that is temporary in nature and will be removed when no
longer necessary to facilitate the project, the building permit may not
be appealed by any party other than the permittee or the department of
transportation. If an appeal is filed, a third party may intervene in
such proceedings by petition.
NEW SECTION. Sec. 6 A new section is added to chapter 35.21 RCW
to read as follows:
(1) To the greatest extent practicable, a permit must be issued by
a city or town to the department of transportation for a transportation
corridor project, as defined in section 1 of this act, within ninety
days of the department completing the permit application.
(2) The department of transportation shall report annually to the
governor and the legislature regarding any permit applications that
take longer than ninety days to approve.
NEW SECTION. Sec. 7 A new section is added to chapter 36.01 RCW
to read as follows:
(1) To the greatest extent practicable, a permit must be issued by
a county to the department of transportation for a transportation
corridor project, as defined in section 1 of this act, within ninety
days of the department completing the permit application.
(2) The department of transportation shall report annually to the
governor and the legislature regarding any permit applications that
take longer than ninety days to approve.
NEW SECTION. Sec. 8 A new section is added to chapter 35A.21 RCW
to read as follows:
(1) To the greatest extent practicable, a permit must be issued by
a code city to the department of transportation for a transportation
corridor project, as defined in section 1 of this act, within ninety
days of the department completing the permit application.
(2) The department of transportation shall report annually to the
governor and the legislature regarding any permit applications that
take longer than ninety days to approve.
NEW SECTION. Sec. 9 A new section is added to chapter 90.58 RCW
to read as follows:
(1) It is the intent of the legislature that normal maintenance,
repair, safety upgrades, and signage improvements within the
right-of-way of state highway facilities be exempt from all local
permits and reviews conducted to implement this chapter. The
legislature finds that when these activities are conducted consistent
with this chapter, they typically do not have an adverse impact on or
affect the normal public use of shorelines. The legislature determines
that it is in the public interest to exclude state highway maintenance
activities from these local review and approval processes under this
chapter.
(2) State highway facility maintenance, replacement of structures,
minor safety upgrades, and signage installations within the
right-of-way of state highways are not subject to permitting or review
under this chapter, including reviews conducted by local governments to
implement this chapter. Examples include, but are not limited to:
Pavement rehabilitation; luminaire and sign-associated maintenance and
replacement; bank protection and scour repair on existing structures
and facilities; culvert cleanout and minor repair; storm water facility
maintenance and repair; shoulders and slope repair; hazard/danger tree
removal; traffic barrier installation, including cable barriers,
guardrails, and berms; rumble strip grinding; installation of
intelligent transportation systems; and weigh-in-motion facilities.
"Minor safety upgrades" and "replacement of structures" do not include
new travel lanes or expansion of transportation facilities. The
replacement of structures must be comparable to the original structure,
including size, shape, configuration, and location, except to meet
current engineering standards or environmental permit requirements.
NEW SECTION. Sec. 10 A new section is added to chapter 43.21C
RCW to read as follows:
Washington state department of transportation projects that are
categorically excluded under the national environmental policy act (42
U.S.C. Sec. 4321 et seq.) are exempt from this chapter.
Sec. 11 RCW 70.95.030 and 2010 1st sp.s. c 7 s 86 are each
amended to read as follows:
As used in this chapter, unless the context indicates otherwise:
(1) "City" means every incorporated city and town.
(2) "Commission" means the utilities and transportation commission.
(3) "Composted material" means organic solid waste that has been
subjected to controlled aerobic degradation at a solid waste facility
in compliance with the requirements of this chapter. Natural decay of
organic solid waste under uncontrolled conditions does not result in
composted material.
(4) "Department" means the department of ecology.
(5) "Director" means the director of the department of ecology.
(6) "Disposal site" means the location where any final treatment,
utilization, processing, or deposit of solid waste occurs.
(7) "Energy recovery" means a process operating under federal and
state environmental laws and regulations for converting solid waste
into usable energy and for reducing the volume of solid waste.
