2510-S AMH MORR HUGH 178
SHB 2510 - H AMD TO H AMD (H-4696.1/18) 990
By Representative Morris
On page 2, beginning on line 4 of the striking amendment, after "kilowatts" strike all material through "year" on line 6
|
EFFECT: Removes the requirement that a net metering system be sized no greater than the customer-generator's measured or calculated peak hourly capacity demand for the previous year.
|
--- END ---