S-3146 _______________________________________________
SUBSTITUTE SENATE BILL NO. 5521
_______________________________________________
State of Washington 51st Legislature 1989 Regular Session
By Senate Committee on Ways & Means (originally sponsored by Senators McDonald and Gaspard; by request of Governor)
Read first time 4/14/89.
AN ACT Adopting the capital budget; making appropriations and authorizing expenditures for capital improvements; authorizing certain projects; and declaring an emergency.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1. A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period ending June 30, 1991, out of the several funds specified in this act.
NEW SECTION. Sec. 2. As used in this act, the following phrases have the following meanings:
"Common School Constr Fund" means Common School Construction Fund;
"Cap Bldg Constr Acct" means Capitol Building Construction Account;
"St Bldg Constr Acct" means State Building Construction Account;
"St Fac Renew Acct" means State Facilities Renewal Account;
"Fish Cap Proj Acct" means Fisheries Capital Projects Account;
"ORA" means Outdoor Recreation Account;
"Sal Enhmt Constr Acct" means Salmon Enhancement Construction Account;
"For Dev Acct" means Forest Development Account;
"Res Mgmt Cost Acct" means Resource Management Cost Account;
"LIRA, DSHS Fac Acct" means Local Improvements Revolving Account‑-Department of Social and Health Services Facilities;
"DSHS Constr Acct" means State Social and Health Services Construction Account;
"CEP & RI Acct" means Charitable, Educational, Penal, and Reformatory Institutions Account;
"WSU Bldg Acct" means Washington State University Building Account;
"St H Ed Constr Acct" means State Higher Education Construction Account;
"EWU Cap Proj Acct" means Eastern Washington University Capital Projects Account;
"TESC Cap Proj Acct" means The Evergreen State College Capital Projects Account;
"CWU Cap Proj Acct" means Central Washington University Capital Projects Account;
"UW Bldg Acct" means University of Washington Building Account;
"WWU Cap Proj Acct" means Western Washington University Capital Projects Account;
"Cap Purch & Dev Acct" means Capitol Purchase and Development Account;
"Hndcp Fac Constr Acct" means Handicapped Facilities Construction Account;
"LIRA, Waste Disp Fac" means State and Local Improvement Revolving Account‑-Waste Disposal Facilities;
"State Emerg Water Proj Rev" means Emergency Water Project Revolving Account‑-State;
"LIRA, Waste Fac 1980" means State and Local Improvement Revolving Account‑-Waste Disposal Facilities 1980;
"LIRA, Water Sup Fac" means State and Local Improvement Revolving Account‑-Water Supply Facilities;
"LIRA" means State and Local Improvement Revolving Account;
"LIRA, Public Rec Fac" means State and Local Improvement Revolving Account‑-Public Recreation Facilities;
"H Ed Constr Acct" means Higher Education Construction Account 1979;
"H Ed Reimb S/T Bonds Acct" means Higher Education Reimbursable Short-Term Bonds Account;
"Unemp Comp Admin Acct" means Unemployment Compensation Administration Account;
"Game Spec Wildlife Acct" means Game Special Wildlife Account;
"Local Jail Imp & Constr Acct" means Local Jail Improvement and Construction Account;
"ORV" means off-road vehicle;
"ESS Rail Assis Acct" means essential rail assistance account;
"ESS Rail Bank Acct" means essential rail bank account;
"East Cap Devel Acct" means east campus development account;
The words "capital improvements" or "capital projects" used in this act mean acquisition of sites, easements, rights of way, or improvements thereon and appurtenances thereto, construction and initial equipment, reconstruction, demolition, or major alterations of new or presently owned capital assets;
"Provided solely" means the specified amount may be spent only for the specified purpose. Unless otherwise specifically authorized in this act, any portion of an amount provided solely for a specified purpose which is unnecessary to fulfill the specified purpose shall revert;
"Revert" or "lapse" means the amount shall return to an unappropriated status;
"Fiscal committees of the legislature" means the senate committee on ways and means and the house of representatives committees on capital facilities and financing, or appropriations, as appropriate.
PART 1
GENERAL GOVERNMENT
NEW SECTION. Sec. 101. FOR THE SECRETARY OF STATE
Renovate essential records protection facility‑-Birch Bay (88-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 60,000
Prior Biennia Future Biennia Total
52,000 112,000
NEW SECTION. Sec. 102. FOR THE SECRETARY OF STATE
Design and construct regional branch archive facility (90-1-003)
Reappropriation Appropriation
St Bldg Constr Acct 3,005,000
Prior Biennia Future Biennia Total
49,000 7,069,000 10,123,000
NEW SECTION. Sec. 103. FOR THE SECRETARY OF STATE
Acquisition and installation of moveable archive vault #2 shelving (90-2-002)
Reappropriation Appropriation
St Bldg Constr Acct 152,000
Prior Biennia Future Biennia Total
152,000
NEW SECTION. Sec. 104. FOR THE OFFICE OF FINANCIAL MANAGEMENT
Local jail facilities (88-2-001)
Reappropriation Appropriation
Local Jail Imp & Con Acct 150,615
St Bldg Constr Acct 1,060,789
Prior Biennia Future Biennia Total
3,827,596 5,039,000
NEW SECTION. Sec. 105. FOR THE OFFICE OF FINANCIAL MANAGEMENT
Branch campus‑-Planning, site acquisition, and development
The appropriation in this section is subject to the following conditions and limitations:
(1) $1,000,000 of this appropriation is provided solely for a contract with the higher education coordinating board, in cooperation with the public institutions of higher education and the office of financial management, to develop a long-range plan for the orderly development of branch campuses. The plan developed by the board shall be submitted to the legislature by January 1, 1990.
(2) $45,000,000 of this appropriation is provided solely for the acquisition and construction of higher education branch campuses in the manner provided in this subsection.
(a) Up to $7,000,000 may be allocated for preplanning and land acquisition in Pierce county.
(b) Up to $7,000,000 may be allocated for preplanning and land acquisition in the Woodinville/Bothell area.
(c) Up to $12,000,000 may be allocated for design and construction in the Tri-Cities area.
(d) Up to $1,000,000 may be allocated to complete design of the Washington State University branch campus in Spokane.
(e) Up to $250,000 may be allocated for planning in Vancouver.
(f) Up to $11,000,000 may be allocated for the Spokane intercollegiate research and technology institute.
(g) No moneys may be allocated under (a) through (f) of this subsection without the prior approval of the office of financial management and the higher education coordinating board.
(3) The remaining moneys not allocated under subsections (1) and (2) of this section shall be placed in reserve status and shall be allocated, after legislative appropriation, to the Washington State University branch campus in Spokane and other branch campus projects identified in this section that are ready for further implementation and development.
(4) Branch campuses funded under this act shall not be separate degree-granting institutions.
Reappropriation Appropriation
St Bldg Constr Acct 46,000,000
Prior Biennia Future Biennia Total
100,000,000 146,000,000
NEW SECTION. Sec. 106. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Energy retrofit projects-Birch Bay (83-4-015)
Reappropriation Appropriation
Cap Bldg Constr Acct 314,700
Prior Biennia Future Biennia Total
715,300 1,030,000
NEW SECTION. Sec. 107. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Temple of Justice renovation (86-1-011)
Reappropriation Appropriation
St Bldg Constr Acct 3,700,000
Prior Biennia Future Biennia Total
11,660,000 15,360,000
NEW SECTION. Sec. 108. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Boiler plant structural repairs (88-1-003)
Reappropriation Appropriation
Cap Bldg Constr Acct 337,000
Prior Biennia Future Biennia Total
15,000 352,000
NEW SECTION. Sec. 109. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Life/safety projects-Buildings (88-1-006)
Reappropriation Appropriation
Cap Bldg Constr Acct 113,000
Prior Biennia Future Biennia Total
1,014,000 1,127,000
NEW SECTION. Sec. 110. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Northern State-Life Safety Repair (88-1-007)
Reappropriation Appropriation
St Bldg Constr Acct 256,418
Prior Biennia Future Biennia Total
68,582 325,000
NEW SECTION. Sec. 111. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Archives renovation (88-2-004)
Reappropriation Appropriation
Cap Purch & Dev Acct 20,000
St Bldg Constr Acct 10,000
Prior Biennia Future Biennia Total
530,000 560,000
NEW SECTION. Sec. 112. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus repairs-Inadequate building systems (88-2-008)
Reappropriation Appropriation
Cap Bldg Constr Acct 50,000
Cap Purch & Dev Acct 50,000
St Bldg Constr Acct 1,825,000
Prior Biennia Future Biennia Total
5,442,000 7,367,000
NEW SECTION. Sec. 113. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
John A. Cherberg Building remodel--Phase I: Floors 2 and 3 (88-2-040)
Reappropriation Appropriation
St Bldg Constr Acct 3,000,000
Prior Biennia Future Biennia Total
800,000 3,800,000
NEW SECTION. Sec. 114. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus property protection (88-3-012)
Reappropriation Appropriation
St Bldg Constr Acct 350,000
Prior Biennia Future Biennia Total
410,000 760,000
NEW SECTION. Sec. 115. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
East Campus programming and planning (88-3-042)
Reappropriation Appropriation
St Bldg Constr Acct 90,000
Prior Biennia Future Biennia Total
910,000 1,000,000
NEW SECTION. Sec. 116. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Highway-License Building renovation (88-5-011)
Reappropriation Appropriation
Cap Purch & Devel Acct 449,000
St Bldg Constr Acct 51,000
Prior Biennia Future Biennia Total
500,000
NEW SECTION. Sec. 117. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Emergency repairs (90-1-001)
Reappropriation Appropriation
Cap Bldg Constr Acct 250,000
Prior Biennia Future Biennia Total
500,000 750,000
NEW SECTION. Sec. 118. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Small repairs and improvements (90-1-002)
Reappropriation Appropriation
Cap Bldg Constr Acct 450,000
Prior Biennia Future Biennia Total
900,000 1,350,000
NEW SECTION. Sec. 119. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus asbestos program (90-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Prior Biennia Future Biennia Total
210,000 410,000
NEW SECTION. Sec. 120. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Northern state repairs (90-1-012)
The appropriations in this section are subject to the following conditions and limitations:
(1) The appropriation in this section from the CEP & RI Account shall be used solely for developing a long range plan for the use of the Northern State Hospital facility. The plan shall be developed cooperatively with the department of social and health services and in consultation with the affected local communities. The study shall be submitted to the office of financial management and the legislature by January 1, 1990.
(2) The remainder of the appropriation shall be used for asbestos abatement in residence facilities in current use.
Reappropriation Appropriation
CEP & RI Acct 100,000
St Bldg Constr Acct 960,000
Prior Biennia Future Biennia Total
1,060,000
NEW SECTION. Sec. 121. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Boiler plant structural repairs (90-1-016)
Reappropriation Appropriation
St Bldg Constr Acct 730,000
Prior Biennia Future Biennia Total
730,000
NEW SECTION. Sec. 122. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Asbestos inventory and inspection program (90-01-023)
The appropriation in this section is subject to the following conditions and limitations:
The department shall:
(1) Develop guidelines for asbestos surveys in all state-owned buildings.
(2) Review and approve state agency asbestos survey policies and procedures.
(3) Establish and maintain a central file of asbestos surveys of state-owned buildings.
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Prior Biennia Future Biennia Total
200,000
NEW SECTION. Sec. 123. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol campus fire, safety, and temperature control system
Reappropriation Appropriation
Cap Bldg Constr Acct 850,000
Prior Biennia Future Biennia Total
850,000
NEW SECTION. Sec. 124. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Sidewalk and street repairs (90-2-005)
Reappropriation Appropriation
Cap Bldg Constr Acct 500,000
Prior Biennia Future Biennia Total
200,000 700,000
NEW SECTION. Sec. 125. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Building exterior repairs and renovation (90-2-006)
Reappropriation Appropriation
Cap Bldg Constr Acct 1,426,000
Prior Biennia Future Biennia Total
1,340,000 2,766,000
NEW SECTION. Sec. 126. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Elevator/escalator repair (90-2-007)
Reappropriation Appropriation
St Bldg Constr Acct 614,000
Prior Biennia Future Biennia Total
1,400,000 2,014,000
NEW SECTION. Sec. 127. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Electrical repairs (90-2-008)
Reappropriation Appropriation
Cap Bldg Constr Acct 797,000
Prior Biennia Future Biennia Total
901,000 1,698,000
NEW SECTION. Sec. 128. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Mechanical system repairs (90-2-009)
Reappropriation Appropriation
St Bldg Constr Acct 2,000,000
Prior Biennia Future Biennia Total
2,341,000 4,341,020
NEW SECTION. Sec. 129. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor works: Interior building repair (90-2-010).
The appropriations in this section are subject to the following conditions and limitations: $80,000 of the state building construction account appropriation is to reimburse the senate for costs incurred in the completion of the renovation of the legislative building.
Reappropriation Appropriation
Motor Transport Acct 262,000
St Bldg Constr Acct 1,205,000
Prior Biennia Future Biennia Total
1,329,000 2,774,000
NEW SECTION. Sec. 130. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol Lake repairs and preservation (90-3-013)
The appropriation in this section is subject to the following conditions and limitations:
(1) $85,000 of this appropriation is provided solely for shoreline repairs.
(2) $100,000 of this appropriation is provided solely for allocation to the department of ecology for a feasibility study to examine proposals to allow the middle basin of Capitol Lake to return to its natural state as a wetland. The study shall be conducted in conjunction with the departments of natural resources, fisheries, wildlife, and general administration and local governmental jurisdictions. The results of the feasibility study shall be submitted to the governor and the fiscal committees of the legislature by December 1, 1989.
Reappropriation Appropriation
Cap Bldg Constr Acct 185,000
Prior Biennia Future Biennia Total
185,000
NEW SECTION. Sec. 131. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Facilities management system (90-4-018)
The appropriation in this section is subject to the following conditions and limitations:
The department shall establish and maintain a central inventory of all state-owned land and facilities. The data elements of the inventory shall be developed in cooperation with the office of financial management.
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Prior Biennia Future Biennia Total
200,000
NEW SECTION. Sec. 132. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Construction of archives storage building (90-4-024)
Reappropriation Appropriation
St Bldg Constr Acct 2,015,000
Prior Biennia Future Biennia Total
2,015,000
NEW SECTION. Sec. 133. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
East campus development (90-5-003)
Design and construct a natural resources building and parking facility on a site directly east of the old Thurston County courthouse.
Reappropriation Appropriation
East Cap Devel Acct 73,000,000
Prior Biennia Future Biennia Total
73,000,000
NEW SECTION. Sec. 134. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Dawley property acquisition (90-5-011)
Reappropriation Appropriation
St Bldg Constr Acct 1,311,000
Prior Biennia Future Biennia Total
1,311,000
NEW SECTION. Sec. 135. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Preplans and surveys (90-5-022)
Reappropriation Appropriation
Cap Bldg Constr Acct 143,000
Prior Biennia Future Biennia Total
143,000
NEW SECTION. Sec. 136. FOR THE MILITARY DEPARTMENT
Tacoma Armory rehabilitation phase 3 (86-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 218,166
Prior Biennia Future Biennia Total
2,081,088 2,299,254
NEW SECTION. Sec. 137. FOR THE MILITARY DEPARTMENT
Construct watercraft support training complex (86-1-003)
The appropriations in this section are subject to the following conditions and limitations:
(1) The state building construction account appropriation is provided for the acquisition of a 50-year lease for 3 acres of land and 6.67 acres of water area at pier 23 from the port of Tacoma.
(2) On or before June 30, 1991, the United States or its agent shall transfer to the state of Washington its interest in 3001 North Starr Street, Tacoma, Washington, consisting of approximately 6.79 acres located in a portion of block 72 of Tacoma tidelands which is located in lot 1, section 29, township 21 north, range 3 east, Willamette meridian, currently owned by the United States Army corps of engineers on behalf of the United States. Such transfer may be in the form of an exchange of such property for a 50-year leasehold interest in approximately 11.04 acres of uplands and wetlands at and adjacent to Pier 23 at the Port of Tacoma, which leasehold interest will be licensed by the United States to the state of Washington for use by the Washington military department.
Reappropriation Appropriation
General Fund‑-Federal 6,885,000
St Bldg Constr Acct 100
Prior Biennia Future Biennia Total
1,640,000 5,500,000 14,025,100
NEW SECTION. Sec. 138. FOR THE MILITARY DEPARTMENT
Minor works: Support federal service agreement (86-1-004)
Reappropriation Appropriation
General Fund‑-Federal 3,189,000
St Bldg Constr Acct 1,063,000
Prior Biennia Future Biennia Total
8,884,000 13,136,000
NEW SECTION. Sec. 139. FOR THE MILITARY DEPARTMENT
Minor works (86-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 100,000 425,000
Prior Biennia Future Biennia Total
2,099,000 1,100,000 3,724,000
NEW SECTION. Sec. 140. FOR THE MILITARY DEPARTMENT
Small repairs and improvements (86-2-006)
Reappropriation Appropriation
St Bldg Constr Acct 375,000
Prior Biennia Future Biennia Total
812,000 1,150,000 2,337,000
NEW SECTION. Sec. 141. FOR THE MILITARY DEPARTMENT
Construct Kent Armory (86-3-007)
Reappropriation Appropriation
General Fund‑-Federal 600,000
St Bldg Constr Acct 488,013
Prior Biennia Future Biennia Total
3,000,987 4,089,000
NEW SECTION. Sec. 142. FOR THE MILITARY DEPARTMENT
Life/safety code compliance (88-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 800,000
Prior Biennia Future Biennia Total
1,600,000 2,400,000
NEW SECTION. Sec. 143. FOR THE MILITARY DEPARTMENT
Repair/replace leaking underground tanks (88-2-008)
Reappropriation Appropriation
St Bldg Constr Acct 205,000 345,000
Prior Biennia Future Biennia Total
82,000 430,000 1,062,000
NEW SECTION. Sec. 144. FOR THE MILITARY DEPARTMENT
Roof renovation (88-3-006)
Reappropriation Appropriation
St Bldg Constr Acct 125,000 700,000
Prior Biennia Future Biennia Total
575,000 900,000 2,300,000
NEW SECTION. Sec. 145. FOR THE MILITARY DEPARTMENT
Exterior painting of facilities (88-3-007)
Reappropriation Appropriation
St Bldg Constr Acct 5,000 258,000
Prior Biennia Future Biennia Total
253,000 500,000 1,016,000
NEW SECTION. Sec. 146. FOR THE MILITARY DEPARTMENT
Facility HVAC renovation (88-4-004)
Reappropriation Appropriation
St Bldg Constr Acct 280,000
Prior Biennia Future Biennia Total
434,000 714,000
NEW SECTION. Sec. 147. FOR THE MILITARY DEPARTMENT
Energy conservation projects (88-4-010)
Reappropriation Appropriation
St Bldg Constr Acct 125,000
Prior Biennia Future Biennia Total
951,000 1,076,000
NEW SECTION. Sec. 148. FOR THE MILITARY DEPARTMENT
Project preplanning (88-5-004)
Reappropriation Appropriation
St Bldg Constr Acct 198,000
Prior Biennia Future Biennia Total
174,000 341,000 713,000
(End of part)
PART 2
HUMAN RESOURCES
NEW SECTION. Sec. 201. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Fire service training center-Minor works (87-4-002)
Reappropriation Appropriation
St Bldg Constr Acct 145,000
Prior Biennia Future Biennia Total
26,000 171,000
NEW SECTION. Sec. 202. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Capitalize development loan fund (88-2-002)
Reappropriation Appropriation
St Bldg Constr Acct 1,100,000 7,000,000
Prior Biennia Future Biennia Total
7,970,000 10,000,000 26,070,000
NEW SECTION. Sec. 203. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Endangered landmark buildings (88-2-009)
This appropriation is provided solely to establish a permanent fund, known as the endangered landmarks preservation fund, to be used by the department to purchase and hold for brief periods landmark buildings which might otherwise be lost or altered, and to resell those buildings with the proceeds for sale deposited in the fund.
This appropriation is provided contingent on an equal amount being provided from nonstate sources on a project-by-project basis.
Reappropriation Appropriation
St Bldg Constr Acct 600,000
Prior Biennia Future Biennia Total
600,000
NEW SECTION. Sec. 204. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Grays Harbor dredging (88-3-006)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation is provided solely for the state's share of costs for Grays Harbor dredging, dike construction, bridge relocation, and related expenses.
(2) The appropriation is contingent on $40,000,000 from the United States army corps of engineers and $10,000,000 from local government funds being provided for the project.
(3) The appropriation is contingent on a cost-sharing arrangement and the execution of a local cooperation agreement between the Port of Grays Harbor and the Army corps of engineers pursuant to Public Law 99-662, the federal water resources development act of 1986.
(4) The Port of Grays Harbor shall make the best possible effort to acquire additional project funding from sources other than those in subsection (2) of this section. Any money, up to $10,000,000 provided from sources other than those in subsection (2) of this section, shall be used to reimburse or replace state building construction account money.
Reappropriation Appropriation
St Bldg Constr Acct 10,000,000
Prior Biennia Future Biennia Total
10,000,000
NEW SECTION. Sec. 205. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Capitalize housing trust fund (88-5-015)
The appropriation in this section is subject to the following conditions and limitations:
(1) No expenditures from this appropriation may be made until the department has completed the state-wide housing data study and the legislature has reviewed the results.
(2) $15,000,000 of this appropriation is provided solely for capital costs and $1,000,000 is provided solely for technical assistance and administrative costs pursuant to the purposes of the housing trust fund under RCW 43.185.050 and 43.185.070. The appropriation for capital costs is for loans or grants for capital projects state-wide that will provide housing for persons or families with special housing needs and with incomes at or below fifty percent of the median family income for the county or standard metropolitan statistical area where the project is located. At least thirty percent of the moneys used for loans or grants shall go to projects located in rural areas.
