H-1367 _______________________________________________
HOUSE BILL NO. 1787
_______________________________________________
State of Washington 51st Legislature 1989 Regular Session
By Representatives H. Sommers, Schoon and Jacobsen
Read first time 2/3/89 and referred to Committee on Capital Facilities & Financing.
AN ACT Adopting the capital budget; making appropriations and authorizing expenditures for capital improvements; authorizing certain projects; and declaring an emergency.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1. A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period ending June 30, 1991, out of the several funds specified in this act.
NEW SECTION. Sec. 2. As used in this act, the following phrases have the following meanings:
"Common School Constr Fund" means Common School Construction Fund;
"Cap Bldg Constr Acct" means Capitol Building Construction Account;
"St Bldg Constr Acct" means State Building Construction Account;
"St Fac Renew Acct" means State Facilities Renewal Account;
"Fish Cap Proj Acct" means Fisheries Capital Projects Account;
"ORA" means Outdoor Recreation Account;
"Sal Enhmt Constr Acct" means Salmon Enhancement Construction Account;
"For Dev Acct" means Forest Development Account;
"Res Mgmt Cost Acct" means Resource Management Cost Account;
"LIRA, DSHS Fac" means Local Improvements Revolving Account‑-Department of Social and Health Services Facilities;
"DSHS Constr Acct" means State Social and Health Services Construction Account;
"CEP & RI Acct" means Charitable, Educational, Penal, and Reformatory Institutions Account;
"WSU Bldg Acct" means Washington State University Building Account;
"St H Ed Constr Acct" means State Higher Education Construction Account;
"EWU Cap Proj Acct" means Eastern Washington University Capital Projects Account;
"TESC Cap Proj Acct" means The Evergreen State College Capital Projects Account;
"CWU Cap Proj Acct" means Central Washington University Capital Projects Account;
"UW Bldg Acct" means University of Washington Building Account;
"WWU Cap Proj Acct" means Western Washington University Capital Projects Account;
"Cap Purch & Dev Acct" means Capitol Purchase and Development Account;
"Hndcp Fac Constr Acct" means Handicapped Facilities Construction Account;
"LIRA, Waste Disp Fac" means State and Local Improvement Revolving Account‑-Waste Disposal Facilities;
"State Emerg Water Proj Rev" means Emergency Water Project Revolving Account‑-State;
"LIRA, Waste Fac 1980" means State and Local Improvement Revolving Account‑-Waste Disposal Facilities 1980;
"LIRA, Water Sup Fac" means State and Local Improvement Revolving Account‑-Water Supply Facilities;
"LIRA" means State and Local Improvement Revolving Account;
"LIRA, Public Rec Fac" means State and Local Improvement Revolving Account‑-Public Recreation Facilities;
"H Ed Constr Acct" means Higher Education Construction Account 1979;
"H Ed Reimb S/T Bonds Acct" means Higher Education Reimbursable Short-Term Bonds Account;
"Unemp Comp Admin Acct" means Unemployment Compensation Administration Account;
"Game Spec Wildlife Acct" means Game Special Wildlife Account;
"Local Jail Imp & Constr Acct" means Local Jail Improvement and Construction Account;
"ORV" means off road vehicle;
"ESS Rail Assis Acct" means essential rail assistance account;
"ESS Rail Bank Acct" means essential rail bank account;
"East Cap Devel Acct" means east campus development account;
The words "capital improvements" or "capital projects" used in this act mean acquisition of sites, easements, rights of way, or improvements thereon and appurtenances thereto, construction and initial equipment, reconstruction, demolition, or major alterations of new or presently owned capital assets. For purposes of this act, "provided solely" means the specified amount may be spent only for the specified purpose. Unless otherwise specifically authorized in this act, any portion of an amount provided solely for a specified purpose which is unnecessary to fulfill the specified purpose shall revert.
"Revert" or "lapse" means the amount shall return to an unappropriated status.
PART I
GENERAL GOVERNMENT
NEW SECTION. Sec. 101. FOR THE SECRETARY OF STATE
Design and construct regional branch archive facility (90-1-003)
Reappropriation Appropriation
St Bldg Constr Acct 3,005,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
49,000 7,069,000 10,123,000
NEW SECTION. Sec. 102. FOR THE SECRETARY OF STATE
Acquisition and installation of moveable archive vault #2 shelving (90-2-002)
Reappropriation Appropriation
St Bldg Constr Acct 152,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
152,000
NEW SECTION. Sec. 103. FOR THE OFFICE OF FINANCIAL MANAGEMENT
Local jail facilities (88-2-001)
Reappropriation Appropriation
Local Jail Imp & Con Acct 150,615
St Bldg Constr Acct 1,060,789
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,827,596 5,039,000
NEW SECTION. Sec. 104. FOR THE OFFICE OF FINANCIAL MANAGEMENT
Branch campuses: Planning (90-5-001)
The office of financial management shall contract with the higher education coordinating board, in cooperation with the public higher education institutions and the office of financial management, to plan for the orderly development of branch campuses through the year 2010. The plan shall be submitted to the office of financial management and the legislature by January 1, 1990, and should contain, but not be limited to, the following items:
(1) Distribution of projected enrollments between sectors of higher education and between main campus and branch campus sites through the year 2010;
(2) Recommendations of specific sites for each branch campus taking into consideration long-term enrollment needs, access to the public, and program offerings;
(3) Estimates of site acquisition and development costs necessary to accommodate estimated enrollments and program offerings at each branch campus.
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,000,000
NEW SECTION. Sec. 105. FOR THE OFFICE OF FINANCIAL MANAGEMENT
Branch campuses: Site acquisition and development (90-5-002)
The appropriation in this section shall be used for the acquisition and construction of higher education branch campuses. No funds in this appropriation shall be spent prior to legislative adoption of a branch campus plan, as outlined in section 104 of this act.
Reappropriation Appropriation
St Bldg Constr Acct 45,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
100,000,000 145,000,000
NEW SECTION. Sec. 106. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus HVAC repairs (86-1-009)
Reappropriation Appropriation
Bldg Constr Acct 145,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
105,000 250,000
NEW SECTION. Sec. 107. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Temple of Justice Renovation (86-1-011)
Reappropriation Appropriation
St Bldg Constr Acct 800,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
14,560,000 15,360,000
NEW SECTION. Sec. 108. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol Lake Preservation (86-2-024)
Reappropriation Appropriation
Cap Bldg Constr Acct 640,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
654,000 1,294,000
NEW SECTION. Sec. 109. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Northern State-Life Safety Repair (88-1-007)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
175,000 325,000
NEW SECTION. Sec. 110. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus repairs-Inadequate building systems (88-2-008)
Reappropriation Appropriation
Cap Bldg Constr Acct 400,000
St Bldg Constr Acct 1,100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,867,000 7,367,000
NEW SECTION. Sec. 111. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
John A. Cherberg Building remodel (88-2-040)
Reappropriation Appropriation
St Bldg Constr Acct 3,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
800,000 3,800,000
NEW SECTION. Sec. 112. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Highway-License Building Renovation (88-5-011)
Reappropriation Appropriation
Cap Purch & Devel Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
300,000 500,000
NEW SECTION. Sec. 113. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Emergency repairs (90-1-001)
Reappropriation Appropriation
Cap Bldg Constr Acct 250,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
500,000 750,000
NEW SECTION. Sec. 114. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Small repairs and improvements (90-1-002)
Reappropriation Appropriation
Cap Bldg Constr Acct 450,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
900,000 1,350,000
NEW SECTION. Sec. 115. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus asbestos program (90-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
210,000 410,000
NEW SECTION. Sec. 116. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Northern state repairs (90-1-012)
(1) The appropriation in this section from the CEP & RI Account shall be used solely for developing a long range plan for the use of the Northern State Hospital facility. The plan shall be developed cooperatively with the department of social and health services and in consultation with the affected local communities. The study shall be submitted to the office of financial management and the legislature by January 1, 1990.
(2) The remainder of the appropriation shall be used for asbestos abatement in residence facilities in current use.
Reappropriation Appropriation
CEP & RI Acct 100,000
St Bldg Constr Acct 960,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,060,000
NEW SECTION. Sec. 117. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Boiler plant structural repairs (90-1-016)
Reappropriation Appropriation
St Bldg Constr Acct 730,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
730,000
NEW SECTION. Sec. 118. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Asbestos inventory and inspection program (90-01-023)
The appropriation in this section is subject to the following conditions and limitations:
The department shall:
(1) Develop guidelines for asbestos surveys in all state-owned buildings.
(2) Review and approve state agency asbestos survey policies and procedures.
(3) Establish and maintain a central file of asbestos surveys of state-owned buildings.
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
200,000
NEW SECTION. Sec. 119. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Sidewalk and street repairs (90-2-005)
Reappropriation Appropriation
Cap Bldg Constr Acct 500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
200,000 700,000
NEW SECTION. Sec. 120. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Building exterior repairs and renovation (90-2-006)
Reappropriation Appropriation
Cap Bldg Constr Acct 1,426,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,340,000 2,766,000
NEW SECTION. Sec. 121. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Elevator/escalator repair (90-2-007)
Reappropriation Appropriation
St Bldg Constr Acct 614,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,400,000 2,014,000
NEW SECTION. Sec. 122. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Electrical repairs (90-2-008)
Reappropriation Appropriation
Cap Bldg Constr Acct 797,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
901,000 1,698,000
NEW SECTION. Sec. 123. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Mechanical system repairs (90-2-009)
Reappropriation Appropriation
St Bldg Constr Acct 2,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,341,000 4,431,020
NEW SECTION. Sec. 124. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Interior building repair (90-2-010)
Reappropriation Appropriation
Motor transport Acct 262,000
St Bldg Constr Acct 1,125,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,329,000 2,716,000
NEW SECTION. Sec. 125. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Highways-Licenses Building renovation (90-2-015)
Reappropriation Appropriation
Cap Bldg Constr Acct 3,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
10,656,680 13,656,680
NEW SECTION. Sec. 126. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol Lake repairs and preservation (90-3-013)
Reappropriation Appropriation
Cap Bldg Constr Acct 1,813,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,813,000
NEW SECTION. Sec. 127. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Facilities management system (90-4-018)
The appropriation in this section is subject to the following conditions and limitations:
The department shall establish and maintain a central inventory of all state-owned land and facilities. The data elements of the inventory shall be developed in cooperation with the office of financial management.
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
200,000
NEW SECTION. Sec. 128. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Construction of archives storage building (90-4-024)
Reappropriation Appropriation
St Bldg Constr Acct 2,015,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,015,000
NEW SECTION. Sec. 129. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
East campus development (90-5-003)
Design and construct a natural resources building and parking facility on a site directly east of the old Thurston County courthouse.
Reappropriation Appropriation
East Cap Devel Acct 73,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
73,000,000
NEW SECTION. Sec. 130. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Dawley property acquisition (90-5-011)
Reappropriation Appropriation
St Bldg Constr Acct 1,311,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,311,000
NEW SECTION. Sec. 131. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Preplans and surveys (90-5-022)
Reappropriation Appropriation
Cap Bldg Constr Acct 143,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
143,000
NEW SECTION. Sec. 132. FOR THE MILITARY DEPARTMENT
Tacoma Armory rehabilitation phase 3 (86-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,200,000 2,300,000
NEW SECTION. Sec. 133. FOR THE MILITARY DEPARTMENT
Constr watercraft supt training complex (86-1-003)
Reappropriation Appropriation
General fund‑-Federal 6,885,000
St Bldg Constr Acct 2,200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,640,000 5,500,000 16,225,000
NEW SECTION. Sec. 134. FOR THE MILITARY DEPARTMENT
Minor works: Support fed service agreement (86-1-004)
Reappropriation Appropriation
General fund‑-Federal 3,189,000
St Bldg Constr Acct 1,063,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
8,884,000 13,136,000
NEW SECTION. Sec. 135. FOR THE MILITARY DEPARTMENT
Minor works (86-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 85,000 425,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,179,000 1,100,000 3,789,000
NEW SECTION. Sec. 136. FOR THE MILITARY DEPARTMENT
Small repairs and improvements (86-2-006)
Reappropriation Appropriation
St Bldg Constr Acct 375,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
812,000 1,150,000 2,337,000
NEW SECTION. Sec. 137. FOR THE MILITARY DEPARTMENT
Construct Kent Armory (86-3-007)
Reappropriation Appropriation
General fund‑-Federal 600,000
St Bldg Constr Acct 375,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,114,000 4,089,000
NEW SECTION. Sec. 138. FOR THE MILITARY DEPARTMENT
Life/Safety code compliance (88-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 800,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,600,000 2,400,000
NEW SECTION. Sec. 139. FOR THE MILITARY DEPARTMENT
Repair/replace leaking underground tanks (88-2-008)
Reappropriation Appropriation
St Bldg Constr Acct 134,000 345,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
153,000 430,000 1,062,000
NEW SECTION. Sec. 140. FOR THE MILITARY DEPARTMENT
Roof renovation (88-3-006)
Reappropriation Appropriation
St Bldg Constr Acct 125,000 700,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
575,000 900,000 2,300,000
NEW SECTION. Sec. 141. FOR THE MILITARY DEPARTMENT
Exterior painting of facilities (88-3-007)
Reappropriation Appropriation
St Bldg Constr Acct 258,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
258,000 500,000 1,016,000
NEW SECTION. Sec. 142. FOR THE MILITARY DEPARTMENT
Facility HVAC renovation (88-4-004)
Reappropriation Appropriation
St Bldg Constr Acct 280,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
434,000 714,000
NEW SECTION. Sec. 143. FOR THE MILITARY DEPARTMENT
Energy conservation projects (88-4-010)
Reappropriation Appropriation
St Bldg Constr Acct 125,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
951,000 1,076,000
NEW SECTION. Sec. 144. FOR THE MILITARY DEPARTMENT
Project preplanning (88-5-004)
Reappropriation Appropriation
St Bldg Constr Acct 198,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
174,000 341,000 713,000
(End of part)
PART 2
HUMAN RESOURCES
NEW SECTION. Sec. 201. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Capitalize development loan fund (88-2-002)
Reappropriation Appropriation
St Bldg Constr Acct 2,200,000 7,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
6,870,000 10,000,000 26,070,000
NEW SECTION. Sec. 202. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Endangered landmark buildings (88-2-009)
This appropriation is provided solely to establish a permanent fund, known as the endangered landmarks preservation fund, to be used by the department to purchase and hold for brief periods landmark buildings which might otherwise be lost or altered, and to resell those buildings with the proceeds for sale deposited in the fund.
This appropriation is provided contingent on an equal amount being provided from nonstate sources on a project by project basis.
Reappropriation Appropriation
St Bldg Constr Acct 600,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
600,000
NEW SECTION. Sec. 203. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Grays Harbor dredging (88-3-006)
The appropriation in this section is provided solely for the state's share of costs for Grays Harbor dredging, dike construction, bridge relocation, and related expenses.
(1) This money is contingent on $40,000,000 from the United States army corps of engineers and $10,000,000 from local government funds being provided for the project.
(2) The port of Grays Harbor shall make the best possible effort to acquire additional project funding from sources other than those in subsection (1) of this section. Any money, up to $10,000,000 provided from sources other than those in subsection (1) of this section, shall be used to reimburse or replace state building construction fund money.
Reappropriation Appropriation
St Bldg Constr Acct 10,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
10,000,000
NEW SECTION. Sec. 204. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Capitalize housing trust fund (88-5-015)
The appropriation in this section is subject to the following conditions and limitations:
(1) No expenditures from this appropriation may be made until the department has completed the state-wide housing data study and the legislature has reviewed the results.
(2) The appropriation shall be used solely for capital costs associated with the purposes of the housing trust fund under RCW 43.185.050. These moneys shall be used for loans or grants for capital projects state-wide that will provide housing for persons or families with special housing needs and with incomes at or below fifty percent of the median family income for the county or standard metropolitan statistical area where the project is located. At least thirty percent of the moneys used for loans or grants shall go to projects located in rural areas.
(3) The department shall to the maximum extent feasible use the appropriation to leverage other funds for capital costs associated with the purposes of the housing trust fund under chapter 43.185 RCW.
Reappropriation Appropriation
St Bldg Constr Acct 2,000,000 15,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
20,000,000 37,000,000
NEW SECTION. Sec. 205. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Tacoma Union Station (88-5-016)
The appropriation in this section, in addition to funds appropriated for the 1987-89 biennium for this project, is subject to the following conditions and limitations:
(1) $1,000,000 is provided solely to prevent further deterioration of the Tacoma Union Station building. This may include, but is not limited to, providing a fire detection system, removing safety hazards, and programming necessary to implement these works.
(2) A maximum of $500,000 may be used for planning regarding future use of the Tacoma Union Station property to promote state economic development.
