5992-S AMS ERIC GAMB 154
SSB 5992 - S AMD TO S-2237.1/15 57
By Senator Ericksen
NOT ADOPTED 02/27/2015
On page 6, line 2 of the amendment, after "RCW 47.60.814(18)." insert "When developing the engineer's estimate for the initial request for proposals, the department must estimate costs assuming that RCW 47.60.814(18) does not apply."
|
EFFECT: Directs DOT to develop an engineer's estimate of costs for the initial RFP that does not assume any additional costs for 'Build in Washington' requirements.
|