(3) The department shall to the maximum extent feasible use the appropriation to leverage other funds for capital costs associated with the purposes of the housing trust fund under chapter 43.185 RCW.
Reappropriation Appropriation
St Bldg Constr Acct 2,000,000 16,000,000
Prior Biennia Future Biennia Total
20,000,000 38,000,000
NEW SECTION. Sec. 206. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Tacoma Union Station (88-5-016)
The appropriation in this section, in addition to funds appropriated for the 1987-89 biennium for this project, is subject to the following conditions and limitations:
(1) $1,000,000 is provided solely to prevent further deterioration of the Tacoma Union Station building. This may include, but is not limited to, providing a fire detection system, removing safety hazards, and programming necessary to implement these works.
(2) A maximum of $500,000 may be used for planning regarding future use of the Tacoma Union Station property to promote state economic development.
(3) The money in subsections (1) and (2) of this section is provided contingent upon a written legal agreement between the city of Tacoma and the state that (a) requires state approval of future uses and disposition of the Tacoma Union Station property and (b) gives the state the right of first refusal to assume the city of Tacoma's option to purchase the Tacoma Union Station property currently owned by the Burlington Northern company.
(4) $500,000 is provided solely for architectural plans and construction specifications for a state museum on the Union Station property.
(5) $400,000 is provided solely for purchase of the Union Station property. The appropriation in this subsection is contingent on a like amount being provided for this purpose from nonstate sources.
(6) $2,000,000 is provided solely for restoration of the rotunda of the Union Station building. The appropriation in this subsection is contingent on the city's agreement to exercise its option to purchase Union Station and the city's agreement to grant to the state the right of first refusal to assume the city's option to purchase the property should the city decide to withdraw from the project.
(7) The money in subsections (4), (5), and (6) of this section is provided contingent upon a written legal agreement between the city of Tacoma and the state that:
(a) The city obtain the state's approval for all decisions with respect to:
(i) Determining final ownership of Union Station itself;
(ii) Identifying appropriate uses for the site; and
(iii) Selecting consultants retained by the city under its contract with the state;
(b) The city consult with the state and, unless prohibited from doing so by terms of the United States general services administration lease, follow the state's recommendations in other significant decisions concerning the development of the Union Station properties, including but not limited to:
(i) Planning the development and redevelopment of the site to accommodate appropriate uses;
(ii) Obtaining financing for acquisition, development, or redevelopment of the property; and
(iii) Acquiring, leasing, subleasing, and/or reselling the property;
(c) If the city finds that it is not possible to follow the state's recommendations, the city will advise the state and allow the state a reasonable opportunity to comment; and
(d) The city shall obtain a public access easement from the United States general services administration or any other owner or lessee that will allow public access through the rotunda to the facilities of any state agency, subject to such reasonable limitations as required by the federal courts for safe and efficient operation. In determining compatible state facilities to be located on the site, the state shall consult with the city and the federal government.
Reappropriation Appropriation
St Bldg Constr Acct 3,400,000
Prior Biennia Future Biennia Total
1,000,000 4,400,000
NEW SECTION. Sec. 207. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
San Juan County Courthouse (88-5-017)
This appropriation is contingent on the provision of an equal amount of money from nonstate sources.
Reappropriation Appropriation
St Bldg Constr Acct 100,000
Prior Biennia Future Biennia Total
100,000
NEW SECTION. Sec. 208. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Columbia County Courthouse (89-4-004)
The appropriations in this section are subject to the following conditions and limitations:
(1) $600,000 is provided solely to repair and restore the Columbia county courthouse.
(2) The $400,000 reappropriation shall be matched by $700,000 in private donations and local funds from Columbia county.
(3) The $200,000 appropriation shall be matched by an equal amount of private donations and local funds from Columbia county.
Reappropriation Appropriation
St Bldg Constr Acct 400,000 200,000
Prior Biennia Future Biennia Total
600,000
NEW SECTION. Sec. 209. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Spokane public facilities (89-5-005)
The appropriation in this section is subject to the following conditions and limitations:
(1) The money appropriated in this section is provided solely for the purposes of RCW 36.100.030 and 36.100.060.
(2) $500,000 of this appropriation shall be repaid to the state building construction account by June 30, 1993.
(3) If this reappropriation is enacted in Substitute Senate Bill No. 6074 prior to June 30, 1989, the reappropriation in this section shall lapse.
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
Prior Biennia Future Biennia Total
1,000,000
NEW SECTION. Sec. 210. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Public works trust fund (90-2-001)
The appropriations in this section are provided solely for public works projects recommended by the public works board and approved by the legislature under chapter 43.155 RCW.
Reappropriation Appropriation
Pub Works Asst Acct 61,627,871 78,241,000
Prior Biennia Future Biennia Total
32,446,397 168,562,493 327,623,873
NEW SECTION. Sec. 211. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Emergency management building minor renovation (90-2-003)
This appropriation shall be used solely to provide handicapped access and improve insulation.
Reappropriation Appropriation
St Bldg Constr Acct 80,000
Prior Biennia Future Biennia Total
80,000
NEW SECTION. Sec. 212. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Fire service training center minor works (90-2-004)
Reappropriation Appropriation
St Bldg Constr Acct 441,887
Prior Biennia Future Biennia Total
441,887
NEW SECTION. Sec. 213. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Nordic Heritage Museum‑-Repairs and improvements
This appropriation is subject to the following conditions and limitations: This appropriation is contingent on $650,000 being provided from nonstate sources.
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Prior Biennia Future Biennia Total
200,000
NEW SECTION. Sec. 214. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Clark County cultural center‑-Planning
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided for a grant to Clark county for planning a cultural art/puppet center and theater.
Reappropriation Appropriation
St Bldg Constr Acct 25,000
Prior Biennia Future Biennia Total
25,000
NEW SECTION. Sec. 215. FOR THE DEPARTMENT OF LABOR AND INDUSTRIES
Property acquisition, design and construct office facility (90-5-001)
Reappropriation Appropriation
Accident Fund 31,500,000
Medical Aid Fund 31,500,000
Prior Biennia Future Biennia Total
63,000,000
NEW SECTION. Sec. 216. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Lakeland Village: Construct habilitation center (79-1-009)
Reappropriation Appropriation
DSHS Constr Acct 450,000
Prior Biennia Future Biennia Total
5,965,662 6,415,662
NEW SECTION. Sec. 217. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Rainier School: Renovate Evergreen Center (79-1-017)
Reappropriation Appropriation
St Bldg Constr Acct 4,400,000
DSHS Constr Acct 150,000
Prior Biennia Future Biennia Total
983,824 5,533,824
NEW SECTION. Sec. 218. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Referendum #37 (79-3-001)
In addition to previously approved projects, $29,000 shall be used to construct an addition to a training center in Skamania county to serve up to ten more developmentally disabled children under four years old, which requires a final application submittal by December 31, 1989, and approval by March 31, 1990.
Reappropriation Appropriation
Handicap Fac Constr Acct 350,000
LIRA, DSHS Fac Acct 23,500
Prior Biennia Future Biennia Total
2,937,539 3,311,039
NEW SECTION. Sec. 219. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
State mental health residences (79-3-002)
This appropriation, in addition to funds appropriated in the 1987-89 biennium for this project, is subject to the following conditions and limitations: A maximum of $40,000 of the funds provided may be spent for renovation or other costs necessary to establish a self-supporting day care center for children of state employees at Eastern State Hospital. $170,000 is provided solely for participation by the department of social and health services in a project to construct a multipurpose child care center at the Everett community college.
Reappropriation Appropriation
Improve‑-DSHS Fac Acct 230,000
Prior Biennia Future Biennia Total
974,177 1,204,177
NEW SECTION. Sec. 220. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Complete artwork (79-4-005)
Reappropriation Appropriation
DSHS Constr Acct 40,000
Prior Biennia Future Biennia Total
108,045 148,045
NEW SECTION. Sec. 221. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Fire safety (83-1-006)
Reappropriation Appropriation
DSHS Constr Acct 25,000
Prior Biennia Future Biennia Total
189,203 214,203
NEW SECTION. Sec. 222. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Frances Haddon Morgan Center: Renovate Marion School (83-1-015)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Prior Biennia Future Biennia Total
1,319,000 1,469,000
NEW SECTION. Sec. 223. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Eastern State Hospital: Renovate wards, phase 1 (83-2-016)
Reappropriation Appropriation
DSHS Constr Acct 100,000
Prior Biennia Future Biennia Total
3,175,000 3,275,000
NEW SECTION. Sec. 224. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Renovate wards, phase 2 (83-2-017)
Reappropriation Appropriation
DSHS Constr Acct 2,300,000
Prior Biennia Future Biennia Total
11,598,000 13,898,000
NEW SECTION. Sec. 225. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Mission Creek: Renovate main buildings (86-1-202)
Reappropriation Appropriation
St Fac Renew Acct 165,000
Prior Biennia Future Biennia Total
1,882,999 2,047,999
NEW SECTION. Sec. 226. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Fircrest School: Construct food service (86-1-403)
Reappropriation Appropriation
DSHS Constr Acct 200,000
Prior Biennia Future Biennia Total
3,896,302 4,096,302
NEW SECTION. Sec. 227. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Referenda 27 and 38 (86-2-099)
The appropriation in this section is subject to the following conditions and limitations:
(1) Up to sixteen full-time equivalent staff per year may be funded from the reappropriation of Referendum 38 moneys for the purpose of reviewing local water improvement accounts.
(2) The appropriation is provided solely for drought-related municipal and industrial water supply projects.
Reappropriation Appropriation
LIRA Water Supp Fac 22,000,000
Prior Biennia Future Biennia Total
23,134,000 45,134,000
NEW SECTION. Sec. 228. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Renovate wards, phase 3 (88-1-307)
Reappropriation Appropriation
St Bldg Constr Acct 375,000
Prior Biennia Future Biennia Total
210,900 585,900
NEW SECTION. Sec. 229. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Child study and treatment center‑-Renovate residences to high school (88-1-318)
Reappropriation Appropriation
St Bldg Constr Acct 160,000
Prior Biennia Future Biennia Total
165,000 325,000
NEW SECTION. Sec. 230. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Involuntary treatment residential facilities (88-2-340)
Reappropriation Appropriation
St Bldg Constr Acct 830,000
Prior Biennia Future Biennia Total
170,000 1,000,000
NEW SECTION. Sec. 231. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Sanitary sewer (88-2-400)
Reappropriation Appropriation
St Bldg Constr Acct 2,650,000
Prior Biennia Future Biennia Total
2,229,000 4,879,000
NEW SECTION. Sec. 232. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor capital renewal: Fire safety (90-1-004)
Reappropriation Appropriation
CEP & RI Acct 600,000
St Bldg Constr Acct 810,000
Prior Biennia Future Biennia Total
335,000 1,200,000 2,945,000
NEW SECTION. Sec. 233. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor capital renewal: Hazardous substance (90-1-005)
Reappropriation Appropriation
CEP & RI Acct 500,000
St Bldg Constr Acct 450,000
Prior Biennia Future Biennia Total
527,000 1,392,500 2,869,500
NEW SECTION. Sec. 234. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Emergency capital repairs (90-1-007)
Reappropriation Appropriation
CEP & RI Acct 250,000
St Bldg Constr Acct 220,000
St Fac Renew Acct 160,000
Prior Biennia Future Biennia Total
864,502 500,000 1,994,502
NEW SECTION. Sec. 235. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Echo Glen: Renovate eleven living units (90-1-210)
Reappropriation Appropriation
St Bldg Constr Acct 2,964,000
Prior Biennia Future Biennia Total
2,964,000
NEW SECTION. Sec. 236. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Ward renovations, phase 4 (90-1-312)
Reappropriation Appropriation
St Bldg Constr Acct 5,189,400
Prior Biennia Future Biennia Total
5,189,400
NEW SECTION. Sec. 237. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Eastern State Hospital: Ward renovations, phase 2 (90-1-339)
Reappropriation Appropriation
St Bldg Constr Acct 4,510,400
Prior Biennia Future Biennia Total
4,510,400
NEW SECTION. Sec. 238. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor capital renewal: Utilities and facilities (90-2-001)
Reappropriation Appropriation
CEP & RI Acct 750,000
St Bldg Constr Acct 450,000
Prior Biennia Future Biennia Total
608,000 2,100,000 3,908,000
NEW SECTION. Sec. 239. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor capital renewal: Roads and grounds (90-2-002)
Reappropriation Appropriation
CEP & RI Acct 500,000
St Bldg Constr Acct 500,000
Prior Biennia Future Biennia Total
122,000 1,200,000 2,322,000
NEW SECTION. Sec. 240. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor capital renewal: Roofs (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 200,000 700,000
Prior Biennia Future Biennia Total
940,000 2,000,000 3,840,000
NEW SECTION. Sec. 241. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Small repairs and improvements (90-2-008)
Reappropriation Appropriation
CEP & RI Acct 190,000
Prior Biennia Future Biennia Total
415,000 605,000
NEW SECTION. Sec. 242. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Bureau of Alcohol and Substance Abuse (90-2-010)
Reappropriation Appropriation
CEP & RI Acct 442,400
Prior Biennia Future Biennia Total
100,000 542,400
NEW SECTION. Sec. 243. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Juvenile rehabilitation division (90-2-020)
Reappropriation Appropriation
CEP & RI Acct 270,100
St Bldg Constr Acct 340,000
St Fac Renew Acct 650,000
Prior Biennia Future Biennia Total
2,375,000 300,000 3,935,100
NEW SECTION. Sec. 244. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Mental health division, including renovation and expansion of bathroom facilities for the PORTAL program at the Northern State multi-service center (90-2-030)
Reappropriation Appropriation
St Bldg Constr Acct 200,000 650,000
St Fac Renew Acct 110,000
Prior Biennia Future Biennia Total
1,514,042 700,000 3,174,042
NEW SECTION. Sec. 245. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Mental health division (2) (90-2-032)
Reappropriation Appropriation
CEP & RI Acct 75,000
Prior Biennia Future Biennia Total
250,000 325,000
NEW SECTION. Sec. 246. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Developmental disabilities division (90-2-040)
Reappropriation Appropriation
CEP & RI Acct 21,200
St Bldg Constr Acct 245,000 517,600
St Fac Renew Acct 80,000
Prior Biennia Future Biennia Total
2,078,999 550,000 3,492,799
NEW SECTION. Sec. 247. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor projects: Health division (90-2-050)
Reappropriation Appropriation
CEP & RI Acct 358,900
Prior Biennia Future Biennia Total
100,000 358,900
NEW SECTION. Sec. 248. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Lakeland Village: Steam plant replacement (90-2-425)
Reappropriation Appropriation
St Bldg Constr Acct 4,063,000
Prior Biennia Future Biennia Total
4,063,000
NEW SECTION. Sec. 249. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor capital renewal, mental health division (90-2-060)
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
Prior Biennia Future Biennia Total
1,000,000
NEW SECTION. Sec. 250. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Resource conservation (90-4-006)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Prior Biennia Future Biennia Total
165,045 315,045
NEW SECTION. Sec. 251. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Preplanning (90-4-009)
Reappropriation Appropriation
CEP & RI Acct 191,400
Prior Biennia Future Biennia Total
329,500 520,900
NEW SECTION. Sec. 252. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Renovation of Barclay Building at the Northern State multiservice center to provide 120 beds for the mentally ill.
Reappropriation Appropriation
St Bldg Constr Acct 3,500,000
Prior Biennia Future Biennia Total
3,500,000
NEW SECTION. Sec. 253. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Food bank facility: Fircrest (90-5-011)
Reappropriation Appropriation
St Bldg Constr Acct 788,000
Prior Biennia Future Biennia Total
788,000
NEW SECTION. Sec. 254. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Food services renovation (88-1-014)
Reappropriation Appropriation
CEP & RI Acct 282,700
Prior Biennia Future Biennia Total
282,700
NEW SECTION. Sec. 255. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Soldiers Home‑-Preplan a thirty bed Alzheimer's unit (88-5-020)
Reappropriation Appropriation
CEP & RI Acct 33,700
Prior Biennia Future Biennia Total
1,908,700 1,942,400
NEW SECTION. Sec. 256. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Minor projects‑-Asbestos (90-1-003)
Reappropriation Appropriation
CEP & RI Acct 300,000
Prior Biennia Future Biennia Total
300,000
NEW SECTION. Sec. 257. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Minor projects‑-Roads and walkways (90-1-005)
Reappropriation Appropriation
CEP & RI Acct 100,000
Prior Biennia Future Biennia Total
100,000
NEW SECTION. Sec. 258. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Air quality, Building 9 (90-1-009)
Reappropriation Appropriation
CEP & RI Acct 313,200
Prior Biennia Future Biennia Total
313,200
NEW SECTION. Sec. 259. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Small projects (90-1-011)
Reappropriation Appropriation
CEP & RI Acct 39,800
Prior Biennia Future Biennia Total
39,800
NEW SECTION. Sec. 260. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Minor projects‑-Building remodel (90-2-008)
Reappropriation Appropriation
CEP & RI Acct 256,000
Prior Biennia Future Biennia Total
256,000
NEW SECTION. Sec. 261. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Minor projects‑-Utilities and energy projects (90-4-006)
Reappropriation Appropriation
CEP & RI Acct 544,000
Prior Biennia Future Biennia Total
544,000
NEW SECTION. Sec. 262. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Minor projects‑-Building study (90-5-012)
Reappropriation Appropriation
CEP & RI Acct 35,000
Prior Biennia Future Biennia Total
35,000
NEW SECTION. Sec. 263. FOR THE DEPARTMENT OF VETERANS' AFFAIRS
Steam distribution system (92-2-024)
Reappropriation Appropriation
CEP & RI Acct 22,200
Prior Biennia Future Biennia Total
895,700 917,900
NEW SECTION. Sec. 264. FOR THE DEPARTMENT OF CORRECTIONS
The department of corrections shall develop a population management and facilities master plan that evaluates alternatives for accommodating increased correctional system population, reflecting updated office of financial management inmate population forecasts and any population increases resulting from legislation enacted during the 1989 legislative session. The plan shall assess and evaluate each alternative on the basis of its short- and long-term program and fiscal impacts and shall be submitted to the fiscal committees of the legislature by December 1, 1989.
NEW SECTION. Sec. 265. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center‑-Enlarge, remodel six hundred beds (83-3-029)
Reappropriation Appropriation
St Bldg Constr Acct 32,961
Prior Biennia Future Biennia Total
1,338,053 1,371,014
NEW SECTION. Sec. 266. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Reformatory facility improvements (83-3-048)
Reappropriation Appropriation
St Bldg Constr Acct 6,500,000 8,600,000
DSHS Constr Acct 500,000
Prior Biennia Future Biennia Total
8,033,303 16,000,000 39,633,303
NEW SECTION. Sec. 267. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary‑-Improve security, facilities, utilities (83-3-052)
Reappropriation Appropriation
St Bldg Constr Acct 400,000 5,898,000
DSHS Constr Acct 1,600,000
Prior Biennia Future Biennia Total
6,317,413 2,476,000 16,691,413
NEW SECTION. Sec. 268. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center renovation of utilities (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 4,000,000 1,261,000
St Fac Renew Acct 300,000
Prior Biennia Future Biennia Total
3,724,000 4,674,000 13,959,000
NEW SECTION. Sec. 269. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center repairs to transportation system, including parking and materials forwarding facility at Western State Hospital (86-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 985,000 3,522,000
St Fac Renew Acct 900,000
Prior Biennia Future Biennia Total
1,408,000 7,081,000 13,896,000
NEW SECTION. Sec. 270. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center building fire/safety (86-1-008)
Reappropriation Appropriation
St Bldg Constr Acct 2,500,000 2,183,000
St Fac Renew Acct 1,000,000
Prior Biennia Future Biennia Total
1,665,000 967,000 8,315,000
NEW SECTION. Sec. 271. FOR THE DEPARTMENT OF CORRECTIONS
State-wide minor projects (86-2-005)
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
St Fac Renew Acct 300,000
Prior Biennia Future Biennia Total
2,879,000 4,179,000
NEW SECTION. Sec. 272. FOR THE DEPARTMENT OF CORRECTIONS
State-wide small repairs and improvements (86-2-006)
Reappropriation Appropriation
St Bldg Constr Acct 250,000
Prior Biennia Future Biennia Total
296,000 546,000
NEW SECTION. Sec. 273. FOR THE DEPARTMENT OF CORRECTIONS
Life/safety code compliance (88-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 700,000
Prior Biennia Future Biennia Total
840,000 1,540,000
NEW SECTION. Sec. 274. FOR THE DEPARTMENT OF CORRECTIONS
State-wide wastewater system improvements (88-1-017)
Reappropriation Appropriation
St Bldg Constr Acct 440,000 605,000
Prior Biennia Future Biennia Total
268,000 1,313,000
NEW SECTION. Sec. 275. FOR THE DEPARTMENT OF CORRECTIONS
State-wide water system improvements (88-1-018)
Reappropriation Appropriation
St Bldg Constr Acct 250,000 939,000
Prior Biennia Future Biennia Total
172,000 1,361,000
NEW SECTION. Sec. 276. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center‑-Implement master plan (88-2-003)
The appropriation in this section is subject to the following conditions and limitations: No expenditure may be made from this appropriation until thirty days following submittal of the master plan to the fiscal committees of the legislature.