(3) The money in subsections (1) and (2) of this section is provided contingent upon a written legal agreement between the city of Tacoma and the state that (a) requires state approval of future uses and disposition of the Tacoma Union Station property and (b) gives the state the right of first refusal to assume the city of Tacoma's option to purchase the Tacoma Union Station property currently owned by the Burlington Northern company.
(4) $500,000 is provided solely for architectural plans and construction specifications for a state museum on the Union Station property.
(5) $400,000 is provided solely for purchase of the Union Station property. The appropriation in this subsection is contingent on a like amount being provided for this purpose from nonstate sources.
(6) $2,000,000 is provided solely for restoration of the rotunda of the Union Station building. The appropriation in this subsection is contingent on the city's agreement to exercise its option to purchase Union Station and the city's agreement to grant to the state the right of first refusal to assume the city's option to purchase the property should the city decide to withdraw from the project.
(7) The money in subsections (4), (5), and (6) of this section is provided contingent upon a written legal agreement between the city of Tacoma and the state that:
(a) The city obtain the state's approval for all decisions with respect to:
(i) Determining final ownership of Union Station itself;
(ii) Identifying appropriate uses for the site; and
(iii) Selecting consultants retained by the city under its contract with the state;
(b) The city consult with the state and, unless prohibited from doing so by terms of the United States general services administration lease, follow the state's recommendations in other significant decisions concerning the development of the Union Station properties, including but not limited to:
(i) Planning the development and redevelopment of the site to accommodate appropriate uses;
(ii) Obtaining financing for acquisition, development, or redevelopment of the property; and
(iii) Acquiring, leasing, subleasing, and/or reselling the property;
(c) If the city finds that it is not possible to follow the state's recommendations, the city will advise the state and allow the state a reasonable opportunity to comment; and
(d) The city shall obtain a public access easement from the United States general services administration or any other owner or lessee that will allow public access through the rotunda to any future state facility.
Reappropriation Appropriation
St Bldg Constr Acct 3,900,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
500,000 4,400,000
NEW SECTION. Sec. 206. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
San Juan County Courthouse (88-5-017)
This appropriation is contingent on the provision of an equal amount of money from nonstate sources.
Reappropriation Appropriation
St Bldg Constr Acct 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
100,000
NEW SECTION. Sec. 207. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Columbia County Courthouse (89-4-004)
The appropriation in this section is subject to the following conditions and limitations:
(1) $400,000 is appropriated to repair and restore the Columbia county courthouse.
(2) The appropriation in this section shall be matched by $700,000 in private donations and local funds from Columbia county.
Reappropriation Appropriation
St Bldg Constr Acct 400,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
400,000
NEW SECTION. Sec. 208. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Spokane public facilities (89-5-005)
The appropriation in this section is subject to the following conditions and limitations: The money appropriated in this section is provided solely for the purposes of RCW 36.100.030 and 36.100.060. Money appropriated in this section may be spent only if the Spokane public facilities district has been created. If all bonds needed to construct a Spokane trade, sports and convention facility have not been authorized by December 31, 1991, the district shall within thirty days thereafter repay the amount appropriated in this section, together with all interest earnings, to the state building construction account.
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,000,000
NEW SECTION. Sec. 209. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Construct fire service training center station (90-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 2,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
15,740 2,015,740
NEW SECTION. Sec. 210. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Public works trust fund (90-2-001)
The appropriations in this section are provided solely for public works projects recommended by the public works board and approved by the legislature under chapter 43.155 RCW.
Reappropriation Appropriation
Pub Works Asst Acct 43,284,704 64,987,112
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
7/1/87 Thereafter
18,038,142 168,562,493 294,872,451
NEW SECTION. Sec. 211. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Emergency management building minor renovation (90-2-003)
This appropriation shall be used solely to provide handicapped access and improve insulation.
Reappropriation Appropriation
St Bldg Constr Acct 80,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
80,000
NEW SECTION. Sec. 212. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Fire service training center minor works (90-2-004)
Reappropriation Appropriation
St Bldg Constr Acct 441,887
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
441,887
NEW SECTION. Sec. 213. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Seattle Asian Cultural Center‑-Design and construction (90-5-006)
This appropriation is subject to the following conditions and limitations:
(1) This appropriation shall be used for construction cost only.
(2) This appropriation is contingent upon an equal amount being provided by nonstate sources.
Reappropriation Appropriation
St Bldg Constr Acct 759,300
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
759,300
NEW SECTION. Sec. 214. FOR THE DEPARTMENT OF LABOR AND INDUSTRIES
Property acquisition, design and construct office facility (90-5-001)
Reappropriation Appropriation
Accident Fund 31,500,000
Medical Aid Fund 31,500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
63,000,000
NEW SECTION. Sec. 215. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Lakeland Village: Construct habilitation center (79-1-009)
Reappropriation Appropriation
DSHS Constr Acct 375,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
6,040,662 6,415,662
NEW SECTION. Sec. 216. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Rainier School: Renovate Evergreen Center (79-1-017)
Reappropriation Appropriation
St Bldg Constr Acct 4,400,000
DSHS Constr Acct 75,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,058,824 5,533,824
NEW SECTION. Sec. 217. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Referendum #37 (79-3-001)
In addition to previously approved projects, $29,000 shall be used to construct an addition to a training center in Skamania county to serve up to ten more developmentally disabled children under four years old, which requires a final application submittal by December 31, 1989, and approval by March 31, 1990.
Reappropriation Appropriation
Handicap Fac Constr Acct 461,951
Improve‑-DSHS Fac Acct 23,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,825,588 3,311,039
NEW SECTION. Sec. 218. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
State mental health residences (79-3-002)
This appropriation, in addition to funds appropriated in the 1987-89 biennium for this project, is subject to the following conditions and limitations: A maximum of $40,000 of the funds provided may be spent for renovation or other costs necessary to establish a self-supporting day care center for children of state employees at Eastern State Hospital. A maximum of $170,000 of the funds provided in this section is provided solely for participation by the department of social and health services in a project to construct a multipurpose child care center at the Everett community college.
Reappropriation Appropriation
Improv‑-DSHS Fac Acct 218,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
985,677 1,204,177
NEW SECTION. Sec. 219. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Complete artwork (79-4-005)
Reappropriation Appropriation
DSHS Constr Acct 40,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
108,045 148,045
NEW SECTION. Sec. 220. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Construct public health lab (81-3-110)
Reappropriation Appropriation
DSHS Constr Acct 12,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
631,490 643,990
NEW SECTION. Sec. 221. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Fire safety (83-1-006)
Reappropriation Appropriation
DSHS Constr Acct 25,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
189,203 214,203
NEW SECTION. Sec. 222. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Eastern State Hospital: Renovate wards, phase 1 (83-2-016)
Reappropriation Appropriation
DSHS Constr Acct 169,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,106,000 3,275,000
NEW SECTION. Sec. 223. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Renovate wards, phase 2 (83-2-017)
Reappropriation Appropriation
DSHS Constr Acct 3,500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
10,398,000 13,898,000
NEW SECTION. Sec. 224. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Mission Creek: Renovate main buildings (86-1-202)
Reappropriation Appropriation
St Fac Renew Acct 123,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,924,999 2,047,999
NEW SECTION. Sec. 225. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Fircrest Schools: Construct food service (86-1-403)
Reappropriation Appropriation
DSHS Constr Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,896,302 4,096,302
NEW SECTION. Sec. 226. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Referendum 27 and 38 (86-2-099)
The appropriations in this section are subject to the following conditions and limitations:
(1) Up to sixteen full-time equivalent staff per year may be funded from the reappropriation of Referendum 38 for the purpose of reviewing local water improvement accounts.
(2) The appropriation is provided solely for drought related municipal and industrial water supply projects.
Reappropriation Appropriation
LIRA Water Supp Fac 25,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
20,134,000 45,134,000
NEW SECTION. Sec. 227. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Renovate wards, phase 3 (88-1-307)
Reappropriation Appropriation
St Bldg Constr Acct 585,900
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
585,900
NEW SECTION. Sec. 228. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
CSTC‑-Renovate residences to high school (88-1-318)
Reappropriation Appropriation
St Bldg Constr Acct 860,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
87,000 947,000
NEW SECTION. Sec. 229. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
ITA residential facilities (88-2-340)
Reappropriation Appropriation
St Bldg Constr Acct 950,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
50,000 1,000,000
NEW SECTION. Sec. 230. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Sanitary sewer (88-2-400)
Reappropriation Appropriation
St Bldg Constr Acct 1,050,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,829,000 4,879,000
NEW SECTION. Sec. 231. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor capital renewal: Fire safety (90-1-004)
Reappropriation Appropriation
CEP & RI Acct 600,000
St Bldg Constr Acct 1,120,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
25,000 1,200,000 2,945,000
NEW SECTION. Sec. 232. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor capital renewal: Hazardous substance (90-1-005)
Reappropriation Appropriation
CEP & RI Acct 500,000
St Bldg Constr Acct 645,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
332,000 1,392,500 2,869,500
NEW SECTION. Sec. 233. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Emergency capital repairs (90-1-007)
Reappropriation Appropriation
CEP & RI Acct 250,000
St Bldg Constr Acct 294,000
St Fac Renew Acct 135,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
815,502 500,000 1,994,502
NEW SECTION. Sec. 234. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Echo Glen: Renovate eleven living units (90-1-210)
Reappropriation Appropriation
St Bldg Constr Acct 2,964,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,964,000
NEW SECTION. Sec. 235. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Ward renovations, phase 4 (90-1-312)
Reappropriation Appropriation
St Bldg Constr Acct 5,189,400
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,189,400
NEW SECTION. Sec. 236. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Eastern State Hospital: Ward renovations, phase 2 (90-1-339)
Reappropriation Appropriation
St Bldg Constr Acct 4,510,400
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
4,510,400
NEW SECTION. Sec. 237. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor capital renewal: Utilities and facilities (90-2-001)
Reappropriation Appropriation
CEP & RI Acct 750,000
St Bldg Constr Acct 780,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
278,000 2,100,000 3,908,000
NEW SECTION. Sec. 238. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor capital renewal: Roads and grounds (90-2-002)
Reappropriation Appropriation
CEP & RI Acct 500,000
St Bldg Constr Acct 510,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
112,200 1,200,000 2,322,200
NEW SECTION. Sec. 239. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor capital renewal: Roofs (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 140,000 700,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,000,000 2,000,000 3,840,000
NEW SECTION. Sec. 240. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Small repairs and improvements (90-2-008)
Reappropriation Appropriation
CEP & RI Acct 190,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
415,000 605,000
NEW SECTION. Sec. 241. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Bureau of Alcohol and Substance Abuse (90-2-010)
Reappropriation Appropriation
CEP & RI Acct 442,400
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
100,000 542,400
NEW SECTION. Sec. 242. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Juvenile rehabilitation division (90-2-020)
Reappropriation Appropriation
CEP & RI Acct 270,100
St Bldg Constr Acct 331,000
St Fac Renew Acct 1,020,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,014,000 300,000 3,935,100
NEW SECTION. Sec. 243. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Mental health division (90-2-030)
Reappropriation Appropriation
St Bldg Constr Acct 600,000
St Fac Renew Acct 292,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,058,799 700,000 2,650,799
NEW SECTION. Sec. 244. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Mental health division (2) (90-2-032)
Reappropriation Appropriation
CEP & RI Acct 75,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
250,000 325,000
NEW SECTION. Sec. 245. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Developmental disabilities division (90-2-040)
Reappropriation Appropriation
CEP & RI Acct 21,200
St Bldg Constr Acct 694,000 517,600
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,063,955 550,000 2,846,755
NEW SECTION. Sec. 246. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Health division (90-2-050)
Reappropriation Appropriation
CEP & RI Acct 358,900
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
100,000 358,900
NEW SECTION. Sec. 247. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Lakeland Village: Steam plant replacement (90-2-425)
Reappropriation Appropriation
St Bldg Constr Acct 4,063,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
4,063,000
NEW SECTION. Sec. 248. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Resource conservation (90-4-006)
Reappropriation Appropriation
St Bldg Constr Acct 220,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
85,000 305,000
NEW SECTION. Sec. 249. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Preplanning (90-4-009)
Reappropriation Appropriation
CEP & RI Acct 215,400
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
329,500 544,900
NEW SECTION. Sec. 250. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Food bank facility: Fircrest (90-5-011)
Reappropriation Appropriation
St Bldg Constr Acct 788,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
788,000
NEW SECTION. Sec. 251. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Food services renovation (88-1-014)
Reappropriation Appropriation
CEP & RI Acct 282,700
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
282,700
NEW SECTION. Sec. 252. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Soldiers Home‑-Preplan a thirty bed Alzheimer's unit (88-5-020)
Reappropriation Appropriation
CEP & RI Acct 33,700
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,908,700 1,942,400
NEW SECTION. Sec. 253. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Preplanning for one hundred bed nursing care unit (88-5-022)
Reappropriation Appropriation
CEP & RI Acct 129,400
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
7,487,600 7,617,000
NEW SECTION. Sec. 254. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Minor projects‑-Asbestos (90-1-003)
Reappropriation Appropriation
CEP & RI Acct 300,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
300,000
NEW SECTION. Sec. 255. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Minor projects‑-Roads and walkways (90-1-005)
Reappropriation Appropriation
CEP & RI Acct 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
100,000
NEW SECTION. Sec. 256. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Air quality, Building 9 (90-1-009)
Reappropriation Appropriation
CEP & RI Acct 313,200
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
313,200
NEW SECTION. Sec. 257. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Small projects (90-1-011)
Reappropriation Appropriation
CEP & RI Acct 39,800
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
39,800
NEW SECTION. Sec. 258. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Minor projects‑-Building remodel (90-2-008)
Reappropriation Appropriation
CEP & RI Acct 256,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
256,000
NEW SECTION. Sec. 259. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Minor projects‑-Utilities and energy projects (90-4-006)
Reappropriation Appropriation
CEP & RI Acct 544,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
544,000
NEW SECTION. Sec. 260. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Minor projects‑-Building study (90-5-012)
Reappropriation Appropriation
CEP & RI Acct 35,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
35,000
NEW SECTION. Sec. 261. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Steam distribution system (92-2-024)
Reappropriation Appropriation
CEP & RI Acct 22,200
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
895,700 917,900
NEW SECTION. Sec. 262. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center enlarge, remodel six hundred beds (83-3-029)
Reappropriation Appropriation
St Bldg Constr Acct 32,961
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,338,053 1,371,014
NEW SECTION. Sec. 263. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Reformatory facility improvements (83-3-048)
Reappropriation Appropriation
St Bldg Constr Acct 5,300,000 8,600,000
DSHS Constr Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
9,533,303 16,000,000 39,633,303
NEW SECTION. Sec. 264. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary improve security, facilities, utilities (83-3-052)
Reappropriation Appropriation
St Bldg Constr Acct 400,000 5,898,000
DSHS Constr Acct 1,650,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
6,267,413 2,476,000 16,691,413
NEW SECTION. Sec. 265. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center renovation of utilities (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 4,377,000 1,261,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,647,000 4,674,000 13,959,000
NEW SECTION. Sec. 266. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center repairs to transportation system (86-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 1,033,831 3,522,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,259,169 7,081,000 13,896,000
NEW SECTION. Sec. 267. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center building fire/safety (86-1-008)
Reappropriation Appropriation
St Bldg Constr Acct 2,000,000 2,183,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,165,000 967,000 8,315,000
NEW SECTION. Sec. 268. FOR THE DEPARTMENT OF CORRECTIONS
State-wide minor projects (86-2-005)
Reappropriation Appropriation
St Bldg Constr Acct 160,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
4,019,000 4,179,000
NEW SECTION. Sec. 269. FOR THE DEPARTMENT OF CORRECTIONS
State-wide small repairs and improvements (86-2-006)
Reappropriation Appropriation
St Bldg Constr Acct 33,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
512,500 546,000
NEW SECTION. Sec. 270. FOR THE DEPARTMENT OF CORRECTIONS
Life safety code compliance (88-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 270,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,270,000 1,540,000
NEW SECTION. Sec. 271. FOR THE DEPARTMENT OF CORRECTIONS
State-wide wastewater system improvements (88-1-017)
Reappropriation Appropriation
St Bldg Constr Acct 418,000 605,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
290,000 1,313,000
NEW SECTION. Sec. 272. FOR THE DEPARTMENT OF CORRECTIONS
State-wide water system improvements (88-1-018)
Reappropriation Appropriation
St Bldg Constr Acct 50,000 939,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
372,000 1,361,000
NEW SECTION. Sec. 273. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center implement master plan (88-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 4,377,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
621,000 28,000,000 32,998,000
NEW SECTION. Sec. 274. FOR THE DEPARTMENT OF CORRECTIONS
Tacoma work release relocation (88-2-004)
Reappropriation Appropriation
St Bldg Constr Acct 4,355,450
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
106,550 4,462,000
NEW SECTION. Sec. 275. FOR THE DEPARTMENT OF CORRECTIONS
Eastern Washington prerelease, site preparation (88-2-005)
Reappropriation Appropriation
St Bldg Constr Acct 947,145
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
63,855 1,011,000
NEW SECTION. Sec. 276. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center for Women implement master plan (88-2-006)
Reappropriation Appropriation
St Bldg Constr Acct 600,687 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
14,313 5,800,000 7,415,000
NEW SECTION. Sec. 277. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center reroof building (88-3-019)
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
65,000 1,065,000
NEW SECTION. Sec. 278. FOR THE DEPARTMENT OF CORRECTIONS
State-wide asbestos removal/encapsulation (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 2,500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,000,000 7,500,000
NEW SECTION. Sec. 279. FOR THE DEPARTMENT OF CORRECTIONS
Hazardous materials management (90-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 879,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
604,000 1,483,000
NEW SECTION. Sec. 280. FOR THE DEPARTMENT OF CORRECTIONS
WCC and WCCW perimeter security upgrade (90-1-007)
Reappropriation Appropriation
St Bldg Constr Acct 1,652,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,277,000 4,929,000
NEW SECTION. Sec. 281. FOR THE DEPARTMENT OF CORRECTIONS
State-wide minor projects (90-1-009)
Reappropriation Appropriation
CEP & RI Acct 1,000,000
St Bldg Constr Acct 4,349,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
8,000,000 13,349,000
NEW SECTION. Sec. 282. FOR THE DEPARTMENT OF CORRECTIONS
State-wide small repairs and improvements (90-1-010)
Reappropriation Appropriation
St Bldg Constr Acct 756,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
756,000
NEW SECTION. Sec. 283. FOR THE DEPARTMENT OF CORRECTIONS
State-wide emergency repairs projects (90-1-013)
Reappropriation Appropriation
CEP & RI Acct 750,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,500,000 2,250,000
NEW SECTION. Sec. 284. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center Reception Center upgrade (90-2-012)
Reappropriation Appropriation
CEP & RI Acct 26,000
St Bldg Constr Acct 236,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
14,400,000 14,662,000
NEW SECTION. Sec. 285. FOR THE DEPARTMENT OF CORRECTIONS
WSP‑-Expand medium security complex (MSC) industries building (90-2-016)
Reappropriation Appropriation
St Bldg Constr Acct 1,213,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,213,000
NEW SECTION. Sec. 286. FOR THE DEPARTMENT OF CORRECTIONS
State-wide roof repair (90-3-011)
Reappropriation Appropriation
St Bldg Constr Acct 1,500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,500,000
NEW SECTION. Sec. 287. FOR THE DEPARTMENT OF CORRECTIONS
Community corrections preplanning for construction‑-Work release (90-4-005)
Reappropriation Appropriation
CEP & RI Acct 218,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
7,790,000 8,008,000
NEW SECTION. Sec. 288. FOR THE DEPARTMENT OF EMPLOYMENT SECURITY
Port Angeles‑-Job Service Center (90-2-001)
Reappropriation Appropriation
Unemploy Comp Admin‑-State 900,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
900,000
NEW SECTION. Sec. 289. FOR THE DEPARTMENT OF EMPLOYMENT SECURITY
Bremerton Job Service Center (92-5-006)
Reappropriation Appropriation
Unemploy Comp Admin‑-State 761,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
761,000
(End of part)
PART 3
NATURAL RESOURCES
NEW SECTION. Sec. 301. FOR THE WASHINGTON STATE ENERGY OFFICE
Energy conservation projects (90-4-001)
The appropriation in this section is subject to the following conditions and limitations:
The department shall contract with the following agencies for the amounts specified to undertake energy conservation projects. Each contract shall require the agencies listed below to deposit into the energy conservation account an amount equal to the contract amount. The payback period shall be determined by the department, but shall not exceed six years.
