PDFRCW 70A.345.060

Remedial actionsRelease or threatened release of hazardous substance. (Expires July 1, 2030.)

(1) The agency may conduct remedial actions and investigate or clean up a release or threatened release of a hazardous substance at or affecting an underground storage tank facility if the following conditions are met:
(a) The owner or operator received a loan or grant for the underground storage tank facility under the revolving program created in this chapter for two million dollars or less;
(b) The remedial actions are conducted in accordance with the rules adopted under chapter 70A.305 RCW;
(c) The owner of real property subject to the remedial actions provides consent for the agency to:
(i) Recover the remedial action costs from the owner; and
(ii) Enter upon the real property to conduct remedial actions limited to those authorized by the owner or operator. Remedial actions must be focused on maintaining the economic vitality of the property. The agency or the agency's authorized representatives shall give reasonable notice before entering property unless an emergency prevents the notice; and
(d) The owner of the underground storage tank facility consents to the agency filing a lien on the underground storage tank facility to recover the agency's remedial action costs.
(2) The agency may conduct the remedial actions authorized under subsection (1) of this section using the moneys in the pollution liability insurance agency underground storage tank revolving account, as required under RCW 70A.345.050. However, for any remedial action where the owner or operator has received a loan or grant, the agency may not expend more than the difference between the amount loaned or granted and two million dollars.
[ 2020 c 310 s 8; 2020 c 20 s 1439; 2016 c 161 s 6. Formerly RCW 70.340.060.]

NOTES:

Reviser's note: This section was amended by 2020 c 20 s 1439 and by 2020 c 310 s 8, each without reference to the other. Both amendments are incorporated in the publication of this section under RCW 1.12.025(2). For rule of construction, see RCW 1.12.025(1).
Effective date2016 c 161 ss 1-13: See note following RCW 70A.345.010.