Reappropriation Appropriation
St Bldg Constr Acct 4,377,000
Prior Biennia Future Biennia Total
621,000 28,000,000 32,998,000
NEW SECTION. Sec. 277. FOR THE DEPARTMENT OF CORRECTIONS
Tacoma work release relocation (88-2-004)
Reappropriation Appropriation
St Bldg Constr Acct 4,200,000
Prior Biennia Future Biennia Total
262,000 4,462,000
NEW SECTION. Sec. 278. FOR THE DEPARTMENT OF CORRECTIONS
Eastern Washington prerelease, site preparation (88-2-005)
Reappropriation Appropriation
St Bldg Constr Acct 340,000
Prior Biennia Future Biennia Total
671,000 1,011,000
NEW SECTION. Sec. 279. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center for Women‑-Implement master plan (88-2-006)
Reappropriation Appropriation
St Bldg Constr Acct 460,000
Prior Biennia Future Biennia Total
155,000 6,800,000 7,415,000
NEW SECTION. Sec. 280. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center‑-Reroof building (88-3-019)
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
Prior Biennia Future Biennia Total
65,000 1,065,000
NEW SECTION. Sec. 281. FOR THE DEPARTMENT OF CORRECTIONS
State-wide asbestos removal/encapsulation (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 2,500,000
Prior Biennia Future Biennia Total
5,000,000 7,500,000
NEW SECTION. Sec. 282. FOR THE DEPARTMENT OF CORRECTIONS
Hazardous materials management (90-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 879,000
Prior Biennia Future Biennia Total
604,000 1,483,000
NEW SECTION. Sec. 283. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center and Washington Corrections Center for Women‑-Perimeter security upgrade (90-1-007)
Reappropriation Appropriation
St Bldg Constr Acct 1,652,000
Prior Biennia Future Biennia Total
3,277,000 4,929,000
NEW SECTION. Sec. 284. FOR THE DEPARTMENT OF CORRECTIONS
State-wide minor projects (90-1-009)
Reappropriation Appropriation
CEP & RI Acct 1,000,000
St Bldg Constr Acct 4,349,000
Prior Biennia Future Biennia Total
8,000,000 13,349,000
NEW SECTION. Sec. 285. FOR THE DEPARTMENT OF CORRECTIONS
State-wide small repairs and improvements (90-1-010)
Reappropriation Appropriation
St Bldg Constr Acct 756,000
Prior Biennia Future Biennia Total
756,000
NEW SECTION. Sec. 286. FOR THE DEPARTMENT OF CORRECTIONS
State-wide emergency repairs projects (90-1-013)
Reappropriation Appropriation
CEP & RI Acct 750,000
Prior Biennia Future Biennia Total
1,500,000 2,250,000
NEW SECTION. Sec. 287. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center Reception Center upgrade (90-2-012)
Reappropriation Appropriation
CEP & RI Acct 26,000
St Bldg Constr Acct 236,000
Prior Biennia Future Biennia Total
14,400,000 14,662,000
NEW SECTION. Sec. 288. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary‑-Expand medium security complex (MSC) industries building (90-2-016)
Reappropriation Appropriation
St Bldg Constr Acct 1,213,000
Prior Biennia Future Biennia Total
1,213,000
NEW SECTION. Sec. 289. FOR THE DEPARTMENT OF CORRECTIONS
State-wide roof repair (90-3-011)
Reappropriation Appropriation
St Bldg Constr Acct 1,500,000
Prior Biennia Future Biennia Total
1,500,000
NEW SECTION. Sec. 290. FOR THE DEPARTMENT OF CORRECTIONS
Clallam Bay corrections center double-celling renovations
Reappropriation Appropriation
St Bldg Constr Acct 4,071,000
Prior Biennia Future Biennia Total
4,071,000
NEW SECTION. Sec. 291. FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
Criminal justice training center
The appropriation in this section is subject to the following conditions and limitations: This appropriation is provided solely for preplanning for colocation of the criminal justice training center at the Washington state patrol academy.
Reappropriation Appropriation
St Bldg Constr Acct 30,000
Prior Biennia Future Biennia Total
30,000
(End of part)
PART 3
NATURAL RESOURCES
NEW SECTION. Sec. 301. FOR THE WASHINGTON STATE ENERGY OFFICE
Energy conservation projects (90-4-001)
The appropriation in this section is subject to the following conditions and limitations:
The department shall contract with the following agencies for the amounts specified to undertake energy conservation projects. Each contract shall require the agencies identified in this section to deposit the savings resulting from these projects into the energy conservation account in an amount equal to the contract amount.
(1) $1,033,000 is provided solely for energy conservation projects for military department facilities.
(2) $362,000 is provided solely for energy conservation projects for the department of social and health services.
(3) $552,000 is provided solely for energy conservation projects for The Evergreen State College.
Reappropriation Appropriation
St Bldg Constr Acct 1,947,000
Prior Biennia Future Biennia Total
2,199,000 4,146,000
NEW SECTION. Sec. 302. FOR THE DEPARTMENT OF ECOLOGY
Referendum 26‑-Waste disposal facilities; special program, state-wide (74-5-004)
Reappropriation Appropriation
LIRA‑-Waste Disp Fac 23,754,000
Prior Biennia Future Biennia Total
207,024,000 230,778,000
NEW SECTION. Sec. 303. FOR THE DEPARTMENT OF ECOLOGY
Referendum 27 and 38‑-Water supply facilities; special program, state-wide (74-5-006)
The appropriation in this section is subject to the following conditions and limitations:
(1) A maximum of $75,000 of this reappropriation may be expended for modification of the gate on the Lake Osoyoos international water control structure authorized by chapter 76, Laws of 1982.
(2) Funds previously appropriated for the East Selah reregulating reservoir shall be reallocated for purposes of early implementation of the Yakima river basin water enhancement project in order to financially assist irrigators in making up 80,000 acre feet of water per year lost because of a 1980 court decision.
Reappropriation Appropriation
LIRA Water Sup Fac 29,424,000
Prior Biennia Future Biennia Total
25,813,000 11,764,000 67,001,000
NEW SECTION. Sec. 304. FOR THE DEPARTMENT OF ECOLOGY
State emergency water project revolving account; special program, state-wide (76-5-003)
Reappropriation Appropriation
St Emer Water Proj Rev 4,004,000 3,905,000
Prior Biennia Future Biennia Total
14,097,000 293,000 22,329,000
NEW SECTION. Sec. 305. FOR THE DEPARTMENT OF ECOLOGY
Padilla Bay Research Reserve‑-Land acquisition/special program (80-2-002)
Reappropriation Appropriation
General Fund‑-Federal 112,000
Prior Biennia Future Biennia Total
1,202,000 1,314,000
NEW SECTION. Sec. 306. FOR THE DEPARTMENT OF ECOLOGY
Referendum 39‑-Waste disposal facilities, 1980; special program, state-wide (82-5-005)
Reappropriation Appropriation
LIRA Waste Fac‑-1980 126,900,000
Prior Biennia Future Biennia Total
324,971,000 451,871,000
NEW SECTION. Sec. 307. FOR THE DEPARTMENT OF ECOLOGY
Water quality account; special programs, state-wide (86-5-007)
The appropriation in this section is subject to the following conditions and limitations:
(1) In developing rules to administer chapter 3, Laws of 1986 and in awarding grants, extended grant payments, or loans from the water quality account, the department shall include, but not be limited to the following:
(a) For facilities that discharge directly into marine waters, the department shall:
(i) Give first priority to secondary wastewater treatment facilities that are mandated by both federal and state law;
(ii) Give second priority to projects which reduce combined sewer overflows; and
(iii) Encourage economies that are derived from any simultaneous projects which achieve both (a) (i) and (ii) of this subsection.
(b) In determining the appropriate level of state assistance for eligible facilities and activities, the department shall consider:
(i) The need to provide additional assistance for eligible activities undertaken by local public bodies which lack taxing or revenue generating authority; and
(ii) The need to provide additional assistance for eligible facilities undertaken by local public bodies that would suffer severe financial hardship in the absence of such additional assistance.
(c) The department shall place such funds as may be necessary from the water quality account into a state revolving loan fund to be used to match capitalization funds provided by the federal environmental protection agency under Public Law 100-4. The department shall also gradually arrange for a transition in the assistance program toward the use of loans.
(d) The following limitations shall apply to the department's total distribution of funds appropriated under this section:
(i) Not more than fifty percent for water pollution control facilities which discharge directly into marine waters;
(ii) Not more than twenty percent for water pollution control activities that prevent or mitigate pollution of underground waters and facilities that protect federally designated sole source aquifers with at least two-thirds for the Spokane-Rathdrum Prairie aquifer;
(iii) Not more than ten percent for water pollution control activities that protect freshwater lakes and rivers including but not limited to Lake Chelan and the Yakima and Columbia rivers;
(iv) Not more than ten percent for activities which control nonpoint source water pollution;
(v) Ten percent and such sums as may be remaining from the categories specified in (d) (i) through (iv) of this subsection for water pollution control activities or facilities as determined by the department.
(2) In determining compliance schedules for the greatest reasonable reduction of combined sewer overflows, the department shall consider the amount of grant or loan moneys available to assist local governments in the planning, design, acquisition, construction, and improvement of combined sewer overflow facilities.
Reappropriation Appropriation
Water Quality Acct 67,051,000 112,530,000
Prior Biennia Future Biennia Total
8,838,000 177,178,000 365,597,000
NEW SECTION. Sec. 308. FOR THE STATE PARKS AND RECREATION COMMISSION
Yakima Greenway acquisition (81-3-098)
Reappropriation Appropriation
ORA‑-State 75,000
Prior Biennia Future Biennia Total
18,000 93,000
NEW SECTION. Sec. 309. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Emergencies (86-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 7,000
Prior Biennia Future Biennia Total
24,000 31,000
NEW SECTION. Sec. 310. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Water supply facilities (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 380,000
Prior Biennia Future Biennia Total
685,000 1,065,000
NEW SECTION. Sec. 311. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Sewage treatment facilities (86-1-003)
Reappropriation Appropriation
LIRA Waste Fac‑-1980 309,000
St Bldg Constr Acct 50,000
ORA‑-Federal 23,000
ORA‑-State 24,000
Prior Biennia Future Biennia Total
359,000 767,000
NEW SECTION. Sec. 312. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boating repairs (86-1-020)
Reappropriation Appropriation
St Bldg Constr Acct 12,000
ORA‑-State 73,000
Prior Biennia Future Biennia Total
330,000 415,000
NEW SECTION. Sec. 313. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boating renovation (86-1-021)
Reappropriation Appropriation
St Bldg Constr Acct 3,000
ORA‑-State 68,000
Prior Biennia Future Biennia Total
62,000 133,000
NEW SECTION. Sec. 314. FOR THE STATE PARKS AND RECREATION COMMISSION
Beacon Rock‑-Replace floats and piling, renovate shear boom (86-1-022)
Reappropriation Appropriation
ORA‑-Federal 6,000
ORA‑-State 47,000
Prior Biennia Future Biennia Total
236,000 289,000
NEW SECTION. Sec. 315. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Energy conservation and landscape repairs (86-1-026)
Reappropriation Appropriation
St Bldg Constr Acct 117,000
ORA‑-State 3,000
Prior Biennia Future Biennia Total
156,000 276,000
NEW SECTION. Sec. 316. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Energy conservation and landscape renovation (86-1-027)
Reappropriation Appropriation
St Bldg Constr Acct 135,000
Prior Biennia Future Biennia Total
352,000 487,000
NEW SECTION. Sec. 317. FOR THE STATE PARKS AND RECREATION COMMISSION
Iron Horse‑-Trail safety and bridge repair/acquisition (86-1-030)
The reappropriation in the trust land purchase account is subject to initial appropriation in House Bill No. 1512.
Reappropriation Appropriation
St Bldg Constr Acct 64,000
Trust Land Pur Acct 200,000
Prior Biennia Future Biennia Total
144,000 408,000
NEW SECTION. Sec. 318. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden‑-Point Wilson bank protection, phase 2 (86-1-032)
Reappropriation Appropriation
St Bldg Constr Acct 85,000
ORA‑-Federal 74,000
ORA‑-State 95,000
Prior Biennia Future Biennia Total
43,000 125,000 422,000
NEW SECTION. Sec. 319. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boating improvements (86-3-005)
Reappropriation Appropriation
ORA‑-Federal 37,000
ORA‑-State 57,000
Prior Biennia Future Biennia Total
115,000 209,000
NEW SECTION. Sec. 320. FOR THE STATE PARKS AND RECREATION COMMISSION
Mount Spokane‑-Entrance road development (86-3-034)
Reappropriation Appropriation
Mot Veh Fund 8,000
Prior Biennia Future Biennia Total
170,000 178,000
NEW SECTION. Sec. 321. FOR THE STATE PARKS AND RECREATION COMMISSION
West Hylebos‑-Acquisition and development (86-4-013)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if the necessary construction contract is not entered into by June 30, 1990.
Reappropriation Appropriation
St Bldg Constr Acct 196,000
Prior Biennia Future Biennia Total
196,000
NEW SECTION. Sec. 322. FOR THE STATE PARKS AND RECREATION COMMISSION
Illahee‑-Replace breakwater, ramps (87-1-024)
Reappropriation Appropriation
ORA‑-Federal 7,000
ORA‑-State 15,000
Prior Biennia Future Biennia Total
196,000 218,000
NEW SECTION. Sec. 323. FOR THE STATE PARKS AND RECREATION COMMISSION
Sacajawea‑-Boat launch reconstruction (87-1-025)
Reappropriation Appropriation
ORA‑-State 14,000
Prior Biennia Future Biennia Total
128,000 142,000
NEW SECTION. Sec. 324. FOR THE STATE PARKS AND RECREATION COMMISSION
Lake Sylvia‑-Dam safety renovation and repair, phase 2 (87-1-028)
Reappropriation Appropriation
St Bldg Constr Acct 6,000 165,000
Prior Biennia Future Biennia Total
136,000 307,000
NEW SECTION. Sec. 325. FOR THE STATE PARKS AND RECREATION COMMISSION
Kopachuck‑-Shoreline protection (87-1-031)
Reappropriation Appropriation
ORA‑-State 44,000
Prior Biennia Future Biennia Total
58,000 102,000
NEW SECTION. Sec. 326. FOR THE STATE PARKS AND RECREATION COMMISSION
Moran‑-Mountain Lake CCC building renovation (87-1-049)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Prior Biennia Future Biennia Total
6,000 156,000
NEW SECTION. Sec. 327. FOR THE STATE PARKS AND RECREATION COMMISSION
Deception Pass‑-Renovate CCC buildings 2 and 3, Rosario (87-1-050)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if the necessary construction contract is not entered into by December 31, 1989.
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Prior Biennia Future Biennia Total
7,000 207,000
NEW SECTION. Sec. 328. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden‑-Phased weatherization of facilities (87-2-016)
Reappropriation Appropriation
St Bldg Constr Acct 160,000
Prior Biennia Future Biennia Total
290,000 450,000
NEW SECTION. Sec. 329. FOR THE STATE PARKS AND RECREATION COMMISSION
Flaming geyser‑-Bridge relocation and installation, phase 2 (87-2-029)
Reappropriation Appropriation
St Bldg Constr Acct 241,000
ORA‑-Federal 180,000
ORA‑-State 172,000
Prior Biennia Future Biennia Total
11,000 625,000 1,229,000
NEW SECTION. Sec. 330. FOR THE STATE PARKS AND RECREATION COMMISSION
Covenant Beach‑-Acquisition and relocation (87-2-039)
Reappropriation Appropriation
St Bldg Constr Acct 95,000
Prior Biennia Future Biennia Total
169,000 264,000
NEW SECTION. Sec. 331. FOR THE STATE PARKS AND RECREATION COMMISSION
Auburn Game Farm‑-Initial park development (87-3-012)
Reappropriation Appropriation
St Bldg Constr Acct 452,000
Prior Biennia Future Biennia Total
77,000 529,000
NEW SECTION. Sec. 332. FOR THE STATE PARKS AND RECREATION COMMISSION
Green River Gorge‑-Acquisition, phased project (87-5-010)
Reappropriation Appropriation
St Bldg Constr Acct 596,000
Prior Biennia Future Biennia Total
396,000 263,000 1,255,000
NEW SECTION. Sec. 333. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Potable water supply, omnibus facility contingency (88-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 65,000
LIRA‑-Water Sup Fac 43,000
Prior Biennia Future Biennia Total
37,000 145,000
NEW SECTION. Sec. 334. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Potable water supply, omnibus minor projects (88-1-003)
Reappropriation Appropriation
St Bldg Constr Acct 366,000
LIRA‑-Water Sup Fac 244,000
Prior Biennia Future Biennia Total
83,000 693,000
NEW SECTION. Sec. 335. FOR THE STATE PARKS AND RECREATION COMMISSION
Sequim Bay‑-Reservoir cover (88-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 23,000
LIRA‑-Water Sup Fac 23,000
Prior Biennia Future Biennia Total
86,000 132,000
NEW SECTION. Sec. 336. FOR THE STATE PARKS AND RECREATION COMMISSION
Sequim Bay‑-Renovate park water system (88-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 46,000
LIRA‑-Water Sup Fac 30,000
Prior Biennia Future Biennia Total
114,000 190,000
NEW SECTION. Sec. 337. FOR THE STATE PARKS AND RECREATION COMMISSION
Moran‑-Renovate potable water system (88-1-006)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if the necessary construction contract is not entered into by December 31, 1989.
Reappropriation Appropriation
St Bldg Constr Acct 153,000
LIRA‑-Water Sup Fac 101,000
Prior Biennia Future Biennia Total
29,000 283,000
NEW SECTION. Sec. 338. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Sewer facilities, omnibus facility contingency (88-1-007)
Reappropriation Appropriation
LIRA Waste Fac‑-1980 154,000
St Bldg Constr Acct 52,000
Prior Biennia Future Biennia Total
93,000 299,000
NEW SECTION. Sec. 339. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Sewer facilities, omnibus minor projects (88-1-008)
Reappropriation Appropriation
LIRA Waste Fac‑-1980 226,000
St Bldg Constr Acct 75,000
Prior Biennia Future Biennia Total
35,000 336,000
NEW SECTION. Sec. 340. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boat pumpout facilities, phased project (88-1-009)
Reappropriation Appropriation
LIRA Waste Fac‑-1980 31,000
St Bldg Constr Acct 440,000
Prior Biennia Future Biennia Total
78,000 549,000
NEW SECTION. Sec. 341. FOR THE STATE PARKS AND RECREATION COMMISSION
Ocean City‑-Connect to municipal sewer system (88-1-010)
Reappropriation Appropriation
LIRA Waste Fac‑-1980 276,000
St Bldg Constr Acct 93,000
Prior Biennia Future Biennia Total
13,000 382,000
NEW SECTION. Sec. 342. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boat traffic control markers and devices (88-1-013)
Reappropriation Appropriation
ORA‑-State 43,000
Prior Biennia Future Biennia Total
67,000 110,000
NEW SECTION. Sec. 343. FOR THE STATE PARKS AND RECREATION COMMISSION
St. Edward‑-Main electrical code compliance (88-1-027)
Reappropriation Appropriation
St Bldg Constr Acct 103,000
Prior Biennia Future Biennia Total
21,000 124,000
NEW SECTION. Sec. 344. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden‑-Electrical service renovation to 7,200 volts (88-1-030)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if the necessary construction contract is not entered into by December 31, 1989.
Reappropriation Appropriation
St Bldg Constr Acct 299,000
Prior Biennia Future Biennia Total
26,000 325,000
NEW SECTION. Sec. 345. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boating facilities, omnibus facilities contingency (88-2-011)
Reappropriation Appropriation
ORA‑-State 177,000
Prior Biennia Future Biennia Total
44,000 221,000
NEW SECTION. Sec. 346. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Boating facilities, omnibus minor projects (88-2-012)
Reappropriation Appropriation
ORA‑-State 648,000
Prior Biennia Future Biennia Total
321,000 969,000
NEW SECTION. Sec. 347. FOR THE STATE PARKS AND RECREATION COMMISSION
Centennial facilities‑-Contingency request (88-2-020)
Reappropriation Appropriation
LIRA, Pub Rec Fac 5,000
Prior Biennia Future Biennia Total
35,000 40,000
NEW SECTION. Sec. 348. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Columbia‑-Renovate historic buildings/Chinook displays (88-2-021)
Reappropriation Appropriation
LIRA, Pub Rec Fac 57,000
Prior Biennia Future Biennia Total
41,000 98,000
NEW SECTION. Sec. 349. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Park facilities renovation, omnibus facilities contingency (88-2-025)
Reappropriation Appropriation
St Bldg Constr Acct 289,000
LIRA, Pub Rec Fac 31,000
Prior Biennia Future Biennia Total
344,000 664,000
NEW SECTION. Sec. 350. FOR THE STATE PARKS AND RECREATION COMMISSION
Camp Wooten‑-Replace men's comfort station #23, add showers (88-2-041)
Reappropriation Appropriation
St Bldg Constr Acct 157,000
Prior Biennia Future Biennia Total
109,700 266,700
NEW SECTION. Sec. 351. FOR THE STATE PARKS AND RECREATION COMMISSION
Bogachiel‑-Campsite and day use renovation (88-2-058)
Reappropriation Appropriation
General Fund‑-State 12,000
Prior Biennia Future Biennia Total
3,000 15,000
NEW SECTION. Sec. 352. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden‑-Ballon Hanger, replace roof, renovate interior (88-3-023)
Reappropriation Appropriation
General Fund‑-State 213,000
St Bldg Constr Acct 195,000
Prior Biennia Future Biennia Total
86,000 494,000
NEW SECTION. Sec. 353. FOR THE STATE PARKS AND RECREATION COMMISSION
Camano Island‑-Point Lowell road relocation (88-3-043)
Reappropriation Appropriation
St Bldg Constr Acct 158,000
Mot Veh Fund 619,000
Prior Biennia Future Biennia Total
44,000 821,000
NEW SECTION. Sec. 354. FOR THE STATE PARKS AND RECREATION COMMISSION
Chief Timothy‑-Boat launch expansion (88-5-014)
Reappropriation Appropriation
ORA‑-State 207,000
Prior Biennia Future Biennia Total
23,000 230,000
NEW SECTION. Sec. 355. FOR THE STATE PARKS AND RECREATION COMMISSION
Moses Lake‑-Boat launch with parking and comfort station (88-5-016)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if the necessary permits are not obtained by December 31, 1989.