(1) No more than $1,033,000 shall be expended for energy conservation projects for Military Department facilities;
(2) No more than $361,600 shall be expended for energy conservation projects for the department of social and health services;
(3) No more than $552,000 shall be expended for energy conservation projects for The Evergreen State College.
Reappropriation Appropriation
St Bldg Constr Acct 1,946,600
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,199,000 4,145,600
NEW SECTION. Sec. 302. FOR THE DEPARTMENT OF ECOLOGY
Referendum 26‑-Waste disposal facilities; special program, state-wide (74-5-004)
Reappropriation Appropriation
LIRA‑-Waste Disp Fac 15,742,506 6,100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
210,524,884 21,220,965 253,588,355
NEW SECTION. Sec. 303. FOR THE DEPARTMENT OF ECOLOGY
Referendum 27 and 38‑-Water supply facilities; special program, state-wide (74-5-006)
The appropriation in this section is subject to the following conditions and limitations:
(1) A maximum of $75,000 of this reappropriation may be expended for modification of the gate on the Lake Osoyoos international water control structure authorized by chapter 76, Laws of 1982.
(2) Funds previously appropriated for the East Selah reregulating reservoir shall be reallocated for purposes of early implementation of the Yakima river basin water enhancement project in order to financially assist irrigators in making up 80,000 acre feet of water per year lost because of a 1980 court decision.
Reappropriation Appropriation
LIRA Water Sup Fac 28,188,656 6,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
67,915,027 56,509,393 158,613,076
NEW SECTION. Sec. 304. FOR THE DEPARTMENT OF ECOLOGY
State emergency water project revolving account; special program, state-wide (76-5-003)
Reappropriation Appropriation
St Emer Water Proj Rev 3,724,782 3,923,199
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,411,242 6,633,165 15,692,388
NEW SECTION. Sec. 305. FOR THE DEPARTMENT OF ECOLOGY
Padilla Bay Research Reserve‑-Land acquisition/special program (80-2-002)
Reappropriation Appropriation
General Fund‑-Federal 112,362
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,201,177 1,313,539
NEW SECTION. Sec. 306. FOR THE DEPARTMENT OF ECOLOGY
Referendum 39‑-Waste disposal facilities, 1980; special program, state-wide (82-5-005)
The appropriation in this section is subject to the following conditions and limitations: A maximum of $1,500,000 of the appropriation may be expended for planning assistance to any ground water management areas created pursuant to chapter 453, Laws of 1985. Such assistance shall be allocated in a manner consistent with chapter 3, Laws of 1986.
Reappropriation Appropriation
LIRA Waste Fac‑-1980 123,049,668 15,200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
312,372,992 153,615,411 604,238,071
NEW SECTION. Sec. 307. FOR THE DEPARTMENT OF ECOLOGY
Water quality account; special programs, state-wide (86-5-007)
The appropriation in this section is subject to the following conditions and limitations:
(1) In developing rules to administer chapter 3, Laws of 1986 and in awarding grants, extended grant payments, or loans from the water quality account, the department shall include, but not be limited to the following:
(a) For facilities that discharge directly into marine waters, the department shall:
(i) Give first priority to secondary wastewater treatment facilities that are mandated by both federal and state law;
(ii) Give second priority to projects which reduce combined sewer overflows; and
(iii) Encourage economies that are derived from any simultaneous projects which achieve both (i) and (ii) of this subsection.
(b) In determining the appropriate level of state assistance for eligible facilities and activities, the department shall consider:
(i) The need to provide additional assistance for eligible activities undertaken by local public bodies which lack taxing or revenue generating authority; and
(ii) The need to provide additional assistance for eligible facilities undertaken by local public bodies that would suffer severe financial hardship in the absence of such additional assistance.
(c) The department shall place such funds as may be necessary from the water quality account into a state revolving loan fund to be used to match capitalization funds provided by the federal environmental protection agency under Public Law 100-4. The department shall also gradually arrange for a transition in the assistance program toward the use of loans.
(d) The following limitations shall apply to the department's total distribution of funds appropriated under this section:
(i) Not more than fifty percent for water pollution control facilities which discharge directly into marine waters;
(ii) Not more than twenty percent for water pollution control activities that prevent or mitigate pollution of underground waters and facilities that protect federally designated sole source aquifers with at least two-thirds for the Spokane-Rathdrum Prairie aquifer;
(iii) Not more than ten percent for water pollution control activities that protect freshwater lakes and rivers including but not limited to Lake Chelan and the Yakima and Columbia rivers;
(iv) Not more than ten percent for activities which control nonpoint source water pollution;
(v) Ten percent and such sums as may be remaining from the categories specified in (i) through (iv) of this subsection for water pollution control activities or facilities as determined by the department.
(2) In determining compliance schedules for the greatest reasonable reduction of combined sewer overflows, the department shall consider the amount of grant or loan moneys available to assist local governments in the planning, design, acquisition, construction, and improvement of combined sewer overflow facilities.
Reappropriation Appropriation
Water Quality Acct 66,976,344 119,737,961
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
8,293,506 339,768,412 534,776,223
NEW SECTION. Sec. 308. FOR THE STATE PARKS AND RECREATION COMMISSION
Yakima Greenway acquisition (81-3-098)
Reappropriation Appropriation
ORA‑-State 92,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,000 93,000
NEW SECTION. Sec. 309. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Water supply facilities (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 197,000
ORA‑-Federal 3,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
735,000 935,000
NEW SECTION. Sec. 310. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Sewage treatment facilities (86-1-003)
Reappropriation Appropriation
LIRA Waste Fac‑-1980 217,500
St Bldg Constr Acct 43,500
ORA‑-Federal 14,500
ORA‑-State 14,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
700,000 990,000
NEW SECTION. Sec. 311. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boating repairs (86-1-020)
Reappropriation Appropriation
St Bldg Constr Acct 19,000
ORA‑-Federal 8,000
ORA‑-State 48,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
388,000 463,000
NEW SECTION. Sec. 312. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boating renovation (86-1-021)
Reappropriation Appropriation
St Bldg Constr Acct 10,800
ORA‑-State 48,200
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
91,000 150,000
NEW SECTION. Sec. 313. FOR THE STATE PARKS AND RECREATION COMMISSION
Beacon Rock‑-Replace floats and piling, renovate shear boom (86-1-022)
Reappropriation Appropriation
ORA‑-Federal 6,000
ORA‑-State 54,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
246,000 306,000
NEW SECTION. Sec. 314. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Energy conservation and landscape renovation (86-1-027)
Reappropriation Appropriation
St Bldg Constr Acct 117,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
423,000 540,000
NEW SECTION. Sec. 315. FOR THE STATE PARKS AND RECREATION COMMISSION
Iron Horse‑-Trail safety and bridge repair/acquisition (86-1-030)
Reappropriation Appropriation
St Bldg Constr Acct 50,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
50,000 100,000
NEW SECTION. Sec. 316. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden‑-Point Wilson bank protection, phase 2 (86-1-032)
Reappropriation Appropriation
St Bldg Constr Acct 108,900
ORA‑-Federal 104,000
ORA‑-State 87,900
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
188,100 124,600 613,500
NEW SECTION. Sec. 317. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boating improvements (86-3-005)
Reappropriation Appropriation
ORA‑-Federal 37,000
ORA‑-State 58,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
124,000 219,000
NEW SECTION. Sec. 318. FOR THE STATE PARKS AND RECREATION COMMISSION
Mount Spokane‑-Entrance road development (86-3-034)
Reappropriation Appropriation
Mot Veh Fund 20,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
180,000 200,000
NEW SECTION. Sec. 319. FOR THE STATE PARKS AND RECREATION COMMISSION
West Hylebos‑-Acquisition and development (86-4-013)
Reappropriation Appropriation
St Bldg Constr Acct 195,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,000 200,000
NEW SECTION. Sec. 320. FOR THE STATE PARKS AND RECREATION COMMISSION
Sacajawea‑-Boat launch reconstruction (87-1-025)
Reappropriation Appropriation
ORA‑-Federal 1,000
ORA‑-State 9,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
91,000 101,000
NEW SECTION. Sec. 321. FOR THE STATE PARKS AND RECREATION COMMISSION
Lake Sylvia‑-Dam safety renovation and repair, phase 2 (87-1-028)
Reappropriation Appropriation
St Bldg Constr Acct 15,000 165,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
127,000 307,000
NEW SECTION. Sec. 322. FOR THE STATE PARKS AND RECREATION COMMISSION
Kopachuck‑-Shoreline protection (87-1-031)
Reappropriation Appropriation
ORA‑-State 40,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
64,000 104,000
NEW SECTION. Sec. 323. FOR THE STATE PARKS AND RECREATION COMMISSION
Moran‑-Mountain Lake CCC building renovation (87-1-049)
Reappropriation Appropriation
St Bldg Constr Acct 140,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
23,000 163,000
NEW SECTION. Sec. 324. FOR THE STATE PARKS AND RECREATION COMMISSION
Deception Pass‑-Renovate CCC buildings 2 and 3, Rosario (87-1-050)
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
10,000 210,000
NEW SECTION. Sec. 325. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden‑-Phased weatherization of facilities (87-2-016)
Reappropriation Appropriation
St Bldg Constr Acct 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
350,000 450,000
NEW SECTION. Sec. 326. FOR THE STATE PARKS AND RECREATION COMMISSION
Flaming geyser‑-Bridge relocation and installation, phase 2 (87-2-029)
Reappropriation Appropriation
St Bldg Constr Acct 31,000
ORA‑-Federal 180,000
ORA‑-State 170,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
16,000 625,000 1,022,000
NEW SECTION. Sec. 327. FOR THE STATE PARKS AND RECREATION COMMISSION
Auburn Game Farm‑-Initial park development (87-3-012)
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
346,000 546,000
NEW SECTION. Sec. 328. FOR THE STATE PARKS AND RECREATION COMMISSION
Green River Gorge‑-Acquisition, phased project (87-5-010)
Reappropriation Appropriation
St Bldg Constr Acct 300,000
ORA‑-Federal 50,000
ORA‑-State 50,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,042,000 263,000 1,705,000
NEW SECTION. Sec. 329. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Potable water supply, omnibus facility contingency (88-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 69,000
LIRA‑-Water Sup Fac 46,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
30,000 145,000
NEW SECTION. Sec. 330. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Potable water supply, omnibus minor projects (88-1-003)
Reappropriation Appropriation
St Bldg Constr Acct 360,000
LIRA‑-Water Sup Fac 240,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
93,000 693,000
NEW SECTION. Sec. 331. FOR THE STATE PARKS AND RECREATION COMMISSION
Sequim Bay‑-Reservoir cover (88-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 24,000
LIRA‑-Water Sup Fac 16,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
92,000 132,000
NEW SECTION. Sec. 332. FOR THE STATE PARKS AND RECREATION COMMISSION
Sequim Bay‑-Renovate park water system (88-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 48,000
LIRA‑-Water Sup Fac 32,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
110,000 190,000
NEW SECTION. Sec. 333. FOR THE STATE PARKS AND RECREATION COMMISSION
Moran‑-Renovate potable water system (88-1-006)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
LIRA‑-Water Sup Fac 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
33,000 283,000
NEW SECTION. Sec. 334. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Sewer facilities, omnibus facility contingency (88-1-007)
Reappropriation Appropriation
LIRA Waste Fac‑-1980 135,000
St Bldg Constr Acct 45,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
118,000 298,000
NEW SECTION. Sec. 335. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Sewer facilities, omnibus minor projects (88-1-008)
Reappropriation Appropriation
LIRA Waste Fac‑-1980 228,000
St Bldg Constr Acct 76,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
32,000 336,000
NEW SECTION. Sec. 336. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boat pumpout facilities, phased project (88-1-009)
Reappropriation Appropriation
LIRA Waste Fac‑-1980 57,000
St Bldg Constr Acct 293,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
199,000 549,000
NEW SECTION. Sec. 337. FOR THE STATE PARKS AND RECREATION COMMISSION
Ocean City‑-Connect to municipal sewer system (88-1-010)
Reappropriation Appropriation
LIRA Waste Fac‑-1980 277,500
St Bldg Constr Acct 92,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
12,000 382,000
NEW SECTION. Sec. 338. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boat traffic control markers and devices (88-1-013)
Reappropriation Appropriation
ORA‑-State 20,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
90,000 110,000
NEW SECTION. Sec. 339. FOR THE STATE PARKS AND RECREATION COMMISSION
St. Edward‑-Main electrical code compliance (88-1-027)
Reappropriation Appropriation
St Bldg Constr Acct 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
24,000 124,000
NEW SECTION. Sec. 340. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden‑-Electrical service renovation to 7,200 volts (88-1-030)
Reappropriation Appropriation
St Bldg Constr Acct 275,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
50,000 325,000
NEW SECTION. Sec. 341. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boating facilities, omnibus facilities contingency (88-2-011)
Reappropriation Appropriation
ORA‑-State 135,700
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
85,300 221,000
NEW SECTION. Sec. 342. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boating facilities, omnibus minor projects (88-2-012)
Reappropriation Appropriation
ORA‑-State 718,400
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
250,600 969,000
NEW SECTION. Sec. 343. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Park facilities renovation, omnibus facilities contingency (88-2-025)
Reappropriation Appropriation
St Bldg Constr Acct 334,000
LIRA, Pub Rec Fac 43,249
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
347,751 725,000
NEW SECTION. Sec. 344. FOR THE STATE PARKS AND RECREATION COMMISSION
Camp Wooten‑-Replace men's comfort station #23, add showers (88-2-041)
Reappropriation Appropriation
St Bldg Constr Acct 157,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
109,700 266,700
NEW SECTION. Sec. 345. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden‑-Ballon Hanger, replace roof, renovate interior (88-3-023)
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
47,000 247,000
NEW SECTION. Sec. 346. FOR THE STATE PARKS AND RECREATION COMMISSION
Camano Island‑-Point Lowell road relocation (88-3-043)
Reappropriation Appropriation
St Bldg Constr Acct 100,000
Mot Veh Fund 619,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
102,000 821,000
NEW SECTION. Sec. 347. FOR THE STATE PARKS AND RECREATION COMMISSION
Chief Timothy‑-Boat launch expansion (88-5-014)
Reappropriation Appropriation
ORA‑-State 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
30,000 230,000
NEW SECTION. Sec. 348. FOR THE STATE PARKS AND RECREATION COMMISSION
Moses Lake‑-Boat launch with parking and comfort station (88-5-016)
Reappropriation Appropriation
ORA‑-State 175,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
17,000 192,000
NEW SECTION. Sec. 349. FOR THE STATE PARKS AND RECREATION COMMISSION
Maryhill‑-Development (88-5-035)
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
76,000 1,076,000
NEW SECTION. Sec. 350. FOR THE STATE PARKS AND RECREATION COMMISSION
Ocean beaches‑-Acquisition of ocean beaches, phased project (88-5-036)
Reappropriation Appropriation
St Bldg Constr Acct 100,000 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
450,000 750,000
NEW SECTION. Sec. 351. FOR THE STATE PARKS AND RECREATION COMMISSION
Mount Spokane‑-Winter recreation facilities (88-5-041)
Reappropriation Appropriation
St Bldg Constr Acct 20,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
63,000 83,000
NEW SECTION. Sec. 352. FOR THE STATE PARKS AND RECREATION COMMISSION
Crystal Falls‑-Acquisition and development phase 2 (88-5-057)
Reappropriation Appropriation
St Bldg Constr Acct 40,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
59,500 329,600 429,100
NEW SECTION. Sec. 353. FOR THE STATE PARKS AND RECREATION COMMISSION
Blake Island‑-Fire protection system, concession building (89-1-050)
