PDF
RCW
57.22.030
Scope of reimbursement.
The reimbursement shall be a pro rata share of construction and contract administration costs of the project. Reimbursement for projects shall include, but not be limited to, design, engineering, installation, and restoration.
[
1996 c 230 s 803
;
1989 c 389 s 13
.]
NOTES:
Part headings not law
—
Effective date
—
1996 c 230:
See notes following RCW
57.02.001
.