Reappropriation Appropriation
ORA‑-State 181,000
Prior Biennia Future Biennia Total
11,000 192,000
NEW SECTION. Sec. 356. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Acquisition/dev. river access, phased project (88-5-017)
Reappropriation Appropriation
ORA‑-State 138,000 60,000
Prior Biennia Future Biennia Total
73,000 271,000
NEW SECTION. Sec. 357. FOR THE STATE PARKS AND RECREATION COMMISSION
Maryhill‑-Development (88-5-035)
Reappropriation Appropriation
St Bldg Constr Acct 1,026,000
Prior Biennia Future Biennia Total
50,000 1,076,000
NEW SECTION. Sec. 358. FOR THE STATE PARKS AND RECREATION COMMISSION
Ocean beaches‑-Acquisition of ocean beaches, phased project (88-5-036)
Reappropriation Appropriation
St Bldg Constr Acct 447,000 200,000
Prior Biennia Future Biennia Total
103,000 750,000
NEW SECTION. Sec. 359. FOR THE STATE PARKS AND RECREATION COMMISSION
Mount Spokane‑-Winter recreation facilities (88-5-041)
Reappropriation Appropriation
St Bldg Constr Acct 12,000
Prior Biennia Future Biennia Total
71,000 83,000
NEW SECTION. Sec. 360. FOR THE STATE PARKS AND RECREATION COMMISSION
Crystal Falls‑-Acquisition and development phase 2 (88-5-057)
Reappropriation Appropriation
St Bldg Constr Acct 31,000
Prior Biennia Future Biennia Total
129,000 330,000 490,000
NEW SECTION. Sec. 361. FOR THE STATE PARKS AND RECREATION COMMISSION
Blake Island‑-Fire protection system, concession building (89-1-050)
Reappropriation Appropriation
St Bldg Constr Acct 119,000
Prior Biennia Future Biennia Total
119,000
NEW SECTION. Sec. 362. FOR THE STATE PARKS AND RECREATION COMMISSION
Omnibus minor projects‑-Water supply/irrigation at Lyon's Ferry, Crow Butte, Wallace Falls, Curlew Lake, Alta Lake, and Mount Spokane (89-1-101)
Reappropriation Appropriation
St Bldg Constr Acct 275,000
Prior Biennia Future Biennia Total
275,000
NEW SECTION. Sec. 363. FOR THE STATE PARKS AND RECREATION COMMISSION
Omnibus minor projects‑-Sanitary facilities at Yakima Sportsman, Lewis and Clark, Stuart Island, Sucia Island, Dash Point, and Blake Island (89-1-102)
Reappropriation Appropriation
St Bldg Constr Acct 152,000
Prior Biennia Future Biennia Total
194,000 346,000
NEW SECTION. Sec. 364. FOR THE STATE PARKS AND RECREATION COMMISSION
Omnibus minor projects‑-Electrical at Fay Bainbridge, Potholes, Fort Flagler, Central Ferry, Pacific Beach, Blake Island, and Alta Lake (89-1-103)
Reappropriation Appropriation
St Bldg Constr Acct 231,000
ORA‑-State 64,000
Prior Biennia Future Biennia Total
295,000
NEW SECTION. Sec. 365. FOR THE STATE PARKS AND RECREATION COMMISSION
Moran‑-Renovate mountain lake dam (89-1-110)
Reappropriation Appropriation
St Bldg Constr Acct 144,000
Prior Biennia Future Biennia Total
144,000
NEW SECTION. Sec. 366. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Compliance with safe drinking water act (89-1-116)
Reappropriation Appropriation
St Bldg Constr Acct 441,000
Prior Biennia Future Biennia Total
441,000
NEW SECTION. Sec. 367. FOR THE STATE PARKS AND RECREATION COMMISSION
Camp Wooten‑-Sewage renovation, phase 2 (89-1-122)
Reappropriation Appropriation
St Bldg Constr Acct 138,000
Prior Biennia Future Biennia Total
138,000
NEW SECTION. Sec. 368. FOR THE STATE PARKS AND RECREATION COMMISSION
Sacajawea‑-Modify river floats, revise piling anchorage system (89-1-129)
Reappropriation Appropriation
ORA‑-State 192,000
Prior Biennia Future Biennia Total
192,000
NEW SECTION. Sec. 369. FOR THE STATE PARKS AND RECREATION COMMISSION
Asbestos removal‑-Forts Worden, Flagler, and Columbia (89-1-134)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Prior Biennia Future Biennia Total
150,000
NEW SECTION. Sec. 370. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Boating/marine construction (89-2-106)
Reappropriation Appropriation
St Bldg Constr Acct 179,000
ORA‑-State 674,000
Prior Biennia Future Biennia Total
853,000
NEW SECTION. Sec. 371. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-General construction (89-2-107)
Reappropriation Appropriation
St Bldg Constr Acct 560,000
Prior Biennia Future Biennia Total
858,000 1,418,000
NEW SECTION. Sec. 372. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Specialized construction (89-2-109)
Reappropriation Appropriation
St Bldg Constr Acct 219,000
Prior Biennia Future Biennia Total
219,000
NEW SECTION. Sec. 373. FOR THE STATE PARKS AND RECREATION COMMISSION
Steamboat Rock‑-Random camp area, Jones Bay (89-2-112)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Prior Biennia Future Biennia Total
150,000
NEW SECTION. Sec. 374. FOR THE STATE PARKS AND RECREATION COMMISSION
Lake Sammamish‑-Boat launch repairs (89-2-139)
Reappropriation Appropriation
ORA‑-State 114,000
Prior Biennia Future Biennia Total
114,000
NEW SECTION. Sec. 375. FOR THE STATE PARKS AND RECREATION COMMISSION
Omnibus minor projects‑-Site/environment/protection at Conconully, Saltwater, Fort Worden, Alta Lake, and Fort Casey (89-3-104)
Reappropriation Appropriation
St Bldg Constr Acct 300,000
Prior Biennia Future Biennia Total
300,000
NEW SECTION. Sec. 376. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Acquisition (89-3-105)
Reappropriation Appropriation
St Bldg Constr Acct 115,000
Prior Biennia Future Biennia Total
140,700 255,700
NEW SECTION. Sec. 377. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus minor projects‑-Weatherproofing (89-3-108)
Reappropriation Appropriation
St Bldg Constr Acct 167,000
Prior Biennia Future Biennia Total
167,000
NEW SECTION. Sec. 378. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden‑-Rebuild boat launch breakwater, dredge marina (89-3-135)
Reappropriation Appropriation
ORA‑-State 315,000
Prior Biennia Future Biennia Total
315,000
NEW SECTION. Sec. 379. FOR THE STATE PARKS AND RECREATION COMMISSION
Larabee‑-Acquisition of Clayton Beach (89-5-002)
Reappropriation Appropriation
St Bldg Constr Acct 342,000
ORA‑-Federal 141,000
Prior Biennia Future Biennia Total
1,258,000 1,741,000
NEW SECTION. Sec. 380. FOR THE STATE PARKS AND RECREATION COMMISSION
Hood Canal‑-Acquisition of property, phase 2 (89-5-111)
Reappropriation Appropriation
St Bldg Constr Acct 50,000 393,000
ORA‑-State 60,000
Prior Biennia Future Biennia Total
503,000
NEW SECTION. Sec. 381. FOR THE STATE PARKS AND RECREATION COMMISSION
Spokane Centennial Trail‑-Acquisition/initial development (89-5-112)
Reappropriation Appropriation
St Bldg Constr Acct 120,000
ORA‑-Federal 119,000
General Fund‑-Federal 3,590,000
Prior Biennia Future Biennia Total
10,000 3,839,000
NEW SECTION. Sec. 382. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Casey‑-Acquisition of keystone spit, phase 2 (89-5-113)
Reappropriation Appropriation
St Bldg Constr Acct 199,000 104,000
ORA‑-Federal 103,000
Prior Biennia Future Biennia Total
301,000 707,000
NEW SECTION. Sec. 383. FOR THE STATE PARKS AND RECREATION COMMISSION
Belfair‑-Acquisition of adjoining property, phase 2 (89-5-114)
Reappropriation Appropriation
St Bldg Constr Acct 29,000 193,000
ORA‑-Federal 27,000
Prior Biennia Future Biennia Total
21,000 270,000
NEW SECTION. Sec. 384. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Canby‑-Initial development, Beards Hollow (89-5-115)
Reappropriation Appropriation
St Bldg Constr Acct 289,000
Prior Biennia Future Biennia Total
289,000
NEW SECTION. Sec. 385. FOR THE STATE PARKS AND RECREATION COMMISSION
Lake Isabella‑-Acquisition, phased (89-5-145)
Reappropriation Appropriation
St Bldg Constr Acct 507,000
Prior Biennia Future Biennia Total
507,000
NEW SECTION. Sec. 386. FOR THE STATE PARKS AND RECREATION COMMISSION
Spokane Centennial Trail‑-Initial development "The Islands" (89-5-166)
Reappropriation Appropriation
St Bldg Constr Acct 250,000
Prior Biennia Future Biennia Total
250,000
NEW SECTION. Sec. 387. FOR THE STATE PARKS AND RECREATION COMMISSION
Ocean Beach OBA‑-Comfort stations and parking at four locations (89-5-120)
Reappropriation Appropriation
St Bldg Constr Acct 342,000
ORA‑-Federal 316,000
Prior Biennia Future Biennia Total
658,000
NEW SECTION. Sec. 388. FOR THE STATE PARKS AND RECREATION COMMISSION
Ohme Gardens‑-Acquisition, safety, and irrigation improvements (89-5-169)
Reappropriation Appropriation
St Bldg Constr Acct 750,000
Prior Biennia Future Biennia Total
1,733,000 2,483,000
NEW SECTION. Sec. 389. FOR THE STATE PARKS AND RECREATION COMMISSION
State-wide‑-Omnibus facility contingency request (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 464,000
Prior Biennia Future Biennia Total
464,000
NEW SECTION. Sec. 390. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Wright feasibility study
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely to perform a feasibility study of acquisition of the Fort Wright property.
Reappropriation Appropriation
St Bldg Constr Acct 75,000
Prior Biennia Future Biennia Total
75,000
NEW SECTION. Sec. 391. FOR THE STATE PARKS AND RECREATION COMMISSION
Wishram Museum--Feasibility study
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided for a feasibility study for a water park and railroad museum in Wishram and bridge access.
Reappropriation Appropriation
St Bldg Constr Acct 10,000
Prior Biennia Future Biennia Total
10,000
NEW SECTION. Sec. 392. FOR THE STATE PARKS AND RECREATION COMMISSION
St. Edward--Lighted entrance trail
Reappropriation Appropriation
St Bldg Constr Acct 136,000
Prior Biennia Future Biennia Total
136,000
NEW SECTION. Sec. 393. FOR THE STATE PARKS AND RECREATION COMMISSION
Auburn game farm‑-Development
Reappropriation Appropriation
St Bldg Constr Acct 350,000
Prior Biennia Future Biennia Total
350,000
NEW SECTION. Sec. 394. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Grants to public agencies' recreation projects (90-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
ORA‑-Federal 150,000 800,000
ORA‑-State 1,069,000 6,436,000
Prior Biennia Future Biennia Total
21,513,000 12,000,000 42,968,000
NEW SECTION. Sec. 395. FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
Community economic revitalization board (86-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 5,340,000
Prior Biennia Future Biennia Total
19,026,000 24,366,000
NEW SECTION. Sec. 396. FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
Washington Technology Center‑-Funds for this project shall be transferred to and administered by the University of Washington (88-1-003)
Reappropriation Appropriation
St Bldg Constr Acct 9,600,000 1,200,000
Prior Biennia Future Biennia Total
5,302,000 16,102,000
NEW SECTION. Sec. 397. FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
Washington State Agricultural Trade Center‑-Yakima (88-3-004)
Reappropriation Appropriation
St Bldg Constr Acct 2,300,000
Prior Biennia Future Biennia Total
4,200,000 6,500,000
NEW SECTION. Sec. 398. FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
Agricultural Complex‑-Yakima (89-2-005)
The appropriations in this section are subject to the following conditions and limitations:
(1) $1,500,000 is provided for parking lot paving, lighting, and landscaping.
(2) $1,000,000 of this appropriation is contingent on a contribution of an equal amount of funds from nonstate sources.
Reappropriation Appropriation
St Bldg Constr Acct 750,000 2,500,000
Prior Biennia Future Biennia Total
1,250,000 4,500,000
NEW SECTION. Sec. 399. FOR THE DEPARTMENT OF TRADE AND ECONOMIC DEVELOPMENT
Mt. St. Helens Road and Visitor Center (90-5-002)
The appropriation in this section is subject to the following conditions and limitations:
(1) This appropriation shall fund no more than twenty-five percent of the total project cost.
(2) This appropriation is contingent on a contribution of $300,000 by Cowlitz county.
Reappropriation Appropriation
St Bldg Constr Acct 5,600,000
Prior Biennia Future Biennia Total
5,600,000
(End of part)
PART 4
NATURAL RESOURCES - CONTINUED
NEW SECTION. Sec. 401.
FOR THE STATE CONSERVATION COMMISSION
Water quality projects (90-2-001)
Reappropriation Appropriation
Water Quality Acct 352,500 2,072,160
Prior Biennia Future Biennia Total
1,509,500 4,400,000 8,334,160
NEW SECTION. Sec. 402. FOR THE DEPARTMENT OF FISHERIES
Habitat‑-Salmon enhancement program (77-1-005)
Reappropriation Appropriation
Salmon Enhancement Acct 25,000
St Bldg Constr Acct 921,000
Prior Biennia Future Biennia Total
4,284,687 5,230,687
NEW SECTION. Sec. 403. FOR THE DEPARTMENT OF FISHERIES
Replacements and alterations (77-2-004)
Reappropriation Appropriation
Fish Cap Proj Acct 3,000
Prior Biennia Future Biennia Total
3,996,000 3,999,000
NEW SECTION. Sec. 404. FOR THE DEPARTMENT OF FISHERIES
Puget Sound artificial reef construction (79-2-008)
Reappropriation Appropriation
ORA‑-Federal 8,000
ORA‑-State 17,000
Prior Biennia Future Biennia Total
421,000 446,000
NEW SECTION. Sec. 405. FOR THE DEPARTMENT OF FISHERIES
Hood Canal Bridge‑-Public fishing access (79-2-011)
Reappropriation Appropriation
St Bldg Constr Acct 52,000
Prior Biennia Future Biennia Total
442,000 494,000
NEW SECTION. Sec. 406. FOR THE DEPARTMENT OF FISHERIES
Oakland Bay tideland access design and construction (81-5-014)
Reappropriation Appropriation
St Bldg Constr Acct 11,000
ORA‑-Federal 90,000
ORA‑-State 79,000
Prior Biennia Future Biennia Total
180,000
NEW SECTION. Sec. 407. FOR THE DEPARTMENT OF FISHERIES
Health, safety and code compliance (86-1-020)
Reappropriation Appropriation
St Bldg Constr Acct 78,000 850,000
Prior Biennia Future Biennia Total
371,000 500,000 1,799,000
NEW SECTION. Sec. 408. FOR THE DEPARTMENT OF FISHERIES
Towhead Island public access‑-Renovation (86-2-028)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if construction has not begun by June 30, 1990.
Reappropriation Appropriation
ORA‑-Federal 20,000
ORA‑-State 191,000
Prior Biennia Future Biennia Total
211,000
NEW SECTION. Sec. 409. FOR THE DEPARTMENT OF FISHERIES
Issaquah Hatchery Interpretative Center (86-2-029)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if construction has not begun by December 31, 1989.
Reappropriation Appropriation
St Bldg Constr Acct 42,000
ORA‑-Federal 53,000
ORA‑-State 18,000
Prior Biennia Future Biennia Total
17,000 130,000
NEW SECTION. Sec. 410. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects‑-Salmon (86-3-022)
Reappropriation Appropriation
St Bldg Constr Acct 116,000
Prior Biennia Future Biennia Total
306,000 422,000
NEW SECTION. Sec. 411. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects‑-Shellfish (86-3-023)
Reappropriation Appropriation
St Bldg Constr Acct 72,000
Prior Biennia Future Biennia Total
376,000 448,000
NEW SECTION. Sec. 412. FOR THE DEPARTMENT OF FISHERIES
Paving and maintenance‑-Asphalt ponds (86-3-024)
Reappropriation Appropriation
St Bldg Constr Acct 10,000
Prior Biennia Future Biennia Total
285,000 295,000
NEW SECTION. Sec. 413. FOR THE DEPARTMENT OF FISHERIES
Bremerton public fishing pier‑-Design and construction (86-3-027)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if construction has not begun by June 30, 1990.
Reappropriation Appropriation
St Bldg Constr Acct 89,000
ORA‑-Federal 410,000
ORA‑-State 285,000
Prior Biennia Future Biennia Total
36,000 820,000
NEW SECTION. Sec. 414. FOR THE DEPARTMENT OF FISHERIES
Willapa Hatchery‑-New main pipeline (86-3-030)
Reappropriation Appropriation
St Bldg Constr Acct 13,000
Prior Biennia Future Biennia Total
373,000 386,000
NEW SECTION. Sec. 415. FOR THE DEPARTMENT OF FISHERIES
Patrol seized gear storage (86-3-033)
Reappropriation Appropriation
St Bldg Constr Acct 5,000
Prior Biennia Future Biennia Total
93,000 98,000
NEW SECTION. Sec. 416. FOR THE DEPARTMENT OF FISHERIES
Hood Canal boat access development (86-3-035)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if an acquisition contract has not been entered into by June 30, 1990.
Reappropriation Appropriation
ORA‑-Federal 30,000
ORA‑-State 270,000
Prior Biennia Future Biennia Total
300,000
NEW SECTION. Sec. 417. FOR THE DEPARTMENT OF FISHERIES
Hood Canal Smelt Beach acquisition (86-3-036)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if an acquisition contract has not been entered into by June 30, 1990.
Reappropriation Appropriation
ORA‑-Federal 150,000
ORA‑-State 150,000
Prior Biennia Future Biennia Total
300,000
NEW SECTION. Sec. 418. FOR THE DEPARTMENT OF FISHERIES
Point Whitney Beach access acquisition (86-3-037)
Reappropriation Appropriation
St Bldg Constr Acct 250,000
ORA‑-Federal 128,000 250,000
ORA‑-State 127,000
Prior Biennia Future Biennia Total
150,000 905,000
NEW SECTION. Sec. 419. FOR THE DEPARTMENT OF FISHERIES
Knappton public access acquisition (86-3-038)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if necessary permits have not been obtained by June 30, 1990.
Reappropriation Appropriation
ORA‑-Federal 54,000
ORA‑-State 55,000
Prior Biennia Future Biennia Total
109,000
NEW SECTION. Sec. 420. FOR THE DEPARTMENT OF FISHERIES
McAllister‑-Improvements (88-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 226,000
Prior Biennia Future Biennia Total
33,000 259,000
NEW SECTION. Sec. 421. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects‑-Salmon north (88-2-005)
Reappropriation Appropriation
St Bldg Constr Acct 8,000
Prior Biennia Future Biennia Total
432,000 440,000
NEW SECTION. Sec. 422. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects‑-Salmon south (88-2-006)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if construction has not begun by December 31, 1989.
Reappropriation Appropriation
General Fund‑-Federal 853,000
St Bldg Constr Acct 362,000
Prior Biennia Future Biennia Total
36,000 1,251,000
NEW SECTION. Sec. 423. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects‑-Salmon coast (88-2-007)
Reappropriation Appropriation
St Bldg Constr Acct 26,000
Prior Biennia Future Biennia Total
166,000 192,000
NEW SECTION. Sec. 424. FOR THE DEPARTMENT OF FISHERIES
Salmon culture‑-Repair and replacement (88-2-008)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Prior Biennia Future Biennia Total
155,000 305,000
NEW SECTION. Sec. 425. FOR THE DEPARTMENT OF FISHERIES
Concrete ponds‑-Repair and replacement (88-2-009)
Reappropriation Appropriation
St Bldg Constr Acct 96,000
Prior Biennia Future Biennia Total
707,000 803,000
NEW SECTION. Sec. 426. FOR THE DEPARTMENT OF FISHERIES
Small repairs and improvements (88-2-019)
Reappropriation Appropriation
General Fund‑-Federal 159,000
Prior Biennia Future Biennia Total
159,000
NEW SECTION. Sec. 427. FOR THE DEPARTMENT OF FISHERIES
Clam and Oyster Beach enhancement (88-5-002)
Reappropriation Appropriation
St Bldg Constr Acct 1,181,000 1,200,000
Prior Biennia Future Biennia Total
32,000 1,200,000 2,413,000
NEW SECTION. Sec. 428. FOR THE DEPARTMENT OF FISHERIES
Fish protection facilities (88-5-012)
Reappropriation Appropriation
St Bldg Constr Acct 50,000 235,000
Prior Biennia Future Biennia Total
154,000 400,000 839,000
NEW SECTION. Sec. 429. FOR THE DEPARTMENT OF FISHERIES
Columbia River‑-Fishing access (88-5-014)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if necessary permits have not been obtained by December 31, 1989.
Reappropriation Appropriation
St Bldg Constr Acct 186,000
Prior Biennia Future Biennia Total
129,000 315,000
NEW SECTION. Sec. 430. FOR THE DEPARTMENT OF FISHERIES
Coast and Puget Sound Salmon enhancement (88-5-016)
Reappropriation Appropriation
Salmon Enhancement Acct 2,632,000
St Bldg Constr Acct 2,500,000
Prior Biennia Future Biennia Total
1,388,000 3,750,000 7,770,000
NEW SECTION. Sec. 431. FOR THE DEPARTMENT OF FISHERIES
Shorefishing access development (88-5-018)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if construction has not begun by December 31, 1989.