Reappropriation Appropriation
St Bldg Constr Acct 119,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
119,000
NEW SECTION. Sec. 354. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Water supply/irrigation (89-1-101)
Reappropriation Appropriation
St Bldg Constr Acct 275,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
275,000
NEW SECTION. Sec. 355. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Sanitary facilities (89-1-102)
Reappropriation Appropriation
St Bldg Constr Acct 152,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
193,900 345,900
NEW SECTION. Sec. 356. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Electrical (89-1-103)
Reappropriation Appropriation
St Bldg Constr Acct 231,000
ORA‑-State 63,700
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
294,700
NEW SECTION. Sec. 357. FOR THE STATE PARKS AND RECREATION COMMISSION
Moran‑-Renovate mountain lake dam (89-1-110)
Reappropriation Appropriation
St Bldg Constr Acct 144,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
144,000
NEW SECTION. Sec. 358. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Compliance with safe drinking water act (89-1-116)
Reappropriation Appropriation
St Bldg Constr Acct 441,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
441,000
NEW SECTION. Sec. 359. FOR THE STATE PARKS AND RECREATION COMMISSION
Camp Wooten‑-Sewage renovation, phase 2 (89-1-122)
Reappropriation Appropriation
St Bldg Constr Acct 138,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
138,000
NEW SECTION. Sec. 360. FOR THE STATE PARKS AND RECREATION COMMISSION
Sacajawea‑-Modify river floats, revise piling anchorage system (89-1-129)
Reappropriation Appropriation
ORA‑-State 192,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
192,000
NEW SECTION. Sec. 361. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Asbestos removal‑-Forts Worden, Flagler, Columbia (89-1-134)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
150,000
NEW SECTION. Sec. 362. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Boating/marine construction (89-2-106)
Reappropriation Appropriation
St Bldg Constr Acct 179,250
ORA‑-State 674,050
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
853,300
NEW SECTION. Sec. 363. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-General construction (89-2-107)
Reappropriation Appropriation
St Bldg Constr Acct 560,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
858,000 1,418,000
NEW SECTION. Sec. 364. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Specialized construction (89-2-109)
Reappropriation Appropriation
St Bldg Constr Acct 219,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
219,000
NEW SECTION. Sec. 365. FOR THE STATE PARKS AND RECREATION COMMISSION
Lake Sammamish‑-Boat launch repairs (89-2-139)
Reappropriation Appropriation
ORA‑-State 114,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
114,000
NEW SECTION. Sec. 366. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Site/environment/protection (89-3-104)
Reappropriation Appropriation
St Bldg Constr Acct 300,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
300,000
NEW SECTION. Sec. 367. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Acquisition (89-3-105)
Reappropriation Appropriation
St Bldg Constr Acct 115,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
140,700 255,700
NEW SECTION. Sec. 368. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Weatherproofing (89-3-108)
Reappropriation Appropriation
St Bldg Constr Acct 167,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
167,000
NEW SECTION. Sec. 369. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden‑-Rebuild boat launch breakwater, dredge marina (89-3-135)
Reappropriation Appropriation
ORA‑-State 315,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
315,000
NEW SECTION. Sec. 370. FOR THE STATE PARKS AND RECREATION COMMISSION
Larabee‑-Acquisition of Clayton Beach (89-5-002)
Reappropriation Appropriation
St Bldg Constr Acct 1,590,000
ORA‑-Federal 140,540
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
10,000 1,740,540
NEW SECTION. Sec. 371. FOR THE STATE PARKS AND RECREATION COMMISSION
Hood Canal‑-Acquisition of property, phase 2 (89-5-111)
Reappropriation Appropriation
St Bldg Constr Acct 49,000 393,000
ORA‑-State 60,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,000 503,000
NEW SECTION. Sec. 372. FOR THE STATE PARKS AND RECREATION COMMISSION
Spokane Centennial Trail‑-Acquisition/initial development (89-5-112)
Reappropriation Appropriation
St Bldg Constr Acct 120,000
ORA‑-Federal 119,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
239,000
NEW SECTION. Sec. 373. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Casey‑-Acquisition of keystone spit, phase 2 (89-5-113)
Reappropriation Appropriation
St Bldg Constr Acct 373,500 104,000
ORA‑-Federal 103,000
ORA‑-State 76,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
50,000 707,000
NEW SECTION. Sec. 374. FOR THE STATE PARKS AND RECREATION COMMISSION
Belfair‑-Acquisition of adjoining property, phase 2 (89-5-114)
Reappropriation Appropriation
St Bldg Constr Acct 32,000 193,000
ORA‑-Federal 27,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
18,000 270,000
NEW SECTION. Sec. 375. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Canby‑-Initial development, Beards Hollow (89-5-115)
Reappropriation Appropriation
St Bldg Constr Acct 289,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
289,000
NEW SECTION. Sec. 376. FOR THE STATE PARKS AND RECREATION COMMISSION
Ocean Beach OBA‑-Comfort stations and parking at four locations (89-5-120)
Reappropriation Appropriation
St Bldg Constr Acct 342,000
ORA‑-Federal 316,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
658,000
NEW SECTION. Sec. 377. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus facility contingency request (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 464,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
464,000
NEW SECTION. Sec. 378. FOR THE STATE PARKS AND RECREATION COMMISSION
Steamboat Rock‑-Random camp area, Jones Bay (95-2-182)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
150,000
NEW SECTION. Sec. 379. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Grants to public agencies' recreation projects (90-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
ORA‑-Federal 150,000 800,000
ORA‑-State 1,068,604 6,436,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
21,513,197 12,000,000 42,967,801
NEW SECTION. Sec. 380. FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
Community economic revitalization board (86-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 5,340,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
19,025,928 24,365,928
NEW SECTION. Sec. 381. FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
Washington Technology Center‑-Funds for this project shall be transferred to and administered by the University of Washington (88-1-003)
Reappropriation Appropriation
St Bldg Constr Acct 4,980,000 1,200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
9,922,000 16,102,000
NEW SECTION. Sec. 382. FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
Washington State Agricultural Trade Center‑-Yakima (88-3-004)
Reappropriation Appropriation
St Bldg Constr Acct 678,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,822,000 6,500,000
NEW SECTION. Sec. 383. FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
Agricultural Complex‑-Yakima (89-2-005)
Reappropriation Appropriation
St Bldg Constr Acct 322,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,678,000 2,000,000
NEW SECTION. Sec. 384. FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
U.S. Olympic Academy (90-5-001)
The appropriation in this section is subject to the following conditions and limitations:
(1) Expenditures made under this appropriation shall not exceed twenty-five percent of the total project design and construction costs, and shall not exceed $5,000,000.
(2) The local match, which shall not be less than seventy-five percent of the total project design and construction costs, shall be cash and the fair market value of donated property.
Reappropriation Appropriation
St Bldg Constr Acct 5,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,000,000
NEW SECTION. Sec. 385. FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
Mt. St. Helens Road and Visitor Center (90-5-002)
The appropriation in this section is subject to the following conditions and limitations:
(1) This appropriation shall fund no more than twenty-five percent of the total project cost.
(2) Any funds provided for this project by Cowlitz county shall reduce this appropriation by a like amount.
Reappropriation Appropriation
St Bldg Constr Acct 5,900,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,900,000
NEW SECTION. Sec. 386. FOR THE STATE CONSERVATION COMMISSION
Water quality projects (90-2-001)
Reappropriation Appropriation
Water Quality Acct 337,700 2,146,300
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,524,300 4,400,000 8,408,300
(End of part)
PART 4
NATURAL RESOURCES - CONTINUED
NEW SECTION. Sec. 401. FOR THE DEPARTMENT OF FISHERIES
Habitat‑-Salmon enhancement program (77-1-005)
Reappropriation Appropriation
Salmon Enhancement Acct 221,100
St Bldg Constr Acct 921,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,897,587 5,039,687
NEW SECTION. Sec. 402. FOR THE DEPARTMENT OF FISHERIES
Replacements and alterations (77-2-004)
Reappropriation Appropriation
Fish Cap Proj Acct 2,263
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,996,688 3,998,951
NEW SECTION. Sec. 403. FOR THE DEPARTMENT OF FISHERIES
Hood Canal Bridge‑-Public fishing access (79-2-011)
Reappropriation Appropriation
St Bldg Constr Acct 47,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
447,000 494,000
NEW SECTION. Sec. 404. FOR THE DEPARTMENT OF FISHERIES
Oakland Bay tideland access design and construction (81-5-014)
Reappropriation Appropriation
St Bldg Constr Acct 11,000
ORA‑-Federal 90,000
ORA‑-State 79,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
180,000
NEW SECTION. Sec. 405. FOR THE DEPARTMENT OF FISHERIES
Health, safety and code compliance (86-1-020)
Reappropriation Appropriation
St Bldg Constr Acct 105,000 850,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
344,000 500,000 1,799,000
NEW SECTION. Sec. 406. FOR THE DEPARTMENT OF FISHERIES
Towhead Island public access‑-Renovation (86-2-028)
Reappropriation Appropriation
ORA‑-Federal 20,000
ORA‑-State 191,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
211,000
NEW SECTION. Sec. 407. FOR THE DEPARTMENT OF FISHERIES
Issaquah Hatchery Interpretative Center (86-2-029)
Reappropriation Appropriation
St Bldg Constr Acct 35,200
ORA‑-Federal 53,000
ORA‑-State 17,800
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
24,000 130,000
NEW SECTION. Sec. 408. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects‑-Salmon (86-3-022)
Reappropriation Appropriation
St Bldg Constr Acct 136,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
286,000 422,000
NEW SECTION. Sec. 409. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects‑-Shellfish (86-3-023)
Reappropriation Appropriation
St Bldg Constr Acct 50,000
Fish Cap Proj Acct 5,975
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
380,597 436,572
NEW SECTION. Sec. 410. FOR THE DEPARTMENT OF FISHERIES
Paving and maintenance‑-Asphalt ponds (86-3-024)
Reappropriation Appropriation
St Bldg Constr Acct 10,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
285,401 295,401
NEW SECTION. Sec. 411. FOR THE DEPARTMENT OF FISHERIES
Bremerton public fishing pier‑-Design and construction (86-3-027)
Reappropriation Appropriation
St Bldg Constr Acct 89,000
ORA‑-Federal 410,000
ORA‑-State 285,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
36,000 820,000
NEW SECTION. Sec. 412. FOR THE DEPARTMENT OF FISHERIES
Willapa Hatchery‑-New main pipeline (86-3-030)
Reappropriation Appropriation
St Bldg Constr Acct 12,640
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
373,000 385,640
NEW SECTION. Sec. 413. FOR THE DEPARTMENT OF FISHERIES
Patrol seized gear storage (86-3-033)
Reappropriation Appropriation
St Bldg Constr Acct 50,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
48,000 98,000
NEW SECTION. Sec. 414. FOR THE DEPARTMENT OF FISHERIES
Hood Canal boat access development (86-3-035)
Reappropriation Appropriation
ORA‑-Federal 30,000
ORA‑-State 270,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
300,000
NEW SECTION. Sec. 415. FOR THE DEPARTMENT OF FISHERIES
Hood Canal Smelt Beach acquisition (86-3-036)
Reappropriation Appropriation
ORA‑-Federal 150,000
ORA‑-State 150,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
300,000
NEW SECTION. Sec. 416. FOR THE DEPARTMENT OF FISHERIES
Point Whitney Beach access acquisition (86-3-037)
Reappropriation Appropriation
St Bldg Constr Acct 250,000
ORA‑-Federal 250,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
255,000 150,000 905,000
NEW SECTION. Sec. 417. FOR THE DEPARTMENT OF FISHERIES
Knappton public access (86-3-038)
Reappropriation Appropriation
ORA‑-Federal 54,000
ORA‑-State 55,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
109,000
NEW SECTION. Sec. 418. FOR THE DEPARTMENT OF FISHERIES
McAllister‑-Improvements (88-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 246,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
13,000 259,000
NEW SECTION. Sec. 419. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects‑-Salmon north (88-2-005)
Reappropriation Appropriation
St Bldg Constr Acct 308,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
132,000 440,000
NEW SECTION. Sec. 420. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects‑-Salmon south (88-2-006)
Reappropriation Appropriation
General Fund‑-Federal 853,000
St Bldg Constr Acct 387,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
11,000 1,251,000
NEW SECTION. Sec. 421. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects‑-Salmon coast (88-2-007)
Reappropriation Appropriation
St Bldg Constr Acct 40,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
152,200 192,200
NEW SECTION. Sec. 422. FOR THE DEPARTMENT OF FISHERIES
Salmon culture‑-Repair and replacement (88-2-008)
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
105,000 305,000
NEW SECTION. Sec. 423. FOR THE DEPARTMENT OF FISHERIES
Concrete ponds‑-Repair and replacement (88-2-009)
Reappropriation Appropriation
St Bldg Constr Acct 137,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
666,000 803,000
NEW SECTION. Sec. 424. FOR THE DEPARTMENT OF FISHERIES
Small repairs and improvements (88-2-019)
Reappropriation Appropriation
General Fund‑-Federal 159,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
159,000
NEW SECTION. Sec. 425. FOR THE DEPARTMENT OF FISHERIES
Clam and Oyster Beach enhancement (88-5-002)
Reappropriation Appropriation
St Bldg Constr Acct 1,013,000 1,200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
200,000 1,200,000 2,413,000
NEW SECTION. Sec. 426. FOR THE DEPARTMENT OF FISHERIES
Fish protection facilities (88-5-012)
Reappropriation Appropriation
St Bldg Constr Acct 50,000 235,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
154,000 400,000 839,000
NEW SECTION. Sec. 427. FOR THE DEPARTMENT OF FISHERIES
Columbia River‑-Fishing access (88-5-014)
Reappropriation Appropriation
St Bldg Constr Acct 186,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
129,000 315,000
NEW SECTION. Sec. 428. FOR THE DEPARTMENT OF FISHERIES
Coast and Puget Sound Salmon enhancement (88-5-016)
Reappropriation Appropriation
Salmon Enhancement Acct 2,020,000
St Bldg Constr Acct 2,500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,000,000 3,750,000 7,770,000
NEW SECTION. Sec. 429. FOR THE DEPARTMENT OF FISHERIES
Shorefishing access development (88-5-018)
Reappropriation Appropriation
St Bldg Constr Acct 623,000 450,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
250,000 1,273,000 2,596,000
NEW SECTION. Sec. 430. FOR THE DEPARTMENT OF FISHERIES
South Sound net pen support facility (90-2-007)
Reappropriation Appropriation
St Bldg Constr Acct 343,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
343,000
NEW SECTION. Sec. 431. FOR THE DEPARTMENT OF FISHERIES
Humptulips upgrade intake dam (90-2-010)
Reappropriation Appropriation
St Bldg Constr Acct 213,100
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
213,100
NEW SECTION. Sec. 432. FOR THE DEPARTMENT OF FISHERIES
Salmon culture minor works projects (90-2-011)
Reappropriation Appropriation
St Bldg Constr Acct 655,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
655,000
NEW SECTION. Sec. 433. FOR THE DEPARTMENT OF FISHERIES
Habitat management shop building (90-2-012)
Reappropriation Appropriation
St Bldg Constr Acct 435,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
435,000
NEW SECTION. Sec. 434. FOR THE DEPARTMENT OF FISHERIES
Field services‑-Minor works (90-2-015)
Reappropriation Appropriation
St Bldg Constr Acct 235,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
100,000 335,000
NEW SECTION. Sec. 435. FOR THE DEPARTMENT OF FISHERIES
Salmon culture‑-Minor capital (90-2-017)
Reappropriation Appropriation
St Bldg Constr Acct 668,700
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,350,000 2,018,700
NEW SECTION. Sec. 436. FOR THE DEPARTMENT OF FISHERIES
George Adams, water supply (90-2-019)
Reappropriation Appropriation
St Bldg Constr Acct 175,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
175,000
NEW SECTION. Sec. 437. FOR THE DEPARTMENT OF FISHERIES
Ilwaco boat access expansion (90-2-023)
Reappropriation Appropriation
ORA‑-State 300,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
