5988-S AMS ANGE S2217.2
SSB 5988 - S AMD TO S AMD (S-2022.2/15) 33
By Senator Angel
ADOPTED 3/2/2015
On page 5, line 25 of the amendment, strike "$177,501,000" and insert "$187,501,000"
On page 5, line 27 of the amendment, strike "$201,251,000" and insert "$210,251,000"
On page 6, after line 4 of the amendment, insert the following:
"(4) $3,000,000 of the connecting Washington accountstate appropriation is provided solely for a corridor congestion study on state route number 16 (Tacoma Narrows bridge to state route number 302).
(5) $4,000,000 of the connecting Washington accountstate appropriation is provided solely for the department to restripe two southbound lanes of state route number 3.
(6) $3,000,000 of the connecting Washington accountstate appropriation is provided solely for the completion of the environmental impact statement for state route number 302 improvements."
EFFECT: $3,000,000 is provided for a corridor congestion study between SR 16 - Tacoma Narrows Bridge to SR 302. $4,000,000 is provided for two southbound lanes of SR 3 to be restriped. $3,000,000 is provided for completion of the EIS for the SR 302 improvement project.
--- END ---