Reappropriation Appropriation
St Bldg Constr Acct 623,000 450,000
Prior Biennia Future Biennia Total
250,000 1,273,000 2,596,000
NEW SECTION. Sec. 432. FOR THE DEPARTMENT OF FISHERIES
South Sound net pen support facility (90-2-007)
Reappropriation Appropriation
St Bldg Constr Acct 343,000
Prior Biennia Future Biennia Total
343,000
NEW SECTION. Sec. 433. FOR THE DEPARTMENT OF FISHERIES
Humptulips upgrade intake dam (90-2-010)
Reappropriation Appropriation
St Bldg Constr Acct 213,000
Prior Biennia Future Biennia Total
213,000
NEW SECTION. Sec. 434. FOR THE DEPARTMENT OF FISHERIES
Salmon culture minor works projects (90-2-011)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if construction has not begun by December 31, 1989.
Reappropriation Appropriation
St Bldg Constr Acct 655,000
Prior Biennia Future Biennia Total
655,000
NEW SECTION. Sec. 435. FOR THE DEPARTMENT OF FISHERIES
Habitat management shop building (90-2-012)
Reappropriation Appropriation
St Bldg Constr Acct 435,000
Prior Biennia Future Biennia Total
435,000
NEW SECTION. Sec. 436. FOR THE DEPARTMENT OF FISHERIES
Field services‑-Minor works (90-2-015)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if construction has not begun by June 30, 1990.
Reappropriation Appropriation
St Bldg Constr Acct 235,000
Prior Biennia Future Biennia Total
100,000 335,000
NEW SECTION. Sec. 437. FOR THE DEPARTMENT OF FISHERIES
Salmon culture‑-Minor capital (90-2-017)
The appropriation in this section is subject to the following condition and limitation: The appropriation shall lapse if construction has not begun by December 31, 1989.
Reappropriation Appropriation
St Bldg Constr Acct 669,000
Prior Biennia Future Biennia Total
1,350,000 2,019,000
NEW SECTION. Sec. 438. FOR THE DEPARTMENT OF FISHERIES
George Adams, water supply (90-2-019)
Reappropriation Appropriation
St Bldg Constr Acct 175,000
Prior Biennia Future Biennia Total
175,000
NEW SECTION. Sec. 439. FOR THE DEPARTMENT OF FISHERIES
Ilwaco boat access expansion (90-2-023)
Reappropriation Appropriation
ORA‑-State 300,000
Prior Biennia Future Biennia Total
300,000
NEW SECTION. Sec. 440. FOR THE DEPARTMENT OF FISHERIES
Bonneville pool access expansion (90-2-028)
Reappropriation Appropriation
ORA‑-State 100,000
Prior Biennia Future Biennia Total
100,000 200,000
NEW SECTION. Sec. 441. FOR THE DEPARTMENT OF FISHERIES
Property acquisition (90-3-009)
Reappropriation Appropriation
St Bldg Constr Acct 330,000
Prior Biennia Future Biennia Total
330,000
NEW SECTION. Sec. 442. FOR THE DEPARTMENT OF FISHERIES
Shellfish surveys and Point Whitney repairs (90-3-013)
Reappropriation Appropriation
St Bldg Constr Acct 175,000
Prior Biennia Future Biennia Total
350,000 525,000
NEW SECTION. Sec. 443. FOR THE DEPARTMENT OF FISHERIES
Point Whitney‑-Property acquisition (90-3-014)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Prior Biennia Future Biennia Total
150,000
NEW SECTION. Sec. 444. FOR THE DEPARTMENT OF FISHERIES
Strait of Juan De Fuca shoreline acquisition (90-5-025)
Reappropriation Appropriation
ORA‑-State 350,000
Prior Biennia Future Biennia Total
200,000 550,000
NEW SECTION. Sec. 445. FOR THE DEPARTMENT OF FISHERIES
Kingston boat launch development (90-5-027)
Reappropriation Appropriation
ORA‑-State 100,000
Prior Biennia Future Biennia Total
100,000
NEW SECTION. Sec. 446. FOR THE DEPARTMENT OF WILDLIFE
Chehalis Valley HMA acquisition (83-5-021)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if the necessary acquisition of property is not complete by December 31, 1989.
Reappropriation Appropriation
Wildlife Acct‑-State 346,000
Prior Biennia Future Biennia Total
346,000
NEW SECTION. Sec. 447. FOR THE DEPARTMENT OF WILDLIFE
Lake Goodwin redevelopment (86-2-021)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if the necessary acquisition of property is not complete by December 31, 1989.
Reappropriation Appropriation
ORA‑-State 77,000
Wildlife Acct‑-State 9,000
Prior Biennia Future Biennia Total
86,000
NEW SECTION. Sec. 448. FOR THE DEPARTMENT OF WILDLIFE
Satsop river: Acquisition and redevelopment (86-2-029)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if the necessary acquisition of property is not complete by December 31, 1989.
Reappropriation Appropriation
ORA‑-State 75,000
Prior Biennia Future Biennia Total
8,000 83,000
NEW SECTION. Sec. 449. FOR THE DEPARTMENT OF WILDLIFE
Mineral Lake‑-Site improvements (86-3-028)
Reappropriation Appropriation
ORA‑-State 40,000
Prior Biennia Future Biennia Total
71,000 111,000
NEW SECTION. Sec. 450. FOR THE DEPARTMENT OF WILDLIFE
Pipe Lake‑-Public fishing access (86-4-027)
Reappropriation Appropriation
ORA‑-State 83,000
Prior Biennia Future Biennia Total
83,000
NEW SECTION. Sec. 451. FOR THE DEPARTMENT OF WILDLIFE
State-wide boating access development (88-5-014)
Reappropriation Appropriation
Wildlife Acct‑-Federal 231,000
Prior Biennia Future Biennia Total
269,000 500,000
NEW SECTION. Sec. 452. FOR THE DEPARTMENT OF WILDLIFE
Aberdeen Fish Hatchery expansion (89-5-017)
Reappropriation Appropriation
Game Spec Wildlife Acct 740,000
Prior Biennia Future Biennia Total
79,000 819,000
NEW SECTION. Sec. 453. FOR THE DEPARTMENT OF WILDLIFE
Asbestos abatement health safety and code compliance, phase 1 (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 600,000
Prior Biennia Future Biennia Total
1,200,000 1,800,000
NEW SECTION. Sec. 454. FOR THE DEPARTMENT OF WILDLIFE
Public fishing access minor works repair (90-1-014)
Reappropriation Appropriation
Wildlife Acct‑-Federal 500,000
Prior Biennia Future Biennia Total
1,300,000 1,800,000
NEW SECTION. Sec. 455. FOR THE DEPARTMENT OF WILDLIFE
Emergency repair and replacement (90-2-002)
Reappropriation Appropriation
Wildlife Acct‑-State 50,000 300,000
Prior Biennia Future Biennia Total
253,000 900,000 1,503,000
NEW SECTION. Sec. 456. FOR THE DEPARTMENT OF WILDLIFE
Facility maintenance small repair and improvements (90-2-003)
Reappropriation Appropriation
Wildlife Acct‑-State 500,000
Prior Biennia Future Biennia Total
629,000 1,100,000 2,229,000
NEW SECTION. Sec. 457. FOR THE DEPARTMENT OF WILDLIFE
Hatchery renovation and improvement (90-2-004)
Reappropriation Appropriation
St Bldg Constr Acct 1,150,000
Wildlife Acct‑-Federal 577,000 1,100,000
Wildlife Acct‑-State 1,000,000
Prior Biennia Future Biennia Total
400,000 13,000,000 17,227,000
NEW SECTION. Sec. 458. FOR THE DEPARTMENT OF WILDLIFE
Redevelopment of public fishing access sites (IAC) (90-2-007)
Reappropriation Appropriation
ORA‑-State 1,126,000
Prior Biennia Future Biennia Total
2,115,000 3,241,000
NEW SECTION. Sec. 459. FOR THE DEPARTMENT OF WILDLIFE
Development of public fishing access sites (IAC) (90-2-008)
Reappropriation Appropriation
St Bldg Constr Acct 294,000
ORA‑-State 136,000
Prior Biennia Future Biennia Total
300,000 730,000
NEW SECTION. Sec. 460. FOR THE DEPARTMENT OF WILDLIFE
Wildlife area repair and development (90-2-016)
Reappropriation Appropriation
Wildlife Acct‑-State 250,000
Prior Biennia Future Biennia Total
500,000 750,000
NEW SECTION. Sec. 461. FOR THE DEPARTMENT OF WILDLIFE
Wells wildlife area repair and improvements (90-2-018)
Reappropriation Appropriation
Game Spec Wildlife Acct 92,000 50,000
Prior Biennia Future Biennia Total
8,000 100,000 250,000
NEW SECTION. Sec. 462. FOR THE DEPARTMENT OF WILDLIFE
Vancouver well (90-2-022)
Reappropriation Appropriation
Wildlife Acct‑-State 167,000
Prior Biennia Future Biennia Total
167,000
NEW SECTION. Sec. 463. FOR THE DEPARTMENT OF WILDLIFE
State-wide fencing repair and replacement (90-3-015)
Reappropriation Appropriation
Wildlife Acct‑-State 1,000,000
Prior Biennia Future Biennia Total
368,000 2,000,000 3,368,000
NEW SECTION. Sec. 464. FOR THE DEPARTMENT OF WILDLIFE
Migratory waterfowl habitat acquisition (90-5-005)
Reappropriation Appropriation
Wildlife Acct‑-State 333,000 350,000
Prior Biennia Future Biennia Total
63,000 700,000 1,446,000
NEW SECTION. Sec. 465. FOR THE DEPARTMENT OF WILDLIFE
Acquisition of critical habitat (90-5-006)
Reappropriation Appropriation
Wildlife Acct‑-State 250,000
Prior Biennia Future Biennia Total
500,000 750,000
NEW SECTION. Sec. 466. FOR THE DEPARTMENT OF WILDLIFE
Acquisition of critical water-oriented access (IAC) (90-5-009)
Reappropriation Appropriation
ORA‑-State 20,000
Wildlife Acct‑-Federal 100,000
Prior Biennia Future Biennia Total
120,000
NEW SECTION. Sec. 467. FOR THE DEPARTMENT OF WILDLIFE
Acquisition of wildlife habitat (90-5-012)
The appropriation in this section is subject to the following conditions and limitations: No moneys appropriated for this project may be expended without first selling owned land of equal or greater value.
Reappropriation Appropriation
Wildlife Acct‑-State 600,000
Prior Biennia Future Biennia Total
800,000 1,400,000
NEW SECTION. Sec. 468. FOR THE DEPARTMENT OF WILDLIFE
Migratory waterfowl habitat development (90-5-017)
Reappropriation Appropriation
Wildlife Acct‑-State 150,000 300,000
Prior Biennia Future Biennia Total
212,000 700,000 1,362,000
NEW SECTION. Sec. 469. FOR THE DEPARTMENT OF WILDLIFE
Habitat enhancement fund (90-5-019)
Reappropriation Appropriation
Wildlife Acct‑-Private/local 500,000
Prior Biennia Future Biennia Total
1,000,000 1,500,000
(End of part)
PART 5
NATURAL RESOURCES - CONTINUED
NEW SECTION. Sec. 501. FOR THE DEPARTMENT OF NATURAL RESOURCES
Right-of-way acquisition (86-3-001)
Reappropriation Appropriation
For Dev Acct 213,000
Res Mgmt Cost Acct 577,000
Prior Biennia Future Biennia Total
1,646,000 950,000 3,386,000
NEW SECTION. Sec. 502. FOR THE DEPARTMENT OF NATURAL RESOURCES
Unforeseen emergency repairs, irrigation (86-3-002)
Reappropriation Appropriation
Res Mgmt Cost Acct 200,000
Prior Biennia Future Biennia Total
492,000 400,000 1,092,000
NEW SECTION. Sec. 503. FOR THE DEPARTMENT OF NATURAL RESOURCES
Commercial development and electronics (86-3-004)
Reappropriation Appropriation
Res Mgmt Cost Acct 420,000
Prior Biennia Future Biennia Total
20,000 400,000 840,000
NEW SECTION. Sec. 504. FOR THE DEPARTMENT OF NATURAL RESOURCES
Recreation sites renovation (86-3-018)
Reappropriation Appropriation
ORV Acct 64,000
ORA‑-State 259,000
Prior Biennia Future Biennia Total
400,000 723,000
NEW SECTION. Sec. 505. FOR THE DEPARTMENT OF NATURAL RESOURCES
Aquatic land enhancement, including acquisition of property on the Snohomish river delta (86-3-020)
Reappropriation Appropriation
Aquatic Lands Acct 1,295,000 4,550,000
Prior Biennia Future Biennia Total
962,000 14,400,000 21,697,000
NEW SECTION. Sec. 506. FOR THE DEPARTMENT OF NATURAL RESOURCES
Land bank (86-4-003)
The appropriation in this section is subject to the following conditions and limitations: No moneys appropriated for this project may be expended without first selling owned land of equal or greater value.
Reappropriation Appropriation
Res Mgmt Cost Acct 12,000,000
Prior Biennia Future Biennia Total
11,440,000 30,000,000 53,440,000
NEW SECTION. Sec. 507. FOR THE DEPARTMENT OF NATURAL RESOURCES
State-wide emergency repairs (88-1-002)
Reappropriation Appropriation
For Dev Acct 9,000
Res Mgmt Cost Acct 32,000
St Bldg Constr Acct 18,000
Prior Biennia Future Biennia Total
54,000 136,000 249,000
NEW SECTION. Sec. 508. FOR THE DEPARTMENT OF NATURAL RESOURCES
State-wide nonemergency repairs (88-2-010)
Reappropriation Appropriation
For Dev Acct 9,000
Res Mgmt Cost Acct 33,000
St Bldg Constr Acct 19,000
Prior Biennia Future Biennia Total
55,000 139,000 255,000
NEW SECTION. Sec. 509. FOR THE DEPARTMENT OF NATURAL RESOURCES
Commercial development/L.I.D. (88-2-020)
Reappropriation Appropriation
Res Mgmt Cost Acct 710,000
Prior Biennia Future Biennia Total
745,000 1,420,000 2,875,000
NEW SECTION. Sec. 510. FOR THE DEPARTMENT OF NATURAL RESOURCES
Timber‑-Fish‑-Wildlife (88-2-021)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if the orphan roads are not identified by September 30, 1989, and construction begun by December 31, 1989.
Reappropriation Appropriation
St Bldg Constr Acct 262,500
Prior Biennia Future Biennia Total
37,500 300,000
NEW SECTION. Sec. 511. FOR THE DEPARTMENT OF NATURAL RESOURCES
Natural resources conservation areas (88-2-060)
The appropriations in this section are subject to the following conditions and limitations: $8,000,000 of this appropriation is subject to the extension of the additional real property excise tax beyond June 30, 1989 (RCW 82.45.060(2)).
Reappropriation Appropriation
Conservation Area Acct 3,500,000 8,000,000
Prior Biennia Future Biennia Total
4,400,000 16,000,000 31,900,000
NEW SECTION. Sec. 512. FOR THE DEPARTMENT OF NATURAL RESOURCES
Natural area preserves property purchases (88-2-061)
The appropriations in this section are subject to the following conditions and limitations: $4,000,000 of this appropriation is subject to the extension of the additional real property excise tax beyond June 30, 1989 (RCW 82.45.060(2)).
Reappropriation Appropriation
Conservation Area Acct 890,000 4,000,000
Prior Biennia Future Biennia Total
3,110,000 8,000,000 16,000,000
NEW SECTION. Sec. 513. FOR THE DEPARTMENT OF NATURAL RESOURCES
Hawks Prairie sewer hookup (88-5-045)
Reappropriation Appropriation
Res Mgmt Cost Acct 50,000
Prior Biennia Future Biennia Total
150,000 200,000
NEW SECTION. Sec. 514. FOR THE DEPARTMENT OF NATURAL RESOURCES
Seed orchard irrigation (89-2-006)
Reappropriation Appropriation
For Dev Acct 19,500
Res Mgmt Cost Acct 45,500
Prior Biennia Future Biennia Total
165,000 160,000 391,000
NEW SECTION. Sec. 515. FOR THE DEPARTMENT OF NATURAL RESOURCES
Irrigation development (89-2-007)
Reappropriation Appropriation
Res Mgmt Cost Acct 453,000
Prior Biennia Future Biennia Total
150,000 200,000 803,000
NEW SECTION. Sec. 516. FOR THE DEPARTMENT OF NATURAL RESOURCES
Management roads (89-2-008)
Reappropriation Appropriation
Res Mgmt Cost Acct 122,000
Prior Biennia Future Biennia Total
233,000 355,000
NEW SECTION. Sec. 517. FOR THE DEPARTMENT OF NATURAL RESOURCES
Communication site maintenance (89-2-009)
Reappropriation Appropriation
Res Mgmt Cost Acct 150,000
Prior Biennia Future Biennia Total
177,000 300,000 627,000
NEW SECTION. Sec. 518. FOR THE DEPARTMENT OF NATURAL RESOURCES
Real estate improved property minor works (89-2-010)
Reappropriation Appropriation
For Dev Acct 25,000
Res Mgmt Cost Acct 365,000
Prior Biennia Future Biennia Total
250,000 780,000 1,420,000
NEW SECTION. Sec. 519. FOR THE DEPARTMENT OF NATURAL RESOURCES
Recreation site renovation (89-3-001)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if the necessary permits are not obtained by June 30, 1990.
Reappropriation Appropriation
St Bldg Constr Acct 550,000
ORA‑-State 561,000
Prior Biennia Future Biennia Total
37,000 1,148,000
NEW SECTION. Sec. 520. FOR THE DEPARTMENT OF NATURAL RESOURCES
Wharf demolition/dock renovation (90-1-403)
Reappropriation Appropriation
Res Mgmt Cost Acct 200,000
Prior Biennia Future Biennia Total
200,000
NEW SECTION. Sec. 521. FOR THE DEPARTMENT OF NATURAL RESOURCES
Asbestos surveys/removal (90-1-703)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if construction has not begun by January 2, 1990.
Reappropriation Appropriation
For Dev Acct 36,000
Res Mgmt Cost Acct 49,000
St Bldg Constr Acct 30,000
Prior Biennia Future Biennia Total
115,000
NEW SECTION. Sec. 522. FOR THE DEPARTMENT OF NATURAL RESOURCES
Environmental cleanup contaminated sites (90-1-704)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if construction has not begun by October 15, 1989.
Reappropriation Appropriation
For Dev Acct 76,000
Res Mgmt Cost Acct 274,000
St Bldg Constr Acct 236,000
Prior Biennia Future Biennia Total
555,000 1,141,000
NEW SECTION. Sec. 523. FOR THE DEPARTMENT OF NATURAL RESOURCES
Environmental protection groundwater; underground fuel tanks (90-1-706)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if construction has not begun by June 30, 1990.
Reappropriation Appropriation
For Dev Acct 14,000
Res Mgmt Cost Acct 119,000
St Bldg Constr Acct 151,000
Prior Biennia Future Biennia Total
284,000 568,000
NEW SECTION. Sec. 524. FOR THE DEPARTMENT OF NATURAL RESOURCES
Colville area office‑-city code compliance (90-1-708)
Reappropriation Appropriation
Res Mgmt Cost Acct 31,500
St Bldg Constr Acct 15,500
Prior Biennia Future Biennia Total
47,000
NEW SECTION. Sec. 525. FOR THE DEPARTMENT OF NATURAL RESOURCES
Regional cold storage (90-2-310)
Reappropriation Appropriation
For Dev Acct 150,000
Res Mgmt Cost Acct 362,000
Prior Biennia Future Biennia Total
142,000 654,000
NEW SECTION. Sec. 526. FOR THE DEPARTMENT OF NATURAL RESOURCES
Irrigation pipeline replacement (90-2-311)
Reappropriation Appropriation
Res Mgmt Cost Acct 532,000
Prior Biennia Future Biennia Total
400,000 932,000
NEW SECTION. Sec. 527. FOR THE DEPARTMENT OF NATURAL RESOURCES
Administration sites repairs (90-2-312)
Reappropriation Appropriation
Res Mgmt Cost Acct 65,000
Prior Biennia Future Biennia Total
130,000 195,000
NEW SECTION. Sec. 528. FOR THE DEPARTMENT OF NATURAL RESOURCES
Bridge and road replacement (90-2-503)
Reappropriation Appropriation
ORV Acct 15,000
For Dev Acct 15,000
Res Mgmt Cost Acct 35,000
Prior Biennia Future Biennia Total
2,240,000 3,512,000
NEW SECTION. Sec. 529. FOR THE DEPARTMENT OF NATURAL RESOURCES
Woodard Bay fencing dev. (90-3-103)
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Prior Biennia Future Biennia Total
200,000
NEW SECTION. Sec. 530. FOR THE DEPARTMENT OF NATURAL RESOURCES
Dishman Hills protection dev. (90-3-104)
Reappropriation Appropriation
St Bldg Constr Acct 100,000
Prior Biennia Future Biennia Total
100,000
NEW SECTION. Sec. 531. FOR THE DEPARTMENT OF NATURAL RESOURCES
Natural area preserves management (90-3-105)
Reappropriation Appropriation
St Bldg Constr Acct 150,000
Prior Biennia Future Biennia Total
200,000 350,000
NEW SECTION. Sec. 532. FOR THE DEPARTMENT OF NATURAL RESOURCES
Construct and improve recreation sites (90-5-201)
The appropriation in this section is subject to the following condition and limitation: This appropriation shall lapse if the recreational projects are not identified and construction begun by June 30, 1990.
