H-1108.1
HOUSE JOINT MEMORIAL 4008
State of Washington
65th Legislature
2017 Regular Session
By Representative Morris
TO ELLIOT MAINZER, BONNEVILLE POWER ADMINISTRATION LEAD ADMINISTRATOR AND TO THE SECRETARY OF THE UNITED STATES DEPARTMENT OF ENERGY:
We, your Memorialists, the Senate and House of Representatives of the State of Washington, in legislative session assembled, respectfully represent and petition as follows:
WHEREAS, The Bonneville Power Administration operates and maintains over fifteen thousand circuit miles of transmission line, known as interties, across the western United States, including Washington state; and
WHEREAS, The Bonneville Power Administration has recognized its role in encouraging the development of renewable resources within the Pacific Northwest; and
WHEREAS, The Montana intertie segment of the eastern intertie, which stretches across the state of Montana and into the state of Washington, was originally built and paid for in part by Washington utilities to provide transmission services for coal-fired generating facilities located in southeastern Montana; and
WHEREAS, The Montana intertie also provides transmission services for renewable energy resources that are vital to the decarbonization of the electric sector and the energy independence of the Pacific Northwest; and
WHEREAS, There is an existing one hundred eighty-four megawatts of unsubscribed transmission capacity in the Montana intertie, which is expected to grow in the next five years; and
WHEREAS, The closure of Colstrip Units 1 and 2 by 2022 will further free up transmission capacity for new or expanded clean and renewable energy resources from Montana into Washington state, thereby providing access to resources that can help Washington meet its renewable energy and greenhouse gas reduction goals; and
WHEREAS, Public utilities would transmit energy between many existing and proposed renewable energy resources and the Bonneville Power Administration's eastern intertie; and
WHEREAS, The economic health of the state of Montana directly impacts the economic well-being of the state of Washington; and
WHEREAS, The existing transmission rate charged by the Bonneville Power Administration of two dollars per megawatt is a barrier to new investment in energy generation resources in Montana; and
WHEREAS, The transmission rate is only applied to one segment of less than one hundred miles out of a fifteen thousand mile system, in an area that is in the most need of new energy resources investment; and
WHEREAS, Reduction or elimination of transmission costs will promote the development of new energy and capacity resources in an area of Montana that is experiencing losses in energy and capacity resources;
NOW, THEREFORE, Your Memorialists respectfully pray that the Bonneville Power Administration consider a rate design for the eastern intertie that eliminates or reduces the transmission rate associated with that part of the eastern intertie known as the Montana intertie.
BE IT RESOLVED, That copies of this Memorial be immediately transmitted to Elliot Mainzer, Bonneville Power Administration Lead Administrator and the Secretary of the United States Department of Energy.
--- END ---