PDFRCW 79A.60.550

Development by department of ecology of design, installation, and operation of sewage pumpout and dump unitsRules.

The department of ecology, in consultation with the commission, shall, for initiation of the statewide program only, develop criteria for the design, installation, and operation of sewage pumpout and dump units, taking into consideration the ease of access to the unit by the boating public. The department of ecology may adopt rules to administer the provisions of this section.
[ 1993 c 244 s 34; 1989 c 393 s 6. Formerly RCW 88.12.335, 88.12.410, and 88.36.060.]

NOTES:

Intent1993 c 244: See note following RCW 79A.60.010.