Reappropriation Appropriation
ORV Acct 117,000
St Bldg Constr Acct 363,000
Prior Biennia Future Biennia Total
480,000
NEW SECTION. Sec. 533. FOR THE DEPARTMENT OF NATURAL RESOURCES
Seattle waterfront phase 1 dev. transient moorage facility (90-5-202)
Reappropriation Appropriation
ORA‑-State 750,000
Prior Biennia Future Biennia Total
750,000 1,500,000
NEW SECTION. Sec. 534. FOR THE DEPARTMENT OF NATURAL RESOURCES
Woodard Bay health and safety dev. (90-5-203)
Reappropriation Appropriation
St Bldg Constr Acct 250,000
ORA‑-Federal 250,000
Prior Biennia Future Biennia Total
500,000
NEW SECTION. Sec. 535. FOR THE DEPARTMENT OF NATURAL RESOURCES
Long Lake phase 2 dev. (90-5-204)
Reappropriation Appropriation
ORV Acct 150,000
ORA‑-State 205,000
Prior Biennia Future Biennia Total
355,000
NEW SECTION. Sec. 536. FOR THE DEPARTMENT OF NATURAL RESOURCES
Geoduck Hatchery (90-5-402)
Reappropriation Appropriation
Res Mgmt Cost Acct 334,000
Prior Biennia Future Biennia Total
334,000
NEW SECTION. Sec. 537. FOR THE DEPARTMENT OF NATURAL RESOURCES
Dredging of Cedar River delta
Reappropriation Appropriation
St Bldg Contr Acct 800,000
Prior Biennia Future Biennia Total
800,000
NEW SECTION. Sec. 538. FOR THE DEPARTMENT OF NATURAL RESOURCES
Spencer Island wetlands acquisition
Reappropriation Appropriation
St Bldg Constr Acct 300,000
Prior Biennia Future Biennia Total
300,000
NEW SECTION. Sec. 539. FOR THE STATE CONVENTION AND TRADE CENTER
Washington State Convention and Trade Center (83-5-001)
Reappropriation Appropriation
Conv Cntr Acct 1,000,000
Prior Biennia Future Biennia Total
35,618,000 36,618,000
NEW SECTION. Sec. 540. FOR THE STATE CONVENTION AND TRADE CENTER
Project reserves and contingency funds (89-5-001)
Reappropriation Appropriation
Conv Cntr Acct 3,000,000
Prior Biennia Future Biennia Total
1,765,000 4,765,000
NEW SECTION. Sec. 541. FOR THE STATE CONVENTION AND TRADE CENTER
Conversion of retail space to meeting rooms (89-5-002)
Reappropriation Appropriation
Conv Cntr Acct 12,250,000
Prior Biennia Future Biennia Total
750,000 13,000,000
NEW SECTION. Sec. 542. FOR THE STATE CONVENTION AND TRADE CENTER
Expansion of the nine hundred level (89-5-003)
Reappropriation Appropriation
Conv Cntr Acct 12,750,000
Prior Biennia Future Biennia Total
550,000 13,300,000
NEW SECTION. Sec. 543. FOR THE STATE CONVENTION AND TRADE CENTER
Purchase of McKay parcel (89-5-004)
Reappropriation Appropriation
Conv Cntr Acct 10,400,000
Prior Biennia Future Biennia Total
10,400,000
NEW SECTION. Sec. 544. FOR THE STATE CONVENTION AND TRADE CENTER
Eagles building: Exterior cleanup and repair (89-5-005)
Reappropriation Appropriation
Conv Cntr Acct 300,000
Prior Biennia Future Biennia Total
300,000
(End of part)
PART 6
TRANSPORTATION
NEW SECTION. Sec. 601. FOR THE WASHINGTON STATE PATROL
Crime laboratory renovation‑-Seattle (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 441,000
Prior Biennia Future Biennia Total
15,000 456,000
NEW SECTION. Sec. 602. FOR THE WASHINGTON STATE PATROL
Expand and renovate laboratory‑-Tacoma (90-2-005)
Reappropriation Appropriation
St Bldg Const Acct 165,200
Prior Biennia Future Biennia Total
6,000 171,200
NEW SECTION. Sec. 603. FOR THE WASHINGTON STATE PATROL
Crime laboratory renovation‑-Spokane (90-2-008)
Reappropriation Appropriation
St Bldg Constr Acct 80,000
Prior Biennia Future Biennia Total
10,000 90,000
NEW SECTION. Sec. 604. FOR THE WASHINGTON STATE PATROL
Construct district headquarters‑-Everett (90-2-018)
This appropriation shall only be used for the design or construction of a crime lab facility as part of the new district headquarters.
Reappropriation Appropriation
St Bldg Constr Acct 470,100
Prior Biennia Future Biennia Total
470,100
NEW SECTION. Sec. 605. FOR THE DEPARTMENT OF TRANSPORTATION
Acquisition of dredge spoils sites (83-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 2,369,430
Prior Biennia Future Biennia Total
2,420,000 4,789,430
NEW SECTION. Sec. 606. FOR THE DEPARTMENT OF TRANSPORTATION
Retention dam: Green/Toutle River site acquisition (87-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 5,387,043
Prior Biennia Future Biennia Total
13,289,430 18,676,473
NEW SECTION. Sec. 607. FOR THE DEPARTMENT OF TRANSPORTATION
Freight rail assistance and banking (90-5-001)
The appropriations in this section are subject to the following conditions and limitations:
(1) $4,700,000 from the essential rail assistance account shall be distributed to county rail districts and port districts only for the purposes of acquiring, maintaining, or improving branch lines.
(2) $2,200,000 from the essential rail bank account shall be used to provide the department with up to eighty percent matching funds to purchase unused rail rights of way.
Reappropriation Appropriation
Ess Rail Assis Acct 4,700,000
Ess Rail Bank Acct 2,200,000
Prior Biennia Future Biennia Total
10,000,000 16,900,000
(End of part)
PART 7
EDUCATION
NEW SECTION. Sec. 701. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1979 (79-3-002)
Reappropriation Appropriation
Common School Constr Fund 100,000
Prior Biennia Future Biennia Total
66,425 166,425
NEW SECTION. Sec. 702. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1981 (81-3-001)
Reappropriation Appropriation
Common School Constr Fund 130,000
Prior Biennia Future Biennia Total
173,758 303,758
NEW SECTION. Sec. 703. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1983 (83-3-001)
Reappropriation Appropriation
Common School Constr Fund 600,000
Prior Biennia Future Biennia Total
1,000,000 1,600,000
NEW SECTION. Sec. 704. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1985-87 (86-4-001)
Reappropriation Appropriation
Common School Constr Fund 2,500,000
Prior Biennia Future Biennia Total
29,500,000 32,000,000
NEW SECTION. Sec. 705. FOR THE STATE BOARD OF EDUCATION
Planning grants: 1985-87 (86-4-007)
Reappropriation Appropriation
Common School Constr Fund 60,000
Prior Biennia Future Biennia Total
292,275 352,275
NEW SECTION. Sec. 706. FOR THE STATE BOARD OF EDUCATION
Artwork grants: 1985-87 (86-4-008)
Reappropriation Appropriation
Common School Constr Fund 180,000
Prior Biennia Future Biennia Total
114,000 294,000
NEW SECTION. Sec. 707. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1987 (88-2-001)
Reappropriation Appropriation
Common School Constr Fund 87,500,000
Prior Biennia Future Biennia Total
120,762,000 208,262,000
NEW SECTION. Sec. 708. FOR THE STATE BOARD OF EDUCATION
Darrington school district: New elementary and middle school (89-2-004)
Reappropriation Appropriation
Common School Constr Fund 3,000,000
Prior Biennia Future Biennia Total
3,000,000
NEW SECTION. Sec. 709. FOR THE STATE BOARD OF EDUCATION
Public school building construction: 1989 (90-2-001)
The appropriation in this section is subject to the following conditions and limitations:
(1) A maximum of $1,055,000 may be spent for state administration of school construction funding.
(2) $30,000,000 is provided in fiscal year 1990 solely for school modernization projects that had both state board approval and local matching funds prior to September 30, 1985.
(3) After October 1, 1989, no funds may be encumbered for school construction and modernization projects unless the state board of education adopts rules adjusting the enrollment forecasting model used for determining district eligibility for state construction assistance, so that, particularly at the lower grade levels, the state-wide totals more closely match the enrollment forecasts from the office of financial management.
Reappropriation Appropriation
Common School Constr Fund 172,162,000
Prior Biennia Future Biennia Total
172,162,000
NEW SECTION. Sec. 710. FOR THE STATE BOARD OF EDUCATION
Common school disbursement limit
A maximum of $222,390,000 of the appropriations and reappropriations in sections 701 through 709 of this act may be disbursed during the 1989-91 biennium.
NEW SECTION. Sec. 711. FOR THE STATE BOARD OF EDUCATION
Public school building construction
The appropriation in this section is subject to the following conditions and limitations:
(1) Not more than $73,000,000 of this appropriation may be encumbered in fiscal year 1990.
(2) This appropriation shall be made from revenue from timber sales authorized by section 316 of Engrossed Substitute Senate Bill No. 5352. If the timber sales under that section are not authorized by June 30, 1989, the appropriation in this section shall lapse.
Reappropriation Appropriation
Common School Constr Fund 97,000,000
Prior Biennia Future Biennia Total
97,000,000
NEW SECTION. Sec. 712. FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
Marine science center construction
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section shall be allocated to educational service district no. 114 for construction of the marine science center in Poulsbo.
(2) The appropriation is contingent on site acquisition and at least $300,000 towards construction costs from private or local sources.
Reappropriation Appropriation
St Bldg Constr Acct 500,000
Prior Biennia Future Biennia Total
500,000
NEW SECTION. Sec. 713. FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
Emergency classroom facilities
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for acquiring emergency classroom facilities to be leased at fair market value to the Castle Rock school district for unhoused students.
Reappropriation Appropriation
Common School Constr Fund 1,000,000
Prior Biennia Future Biennia Total
1,000,000
NEW SECTION. Sec. 714. FOR THE STATE SCHOOL FOR THE BLIND
Automatic sliding doors‑-Irwin education building (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 14,580
Prior Biennia Future Biennia Total
14,580
NEW SECTION. Sec. 715. FOR THE STATE SCHOOL FOR THE BLIND
Asbestos abatement (90-1-006)
Reappropriation Appropriation
St Bldg Constr Acct 324,000
Prior Biennia Future Biennia Total
324,000
NEW SECTION. Sec. 716. FOR THE STATE SCHOOL FOR THE BLIND
Replace heating and ventilation system and roof repairs: Irwin building (90-2-002)
Reappropriation Appropriation
St Bldg Constr Acct 130,000
Prior Biennia Future Biennia Total
130,000
NEW SECTION. Sec. 717. FOR THE STATE SCHOOL FOR THE BLIND
Driveway/parking lot repaving (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 21,270
Prior Biennia Future Biennia Total
21,270
NEW SECTION. Sec. 718. FOR THE STATE SCHOOL FOR THE DEAF
Remove and replace three transformers/clerk (90-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 36,500
Prior Biennia Future Biennia Total
36,500
NEW SECTION. Sec. 719. FOR THE STATE SCHOOL FOR THE DEAF
Asbestos abatement (90-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 245,000
Prior Biennia Future Biennia Total
245,000
NEW SECTION. Sec. 720. FOR THE STATE SCHOOL FOR THE DEAF
Wheelchair lifts‑-Clark Hall, vocational, Northrup School (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 147,100
Prior Biennia Future Biennia Total
147,100
NEW SECTION. Sec. 721. FOR THE STATE SCHOOL FOR THE DEAF
Roof repair (91-2-002)
Reappropriation Appropriation
St Bldg Constr Acct 50,000
Prior Biennia Future Biennia Total
50,000
NEW SECTION. Sec. 722. HIGHER EDUCATION
The legislature finds that the state's institutions of higher education are facing unsurpassed capital needs. These capital needs should be addressed through both public and private financing methods, including private donations authorized under Substitute Senate Bill No. 6075 and college savings bonds authorized under Senate Bill No. 5218.
NEW SECTION. Sec. 723. FOR THE UNIVERSITY OF WASHINGTON
Roberts Hall renovation (83-1-012)
Reappropriation Appropriation
H Ed Reimb S/T Bonds Acct 200,000
Prior Biennia Future Biennia Total
5,355,794 5,555,794
NEW SECTION. Sec. 724. FOR THE UNIVERSITY OF WASHINGTON
Safety‑-Fire code, PCB and life safety (86-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 4,000,000
UW Bldg Acct 8,600,000
Prior Biennia Future Biennia Total
1,707,000 14,000,000 29,507,000
NEW SECTION. Sec. 725. FOR THE UNIVERSITY OF WASHINGTON
Safety‑-Asbestos removal (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 2,200,000
UW Bldg Acct 350,000 5,500,000
Prior Biennia Future Biennia Total
1,450,000 20,000,000 29,500,000
NEW SECTION. Sec. 726. FOR THE UNIVERSITY OF WASHINGTON
Safety‑-General (86-1-003)
Reappropriation Appropriation
St Bldg Constr Acct 750,000
Prior Biennia Future Biennia Total
250,000 1,000,000
NEW SECTION. Sec. 727. FOR THE UNIVERSITY OF WASHINGTON
Minor works‑-Building renewal (86-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 2,600,000
UW Bldg Acct 1,740,000 9,733,000
Prior Biennia Future Biennia Total
4,274,325 26,000,000 50,077,090
NEW SECTION. Sec. 728. FOR THE UNIVERSITY OF WASHINGTON
Fisheries repairs and expansion (86-1-014)
Reappropriation Appropriation
St H Ed Constr Acct 2,600,000
Prior Biennia Future Biennia Total
3,090,805 5,690,805
NEW SECTION. Sec. 729. FOR THE UNIVERSITY OF WASHINGTON
HSC G Court, H Wing and I Court addition (86-2-021)
Reappropriation Appropriation
St Bldg Constr Acct 20,400,000 24,692,000
UW Bldg Acct 3,500,000
Prior Biennia Future Biennia Total
776,000 49,368,000
NEW SECTION. Sec. 730. FOR THE UNIVERSITY OF WASHINGTON
Minor works‑-Program renewal (86-3-005)
The appropriation in this section is subject to the following condition and limitation: No funds shall be expended for land acquisition.
Reappropriation Appropriation
UW Bldg Acct 2,700,000 9,000,000
Prior Biennia Future Biennia Total
9,921,000 42,270,000 70,914,527
NEW SECTION. Sec. 731. FOR THE UNIVERSITY OF WASHINGTON
Energy conservation (86-4-023)
Reappropriation Appropriation
St Bldg Constr Acct 900,000
H Ed Constr Acct 300,000
Prior Biennia Future Biennia Total
663,566 1,863,566
NEW SECTION. Sec. 732. FOR THE UNIVERSITY OF WASHINGTON
Pavilion roof (88-1-009)
Reappropriation Appropriation
St Bldg Constr Acct 652,000
Prior Biennia Future Biennia Total
80,000 732,000
NEW SECTION. Sec. 733. FOR THE UNIVERSITY OF WASHINGTON
Electrical distribution system (88-1-011)
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
Prior Biennia Future Biennia Total
500,000 5,139,000 6,639,000
NEW SECTION. Sec. 734. FOR THE UNIVERSITY OF WASHINGTON
Power plant chiller (88-1-012)
Reappropriation Appropriation
St Bldg Constr Acct 750,000
Prior Biennia Future Biennia Total
250,000 1,000,000
NEW SECTION. Sec. 735. FOR THE UNIVERSITY OF WASHINGTON
Power plant stack replacement (88-1-023)
Reappropriation Appropriation
UW Bldg Acct 1,050,000
Prior Biennia Future Biennia Total
450,000 1,500,000
NEW SECTION. Sec. 736. FOR THE UNIVERSITY OF WASHINGTON
Suzzallo Library addition (88-2-013)
Reappropriation Appropriation
St Bldg Constr Acct 20,600,000
Prior Biennia Future Biennia Total
11,310,104 34,583,000
NEW SECTION. Sec. 737. FOR THE UNIVERSITY OF WASHINGTON
Communications building renovation (88-2-014)
Reappropriation Appropriation
St Bldg Constr Acct 4,480,000 1,015,000
UW Bldg Acct 1,167,000
Prior Biennia Future Biennia Total
75,000 6,737,000
NEW SECTION. Sec. 738. FOR THE UNIVERSITY OF WASHINGTON
H wing renovation (88-2-015)
Reappropriation Appropriation
St Bldg Constr Acct 715,000
Prior Biennia Future Biennia Total
18,000 733,000
NEW SECTION. Sec. 739. FOR THE UNIVERSITY OF WASHINGTON
Power plant boiler (88-2-022)
Reappropriation Appropriation
St Bldg Constr Acct 490,000
Prior Biennia Future Biennia Total
203,000 693,000
NEW SECTION. Sec. 740. FOR THE UNIVERSITY OF WASHINGTON
Science and engineering planning (88-2-044)
Reappropriation Appropriation
UW Bldg Acct 250,000
Prior Biennia Future Biennia Total
750,000 1,000,000
NEW SECTION. Sec. 741. FOR THE UNIVERSITY OF WASHINGTON
Power plant boiler retrofit (88-4-024)
Reappropriation Appropriation
UW Bldg Acct 2,050,000
Prior Biennia Future Biennia Total
250,000 2,300,000
NEW SECTION. Sec. 742. FOR THE UNIVERSITY OF WASHINGTON
Emergency power generation (90-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 11,110,000
Prior Biennia Future Biennia Total
11,110,000
NEW SECTION. Sec. 743. FOR THE UNIVERSITY OF WASHINGTON
Physics I (90-2-009)
The appropriation in this section is subject to the following conditions and limitations: It is the intent of the legislature that at least one-third of the construction costs of this project shall be provided from private sources. The project shall be constructed on campus.
Reappropriation Appropriation
St Bldg Constr Acct 4,155,000
Prior Biennia Future Biennia Total
4,155,000
NEW SECTION. Sec. 744. FOR THE UNIVERSITY OF WASHINGTON
Chemistry I (90-2-011)
The appropriation in this section is subject to the following conditions and limitations: The project shall be constructed on campus.
Reappropriation Appropriation
St Bldg Constr Acct 39,152,000
Prior Biennia Future Biennia Total
39,152,000
NEW SECTION. Sec. 745. FOR THE UNIVERSITY OF WASHINGTON
Electrical engineering building addition (90-2-013)
The appropriation in this section is subject to the following conditions and limitations: It is the intent of the legislature that at least one-third of the construction costs of this project shall be provided from private sources. The project shall be constructed on campus.
Reappropriation Appropriation
St Bldg Constr Acct 3,111,000
Prior Biennia Future Biennia Total
3,111,000
NEW SECTION. Sec. 746. FOR THE UNIVERSITY OF WASHINGTON
Computer sciences building (92-2-024)
The appropriation in this section is subject to the following conditions and limitations: It is the intent of the legislature that at least one-third of the construction costs of this project shall be provided from private sources. The project shall be constructed on campus.
