5992-S AMS ERIC GAMB 154

                

SSB 5992 - S AMD TO S-2237.1/15 57

By Senator Ericksen

NOT ADOPTED 02/27/2015

    On page 6, line 2 of the amendment, after "RCW 47.60.814(18)." insert "When developing the engineer's estimate for the initial request for proposals, the department must estimate costs assuming that RCW 47.60.814(18) does not apply."

    

 

 

EFFECT: Directs DOT to develop an engineer's estimate of costs for the initial RFP that does not assume any additional costs for 'Build in Washington' requirements.

  

 

 

--- END ---