300,000
NEW SECTION. Sec. 438. FOR THE DEPARTMENT OF FISHERIES
Bonneville pool access expansion (90-2-028)
Reappropriation Appropriation
ORA‑-State 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
100,000 200,000
NEW SECTION. Sec. 439. FOR THE DEPARTMENT OF FISHERIES
Property acquisition (90-3-009)
Reappropriation Appropriation
St Bldg Constr Acct 330,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
330,000
NEW SECTION. Sec. 440. FOR THE DEPARTMENT OF FISHERIES
Shellfish surveys and Point Whitney repairs (90-3-013)
Reappropriation Appropriation
St Bldg Constr Acct 175,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
350,000 525,000
NEW SECTION. Sec. 441. FOR THE DEPARTMENT OF FISHERIES
Point Whitney‑-Property acquisition (90-3-014)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
150,000
NEW SECTION. Sec. 442. FOR THE DEPARTMENT OF FISHERIES
Cedar River spawning channel (90-5-005)
Reappropriation Appropriation
St Bldg Constr Acct 800,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,000,000 2,800,000
NEW SECTION. Sec. 443. FOR THE DEPARTMENT OF FISHERIES
Strait of Juan De Fuca shoreline acquisition (90-5-025)
Reappropriation Appropriation
ORA‑-State 350,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
200,000 550,000
NEW SECTION. Sec. 444. FOR THE DEPARTMENT OF FISHERIES
Kingston boat launch development (90-5-027)
Reappropriation Appropriation
ORA‑-State 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
100,000
NEW SECTION. Sec. 445. FOR THE DEPARTMENT OF WILDLIFE
Aberdeen Fish Hatchery expansion (89-5-017)
Reappropriation Appropriation
Game Spec Wildlife Acct 700,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
119,000 819,000
NEW SECTION. Sec. 446. FOR THE DEPARTMENT OF WILDLIFE
Asbestos abatement health safety and code compliance, phase 1 (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 600,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,200,000 1,800,000
NEW SECTION. Sec. 447. FOR THE DEPARTMENT OF WILDLIFE
Public fishing access minor works repair (90-1-014)
Reappropriation Appropriation
Wildlife Acct‑-Federal 200,000 500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
216,000 1,300,000 2,216,000
NEW SECTION. Sec. 448. FOR THE DEPARTMENT OF WILDLIFE
Emergency repair and replacement (90-2-002)
Reappropriation Appropriation
Wildlife Acct‑-State 300,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
303,000 900,000 1,503,000
NEW SECTION. Sec. 449. FOR THE DEPARTMENT OF WILDLIFE
Facility maintenance small repair and improvements (90-2-003)
Reappropriation Appropriation
Wildlife Acct‑-State 500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
629,000 1,100,000 2,229,000
NEW SECTION. Sec. 450. FOR THE DEPARTMENT OF WILDLIFE
Hatchery renovation and improvement (90-2-004)
Reappropriation Appropriation
St Bldg Constr Acct 1,150,000
Wildlife Acct‑-Federal 400,000 1,100,000
Wildlife Acct‑-State 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
915,000 13,000,000 17,565,000
NEW SECTION. Sec. 451. FOR THE DEPARTMENT OF WILDLIFE
Redevelopment of public fishing access sites (IAC) (90-2-007)
Reappropriation Appropriation
ORA‑-State 1,126,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,115,000 3,241,000
NEW SECTION. Sec. 452. FOR THE DEPARTMENT OF WILDLIFE
Development of public fishing access sites (IAC) (90-2-008)
Reappropriation Appropriation
St Bldg Constr Acct 294,000
ORA‑-State 136,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
300,000 730,000
NEW SECTION. Sec. 453. FOR THE DEPARTMENT OF WILDLIFE
Wildlife area repair and development (90-2-016)
Reappropriation Appropriation
Wildlife Acct‑-State 250,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
500,000 750,000
NEW SECTION. Sec. 454. FOR THE DEPARTMENT OF WILDLIFE
Wells wildlife area repair and improvements (90-2-018)
Reappropriation Appropriation
Game Spec Wildlife Acct 50,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
100,000 100,000 250,000
NEW SECTION. Sec. 455. FOR THE DEPARTMENT OF WILDLIFE
State-wide fencing repair and replacement (90-3-015)
Reappropriation Appropriation
Wildlife Acct‑-State 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
368,000 2,000,000 3,368,000
NEW SECTION. Sec. 456. FOR THE DEPARTMENT OF WILDLIFE
Migratory waterfowl habitat acquisition (90-5-005)
Reappropriation Appropriation
Wildlife Acct‑-State 350,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
396,000 700,000 1,446,000
NEW SECTION. Sec. 457. FOR THE DEPARTMENT OF WILDLIFE
Acquisition of critical habitat (90-5-006)
Reappropriation Appropriation
Wildlife Acct‑-State 250,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
500,000 750,000
NEW SECTION. Sec. 458. FOR THE DEPARTMENT OF WILDLIFE
Acquisition of critical water oriented access (IAC) (90-5-009)
Reappropriation Appropriation
ORA‑-State 20,250
Wildlife Acct‑-Federal 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
120,250
NEW SECTION. Sec. 459. FOR THE DEPARTMENT OF WILDLIFE
Acquisition of wildlife habitat (90-5-012)
The appropriation in this section is subject to the following conditions and limitations: No moneys appropriated for this project may be expended without first selling owned land of equal or greater value.
Reappropriation Appropriation
Wildlife Acct‑-State 600,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
800,000 1,400,000
NEW SECTION. Sec. 460. FOR THE DEPARTMENT OF WILDLIFE
Migratory waterfowl habitat development (90-5-017)
Reappropriation Appropriation
Wildlife Acct‑-State 300,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
362,000 700,000 1,362,000
NEW SECTION. Sec. 461. FOR THE DEPARTMENT OF WILDLIFE
Habitat enhancement fund (90-5-019)
Reappropriation Appropriation
Wildlife Acct‑-Private/local 500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,000,000 1,500,000
NEW SECTION. Sec. 462. FOR THE DEPARTMENT OF NATURAL RESOURCES
Right-of-way acquisition (86-3-001)
Reappropriation Appropriation
For Dev Acct 213,000
Res Mgmt Cost Acct 577,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,646,000 950,000 3,386,000
NEW SECTION. Sec. 463. FOR THE DEPARTMENT OF NATURAL RESOURCES
Unforeseen emergency repairs, irrigation (86-3-002)
Reappropriation Appropriation
Res Mgmt Cost Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
492,000 400,000 1,092,000
NEW SECTION. Sec. 464. FOR THE DEPARTMENT OF NATURAL RESOURCES
Commercial development and electronics (86-3-004)
Reappropriation Appropriation
Res Mgmt Cost Acct 420,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
20,000 400,000 840,000
NEW SECTION. Sec. 465. FOR THE DEPARTMENT OF NATURAL RESOURCES
Recreation sites renovation (86-3-018)
Reappropriation Appropriation
ORV Acct 300,000
ORA‑-State 300,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
123,000 723,000
NEW SECTION. Sec. 466. FOR THE DEPARTMENT OF NATURAL RESOURCES
Aquatic land enhancement (86-3-020)
Reappropriation Appropriation
Aquatic Lands Acct 1,150,000 5,040,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,607,000 14,400,000 22,197,000
NEW SECTION. Sec. 467. FOR THE DEPARTMENT OF NATURAL RESOURCES
Land bank (86-4-003)
The appropriation in this section is subject to the following conditions and limitations: No moneys appropriated for this project may be expended without first selling owned land of equal or greater value.
Reappropriation Appropriation
Res Mgmt Cost Acct 12,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
11,440,000 30,000,000 53,440,000
NEW SECTION. Sec. 468. FOR THE DEPARTMENT OF NATURAL RESOURCES
State-wide emergency repairs (88-1-002)
Reappropriation Appropriation
For Dev Acct 8,600
Res Mgmt Cost Acct 32,300
St Bldg Constr Acct 18,300
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
54,000 135,900 249,100
NEW SECTION. Sec. 469. FOR THE DEPARTMENT OF NATURAL RESOURCES
State-wide nonemergency repairs (88-2-010)
Reappropriation Appropriation
For Dev Acct 8,700
Res Mgmt Cost Acct 32,900
St Bldg Constr Acct 18,700
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
55,000 138,500 253,800
NEW SECTION. Sec. 470. FOR THE DEPARTMENT OF NATURAL RESOURCES
Commercial development/L.I.D. (88-2-020)
Reappropriation Appropriation
Res Mgmt Cost Acct 710,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
745,000 1,420,000 2,875,000
NEW SECTION. Sec. 471. FOR THE DEPARTMENT OF NATURAL RESOURCES
Timber‑-Fish‑-Wildlife (88-2-021)
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
100,000 300,000
NEW SECTION. Sec. 472. FOR THE DEPARTMENT OF NATURAL RESOURCES
Natural resources conservation areas (88-2-060)
Reappropriation Appropriation
Conservation Area Acct 4,000,000 8,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,900,000 16,000,000 31,900,000
$8,000,000 of this appropriation is subject to the extension of the additional real property excise tax beyond June 30, 1989 (RCW 82.45.060(2)).
NEW SECTION. Sec. 473. FOR THE DEPARTMENT OF NATURAL RESOURCES
NAP property purchases (88-2-061)
Reappropriation Appropriation
Conservation Area Acct 2,000,000 4,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,000,000 8,000,000 16,000,000
$4,000,000 of this appropriation is subject to the extension of the additional real property excise tax beyond June 30, 1989 (RCW 82.45.060(2)).
NEW SECTION. Sec. 474. FOR THE DEPARTMENT OF NATURAL RESOURCES
Seed orchard irrigation (89-2-006)
Reappropriation Appropriation
For Dev Acct 19,500
Res Mgmt Cost Acct 45,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
165,000 160,000 390,000
NEW SECTION. Sec. 475. FOR THE DEPARTMENT OF NATURAL RESOURCES
Irrigation development (89-2-007)
Reappropriation Appropriation
Res Mgmt Cost Acct 150,000 452,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
200,000 802,500
NEW SECTION. Sec. 476. FOR THE DEPARTMENT OF NATURAL RESOURCES
Management roads (89-2-008)
Reappropriation Appropriation
Res Mgmt Cost Acct 122,400
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
305,600 428,000
NEW SECTION. Sec. 477. FOR THE DEPARTMENT OF NATURAL RESOURCES
Communication site maintenance (89-2-009)
Reappropriation Appropriation
Res Mgmt Cost Acct 150,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
177,000 300,000 627,000
NEW SECTION. Sec. 478. FOR THE DEPARTMENT OF NATURAL RESOURCES
Real estate improved property minor works (89-2-010)
Reappropriation Appropriation
For Dev Acct 25,000
Res Mgmt Cost Acct 365,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
250,000 780,000 1,420,000
NEW SECTION. Sec. 479. FOR THE DEPARTMENT OF NATURAL RESOURCES
Recreation site renovation (89-3-001)
Reappropriation Appropriation
St Bldg Constr Acct 500,000
ORA‑-State 500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
148,000 1,148,000
NEW SECTION. Sec. 480. FOR THE DEPARTMENT OF NATURAL RESOURCES
Wharf demolition/dock renovation (90-1-403)
Reappropriation Appropriation
Res Mgmt Cost Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
200,000
NEW SECTION. Sec. 481. FOR THE DEPARTMENT OF NATURAL RESOURCES
Asbestos surveys/removal (90-1-703)
Reappropriation Appropriation
For Dev Acct 35,700
Res Mgmt Cost Acct 49,200
St Bldg Constr Acct 30,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
114,900
NEW SECTION. Sec. 482. FOR THE DEPARTMENT OF NATURAL RESOURCES
Environmental cleanup (90-1-704)
Reappropriation Appropriation
For Dev Acct 75,900
Res Mgmt Cost Acct 273,500
St Bldg Constr Acct 235,600
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
554,900 1,139,900
NEW SECTION. Sec. 483. FOR THE DEPARTMENT OF NATURAL RESOURCES
Environmental protection (90-1-706)
Reappropriation Appropriation
For Dev Acct 13,700
Res Mgmt Cost Acct 119,300
St Bldg Constr Acct 151,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
284,000 568,000
NEW SECTION. Sec. 484. FOR THE DEPARTMENT OF NATURAL RESOURCES
NE city code compliance (90-1-708)
Reappropriation Appropriation
Res Mgmt Cost Acct 31,500
St Bldg Constr Acct 15,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
47,000
NEW SECTION. Sec. 485. FOR THE DEPARTMENT OF NATURAL RESOURCES
Regional cold storage (90-2-310)
Reappropriation Appropriation
For Dev Acct 150,000
Res Mgmt Cost Acct 362,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
142,000 654,000
NEW SECTION. Sec. 486. FOR THE DEPARTMENT OF NATURAL RESOURCES
Irrigation pipeline replacement (90-2-311)
Reappropriation Appropriation
Res Mgmt Cost Acct 532,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
400,000 932,000
NEW SECTION. Sec. 487. FOR THE DEPARTMENT OF NATURAL RESOURCES
Administration sites repairs (90-2-312)
Reappropriation Appropriation
Res Mgmt Cost Acct 65,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
130,000 195,000
NEW SECTION. Sec. 488. FOR THE DEPARTMENT OF NATURAL RESOURCES
Bridge and road replacement (90-2-503)
Reappropriation Appropriation
ORV Acct 15,000
For Dev Acct 15,000
Res Mgmt Cost Acct 35,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,240,000 3,512,000
NEW SECTION. Sec. 489. FOR THE DEPARTMENT OF NATURAL RESOURCES
Woodard Bay NRCA fencing dev. (90-3-103)
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
200,000
NEW SECTION. Sec. 490. FOR THE DEPARTMENT OF NATURAL RESOURCES
Dishman Hills protection dev. (90-3-104)
Reappropriation Appropriation
St Bldg Constr Acct 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
100,000
NEW SECTION. Sec. 491. FOR THE DEPARTMENT OF NATURAL RESOURCES
Natural area preserves management (90-3-105)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
200,000 350,000
NEW SECTION. Sec. 492. FOR THE DEPARTMENT OF NATURAL RESOURCES
Construct and improve recreation sites (90-5-201)
Reappropriation Appropriation
ORV Acct 117,000
St Bldg Constr Acct 363,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
480,000
NEW SECTION. Sec. 493. FOR THE DEPARTMENT OF NATURAL RESOURCES
Seattle waterfront phase 1 dev. (90-5-202)
Reappropriation Appropriation
ORA‑-State 750,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
750,000 1,500,000
NEW SECTION. Sec. 494. FOR THE DEPARTMENT OF NATURAL RESOURCES
Woodard Bay health and safety dev. (90-5-203)
Reappropriation Appropriation
St Bldg Constr Acct 250,000
ORA‑-Federal 250,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
500,000
NEW SECTION. Sec. 495. FOR THE DEPARTMENT OF NATURAL RESOURCES
Long Lake phase 2 dev. (90-5-204)
Reappropriation Appropriation
ORV Acct 150,000
ORA‑-State 205,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
355,000
NEW SECTION. Sec. 496. FOR THE DEPARTMENT OF NATURAL RESOURCES
Geoduck Hatchery (90-5-402)
Reappropriation Appropriation
Res Mgmt Cost Acct 333,927
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
333,927
(End of part)
PART 5
NATURAL RESOURCES - CONTINUED
NEW SECTION. Sec. 501. FOR THE STATE AND TRADE CONVENTION CENTER
Washington State Convention and Trade Center (83-5-001)
Reappropriation Appropriation
Conv Cntr Acct 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
35,618,000 36,618,000
NEW SECTION. Sec. 502. FOR THE STATE AND TRADE CONVENTION CENTER
Project reserves and contingency funds (89-5-001)
Reappropriation Appropriation
Conv Cntr Acct 3,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,765,000 4,765,000
NEW SECTION. Sec. 503. FOR THE STATE AND TRADE CONVENTION CENTER
Conversion of retail space to meeting rooms (89-5-002)
Reappropriation Appropriation
Conv Cntr Acct 12,250,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
750,000 13,000,000
NEW SECTION. Sec. 504. FOR THE STATE AND TRADE CONVENTION CENTER
Expansion of the nine hundred level (89-5-003)
Reappropriation Appropriation
Conv Cntr Acct 12,750,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
550,000 13,300,000
NEW SECTION. Sec. 505. FOR THE STATE AND TRADE CONVENTION CENTER
Purchase of McKay parcel (89-5-004)
Reappropriation Appropriation
Conv Cntr Acct 10,400,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
10,400,000
NEW SECTION. Sec. 506. FOR THE STATE AND TRADE CONVENTION CENTER
Eagles building: Exterior cleanup and repair (89-5-005)
Reappropriation Appropriation
Conv Cntr Acct 300,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
300,000
(End of part)
PART 6
TRANSPORTATION
NEW SECTION. Sec. 601. FOR THE WASHINGTON STATE PATROL
Crime laboratory renovation‑-Seattle (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 703,900
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
15,000 718,900
NEW SECTION. Sec. 602. FOR THE WASHINGTON STATE PATROL
Expand and renovate laboratory‑-Tacoma (90-2-005)
Reappropriation Appropriation
St Bldg Const Acct 165,200
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
6,000 171,200
NEW SECTION. Sec. 603. FOR THE WASHINGTON STATE PATROL
Crime laboratory renovation‑-Spokane (90-2-008)
Reappropriation Appropriation
St Bldg Constr Acct 287,200
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
10,000 297,200
NEW SECTION. Sec. 604. FOR THE DEPARTMENT OF TRANSPORTATION
Acquisition of dredge spoils sites (83-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 2,369,430
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,420,000 4,789,430
NEW SECTION. Sec. 605. FOR THE DEPARTMENT OF TRANSPORTATION
Retention dam: Green/Toutle River site acquisition (87-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 5,387,043
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
13,289,430 18,676,473
NEW SECTION. Sec. 606. FOR THE DEPARTMENT OF TRANSPORTATION
Freight rail assistance and banking (90-5-001)
The appropriations in this section are subject to the following conditions and limitations:
(1) $4,700,000 from the essential rail assistance account shall be distributed to county rail districts and port districts only for the purposes of acquiring, maintaining, or improving branch lines.
