2586-S AMH GOEH H4998.1
SHB 2586 - H AMD TO H AMD (H-4987.1/20) 1441
By Representative Goehner
On page 1, line 27, after "(2)" insert "The governing authority of an electric utility formed under this chapter may not adopt a beneficial electrification plan prior to completing a survey of the availability of contractors in the local area to install or repair and service the equipment or systems that are targeted by an electrification option under the beneficial electrification plan.
(3)"
Renumber the remaining subsections consecutively and correct any internal references accordingly.
On page 3, line 31, after "(2)" insert "The commission of a public utility district may not adopt a beneficial electrification plan prior to completing a survey of the availability of contractors in the local area to install or repair and service the equipment or systems that are targeted by an electrification option under the beneficial electrification plan.
(3)"
Renumber the remaining subsections consecutively and correct any internal references accordingly.
EFFECT: Prohibits the governing body of a municipal electric utility or public utility district from adopting a beneficial electrification plan prior to completing a survey of the availability of contractors in the local area to install or repair and service the equipment or systems that are targeted by an electrification option under the beneficial electrification plan.