Beginning on page 1, after line 16, strike all material through "structure." on page 2, line 5 and insert the following:
"(i) Remove the bank protection structure;
(ii) No action, control upland drainage;
(iii) Protect, enhance, and replace vegetation;
(iv) Relocate improvements or structures;
(v) Construct a soft structure by placing beach nourishment and large woody material;
(vi) Construct upland retaining walls;
(vii) Construct a hard structure, such as bulkhead and rock revetment, landward of the ordinary high water line; or
(viii) Construct a hard structure, such as a bulkhead and rock revetments, at the ordinary high water line."