(2) $2,200,000 from the essential rail bank account shall be used to provide the department with up to eighty percent matching funds to purchase unused rail rights of way.
Reappropriation Appropriation
Ess Rail Assis Acct 4,700,000
Ess Rail Bank Acct 2,200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
10,000,000 16,900,000
(End of part)
PART 7
EDUCATION
NEW SECTION. Sec. 701. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1979 (79-3-002)
Reappropriation Appropriation
Common School Constr Fund 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
66,425 166,425
NEW SECTION. Sec. 702. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1981 (81-3-001)
Reappropriation Appropriation
Common School Constr Fund 140,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
163,758 303,758
NEW SECTION. Sec. 703. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1983 (83-3-001)
Reappropriation Appropriation
Common School Constr Fund 600,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,000,000 1,600,000
NEW SECTION. Sec. 704. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1985-87 (86-4-001)
Reappropriation Appropriation
Common School Constr Fund 3,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
29,000,000 32,000,000
NEW SECTION. Sec. 705. FOR THE STATE BOARD OF EDUCATION
Planning grants: 1985-87 (86-4-007)
Reappropriation Appropriation
Common School Constr Fund 152,275
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
200,000 352,275
NEW SECTION. Sec. 706. FOR THE STATE BOARD OF EDUCATION
Artwork grants: 1985-87 (86-4-008)
Reappropriation Appropriation
Common School Constr Fund 150,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
144,000 294,000
NEW SECTION. Sec. 707. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1987 (88-2-001)
Reappropriation Appropriation
Common School Constr Fund 50,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
158,262,000 208,262,000
NEW SECTION. Sec. 708. FOR THE STATE BOARD OF EDUCATION
Darrington school district: New elementary and middle school (89-2-004)
Reappropriation Appropriation
Common School Constr Fund 3,405,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,405,000
NEW SECTION. Sec. 709. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1989 (90-2-001)
The appropriation in this section is subject to the following condition and limitation: A maximum of $1,050,000 may be spent for state administration of school construction funding.
Reappropriation Appropriation
Common School Constr Fund 147,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
147,000,000
NEW SECTION. Sec. 710. FOR THE STATE BOARD OF EDUCATION
Common school disbursement limit
A maximum of $147,000,000 of the appropriations and reappropriations in sections 701 through 709 of this act may be disbursed during the 1989-91 biennium.
NEW SECTION. Sec. 711. FOR THE WASHINGTON INSTITUTE OF APPLIED TECHNOLOGY
Vocational Technology Center (88-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 475,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,525,000 6,000,000
NEW SECTION. Sec. 712. FOR THE STATE SCHOOL FOR THE BLIND
Automatic sliding doors‑-Irwin education building (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 14,580
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
14,580
NEW SECTION. Sec. 713. FOR THE STATE SCHOOL FOR THE BLIND
Replace heating and ventilation system and roof repairs: Irwin building (90-2-002)
Reappropriation Appropriation
St Bldg Constr Acct 130,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
130,000
NEW SECTION. Sec. 714. FOR THE STATE SCHOOL FOR THE BLIND
Driveway/parking lot repaving (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 21,270
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
21,270
NEW SECTION. Sec. 715. FOR THE STATE SCHOOL FOR THE DEAF
Remove and replace three transformers/clerk (90-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 36,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
36,500
NEW SECTION. Sec. 716. FOR THE STATE SCHOOL FOR THE DEAF
Wheelchair lifts‑-Clark Hall, vocational, Northrup School (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 147,100
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
147,100
NEW SECTION. Sec. 717. FOR THE STATE SCHOOL FOR THE DEAF
Roof repair (91-2-002)
Reappropriation Appropriation
St Bldg Constr Acct 50,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
50,000
NEW SECTION. Sec. 718. FOR THE UNIVERSITY OF WASHINGTON
Safety‑-Fire code, PCB and life safety (86-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 3,125,000
UW Bldg Acct 8,600,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,582,000 14,000,000 30,507,000
NEW SECTION. Sec. 719. FOR THE UNIVERSITY OF WASHINGTON
Safety‑-Asbestos removal (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 2,008,000
UW Bldg Acct 808,000 5,500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,184,000 20,000,000 29,500,000
NEW SECTION. Sec. 720. FOR THE UNIVERSITY OF WASHINGTON
Safety‑-General (86-1-003)
Reappropriation Appropriation
St Bldg Constr Acct 798,382
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
201,618 1,000,000
NEW SECTION. Sec. 721. FOR THE UNIVERSITY OF WASHINGTON
Minor works‑-Building renewal (86-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 2,090,000
UW Bldg Acct 776,000 9,733,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,748,325 26,000,000 49,597,325
NEW SECTION. Sec. 722. FOR THE UNIVERSITY OF WASHINGTON
Fisheries repairs and expansion (86-1-014)
Reappropriation Appropriation
St H Ed Constr Acct 1,868,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,882,805 5,750,805
NEW SECTION. Sec. 723. FOR THE UNIVERSITY OF WASHINGTON
HSC G Court, H Wing and I Court addition (86-2-021)
Reappropriation Appropriation
St Bldg Constr Acct 20,300,000 24,692,000
UW Bldg Acct 3,500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,011,000 49,503,000
NEW SECTION. Sec. 724. FOR THE UNIVERSITY OF WASHINGTON
Minor works‑-Program renewal (86-3-005)
The appropriation in this section is subject to the following condition and limitation: No funds shall be expended for land acquisition.
Reappropriation Appropriation
UW Bldg Acct 969,000 9,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
10,483,000 42,270,000 69,141,000
NEW SECTION. Sec. 725. FOR THE UNIVERSITY OF WASHINGTON
Energy conservation (86-4-023)
Reappropriation Appropriation
St Bldg Constr Acct 750,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
250,000 1,000,000
NEW SECTION. Sec. 726. FOR THE UNIVERSITY OF WASHINGTON
Electrical distribution system (88-1-011)
Reappropriation Appropriation
St Bldg Constr Acct 500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,000,000 5,139,000 6,639,000
NEW SECTION. Sec. 727. FOR THE UNIVERSITY OF WASHINGTON
Power plant chiller (88-1-012)
Reappropriation Appropriation
St Bldg Constr Acct 180,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
820,000 1,000,000
NEW SECTION. Sec. 728. FOR THE UNIVERSITY OF WASHINGTON
Power plant stack replacement (88-1-023)
Reappropriation Appropriation
UW Bldg Acct 1,200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
300,000 1,500,000
NEW SECTION. Sec. 729. FOR THE UNIVERSITY OF WASHINGTON
Suzzallo Library addition (88-2-013)
Reappropriation Appropriation
St Bldg Constr Acct 16,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
15,283,000 32,583,000
NEW SECTION. Sec. 730. FOR THE UNIVERSITY OF WASHINGTON
Communications building renovation (88-2-014)
Reappropriation Appropriation
St Bldg Constr Acct 4,300,000 1,015,000
UW Bldg Acct 1,167,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
255,000 6,737,000
NEW SECTION. Sec. 731. FOR THE UNIVERSITY OF WASHINGTON
Power plant boiler retrofit (88-4-024)
Reappropriation Appropriation
UW Bldg Acct 1,600,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
700,000 2,300,000
NEW SECTION. Sec. 732. FOR THE UNIVERSITY OF WASHINGTON
Emergency power generation (90-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 11,110,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
11,110,000
NEW SECTION. Sec. 733. FOR THE UNIVERSITY OF WASHINGTON
Physics I (90-2-009)
Reappropriation Appropriation
St Bldg Constr Acct 4,155,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
4,155,000
NEW SECTION. Sec. 734. FOR THE UNIVERSITY OF WASHINGTON
Chemistry I (90-2-011)
Reappropriation Appropriation
St Bldg Constr Acct 39,152,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
39,152,000
NEW SECTION. Sec. 735. FOR THE UNIVERSITY OF WASHINGTON
Electrical engineering building addition (90-2-013)
Reappropriation Appropriation
St Bldg Constr Acct 3,111,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,111,000
NEW SECTION. Sec. 736. FOR THE UNIVERSITY OF WASHINGTON
Computer sciences building (92-2-024)
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,000,000
NEW SECTION. Sec. 737. FOR WASHINGTON STATE UNIVERSITY
Chemistry building, phase 2 (86-1-003)
Reappropriation Appropriation
H Ed Construct Acct 982,000
WSU Bldg Acct 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
12,810,000 14,792,000
NEW SECTION. Sec. 738. FOR WASHINGTON STATE UNIVERSITY
Food‑-Human nutrition facility‑-Equipment (86-1-004)
Reappropriation Appropriation
WSU Bldg Acct 1,977,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,517,000 4,494,000
NEW SECTION. Sec. 739. FOR WASHINGTON STATE UNIVERSITY
McCoy Hall capital renewal (86-1-005)
Reappropriation Appropriation
H Ed Construct Acct 111,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,138,000 2,249,000
NEW SECTION. Sec. 740. FOR WASHINGTON STATE UNIVERSITY
Science Hall renewal, phase 2 (86-1-006)
Reappropriation Appropriation
H Ed Construct Acct 2,807,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
8,902,000 11,709,000
NEW SECTION. Sec. 741. FOR WASHINGTON STATE UNIVERSITY
Neill Hall renewal (86-1-007)
Reappropriation Appropriation
WSU Bldg Acct 2,191,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,059,000 3,250,000
NEW SECTION. Sec. 742. FOR WASHINGTON STATE UNIVERSITY
Minor capital improvement (88-1-001)
Reappropriation Appropriation
WSU Bldg Acct 1,896,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,827,000 4,723,000
NEW SECTION. Sec. 743. FOR WASHINGTON STATE UNIVERSITY
Minor capital renewal (88-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 2,109,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,593,000 5,702,000
NEW SECTION. Sec. 744. FOR WASHINGTON STATE UNIVERSITY
Preplanning (88-1-004)
Reappropriation Appropriation
WSU Bldg Acct 107,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
107,000
NEW SECTION. Sec. 745. FOR WASHINGTON STATE UNIVERSITY
Todd Hall addition (88-1-011)
Reappropriation Appropriation
St Bldg Constr Acct 3,898,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,434,000 5,332,000
NEW SECTION. Sec. 746. FOR WASHINGTON STATE UNIVERSITY
Fine arts mechanical renovation (88-1-012)
Reappropriation Appropriation
WSU Bldg Acct 450,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,669,000 3,119,000
NEW SECTION. Sec. 747. FOR WASHINGTON STATE UNIVERSITY
Carpenter Hall renewal (88-2-005)
Reappropriation Appropriation
H Ed Construct Acct 2,615,000
WSU Bldg Acct 1,083,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,502,000 6,200,000
NEW SECTION. Sec. 748. FOR WASHINGTON STATE UNIVERSITY
Dairy forage facility (88-3-007)
Reappropriation Appropriation
WSU Bldg Acct 763,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
419,000 1,182,000
NEW SECTION. Sec. 749. FOR WASHINGTON STATE UNIVERSITY
Veterinary research diagnostic center (88-5-006)
Reappropriation Appropriation
St Bldg Constr Acct 91,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
159,000 3,172,600 3,422,600
NEW SECTION. Sec. 750. FOR WASHINGTON STATE UNIVERSITY
Minor capital improvements (90-1-001)
Reappropriation Appropriation
WSU Bldg Acct 5,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
8,233,000
NEW SECTION. Sec. 751. FOR WASHINGTON STATE UNIVERSITY
Hazardous, pathological, radioactive waste handling facilities (90-1-004)
Reappropriation Appropriation
WSU Bldg Acct 152,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
11,000,000 11,152,000
NEW SECTION. Sec. 752. FOR WASHINGTON STATE UNIVERSITY
Nuclear radiation center study (90-1-011)
Reappropriation Appropriation
WSU Bldg Acct 53,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
4,000,000 4,053,000
NEW SECTION. Sec. 753. FOR WASHINGTON STATE UNIVERSITY
Expansion of east campus electrical substation (90-1-014)
Reappropriation Appropriation
WSU Bldg Acct 533,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
533,000
NEW SECTION. Sec. 754. FOR WASHINGTON STATE UNIVERSITY
Smith Gym electrical system renewal (90-1-018)
Reappropriation Appropriation
WSU Bldg Acct 648,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
648,000
NEW SECTION. Sec. 755. FOR WASHINGTON STATE UNIVERSITY
Holland Library addition (90-2-013)
Reappropriation Appropriation
St Bldg Constr Acct 33,400,000
WSU Bldg Acct 184,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
87,000 33,671,000
NEW SECTION. Sec. 756. FOR WASHINGTON STATE UNIVERSITY
Veterinary Teaching Hospital (90-2-016)
Reappropriation Appropriation
St Bldg Constr Acct 1,300,000
WSU Bldg Acct 200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
327,000 29,438,000 31,265,000
NEW SECTION. Sec. 757. FOR WASHINGTON STATE UNIVERSITY
Food‑-Human nutrition building, phase 2 (90-2-020)
Reappropriation Appropriation
General Fund‑-Federal 12,688,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
12,688,000
NEW SECTION. Sec. 758. FOR WASHINGTON STATE UNIVERSITY
Whets expansion, phase 1 (90-2-902)
Reappropriation Appropriation
St Bldg Constr Acct 2,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,000,000
NEW SECTION. Sec. 759. FOR WASHINGTON STATE UNIVERSITY
Minor capital renewal (90-3-002)
Reappropriation Appropriation
St Bldg Constr Acct 5,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,000,000
NEW SECTION. Sec. 760. FOR WASHINGTON STATE UNIVERSITY
Todd Hall renewal (90-3-003)
Reappropriation Appropriation
WSU Bldg Acct 182,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
182,000
NEW SECTION. Sec. 761. FOR WASHINGTON STATE UNIVERSITY
WSU Tri-Cities University Center (90-5-901)
Reappropriation Appropriation
St Bldg Constr Acct 213,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
509,000 722,000
NEW SECTION. Sec. 762. FOR EASTERN WASHINGTON UNIVERSITY
Mathematical science and technology remodel (81-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 82,900
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,789,700 6,219,600
NEW SECTION. Sec. 763. FOR EASTERN WASHINGTON UNIVERSITY
Science building addition/remodel (83-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 3,000,000 6,784,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
6,028,000 2,952,600 18,765,100
NEW SECTION. Sec. 764. FOR EASTERN WASHINGTON UNIVERSITY
Electrical system renewal (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 1,414,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,013,000 3,427,000
NEW SECTION. Sec. 765. FOR EASTERN WASHINGTON UNIVERSITY
Roof replacement (86-1-003)
Reappropriation Appropriation
St Bldg Constr Acct 500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
915,000 1,500,000 2,915,000
NEW SECTION. Sec. 766. FOR EASTERN WASHINGTON UNIVERSITY
Water storage and distribution (86-1-004)
Reappropriation Appropriation
St H Ed Constr Acct 300,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
870,000 1,170,000
NEW SECTION. Sec. 767. FOR EASTERN WASHINGTON UNIVERSITY
Minor works projects (86-1-010)
Reappropriation Appropriation
EWU Cap Proj Acct 100,000 2,100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,800,000 8,536,000 12,536,000
NEW SECTION. Sec. 768. FOR EASTERN WASHINGTON UNIVERSITY
Small repairs projects (86-1-011)
Reappropriation Appropriation
EWU Cap Proj Acct 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
693,000 3,200,000 4,893,000
NEW SECTION. Sec. 769. FOR EASTERN WASHINGTON UNIVERSITY
Energy conservation (86-2-006)
Reappropriation Appropriation
St H Ed Constr Acct 100,000
St Bldg Constr Acct 37,839
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
418,161 556,000
NEW SECTION. Sec. 770. FOR EASTERN WASHINGTON UNIVERSITY
Life/safety and code compliance: Asbestos (88-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 209,000 1,900,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
