PDFRCW 47.56.120

Toll bridgesConstruction directedCosts.

In the event that any toll bridge should be constructed, all cost thereof including right-of-way, survey, and engineering shall be paid out of any funds available for payment of the cost of such toll bridge under this chapter.
[ 2008 c 122 s 13; 1977 ex.s. c 151 s 70; 1961 c 13 s 47.56.120. Prior: 1937 c 173 s 4; RRS s 6524-4.]