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
Prior Biennia Future Biennia Total
1,000,000
NEW SECTION. Sec. 747. FOR WASHINGTON STATE UNIVERSITY
Chemistry building, phase 2 (86-1-003)
Reappropriation Appropriation
H Ed Constr Acct 1,932,000
WSU Bldg Acct 1,000,000
Prior Biennia Future Biennia Total
11,860,000 14,792,000
NEW SECTION. Sec. 748. FOR WASHINGTON STATE UNIVERSITY
Food‑-Human nutrition facility‑-Equipment (86-1-004)
Reappropriation Appropriation
WSU Bldg Acct 1,502,000
Prior Biennia Future Biennia Total
2,915,435 4,417,435
NEW SECTION. Sec. 749. FOR WASHINGTON STATE UNIVERSITY
McCoy Hall capital renewal (86-1-005)
Reappropriation Appropriation
H Ed Constr Acct 78,000
Prior Biennia Future Biennia Total
2,162,537 2,240,537
NEW SECTION. Sec. 750. FOR WASHINGTON STATE UNIVERSITY
Science Hall renewal, phase 2 (86-1-006)
Reappropriation Appropriation
H Ed Constr Acct 3,603,000
Prior Biennia Future Biennia Total
8,151,395 11,754,395
NEW SECTION. Sec. 751. FOR WASHINGTON STATE UNIVERSITY
Neill Hall renewal (86-1-007)
Reappropriation Appropriation
WSU Bldg Acct 3,569,500
Prior Biennia Future Biennia Total
3,569,500
NEW SECTION. Sec. 752. FOR WASHINGTON STATE UNIVERSITY
Minor capital improvement (88-1-001)
Reappropriation Appropriation
WSU Bldg Acct 1,896,000
Prior Biennia Future Biennia Total
2,827,000 4,723,000
NEW SECTION. Sec. 753. FOR WASHINGTON STATE UNIVERSITY
Minor capital renewal (88-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 2,109,000
Prior Biennia Future Biennia Total
3,593,000 5,702,000
NEW SECTION. Sec. 754. FOR WASHINGTON STATE UNIVERSITY
Preplanning (88-1-004)
Reappropriation Appropriation
WSU Bldg Acct 107,000
Prior Biennia Future Biennia Total
107,000
NEW SECTION. Sec. 755. FOR WASHINGTON STATE UNIVERSITY
Todd Hall addition (88-1-011)
Reappropriation Appropriation
St Bldg Constr Acct 4,904,000
Prior Biennia Future Biennia Total
428,000 5,332,000
NEW SECTION. Sec. 756. FOR WASHINGTON STATE UNIVERSITY
Fine arts mechanical renovation (88-1-012)
Reappropriation Appropriation
WSU Bldg Acct 240,000
Prior Biennia Future Biennia Total
2,713,000 2,953,000
NEW SECTION. Sec. 757. FOR WASHINGTON STATE UNIVERSITY
Carpenter Hall renewal (88-2-005)
Reappropriation Appropriation
H Ed Constr Acct 3,029,400
WSU Bldg Acct 2,685,000
Prior Biennia Future Biennia Total
485,600 6,200,000
NEW SECTION. Sec. 758. FOR WASHINGTON STATE UNIVERSITY
Dairy forage facility (88-3-007)
Reappropriation Appropriation
WSU Bldg Acct 1,100,000
Prior Biennia Future Biennia Total
82,000 1,182,000
NEW SECTION. Sec. 759. FOR WASHINGTON STATE UNIVERSITY
Veterinary research diagnostic center (88-5-006)
Reappropriation Appropriation
St Bldg Constr Acct 225,000
Prior Biennia Future Biennia Total
25,000 3,172,600 3,422,600
NEW SECTION. Sec. 760. FOR WASHINGTON STATE UNIVERSITY
Minor capital improvements (90-1-001)
Reappropriation Appropriation
WSU Bldg Acct 5,000,000
Prior Biennia Future Biennia Total
8,233,000
NEW SECTION. Sec. 761. FOR WASHINGTON STATE UNIVERSITY
Hazardous, pathological, radioactive waste handling facilities (90-1-004)
Reappropriation Appropriation
WSU Bldg Acct 152,000
Prior Biennia Future Biennia Total
11,000,000 11,152,000
NEW SECTION. Sec. 762. FOR WASHINGTON STATE UNIVERSITY
Nuclear radiation center study (90-1-011)
Reappropriation Appropriation
WSU Bldg Acct 53,000
Prior Biennia Future Biennia Total
4,000,000 4,053,000
NEW SECTION. Sec. 763. FOR WASHINGTON STATE UNIVERSITY
Expansion of east campus electrical substation (90-1-014)
Reappropriation Appropriation
WSU Bldg Acct 533,000
Prior Biennia Future Biennia Total
533,000
NEW SECTION. Sec. 764. FOR WASHINGTON STATE UNIVERSITY
Smith Gym electrical system renewal (90-1-018)
Reappropriation Appropriation
WSU Bldg Acct 648,000
Prior Biennia Future Biennia Total
648,000
NEW SECTION. Sec. 765. FOR WASHINGTON STATE UNIVERSITY
Holland Library addition (90-2-013)
Reappropriation Appropriation
St Bldg Constr Acct 33,400,000
WSU Bldg Acct 184,000
Prior Biennia Future Biennia Total
87,000 33,671,000
NEW SECTION. Sec. 766. FOR WASHINGTON STATE UNIVERSITY
Veterinary Teaching Hospital (90-2-016)
Reappropriation Appropriation
St Bldg Constr Acct 1,300,000
WSU Bldg Acct 200,000
Prior Biennia Future Biennia Total
327,000 29,438,000 31,265,000
NEW SECTION. Sec. 767. FOR WASHINGTON STATE UNIVERSITY
Food‑-Human nutrition building, phase 2 (90-2-020)
Reappropriation Appropriation
General Fund‑-Federal 12,688,000
Prior Biennia Future Biennia Total
12,688,000
NEW SECTION. Sec. 768. FOR WASHINGTON STATE UNIVERSITY
Minor capital renewal (90-3-002)
Reappropriation Appropriation
St Bldg Constr Acct 5,000,000
Prior Biennia Future Biennia Total
5,000,000
NEW SECTION. Sec. 769. FOR WASHINGTON STATE UNIVERSITY
Todd Hall renewal (90-3-003)
Reappropriation Appropriation
WSU Bldg Acct 182,000
Prior Biennia Future Biennia Total
182,000
NEW SECTION. Sec. 770. FOR WASHINGTON STATE UNIVERSITY
WSU Tri-Cities University Center (90-5-901)
Reappropriation Appropriation
St Bldg Constr Acct 420,000
Prior Biennia Future Biennia Total
300,000 720,000
NEW SECTION. Sec. 771. FOR EASTERN WASHINGTON UNIVERSITY
Mathematical science and technology remodel (81-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 74,000 82,900
Prior Biennia Future Biennia Total
273,000 5,789,700 6,219,600
NEW SECTION. Sec. 772. FOR EASTERN WASHINGTON UNIVERSITY
Science building addition/remodel (83-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 6,250,000 6,784,500
Prior Biennia Future Biennia Total
2,778,000 2,952,600 18,765,100
NEW SECTION. Sec. 773. FOR EASTERN WASHINGTON UNIVERSITY
Electrical system renewal (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 1,905,000
St Fac Renew Acct 709,000
Prior Biennia Future Biennia Total
813,000 3,427,000
NEW SECTION. Sec. 774. FOR EASTERN WASHINGTON UNIVERSITY
Roof replacement (86-1-003)
Reappropriation Appropriation
St Bldg Constr Acct 500,000
Prior Biennia Future Biennia Total
915,000 1,500,000 2,915,000
NEW SECTION. Sec. 775. FOR EASTERN WASHINGTON UNIVERSITY
Water storage and distribution (86-1-004)
Reappropriation Appropriation
St H Ed Constr Acct 207,000
Prior Biennia Future Biennia Total
963,000 1,170,000
NEW SECTION. Sec. 776. FOR EASTERN WASHINGTON UNIVERSITY
Minor works projects (86-1-010)
Reappropriation Appropriation
EWU Cap Proj Acct 403,000 2,100,000
Prior Biennia Future Biennia Total
1,497,000 8,536,000 12,536,000
NEW SECTION. Sec. 777. FOR EASTERN WASHINGTON UNIVERSITY
Small repairs projects (86-1-011)
Reappropriation Appropriation
EWU Cap Proj Acct 155,000 1,000,000
Prior Biennia Future Biennia Total
478,000 3,200,000 4,833,000
NEW SECTION. Sec. 778. FOR EASTERN WASHINGTON UNIVERSITY
Energy conservation (86-2-006)
Reappropriation Appropriation
St H Ed Constr Acct 424,000
St Bldg Constr Acct 30,000
Prior Biennia Future Biennia Total
102,000 556,000
NEW SECTION. Sec. 779. FOR EASTERN WASHINGTON UNIVERSITY
Life/safety and code compliance: Asbestos (88-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 1,900,000
EWU Cap Proj Acct 170,000
Prior Biennia Future Biennia Total
513,000 4,000,000 6,583,000
NEW SECTION. Sec. 780. FOR EASTERN WASHINGTON UNIVERSITY
Fire suppression (88-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 215,000
Prior Biennia Future Biennia Total
361,000 2,158,000 2,734,000
NEW SECTION. Sec. 781. FOR EASTERN WASHINGTON UNIVERSITY
Computer replacement (90-2-005)
Reappropriation Appropriation
EWU Cap Proj Acct 1,611,000
Prior Biennia Future Biennia Total
1,611,000
NEW SECTION. Sec. 782. FOR EASTERN WASHINGTON UNIVERSITY
Deferred maintenance (90-3-009)
Reappropriation Appropriation
EWU Cap Proj Acct 516,000
Prior Biennia Future Biennia Total
516,000
NEW SECTION. Sec. 783. FOR EASTERN WASHINGTON UNIVERSITY
Kennedy Library addition/HVAC‑-Preplanning (90-5-003)
Reappropriation Appropriation
EWU Cap Proj Acct 165,000
Prior Biennia Future Biennia Total
165,000
NEW SECTION. Sec. 784. FOR CENTRAL WASHINGTON UNIVERSITY
Energy savings projects (86-2-005)
Reappropriation Appropriation
CWU Cap Proj Acct 725,000
Prior Biennia Future Biennia Total
183,818 908,818
NEW SECTION. Sec. 785. FOR CENTRAL WASHINGTON UNIVERSITY
Nicholson Pavilion, Phase I (86-3-001)
Reappropriation Appropriation
H Ed Constr Acct 9,500
Prior Biennia Future Biennia Total
959,506 969,006
NEW SECTION. Sec. 786. FOR CENTRAL WASHINGTON UNIVERSITY
Small repairs and improvements (86-3-013)
Reappropriation Appropriation
CWU Cap Proj Acct 30,000
Prior Biennia Future Biennia Total
503,000 533,000
NEW SECTION. Sec. 787. FOR CENTRAL WASHINGTON UNIVERSITY
Life safety-Code compliance (88-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 509,000
Prior Biennia Future Biennia Total
1,248,000 1,757,000
NEW SECTION. Sec. 788. FOR CENTRAL WASHINGTON UNIVERSITY
Handicap modifications (88-1-007)
Reappropriation Appropriation
CWU Cap Proj Acct 625,000
Prior Biennia Future Biennia Total
90,000 715,000
NEW SECTION. Sec. 789. FOR CENTRAL WASHINGTON UNIVERSITY
Nicholson Pavilion phase 2 (88-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 3,600,000
Prior Biennia Future Biennia Total
263,000 3,863,000
NEW SECTION. Sec. 790. FOR CENTRAL WASHINGTON UNIVERSITY
Life/safety (90-1-030)
Reappropriation Appropriation
St Bldg Constr Acct 831,000
Prior Biennia Future Biennia Total
1,000,000 1,831,000
NEW SECTION. Sec. 791. FOR CENTRAL WASHINGTON UNIVERSITY
Asbestos abatement (90-1-040)
Reappropriation Appropriation
St Bldg Constr Acct 1,000,000
Prior Biennia Future Biennia Total
1,735,000 1,000,000 3,735,000
NEW SECTION. Sec. 792. FOR CENTRAL WASHINGTON UNIVERSITY
Psychology animal research facility (90-1-060)
Reappropriation Appropriation
St Bldg Constr Acct 1,547,000
Prior Biennia Future Biennia Total
1,547,000
NEW SECTION. Sec. 793. FOR CENTRAL WASHINGTON UNIVERSITY
Barge Hall renovation (90-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 600,000
Prior Biennia Future Biennia Total
7,744,800 8,344,800
NEW SECTION. Sec. 794. FOR CENTRAL WASHINGTON UNIVERSITY
Telecommunications system‑-Phase 2 (90-2-003)
Reappropriation Appropriation
CWU Cap Proj Acct 1,732,000 1,443,600
Prior Biennia Future Biennia Total
68,000 3,243,600
NEW SECTION. Sec. 795. FOR CENTRAL WASHINGTON UNIVERSITY
Shaw/Smyser Hall remodel (90-2-005)
Reappropriation Appropriation
St Bldg Constr Acct 2,405,900
CWU Cap Proj Acct 1,300,000
Prior Biennia Future Biennia Total
3,705,900
NEW SECTION. Sec. 796. FOR CENTRAL WASHINGTON UNIVERSITY
Minor works projects group I (90-2-050)
Reappropriation Appropriation
CWU Cap Proj Acct 800,000 3,856,600
Prior Biennia Future Biennia Total
2,212,958 10,450,000 17,319,558
(End of part)
PART 8
EDUCATION - CONTINUED
NEW SECTION. Sec. 801. FOR THE EVERGREEN STATE COLLEGE
Life safety‑-Code compliance (88-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 172,000 819,000
Prior Biennia Future Biennia Total
1,012,000 2,003,000
NEW SECTION. Sec. 802. FOR THE EVERGREEN STATE COLLEGE
Energy audit compliance (88-2-016)
Reappropriation Appropriation
St Bldg Constr Acct 60,000
Prior Biennia Future Biennia Total
145,000 205,000
NEW SECTION. Sec. 803. FOR THE EVERGREEN STATE COLLEGE
Campus recreation center, Phase II: Gym (88-5-015)
Reappropriation Appropriation
St Bldg Constr Acct 474,572
Prior Biennia Future Biennia Total
6,298,428 6,773,000
NEW SECTION. Sec. 804. FOR THE EVERGREEN STATE COLLEGE
Asbestos removal (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 60,000
Prior Biennia Future Biennia Total
443,000 503,000
NEW SECTION. Sec. 805. FOR THE EVERGREEN STATE COLLEGE
Failed systems (90-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 544,070
Prior Biennia Future Biennia Total
544,070
NEW SECTION. Sec. 806. FOR THE EVERGREEN STATE COLLEGE
Minor works (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 178,720
Prior Biennia Future Biennia Total
178,720
NEW SECTION. Sec. 807. FOR THE EVERGREEN STATE COLLEGE
Emergency repairs (90-2-022)
Reappropriation Appropriation
TESC Cap Proj Acct 81,000
Prior Biennia Future Biennia Total
81,000
NEW SECTION. Sec. 808. FOR THE EVERGREEN STATE COLLEGE
Small repairs and improvements (90-2-023)
Reappropriation Appropriation
TESC Cap Proj Acct 162,000
Prior Biennia Future Biennia Total
162,000
NEW SECTION. Sec. 809. FOR THE EVERGREEN STATE COLLEGE
Deferred maintenance (90-3-006)
Reappropriation Appropriation
St Bldg Constr Acct 1,641,870
Prior Biennia Future Biennia Total
1,641,870
NEW SECTION. Sec. 810. FOR WESTERN WASHINGTON UNIVERSITY
Const Tech Bldg/remodel Art Tech building phase 2 (84-3-001)
Reappropriation Appropriation
St Bldg Constr Acct 100,000
Prior Biennia Future Biennia Total
9,809,055 9,909,055
NEW SECTION. Sec. 811. FOR WESTERN WASHINGTON UNIVERSITY
Construct/equip science facility phase 1 (90-1-001)
Reappropriation Appropriation
St Bldg Constr Acct 20,730,700
WWU Cap Proj Acct 1,082,000
Prior Biennia Future Biennia Total
168,000 21,980,700
NEW SECTION. Sec. 812. FOR WESTERN WASHINGTON UNIVERSITY
Asbestos abatement‑-Multiple buildings (90-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 3,000,000
Prior Biennia Future Biennia Total
3,000,000
NEW SECTION. Sec. 813. FOR WESTERN WASHINGTON UNIVERSITY
Minor works request/small repairs and improvements (90-1-004)
Reappropriation Appropriation
WWU Cap Proj Acct 2,503,000 3,900,000
Prior Biennia Future Biennia Total
8,948,481 12,000,000 27,351,481
NEW SECTION. Sec. 814. FOR WESTERN WASHINGTON UNIVERSITY
Science facility, phase 2 (design) (90-1-005)
Reappropriation Appropriation
St Bldg Constr Acct 887,300
Prior Biennia Future Biennia Total
19,332,800 20,220,100
NEW SECTION. Sec. 815. FOR WESTERN WASHINGTON UNIVERSITY
Institute of Wildlife Toxicology‑-Facility acquisition (90-2-003)
Reappropriation Appropriation
WWU Cap Proj Acct 1,500,000
Prior Biennia Future Biennia Total
1,500,000
NEW SECTION. Sec. 816. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Addition to air conditioning (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 206,000
Prior Biennia Future Biennia Total
125,000 331,000
NEW SECTION. Sec. 817. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Museum interior remodeling (88-3-004)
Reappropriation Appropriation
St Bldg Constr Acct 1,937,000
Prior Biennia Future Biennia Total
305,000 2,242,000
NEW SECTION. Sec. 818. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Small improvement project to extend building's useful life (90-3-006)
Reappropriation Appropriation
St Bldg Constr Acct 151,500
Prior Biennia Future Biennia Total
151,500
NEW SECTION. Sec. 819. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
New exhibition center at Union Station: Phase I (90-5-005)
The appropriation in this section is subject to the following conditions and limitations:
(1) This appropriation is provided solely for land acquisition, design and engineering, and final preplanning. No funds shall be used for construction.
(2) This appropriation is contingent on receipt of a contribution of $1,200,000 in cash from nonstate sources.
(3) It is the intent of the legislature that all subsequent appropriations for this project will be contingent on receipt of cash contributions equal to one-third of project costs.