474,000 4,000,000 6,583,000
NEW SECTION. Sec. 771. FOR EASTERN WASHINGTON UNIVERSITY
Fire suppression (88-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 126,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
450,000 2,158,000 2,734,000
NEW SECTION. Sec. 772. FOR EASTERN WASHINGTON UNIVERSITY
Computer replacement (90-2-005)
Reappropriation Appropriation
EWU Cap Proj Acct 1,611,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,611,000
NEW SECTION. Sec. 773. FOR EASTERN WASHINGTON UNIVERSITY
Deferred maintenance (90-3-009)
Reappropriation Appropriation
EWU Cap Proj Acct 516,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
516,000
NEW SECTION. Sec. 774. FOR EASTERN WASHINGTON UNIVERSITY
Kennedy Library addition/HVAC‑-Preplanning (90-5-003)
Reappropriation Appropriation
EWU Cap Proj Acct 165,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
165,000
NEW SECTION. Sec. 775. FOR CENTRAL WASHINGTON UNIVERSITY
Energy savings projects (86-2-005)
Reappropriation Appropriation
CWU Cap Proj Acct 18,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
697,000 715,000
NEW SECTION. Sec. 776. FOR CENTRAL WASHINGTON UNIVERSITY
Small repairs and improvements (86-3-013)
Reappropriation Appropriation
CWU Cap Proj Acct 20,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
513,000 533,000
NEW SECTION. Sec. 777. FOR CENTRAL WASHINGTON UNIVERSITY
Handicap modifications (88-1-007)
Reappropriation Appropriation
CWU Cap Proj Acct 272,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
443,000 715,000
NEW SECTION. Sec. 778. FOR CENTRAL WASHINGTON UNIVERSITY
Nicholson Pavilion phase 2 (88-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 1,845,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,018,000 3,863,000
NEW SECTION. Sec. 779. FOR CENTRAL WASHINGTON UNIVERSITY
Life/safety (90-1-030)
Reappropriation Appropriation
St Bldg Constr Acct 831,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,000,000 1,831,000
NEW SECTION. Sec. 780. FOR CENTRAL WASHINGTON UNIVERSITY
Asbestos abatement (90-1-040)
Reappropriation Appropriation
St Bldg Constr Acct 509,000 1,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,735,000 1,000,000 4,244,000
NEW SECTION. Sec. 781. FOR CENTRAL WASHINGTON UNIVERSITY
Psychology animal research facility (90-1-060)
Reappropriation Appropriation
St Bldg Constr Acct 1,547,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,547,000
NEW SECTION. Sec. 782. FOR CENTRAL WASHINGTON UNIVERSITY
Barge Hall renovation (90-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 600,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
7,744,800 8,344,800
NEW SECTION. Sec. 783. FOR CENTRAL WASHINGTON UNIVERSITY
Telecommunications system‑-Phase 2 (90-2-003)
Reappropriation Appropriation
CWU Cap Proj Acct 875,000 1,443,600
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
925,000 3,243,600
NEW SECTION. Sec. 784. FOR CENTRAL WASHINGTON UNIVERSITY
Shaw/Smyser Hall remodel (90-2-005)
Reappropriation Appropriation
St Bldg Constr Acct 2,405,900
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,405,900
NEW SECTION. Sec. 785. FOR CENTRAL WASHINGTON UNIVERSITY
Minor works projects group I (90-2-050)
Reappropriation Appropriation
CWU Cap Proj Acct 809,000 5,156,600
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,203,958 10,450,000 18,619,558
NEW SECTION. Sec. 786. FOR THE EVERGREEN STATE COLLEGE
Life safety‑-Code compliance (88-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 819,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,003,000
NEW SECTION. Sec. 787. FOR THE EVERGREEN STATE COLLEGE
Asbestos removal (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 60,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
443,000 503,000
NEW SECTION. Sec. 788. FOR THE EVERGREEN STATE COLLEGE
Failed systems (90-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 544,070
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
544,070
NEW SECTION. Sec. 789. FOR THE EVERGREEN STATE COLLEGE
Minor works (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 178,720
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
178,720
NEW SECTION. Sec. 790. FOR THE EVERGREEN STATE COLLEGE
Emergency repairs (90-2-022)
Reappropriation Appropriation
TESC Cap Proj Acct 81,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
81,000
NEW SECTION. Sec. 791. FOR THE EVERGREEN STATE COLLEGE
Small repairs and improvements (90-2-023)
Reappropriation Appropriation
TESC Cap Proj Acct 162,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
162,000
NEW SECTION. Sec. 792. FOR THE EVERGREEN STATE COLLEGE
Deferred maintenance (90-3-006)
Reappropriation Appropriation
St Bldg Constr Acct 1,641,870
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,641,870
NEW SECTION. Sec. 793. FOR THE EVERGREEN STATE COLLEGE
Public service building‑-Preplanning (90-5-010)
Reappropriation Appropriation
St Bldg Constr Acct 210,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
210,000
(End of part)
PART 8
EDUCATION - CONTINUED
NEW SECTION. Sec. 801. FOR WESTERN WASHINGTON UNIVERSITY
Const Tech Bldg/remodel Art Tech building phase 2 (84-3-001)
Reappropriation Appropriation
St Bldg Constr Acct 100,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
9,809,055 9,909,055
NEW SECTION. Sec. 802. FOR WESTERN WASHINGTON UNIVERSITY
Construct/equip science facility phase 1 (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 20,730,700
WWU Cap Proj Acct 450,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
800,000 21,980,700
NEW SECTION. Sec. 803. FOR WESTERN WASHINGTON UNIVERSITY
Asbestos abatement‑-Multiple buildings (90-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 3,000,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,000,000
NEW SECTION. Sec. 804. FOR WESTERN WASHINGTON UNIVERSITY
Minor works request/small repairs and improvements (90-1-004)
Reappropriation Appropriation
WWU Cap Proj Acct 2,503,000 3,900,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
8,948,481 12,000,000 27,351,481
NEW SECTION. Sec. 805. FOR WESTERN WASHINGTON UNIVERSITY
Science facility, phase 2 (design) (90-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 887,300
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
19,332,800 20,220,100
NEW SECTION. Sec. 806. FOR WESTERN WASHINGTON UNIVERSITY
Institute of Wildlife Toxicology‑-Facility acquisition (90-2-003)
Reappropriation Appropriation
WWU Cap Proj Acct 1,500,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,500,000
NEW SECTION. Sec. 807. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Addition to air conditioning (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 206,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
125,000 331,000
NEW SECTION. Sec. 808. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Museum interior remodeling (88-3-004)
Reappropriation Appropriation
St Bldg Constr Acct 1,937,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
305,000 2,242,000
NEW SECTION. Sec. 809. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Small improvement project to extend building's useful life (90-3-006)
Reappropriation Appropriation
St Bldg Constr Acct 151,500
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
151,500
NEW SECTION. Sec. 810. FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
Campbell House‑-Restoration (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 750,700
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
343,000 1,093,700
NEW SECTION. Sec. 811. FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
Cheney Cowles Museum‑-Repair roof and heating/cooling (89-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 80,100
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
80,100
NEW SECTION. Sec. 812. FOR THE STATE CAPITOL HISTORICAL ASSOCIATION
Minor works State Museum Olympia (90-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 9,000 27,100
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
91,000 48,000 175,100
NEW SECTION. Sec. 813. FOR THE STATE CAPITOL HISTORICAL ASSOCIATION
Design and construct agency headquarters, Capitol Campus, Olympia (90-5-001)
Reappropriation Appropriation
St Bldg Constr Acct 7,890,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
10,000 7,900,000
NEW SECTION. Sec. 814. FOR THE STATE CAPITOL HISTORICAL ASSOCIATION
Energy efficiency agency headquarters‑-Olympia (91-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 15,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,000 16,000
NEW SECTION. Sec. 815. FOR THE COMMUNITY COLLEGE SYSTEM
HVAC repairs (83-2-007)
Reappropriation Appropriation
St H Ed Constr Acct 55,161
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
33,187 88,348
NEW SECTION. Sec. 816. FOR THE COMMUNITY COLLEGE SYSTEM
Minor works request (RMI) (86-1-001)
Reappropriation Appropriation
H Ed Reimb S/T Bonds Acct 145,007
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
695,558 840,565
NEW SECTION. Sec. 817. FOR THE COMMUNITY COLLEGE SYSTEM
Critical repair projects (86-1-003)
Reappropriation Appropriation
H Ed Reimb S/T Bonds Acct 578,666
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
508,335 1,087,001
NEW SECTION. Sec. 818. FOR THE COMMUNITY COLLEGE SYSTEM
General repair projects (86-1-004)
Reappropriation Appropriation
St Fac Renew‑-Acct 1,145,540
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,906,325 4,051,865
NEW SECTION. Sec. 819. FOR THE COMMUNITY COLLEGE SYSTEM
Energy conservation projects (86-1-005)
Reappropriation Appropriation
St Fac Renew Acct 680,782
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
699,155 1,379,937
NEW SECTION. Sec. 820. FOR THE COMMUNITY COLLEGE SYSTEM
Food service building: Olympic (86-1-019)
Reappropriation Appropriation
St H Ed Constr Acct 166,665
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,154,206 2,320,871
NEW SECTION. Sec. 821. FOR THE COMMUNITY COLLEGE SYSTEM
Minor renovations (86-2-006)
Reappropriation Appropriation
St Fac Renew Acct 1,149,227
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,519,681 3,668,908
NEW SECTION. Sec. 822. FOR THE COMMUNITY COLLEGE SYSTEM
Program/plan/construct: Library/student Center, Everett (86-2-031)
Reappropriation Appropriation
General Fund 21,425
St Bldg Constr Acct 2,501,830
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
5,653,092 8,176,347
NEW SECTION. Sec. 823. FOR THE COMMUNITY COLLEGE SYSTEM
Construct main storage building‑-Clark (86-3-009)
Reappropriation Appropriation
St H Ed Constr Acct 4,687
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
172,909 177,596
NEW SECTION. Sec. 824. FOR THE COMMUNITY COLLEGE SYSTEM
Minor improvements (86-3-011)
Reappropriation Appropriation
St H Ed Constr Acct 30,886
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
872,234 903,120
NEW SECTION. Sec. 825. FOR THE COMMUNITY COLLEGE SYSTEM
Edison North renovation II: Seattle central (86-3-013)
Reappropriation Appropriation
St H Ed Constr Acct 592,093
St Bldg Constr Acct 4,211,350
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,112,869 7,916,312
NEW SECTION. Sec. 826. FOR THE COMMUNITY COLLEGE SYSTEM
Construct core facility and instructional space: Whatcom (86-3-015)
Reappropriation Appropriation
St H Ed Constr Acct 112,403
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,107,565 1,219,968
NEW SECTION. Sec. 827. FOR THE COMMUNITY COLLEGE SYSTEM
Replace relocatable buildings: Pierce (86-3-017)
Reappropriation Appropriation
St H Ed Constr Acct 78,117
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
849,284 927,401
NEW SECTION. Sec. 828. FOR THE COMMUNITY COLLEGE SYSTEM
Vocational science facility: Wenatchee (86-3-020)
Reappropriation Appropriation
St H Ed Constr Acct 341,554
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,901,445 2,242,999
NEW SECTION. Sec. 829. FOR THE COMMUNITY COLLEGE SYSTEM
Extension facility: Puyallup (86-3-021)
Reappropriation Appropriation
St H Ed Constr Acct 25,988
St Bldg Constr Acct 5,376,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
177,161 5,579,149
NEW SECTION. Sec. 830. FOR THE COMMUNITY COLLEGE SYSTEM
Tech building and related remodeling: Skagit Valley (86-3-022)
Reappropriation Appropriation
St Bldg Constr Acct 545,486
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,054,514 3,600,000
NEW SECTION. Sec. 831. FOR THE COMMUNITY COLLEGE SYSTEM
Heavy equipment building: Grays Harbor (86-3-023)
Reappropriation Appropriation
St Bldg Constr Acct 176,659
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
601,341 778,000
NEW SECTION. Sec. 832. FOR THE COMMUNITY COLLEGE SYSTEM
Learning Resource Center: South Puget Sound CC (86-3-025)
Reappropriation Appropriation
St Bldg Constr Acct 4,860,816
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,373,184 7,234,000
NEW SECTION. Sec. 833. FOR THE COMMUNITY COLLEGE SYSTEM
Heavy equipment building: South Seattle (86-3-026)
Reappropriation Appropriation
St Bldg Constr Acct 3,110,473
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,502,527 4,613,000
NEW SECTION. Sec. 834. FOR THE COMMUNITY COLLEGE SYSTEM
Energy grant: Tacoma (86-3-030)
Reappropriation Appropriation
General Fund 97,857
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
87,143 185,000
NEW SECTION. Sec. 835. FOR THE COMMUNITY COLLEGE SYSTEM
Preplanning for 1987-89 major projects (86-4-999)
Reappropriation Appropriation
St H Ed Constr Acct 21,512
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
155,477 176,989
NEW SECTION. Sec. 836. FOR THE COMMUNITY COLLEGE SYSTEM
Minor works (RMI) (88-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 2,002,615
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,497,385 3,500,000
NEW SECTION. Sec. 837. FOR THE COMMUNITY COLLEGE SYSTEM
Repairs‑-Exterior walls (88-3-003)
Reappropriation Appropriation
St Bldg Constr Acct 2,208,444
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,055,556 4,264,000
NEW SECTION. Sec. 838. FOR THE COMMUNITY COLLEGE SYSTEM
Repairs‑-Mechanical/HVAC (88-3-004)
Reappropriation Appropriation
St Bldg Constr Acct 2,946,849
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,128,151 4,075,000
NEW SECTION. Sec. 839. FOR THE COMMUNITY COLLEGE SYSTEM
Minor improvements (88-3-005)
Reappropriation Appropriation
St Bldg Constr Acct 6,824,863
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
6,939,137 13,764,000
NEW SECTION. Sec. 840. FOR THE COMMUNITY COLLEGE SYSTEM
Repairs‑-Electrical (88-3-006)
Reappropriation Appropriation
St Bldg Constr Acct 1,044,047
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
347,953 1,392,000
NEW SECTION. Sec. 841. FOR THE COMMUNITY COLLEGE SYSTEM
Repairs‑-Sites and interiors (88-3-007)
Reappropriation Appropriation
St Bldg Constr Acct 685,604
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,240,396 1,926,000
NEW SECTION. Sec. 842. FOR THE COMMUNITY COLLEGE SYSTEM
Agricultural technology building (Walla Walla) (88-3-008)
Reappropriation Appropriation
St Bldg Constr Acct 166,325 2,946,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
50,478 3,162,803
NEW SECTION. Sec. 843. FOR THE COMMUNITY COLLEGE SYSTEM
Vocational shop (Wenatchee Valley) (88-3-010)
Reappropriation Appropriation
St Bldg Constr Acct 64,747 880,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
17,253 962,000
NEW SECTION. Sec. 844. FOR THE COMMUNITY COLLEGE SYSTEM
Computer facility (Edmonds) (88-3-011)
Reappropriation Appropriation
St Bldg Constr Acct 168,568 3,624,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
79,434 3,872,002
NEW SECTION. Sec. 845. FOR THE COMMUNITY COLLEGE SYSTEM
Learning Resource Center (Clark) (88-3-012)
Reappropriation Appropriation
St Bldg Constr Acct 201,334 6,077,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
145,666 6,424,000
NEW SECTION. Sec. 846. FOR THE COMMUNITY COLLEGE SYSTEM
Extension center (Yakima Valley) (88-3-013)
Reappropriation Appropriation
St Bldg Constr Acct 76,381 1,586,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
48,145 1,710,526
NEW SECTION. Sec. 847. FOR THE COMMUNITY COLLEGE SYSTEM
Math/science building (Spokane Falls) (88-3-015)
Reappropriation Appropriation
St Bldg Constr Acct 144,486 5,510,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
172,152 5,826,638
NEW SECTION. Sec. 848. FOR THE COMMUNITY COLLEGE SYSTEM
LRC (Spokane) (88-3-016)
Reappropriation Appropriation
St Bldg Constr Acct 82,296 5,270,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
257,277 5,609,573
NEW SECTION. Sec. 849. FOR THE COMMUNITY COLLEGE SYSTEM
Construct Clarkston Extension Center: (Walla Walla) (88-3-017)