(8) "Functional standards" means criteria for solid waste handling
expressed in terms of expected performance or solid waste handling
functions.
(9) "Incineration" means a process of reducing the volume of solid
waste operating under federal and state environmental laws and
regulations by use of an enclosed device using controlled flame
combustion.
(10) "Inert waste landfill" means a landfill that receives only
inert waste, as determined under RCW 70.95.065, and includes facilities
that use inert wastes as a component of fill.
(11) "Jurisdictional health department" means city, county, city-county, or district public health department.
(12) "Landfill" means a disposal facility or part of a facility at
which solid waste is placed in or on land and which is not a land
treatment facility.
(13) "Local government" means a city, town, or county.
(14) "Modify" means to substantially change the design or
operational plans including, but not limited to, removal of a design
element previously set forth in a permit application or the addition of
a disposal or processing activity that is not approved in the permit.
(15) "Multiple-family residence" means any structure housing two or
more dwelling units.
(16) "Person" means individual, firm, association, copartnership,
political subdivision, government agency, municipality, industry,
public or private corporation, or any other entity whatsoever.
(17) "Recyclable materials" means those solid wastes that are
separated for recycling or reuse, such as papers, metals, and glass,
that are identified as recyclable material pursuant to a local
comprehensive solid waste plan. Prior to the adoption of the local
comprehensive solid waste plan, adopted pursuant to RCW 70.95.110(2),
local governments may identify recyclable materials by ordinance from
July 23, 1989.
(18) "Recycling" means transforming or remanufacturing waste
materials into usable or marketable materials for use other than
landfill disposal or incineration.
(19) "Residence" means the regular dwelling place of an individual
or individuals.
(20) "Sewage sludge" means a semisolid substance consisting of
settled sewage solids combined with varying amounts of water and
dissolved materials, generated from a wastewater treatment system, that
does not meet the requirements of chapter 70.95J RCW.
(21) "Soil amendment" means any substance that is intended to
improve the physical characteristics of the soil, except composted
material, commercial fertilizers, agricultural liming agents,
unmanipulated animal manures, unmanipulated vegetable manures, food
wastes, food processing wastes, and materials exempted by rule of the
department, such as biosolids as defined in chapter 70.95J RCW and
wastewater as regulated in chapter 90.48 RCW.
(22) "Solid waste" or "wastes" means all putrescible and
nonputrescible solid and semisolid wastes including, but not limited
to, garbage, rubbish, ashes, industrial wastes, swill, sewage sludge,
demolition and construction wastes, abandoned vehicles or parts
thereof, and recyclable materials. "Solid waste" or "wastes" excludes
construction material generated by the department of transportation
that does not threaten human or environmental health.
(23) "Solid waste handling" means the management, storage,
collection, transportation, treatment, utilization, processing, and
final disposal of solid wastes, including the recovery and recycling of
materials from solid wastes, the recovery of energy resources from
solid wastes or the conversion of the energy in solid wastes to more
useful forms or combinations thereof.
(24) "Source separation" means the separation of different kinds of
solid waste at the place where the waste originates.
(25) "Vehicle" includes every device physically capable of being
moved upon a public or private highway, road, street, or watercourse
and in, upon, or by which any person or property is or may be
transported or drawn upon a public or private highway, road, street, or
watercourse, except devices moved by human or animal power or used
exclusively upon stationary rails or tracks.
(26) "Waste-derived soil amendment" means any soil amendment as
defined in this chapter that is derived from solid waste as defined in
this section, but does not include biosolids or biosolids products
regulated under chapter 70.95J RCW or wastewaters regulated under
chapter 90.48 RCW.
(27) "Waste reduction" means reducing the amount or toxicity of
waste generated or reusing materials.
(28) "Yard debris" means plant material commonly created in the
course of maintaining yards and gardens, and through horticulture,
gardening, landscaping, or similar activities. Yard debris includes
but is not limited to grass clippings, leaves, branches, brush, weeds,
flowers, roots, windfall fruit, vegetable garden debris, holiday trees,
and tree prunings four inches or less in diameter.