Reappropriation Appropriation
St Bldg Constr Acct 3,200,000
Prior Biennia Future Biennia Total
3,200,000
NEW SECTION. Sec. 820. FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
Cheney Cowles Museum‑-Repair roof and heating/cooling (89-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 80,100
Prior Biennia Future Biennia Total
80,100
NEW SECTION. Sec. 821. FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
Campbell House‑-Restoration (86-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 750,700
Prior Biennia Future Biennia Total
343,000 1,093,700
NEW SECTION. Sec. 822. FOR THE STATE CAPITOL HISTORICAL ASSOCIATION
Minor works State Museum Olympia (90-1-002)
Reappropriation Appropriation
St Bldg Constr Acct 9,000 27,100
Prior Biennia Future Biennia Total
91,000 48,000 175,100
NEW SECTION. Sec. 823. FOR THE STATE CAPITOL HISTORICAL ASSOCIATION
Energy efficiency agency headquarters‑-Olympia (91-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 15,000
Prior Biennia Future Biennia Total
1,000 16,000
NEW SECTION. Sec. 824. FOR THE COMMUNITY COLLEGE SYSTEM
Minor capital improvements (83-2-002)
Reappropriation Appropriation
H Ed Constr Acct 4,745
Prior Biennia Future Biennia Total
17,969 22,714
NEW SECTION. Sec. 825. FOR THE COMMUNITY COLLEGE SYSTEM
HVAC repairs (83-2-007)
Reappropriation Appropriation
St H Ed Constr Acct 42,140
Prior Biennia Future Biennia Total
46,208 88,348
NEW SECTION. Sec. 826. FOR THE COMMUNITY COLLEGE SYSTEM
Minor works request (RMI) (86-1-001)
Reappropriation Appropriation
H Ed Reimb S/T Bonds Acct 97,857
Prior Biennia Future Biennia Total
742,708 840,565
NEW SECTION. Sec. 827. FOR THE COMMUNITY COLLEGE SYSTEM
Critical repair projects (86-1-003)
Reappropriation Appropriation
H Ed Reimb S/T Bonds Acct 473,630
Prior Biennia Future Biennia Total
613,391 1,087,021
NEW SECTION. Sec. 828. FOR THE COMMUNITY COLLEGE SYSTEM
General repair projects (86-1-004)
Reappropriation Appropriation
St Fac Renew‑-Acct 684,883
Prior Biennia Future Biennia Total
3,366,982 4,051,865
NEW SECTION. Sec. 829. FOR THE COMMUNITY COLLEGE SYSTEM
Energy conservation projects (86-1-005)
Reappropriation Appropriation
St Fac Renew Acct 337,208
Prior Biennia Future Biennia Total
1,042,729 1,379,937
NEW SECTION. Sec. 830. FOR THE COMMUNITY COLLEGE SYSTEM
Prior hall renovation (86-1-018)
Reappropriation Appropriation
H Ed Constr Acct 5,945
Prior Biennia Future Biennia Total
847,554 853,499
NEW SECTION. Sec. 831. FOR THE COMMUNITY COLLEGE SYSTEM
Food service building: Olympic (86-3-019)
Reappropriation Appropriation
St H Ed Constr Acct 159,581
Prior Biennia Future Biennia Total
2,161,290 2,320,871
NEW SECTION. Sec. 832. FOR THE COMMUNITY COLLEGE SYSTEM
Minor renovations (86-2-006)
Reappropriation Appropriation
St Fac Renew Acct 228,366
Prior Biennia Future Biennia Total
3,440,542 3,668,908
NEW SECTION. Sec. 833. FOR THE COMMUNITY COLLEGE SYSTEM
Minor remodel projects (86-2-007)
Reappropriation Appropriation
St Fac Renew Acct 96,717
Prior Biennia Future Biennia Total
802,701 899,418
NEW SECTION. Sec. 834. FOR THE COMMUNITY COLLEGE SYSTEM
Program/plan/construct: Library/student Center, Everett (86-2-031)
Reappropriation Appropriation
St Bldg Constr Acct 864,029
Prior Biennia Future Biennia Total
7,312,318 8,176,347
NEW SECTION. Sec. 835. FOR THE COMMUNITY COLLEGE SYSTEM
Construct main storage building‑-Clark (86-3-009)
Reappropriation Appropriation
St H Ed Constr Acct 1,626
Prior Biennia Future Biennia Total
175,971 177,597
NEW SECTION. Sec. 836. FOR THE COMMUNITY COLLEGE SYSTEM
Minor improvements (86-3-011)
Reappropriation Appropriation
St H Ed Constr Acct 26,092
Prior Biennia Future Biennia Total
877,028 903,120
NEW SECTION. Sec. 837. FOR THE COMMUNITY COLLEGE SYSTEM
Edison North renovation II: Seattle central (86-3-013)
Reappropriation Appropriation
St H Ed Constr Acct 32,663
St Bldg Constr Acct 1,753,859
Prior Biennia Future Biennia Total
6,129,790 7,916,312
NEW SECTION. Sec. 838. FOR THE COMMUNITY COLLEGE SYSTEM
Construct core facility and instructional space: Whatcom (86-3-015)
Reappropriation Appropriation
St H Ed Constr Acct 24,099
Prior Biennia Future Biennia Total
1,195,868 1,219,967
NEW SECTION. Sec. 839. FOR THE COMMUNITY COLLEGE SYSTEM
Replace relocatable buildings: Pierce (86-3-017)
Reappropriation Appropriation
St H Ed Constr Acct 46,613
Prior Biennia Future Biennia Total
880,787 927,400
NEW SECTION. Sec. 840. FOR THE COMMUNITY COLLEGE SYSTEM
Vocational science facility: Wenatchee (86-3-020)
Reappropriation Appropriation
St H Ed Constr Acct 159,342
Prior Biennia Future Biennia Total
2,083,657 2,242,999
NEW SECTION. Sec. 841. FOR THE COMMUNITY COLLEGE SYSTEM
Extension facility: Puyallup (86-3-021)
Reappropriation Appropriation
St Bldg Constr Acct 5,263,973
Prior Biennia Future Biennia Total
315,176 5,579,149
NEW SECTION. Sec. 842. FOR THE COMMUNITY COLLEGE SYSTEM
Tech building and related remodeling: Skagit Valley (86-3-022)
Reappropriation Appropriation
St Bldg Constr Acct 54,999
Prior Biennia Future Biennia Total
3,545,001 3,600,000
NEW SECTION. Sec. 843. FOR THE COMMUNITY COLLEGE SYSTEM
Heavy equipment building: Grays Harbor (86-3-023)
Reappropriation Appropriation
St Bldg Constr Acct 32,851
Prior Biennia Future Biennia Total
745,149 778,000
NEW SECTION. Sec. 844. FOR THE COMMUNITY COLLEGE SYSTEM
Learning Resource Center: South Puget Sound CC (86-3-025)
Reappropriation Appropriation
St Bldg Constr Acct 2,278,211
Prior Biennia Future Biennia Total
4,955,789 7,234,000
NEW SECTION. Sec. 845. FOR THE COMMUNITY COLLEGE SYSTEM
Heavy equipment building: South Seattle (86-3-026)
Reappropriation Appropriation
St Bldg Constr Acct 594,006
Prior Biennia Future Biennia Total
4,018,994 4,613,000
NEW SECTION. Sec. 846. FOR THE COMMUNITY COLLEGE SYSTEM
Preplanning for 1987-89 major projects (86-4-999)
Reappropriation Appropriation
St H Ed Constr Acct 12,921
Prior Biennia Future Biennia Total
164,068 176,989
NEW SECTION. Sec. 847. FOR THE COMMUNITY COLLEGE SYSTEM
Minor works (RMI) (88-2-001)
Reappropriation Appropriation
St Bldg Constr Acct 1,331,193
Prior Biennia Future Biennia Total
2,168,807 3,500,000
NEW SECTION. Sec. 848. FOR THE COMMUNITY COLLEGE SYSTEM
Repairs‑-Exterior walls (88-3-003)
Reappropriation Appropriation
St Bldg Constr Acct 1,273,171
Prior Biennia Future Biennia Total
2,990,829 4,264,000
NEW SECTION. Sec. 849. FOR THE COMMUNITY COLLEGE SYSTEM
Repairs‑-Mechanical/HVAC (88-3-004)
Reappropriation Appropriation
St Bldg Constr Acct 2,149,189
Prior Biennia Future Biennia Total
1,925,811 4,075,000
NEW SECTION. Sec. 850. FOR THE COMMUNITY COLLEGE SYSTEM
Minor improvements (88-3-005)
Reappropriation Appropriation
St Bldg Constr Acct 5,288,563
Prior Biennia Future Biennia Total
8,475,437 13,764,000
NEW SECTION. Sec. 851. FOR THE COMMUNITY COLLEGE SYSTEM
Repairs‑-Electrical (88-3-006)
Reappropriation Appropriation
St Bldg Constr Acct 743,042
Prior Biennia Future Biennia Total
648,958 1,392,000
NEW SECTION. Sec. 852. FOR THE COMMUNITY COLLEGE SYSTEM
Repairs‑-Sites and interiors (88-3-007)
Reappropriation Appropriation
St Bldg Constr Acct 402,427
Prior Biennia Future Biennia Total
1,523,573 1,926,000
NEW SECTION. Sec. 853. FOR THE COMMUNITY COLLEGE SYSTEM
Agricultural technology building (Walla Walla) (88-3-008)
Reappropriation Appropriation
St Bldg Constr Acct 166,325 2,946,000
Prior Biennia Future Biennia Total
50,478 3,162,803
NEW SECTION. Sec. 854. FOR THE COMMUNITY COLLEGE SYSTEM
Vocational shop (Wenatchee Valley) (88-3-010)
Reappropriation Appropriation
St Bldg Constr Acct 60,274 880,000
Prior Biennia Future Biennia Total
21,726 962,000
NEW SECTION. Sec. 855. FOR THE COMMUNITY COLLEGE SYSTEM
Computer facility (Edmonds) (88-3-011)
Reappropriation Appropriation
St Bldg Constr Acct 123,480 3,624,000
Prior Biennia Future Biennia Total
124,522 3,872,002
NEW SECTION. Sec. 856. FOR THE COMMUNITY COLLEGE SYSTEM
Learning Resource Center (Clark) (88-3-012)
Reappropriation Appropriation
St Bldg Constr Acct 113,758 6,077,000
Prior Biennia Future Biennia Total
233,242 6,424,000
NEW SECTION. Sec. 857. FOR THE COMMUNITY COLLEGE SYSTEM
Extension center (Yakima Valley) (88-3-013)
Reappropriation Appropriation
St Bldg Constr Acct 62,699 1,586,000
Prior Biennia Future Biennia Total
61,827 1,710,526
NEW SECTION. Sec. 858. FOR THE COMMUNITY COLLEGE SYSTEM
Math/science building (Spokane Falls) (88-3-015)
Reappropriation Appropriation
St Bldg Constr Acct 112,990 5,510,000
Prior Biennia Future Biennia Total
203,648 5,826,638
NEW SECTION. Sec. 859. FOR THE COMMUNITY COLLEGE SYSTEM
Learning resource center addition (Spokane) (88-3-016)
Reappropriation Appropriation
St Bldg Constr Acct 52,067 5,270,000
Prior Biennia Future Biennia Total
287,506 5,609,573
NEW SECTION. Sec. 860. FOR THE COMMUNITY COLLEGE SYSTEM
Construct Clarkston Extension Center: (Walla Walla) (88-3-017)
Reappropriation Appropriation
St Bldg Constr Acct 83,172
Prior Biennia Future Biennia Total
3,392,471 3,475,643
NEW SECTION. Sec. 861. FOR THE COMMUNITY COLLEGE SYSTEM
Tacoma Computer Center: TCC (88-3-018)
Reappropriation Appropriation
St Bldg Constr Acct 1,848,278
Prior Biennia Future Biennia Total
709,722 2,558,000
NEW SECTION. Sec. 862. FOR THE COMMUNITY COLLEGE SYSTEM
Preplanning for 1989-93 major projects (88-4-014)
Reappropriation Appropriation
St Bldg Constr Acct 103,159
Prior Biennia Future Biennia Total
393,841 497,000
NEW SECTION. Sec. 863. FOR THE COMMUNITY COLLEGE SYSTEM
Whidbey LRC/instruc. (Skagit Valley) (88-5-020)
Reappropriation Appropriation
St Bldg Constr Acct 108,000
Prior Biennia Future Biennia Total
37,000 1,927,000 2,072,000
NEW SECTION. Sec. 864. FOR THE COMMUNITY COLLEGE SYSTEM
Science/fine arts/PE (South Puget Sound) (88-5-021)
Reappropriation Appropriation
St Bldg Constr Acct 256,000
Prior Biennia Future Biennia Total
72,000 5,494,000 5,822,000
NEW SECTION. Sec. 865. FOR THE COMMUNITY COLLEGE SYSTEM
Early childhood education (Shoreline) (88-5-022)
Reappropriation Appropriation
St Bldg Constr Acct 78,000
Prior Biennia Future Biennia Total
41,000 1,258,000 1,377,000
NEW SECTION. Sec. 866. FOR THE COMMUNITY COLLEGE SYSTEM
Library remodel (Columbia Basin) (88-5-023)
Reappropriation Appropriation
St Bldg Constr Acct 113,000
Prior Biennia Future Biennia Total
48,000 1,893,000 2,054,000
NEW SECTION. Sec. 867. FOR THE COMMUNITY COLLEGE SYSTEM
Vocational shops (Centralia) (88-5-024)
Reappropriation Appropriation
St Bldg Constr Acct 95,000
Prior Biennia Future Biennia Total
43,000 2,089,000 2,227,000
NEW SECTION. Sec. 868. FOR THE COMMUNITY COLLEGE SYSTEM
LRC addition/remodel (Tacoma) (88-5-025)
Reappropriation Appropriation
St Bldg Constr Acct 90,000
Prior Biennia Future Biennia Total
34,000 1,720,000 1,844,000
NEW SECTION. Sec. 869. FOR THE COMMUNITY COLLEGE SYSTEM
Vocational food addition (Lower Columbia) (88-5-026)
Reappropriation Appropriation
St Bldg Constr Acct 140,000
Prior Biennia Future Biennia Total
42,000 2,934,000 3,116,000
NEW SECTION. Sec. 870. FOR THE COMMUNITY COLLEGE SYSTEM
Business education building (Spokane) (88-5-027)
Reappropriation Appropriation
St Bldg Constr Acct 245,000
Prior Biennia Future Biennia Total
76,000 6,398,000 6,719,000
NEW SECTION. Sec. 871. FOR THE COMMUNITY COLLEGE SYSTEM
Student activity/PE (Seattle Central) (88-5-028)
Reappropriation Appropriation
St Bldg Constr Acct 400,000
Prior Biennia Future Biennia Total
107,000 507,000
NEW SECTION. Sec. 872. FOR THE COMMUNITY COLLEGE SYSTEM
WSU Education Center: Clark (89-5-019)
Reappropriation Appropriation
St Bldg Constr Acct 1,759,438
Prior Biennia Future Biennia Total
40,562 1,800,000
NEW SECTION. Sec. 873. FOR THE COMMUNITY COLLEGE SYSTEM
Multipurpose Child Care Center: Everett (89-5-020)
Reappropriation Appropriation
St Bldg Constr Acct 557,608
Prior Biennia Future Biennia Total
42,392 600,000
NEW SECTION. Sec. 874. FOR THE COMMUNITY COLLEGE SYSTEM
Fire/security repairs (7) (90-1-004)
Reappropriation Appropriation
St Bldg Constr Acct 947,610
Prior Biennia Future Biennia Total
947,610
NEW SECTION. Sec. 875. FOR THE COMMUNITY COLLEGE SYSTEM
Asbestos repairs (4) (90-1-008)
Reappropriation Appropriation
St Bldg Constr Acct 1,217,200
Prior Biennia Future Biennia Total
1,217,200
NEW SECTION. Sec. 876. FOR THE COMMUNITY COLLEGE SYSTEM
Roof/structural repairs (20) (90-2-002)
Reappropriation Appropriation
St Bldg Constr Acct 3,658,000
Prior Biennia Future Biennia Total
3,658,000
NEW SECTION. Sec. 877. FOR THE COMMUNITY COLLEGE SYSTEM
HVAC/mechanical repairs (15) (90-2-003)
Reappropriation Appropriation
St Bldg Constr Acct 2,972,830
Prior Biennia Future Biennia Total
2,972,830
NEW SECTION. Sec. 878. FOR THE COMMUNITY COLLEGE SYSTEM
Electrical repairs (4) (90-2-005)
Reappropriation Appropriation
St Bldg Constr Acct 371,240
Prior Biennia Future Biennia Total
371,240
NEW SECTION. Sec. 879. FOR THE COMMUNITY COLLEGE SYSTEM
Small repairs and improvements (90-3-001)
Reappropriation Appropriation
St Bldg Constr Acct 4,200,000
Prior Biennia Future Biennia Total
4,200,000
NEW SECTION. Sec. 880. FOR THE COMMUNITY COLLEGE SYSTEM
LARC (Centralia) (90-3-006)
Reappropriation Appropriation
St Bldg Constr Acct 61,239 4,012,000
Prior Biennia Future Biennia Total
190,731 4,263,970
NEW SECTION. Sec. 881. FOR THE COMMUNITY COLLEGE SYSTEM
Facility repairs (18) (90-3-007)
Reappropriation Appropriation
St Bldg Constr Acct 3,848,180
Prior Biennia Future Biennia Total
3,848,180
NEW SECTION. Sec. 882. FOR THE COMMUNITY COLLEGE SYSTEM
Technology labs (Highline) (90-3-023)
Reappropriation Appropriation
St Bldg Constr Acct 140,196 2,595,000
Prior Biennia Future Biennia Total
62,942 2,798,138
NEW SECTION. Sec. 883. FOR THE COMMUNITY COLLEGE SYSTEM
Minor improvements (50) (90-5-009)
Reappropriation Appropriation
St Bldg Constr Acct 13,292,940
Prior Biennia Future Biennia Total
13,292,940
NEW SECTION. Sec. 884. FOR THE COMMUNITY COLLEGE SYSTEM
Technology center (Whatcom) (90-5-010)
Reappropriation Appropriation
St Bldg Constr Acct 63,000
Prior Biennia Future Biennia Total
185,000 248,000
NEW SECTION. Sec. 885. FOR THE COMMUNITY COLLEGE SYSTEM
PE facility (North Seattle) (90-5-011)
Reappropriation Appropriation
St Bldg Constr Acct 45,000
Prior Biennia Future Biennia Total
165,000 210,000
NEW SECTION. Sec. 886. FOR THE COMMUNITY COLLEGE SYSTEM
Applied arts building (Spokane Falls) (90-5-012)
Reappropriation Appropriation
St Bldg Constr Acct 68,000
Prior Biennia Future Biennia Total
190,000 258,000
NEW SECTION. Sec. 887. FOR THE COMMUNITY COLLEGE SYSTEM
Industrial technology building (Spokane) (90-5-013)
Reappropriation Appropriation
St Bldg Constr Acct 64,000
Prior Biennia Future Biennia Total
204,000 268,000
NEW SECTION. Sec. 888. FOR THE COMMUNITY COLLEGE SYSTEM
Vocational art facility (Shoreline) (90-5-014)
Reappropriation Appropriation
St Bldg Constr Acct 51,000
Prior Biennia Future Biennia Total
125,000 176,000
NEW SECTION. Sec. 889. FOR THE COMMUNITY COLLEGE SYSTEM
Business education building (Clark) (90-5-015)
Reappropriation Appropriation
St Bldg Constr Acct 73,000
Prior Biennia Future Biennia Total
231,000 304,000
NEW SECTION. Sec. 890. FOR THE COMMUNITY COLLEGE SYSTEM
Student center (South Seattle) (90-5-016)
Reappropriation Appropriation
St Bldg Constr Acct 59,000
Prior Biennia Future Biennia Total
185,000 244,000
NEW SECTION. Sec. 891. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Pierce College‑-Planning, phase I of Puyallup campus master plan
Reappropriation Appropriation
St Bldg Constr Acct 200,000
Prior Biennia Future Biennia Total
200,000
NEW SECTION. Sec. 892. FOR THE COMMUNITY COLLEGE SYSTEM
Library addition (Skagit Valley) (90-5-017)
Reappropriation Appropriation
St Bldg Constr Acct 44,000
Prior Biennia Future Biennia Total
1,879,000 1,923,000
(End of part)
PART 9
ALL OTHER EXPENDITURES
NEW SECTION. Sec. 901. FOR SPECIAL APPROPRIATION TO THE GOVERNOR
Puyallup tribal settlement (90-5-001)
The appropriation in this section is subject to the following conditions and limitations: None of this appropriation or any other state funds provided under terms of the Puyallup tribal settlement agreement dated August 27, 1988, shall be released or in any way obligated by the director of financial management until at least ninety percent of all other payments, contributions, or obligations from all other public and private parties have been made available under the terms and in full compliance with the agreement.
Reappropriation Appropriation
St Bldg Constr Acct 9,417,000
Prior Biennia Future Biennia Total
9,417,000
NEW SECTION. Sec. 902. FOR THE ARTS COMMISSION‑-ART WORK ALLOWANCE. Up to one-half of one percent of moneys appropriated in this act shall be spent as provided in RCW 28A.58.055, 28B.10.027, and 43.17.200.
NEW SECTION. Sec. 903. To carry out effectively the provisions of this act, the governor may assign responsibility for planning, engineering, construction, and other related activities to any appropriate agency.
NEW SECTION. Sec. 904. Reappropriations shall be limited to the unexpended balances remaining June 30, 1989, in the current appropriation for each project.
NEW SECTION. Sec. 905. In order to provide for consistent and comparable asbestos survey data, and to insure that the chain of evidence requirements for asbestos samples and survey data are met in regard to pending asbestos manufacturer litigation:
(1) No state agency shall expend new funds appropriated in the 1989-91 biennium for asbestos surveys prior to approval by the department of general administration of the agency's asbestos survey policies and procedures. At the completion of each survey, state agencies shall submit the findings to the department in a format to be determined by the department.
(2) The department of general administration shall distribute to all state agencies chain of evidence requirements, as developed by the department and the office of the attorney general. State agencies expending appropriated funds for asbestos survey and abatement projects shall make every effort to conform with chain of evidence requirements.
NEW SECTION. Sec. 906. As part of the annual six year update to the state facilities and capital plan, agencies shall provide lease development projects to the office of financial management.
NEW SECTION. Sec. 907. If any federal moneys appropriated by this act for capital projects are not received by the state, the department or agency to which the moneys were appropriated may replace the federal moneys with any moneys available from private or local sources. No replacement may occur under this section without the prior approval of the director of financial management in consultation with the committees on ways and means of the senate and house of representatives.
NEW SECTION. Sec. 908. Notwithstanding any other provisions of law, for the 1989-91 biennium, state treasurer transfers of reimbursement to the general fund from the community college capital projects account for debt service payments made under the provisions of Title 28B RCW shall occur only after such debt service payment has been made and only to the extent that funds are actually available in the account. Any unpaid reimbursements shall be a continuing obligation against the community college capital projects account until paid. The state board for community college education need not accumulate any specific balance in the community college capital projects account in anticipation of transfers to reimburse the general fund.
NEW SECTION. Sec. 909. (1) By December 15, 1989, the office of financial management shall coordinate the efforts of the department of natural resources, the department of social and health services, and the department of general administration to inventory and record all lands and other capital assets ever acquired or dedicated for the care of blind or deaf or otherwise disabled youth, for juvenile offenders, and for persons who are mentally ill or developmentally disabled.
(2) The office of financial management shall contract with an independent consultant to identify strategies for the more aggressive management of these lands and facilities to maximize the funds acquired through the use of these lands.
(3) On July 1, 1990, there is created in the state treasury an account to be known as the disabilities trust principal account. The corpus of the disabilities trust principal account shall be the lands or property acquired by grant, purchase, or donation for the care of persons who are juvenile offenders, mentally ill, or developmentally disabled. Proceeds received from the sale of such lands shall be retained in the account. The corpus of this account shall not be depleted. Surplus cash available in this account is to be invested in the same manner as the common school permanent fund.
(4) The disabilities trust principal account shall be managed as aggressively as possible to preserve the asset base, to provide housing for the developmentally disabled and mentally ill populations, and to maximize income to purchase facilities or residential support.
(5) There is also created in the state treasury an account to be known as the disabilities trust income account. Revenues received from the investment, rental, or lease of trust assets of the disabilities trust principal account are to be transferred to the disabilities trust income account for the purpose of providing housing and residential support for juvenile offenders, the developmentally disabled, and mentally ill.
(6) The disabilities trust income account shall be administered according to chapter 43.185 RCW.
(7) No land or other capital assets described in this section may be sold, given, traded, or encumbered for any period of time beyond June 30, 1991, unless such sale, gift, trade, or encumbrance is specifically authorized by the legislature: PROVIDED, That trust lands acquired by grant at statehood for charitable, educational, penal, and reformatory institutions may be managed for the production of income and preservation or enhancement of asset value, including exchanges where at least equal value is secured to the trust.
NEW SECTION. Sec. 910. Any capital improvements or capital project involving construction or major expansion of a state office facility, including district headquarters, detachment offices, and off-campus faculty offices, shall be reviewed by the department of general administration for possible consolidation and compliance with state office standards prior to allotment of funds. The intent of the requirement imposed by this section is to eliminate duplication and reduce total office space requirements where feasible, while ensuring proper service to the public.
NEW SECTION. Sec. 911. The governor, through the director of financial management, may authorize a transfer of appropriation authority provided for a capital project which is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient. No such transfer shall be used to expand the capacity of any facility beyond that intended by the legislature in making the appropriation. Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects which are funded from the same fund or account.
For the purposes of this section, the governor may find that an amount is in excess of the amount required for the completion of a project only if (1) the project as defined in the notes to the budget document is substantially complete and there are funds remaining or (2) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated herein.
For the purposes of this section, the legislature intends that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.
A report of any transfer effected under this section shall be filed with the legislative auditor by the director of financial management within thirty days of the date the transfer is effected. The legislative auditor shall review and compile these filings and periodically report thereon to the legislative budget committee and the appropriate standing committees of the senate and house of representatives.
NEW SECTION. Sec. 912. State agencies, departments, and institutions moving into new or existing office space or other facilities shall, if practical and feasible, make use of the agencies' existing furnishings and equipment and shall minimize purchases of new furnishings and equipment.
NEW SECTION. Sec. 913. State agencies, departments, and institutions receiving appropriations under this act for unanticipated or emergency repairs shall submit to the fiscal committees of the legislature by January 2, 1990, a description of each expenditure made from the appropriation during the prior eighteen months.
NEW SECTION. Sec. 914. To assure that major construction projects are carried out in accordance with legislative and executive intent, capital projects for renovation or additional space contained in this act that exceed two million five hundred thousand dollars and have not completed a program document prior to September 1, 1988, shall not expend funds for planning and construction until the office of financial management has reviewed the agency's programmatic document and approved the continuation of the project. The program document shall include but not be limited to projected workload, site conditions, user requirements, current space available, and an overall budget and cost estimate breakdown.
NEW SECTION. Sec. 915. The appropriations contained in this act are maximum expenditure authorizations. Pursuant to RCW 43.88.037, moneys disbursed from the treasury on the basis of a formalized loan agreement with another governmental entity shall be treated as a loan and are to be recorded as loans receivable and not as expenditures for accounting purposes. To the extent that moneys are disbursed on a loan basis, the corresponding appropriation shall be reduced by the amount of loan moneys disbursed from the treasury during the 1989-91 biennium.
NEW SECTION. Sec. 916. If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.
NEW SECTION. Sec. 917. This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and shall take effect immediately.