Reappropriation Appropriation
St Bldg Constr Acct 248,670
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,783,330 3,032,000
NEW SECTION. Sec. 850. FOR THE COMMUNITY COLLEGE SYSTEM
Tacoma Computer Center: TCC (88-3-018)
Reappropriation Appropriation
St Bldg Constr Acct 2,392,889
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
165,111 2,558,000
NEW SECTION. Sec. 851. FOR THE COMMUNITY COLLEGE SYSTEM
Preplanning for 1989-93 major projects (88-4-010)
Reappropriation Appropriation
St Bldg Constr Acct 145,226
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
351,774 497,000
NEW SECTION. Sec. 852. FOR THE COMMUNITY COLLEGE SYSTEM
Whidbey LRC/instruc. (Skagit Valley) (88-5-020)
Reappropriation Appropriation
St Bldg Constr Acct 108,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
37,000 1,927,000 2,072,000
NEW SECTION. Sec. 853. FOR THE COMMUNITY COLLEGE SYSTEM
Science/fine arts/PE (South Puget Sound) (88-5-021)
Reappropriation Appropriation
St Bldg Constr Acct 256,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
72,000 5,494,000 5,822,000
NEW SECTION. Sec. 854. FOR THE COMMUNITY COLLEGE SYSTEM
Early childhood education (Shoreline) (88-5-022)
Reappropriation Appropriation
St Bldg Constr Acct 78,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
41,000 1,258,000 1,377,000
NEW SECTION. Sec. 855. FOR THE COMMUNITY COLLEGE SYSTEM
Library remodel (Columbia Basin) (88-5-023)
Reappropriation Appropriation
St Bldg Constr Acct 113,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
48,000 1,893,000 2,054,000
NEW SECTION. Sec. 856. FOR THE COMMUNITY COLLEGE SYSTEM
Vocational shops (Centralia) (88-5-024)
Reappropriation Appropriation
St Bldg Constr Acct 95,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
43,000 2,089,000 2,227,000
NEW SECTION. Sec. 857. FOR THE COMMUNITY COLLEGE SYSTEM
LRC addition/remodel (Tacoma) (88-5-025)
Reappropriation Appropriation
St Bldg Constr Acct 90,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
34,000 1,720,000 1,844,000
NEW SECTION. Sec. 858. FOR THE COMMUNITY COLLEGE SYSTEM
Vocational food addition (Lower Columbia) (88-5-026)
Reappropriation Appropriation
St Bldg Constr Acct 140,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
42,000 2,934,000 3,116,000
NEW SECTION. Sec. 859. FOR THE COMMUNITY COLLEGE SYSTEM
Business education building (Spokane) (88-5-027)
Reappropriation Appropriation
St Bldg Constr Acct 245,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
76,000 6,398,000 6,719,000
NEW SECTION. Sec. 860. FOR THE COMMUNITY COLLEGE SYSTEM
Student activity/PE (Seattle Central) (88-5-028)
Reappropriation Appropriation
St Bldg Constr Acct 400,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
107,000 507,000
NEW SECTION. Sec. 861. FOR THE COMMUNITY COLLEGE SYSTEM
WSU Education Center: Clark (89-5-019)
Reappropriation Appropriation
St Bldg Constr Acct 1,800,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,800,000
NEW SECTION. Sec. 862. FOR THE COMMUNITY COLLEGE SYSTEM
Multipurpose Child Care Center: Everett (89-5-020)
Reappropriation Appropriation
St Bldg Constr Acct 600,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
600,000
NEW SECTION. Sec. 863. FOR THE COMMUNITY COLLEGE SYSTEM
Fire/security repairs (7) (90-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 947,610
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
947,610
NEW SECTION. Sec. 864. FOR THE COMMUNITY COLLEGE SYSTEM
Asbestos repairs (4) (90-1-008)
Reappropriation Appropriation
St Bldg Constr Acct 1,217,200
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,217,200
NEW SECTION. Sec. 865. FOR THE COMMUNITY COLLEGE SYSTEM
Roof/structural repairs (20) (90-2-002)
Reappropriation Appropriation
St Bldg Constr Acct 3,658,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,658,000
NEW SECTION. Sec. 866. FOR THE COMMUNITY COLLEGE SYSTEM
HVAC/mechanical repairs (15) (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 2,972,830
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
2,972,830
NEW SECTION. Sec. 867. FOR THE COMMUNITY COLLEGE SYSTEM
Electrical repairs (4) (90-2-005)
Reappropriation Appropriation
St Bldg Constr Acct 371,240
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
371,240
NEW SECTION. Sec. 868. FOR THE COMMUNITY COLLEGE SYSTEM
Small repairs and improvements (90-3-001)
Reappropriation Appropriation
St Bldg Constr Acct 4,200,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
4,200,000
NEW SECTION. Sec. 869. FOR THE COMMUNITY COLLEGE SYSTEM
LARC (Centralia) (90-3-006)
Reappropriation Appropriation
St Bldg Constr Acct 133,680 4,012,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
118,800 4,263,970
NEW SECTION. Sec. 870. FOR THE COMMUNITY COLLEGE SYSTEM
Facility repairs (18) (90-3-007)
Reappropriation Appropriation
St Bldg Constr Acct 3,848,180
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
3,848,180
NEW SECTION. Sec. 871. FOR THE COMMUNITY COLLEGE SYSTEM
Technology labs (Highline) (90-3-023)
Reappropriation Appropriation
St Bldg Constr Acct 147,098 2,595,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
56,040 2,798,138
NEW SECTION. Sec. 872. FOR THE COMMUNITY COLLEGE SYSTEM
Minor improvements (50) (90-5-009)
Reappropriation Appropriation
St Bldg Constr Acct 13,292,940
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
13,292,940
NEW SECTION. Sec. 873. FOR THE COMMUNITY COLLEGE SYSTEM
Technology center (Whatcom) (90-5-010)
Reappropriation Appropriation
St Bldg Constr Acct 63,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
185,000 248,000
NEW SECTION. Sec. 874. FOR THE COMMUNITY COLLEGE SYSTEM
PE facility (North Seattle) (90-5-011)
Reappropriation Appropriation
St Bldg Constr Acct 45,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
165,000 210,000
NEW SECTION. Sec. 875. FOR THE COMMUNITY COLLEGE SYSTEM
Applied arts building (Spokane Falls) (90-5-012)
Reappropriation Appropriation
St Bldg Constr Acct 68,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
190,000 258,000
NEW SECTION. Sec. 876. FOR THE COMMUNITY COLLEGE SYSTEM
Industrial technology building (Spokane) (90-5-013)
Reappropriation Appropriation
St Bldg Constr Acct 64,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
204,000 268,000
NEW SECTION. Sec. 877. FOR THE COMMUNITY COLLEGE SYSTEM
Vocational art facility (Shoreline) (90-5-014)
Reappropriation Appropriation
St Bldg Constr Acct 51,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
125,000 176,000
NEW SECTION. Sec. 878. FOR THE COMMUNITY COLLEGE SYSTEM
Business education building (Clark) (90-5-015)
Reappropriation Appropriation
St Bldg Constr Acct 73,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
231,000 304,000
NEW SECTION. Sec. 879. FOR THE COMMUNITY COLLEGE SYSTEM
Student center (South Seattle) (90-5-016)
Reappropriation Appropriation
St Bldg Constr Acct 59,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
185,000 244,000
NEW SECTION. Sec. 880. FOR THE COMMUNITY COLLEGE SYSTEM
Library addition (Skagit Valley) (90-5-017)
Reappropriation Appropriation
St Bldg Constr Acct 44,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
1,879,000 1,923,000
(End of part)
PART 9
ALL OTHER EXPENDITURES
NEW SECTION. Sec. 901. FOR SPECIAL APPROPRIATION TO THE GOVERNOR
Puyallup tribal settlement (90-5-001)
Reappropriation Appropriation
St Bldg Constr Acct 9,417,000
Project Estimated Estimated
Costs Costs Total
Through 7/1/91 and Costs
6/30/89 Thereafter
9,417,000
NEW SECTION. Sec. 902. FOR THE ARTS COMMISSION‑-ART WORK ALLOWANCE
Artwork allowance pooling: Up to one-half of one percent of moneys appropriated in this act shall be spent as provided in RCW 28A.58.055, 28B.10.027, and 43.17.200.
NEW SECTION. Sec. 903. To carry out effectively the provisions of this act, the governor may assign responsibility for planning, engineering, construction, and other related activities to any appropriate agency.
NEW SECTION. Sec. 904. Reappropriations shall be limited to the unexpended balances remaining June 30, 1989, in the current appropriation for each project.
NEW SECTION. Sec. 905. In order to provide for consistent and comparable asbestos survey data, and to insure that the chain of evidence requirements for asbestos samples and survey data are met in regard to pending asbestos manufacturer litigation:
(1) No state agency shall expend new funds appropriated in the 1989-91 biennium for asbestos surveys prior to approval by the department of general administration of the agency's asbestos survey policies and procedures. At the completion of each survey, state agencies shall submit the findings to the department in a format to be determined by the department.
(2) The department of general administration shall distribute to all state agencies chain of evidence requirements, as developed by the department and the office of the attorney general. State agencies expending appropriated funds for asbestos survey and abatement projects shall make every effort to conform with chain of evidence requirements.
NEW SECTION. Sec. 906. As part of the annual six year update to the State Facilities and Capital Plan, agencies shall provide lease development projects to the office of financial management.
NEW SECTION. Sec. 907. If any federal moneys appropriated by this act for capital projects are not received by the state, the department or agency to which the moneys were appropriated may replace the federal moneys with any moneys available from private or local sources. No replacement may occur under this section without the prior approval of the director of financial management in consultation with the committees on ways and means of the senate and house of representatives.
NEW SECTION. Sec. 908. Notwithstanding any other provisions of law, for the 1989-91 biennium, state treasurer transfers of reimbursement to the general fund from the community college capital projects account for debt service payments made under the provisions of Title 28B RCW shall occur only after such debt service payment has been made and only to the extent that funds are actually available in the account. Any unpaid reimbursements shall be a continuing obligation against the community college capital projects account until paid. The state board for community college education need not accumulate any specific balance in the community college capital projects account in anticipation of transfers to reimburse the general fund.
NEW SECTION. Sec. 909. Any capital improvements or capital project involving construction or major expansion of a state office facility, including district headquarters, detachment offices, and off-campus faculty offices, shall be reviewed by the department of general administration for possible consolidation and compliance with state office standards prior to allotment of funds. The intent of the requirement imposed by this section is to eliminate duplication and reduce total office space requirements where feasible, while ensuring proper service to the public.
NEW SECTION. Sec. 910. The governor, through the director of financial management, may authorize a transfer of appropriation authority provided for a capital project which is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient. No such transfer shall be used to expand the capacity of any facility beyond that intended by the legislature in making the appropriation. Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects which are funded from the same fund or account.
For the purposes of this section, the governor may find that an amount is in excess of the amount required for the completion of a project only if (1) the project as defined in the notes to the budget document is substantially complete and there are funds remaining or (2) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated herein.
For the purposes of this section, the legislature intends that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.
A report of any transfer effected under this section shall be filed with the legislative auditor by the director of financial management within thirty days of the date the transfer is effected. The legislative auditor shall review and compile these filings and periodically report thereon to the legislative budget committee and the appropriate standing committees of the senate and house of representatives.
NEW SECTION. Sec. 911. (1) The legislature finds:
(a) Estimates of capital project costs are prepared in a manner to ensure sufficient funds are available for the completion of projects.
(b) Actual project costs are influenced by variations in cost factors, changing unit price levels, available inventories, inflation rates, gross construction volume at the time of project bid, and other factors that cannot be predicted at the time of estimating capital project costs.
(c) Due to funding limitations, necessary capital projects are deferred to ensuing biennia.
(d) The deferral of capital projects results in increased project costs due to the effects of inflation and increased deterioration of facilities.
(e) No statutory authority currently exists to allow project cost savings to be used to implement necessary capital projects that were deferred to ensuing biennia due to lack of funds.
(2) There is hereby authorized a capital projects cost control incentive program for the 1989-91 biennium.
(3) Appropriations not required by an agency to complete capital projects authorized in this act, may be expended to implement, in priority sequence, those capital projects of the agency listed in the Governor's Six-Year Capital and Facility Plan for the 1991-93 Biennium, as that list exists in the Governor's final 1990 update of the six-year plan. Expenditures under this section are subject to the following conditions:
(a) No expenditure may be made without the prior allotment approval of the office of financial management.
(b) The office of financial management shall notify the senate and house ways and means committees prior to authorizing any project for implementation under this section.
(c) No project may be authorized under this section by the office of financial management unless sufficient funds are available to complete a project's design phase, construction phase, or both.
(d) Appropriations in this act for a capital project shall not be expended under this section unless:
(i) All contracts associated with the performance of the project have been completed and accepted by the state of Washington;
(ii) The statutory thirty-day lien period for each project has expired;
(iii) All claims of lien against project contracts have been satisfied;
(iv) There are no outstanding claims against the state of Washington by any contracted party to the project construction contract; and
(v) Any and all negotiated settlements or settlements arising from the findings of an arbitration board or court of jurisdiction have been satisfied.
NEW SECTION. Sec. 912. To assure that major construction projects are carried out in accordance with legislative and executive intent, capital projects for renovation or additional space contained in this act that exceed two million five hundred thousand dollars and have not completed a program document prior to September 1, 1988, shall not expend funds for planning and construction until the office of financial management has reviewed the agency's programmatic document and approved the continuation of the project. The program document shall include but not be limited to projected workload, site conditions, user requirements, current space available, and an overall budget and cost estimate breakdown.
NEW SECTION. Sec. 913. The appropriations contained in this act are maximum expenditure authorizations. Pursuant to RCW 43.88.037, moneys disbursed from the treasury on the basis of a formalized loan agreement with another governmental entity shall be treated as a loan and are to be recorded as loans receivable and not as expenditures for accounting purposes. To the extent that moneys are disbursed on a loan basis, the corresponding appropriation shall be reduced by the amount of loan moneys disbursed from the treasury during the 1989-91 biennium.
NEW SECTION. Sec. 914. If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.
NEW SECTION. Sec. 915. This act is necessary for the immediate preservation of the public peace, health, and safety, the support of the state government and its existing public institutions, and shall take effect immediately.