702.7 Materials and methods. New work shall comply with the materials and methods requirements in the International Building Code, Washington State Energy Code, International Mechanical Code, and Uniform Plumbing Code, as applicable, that specify material standards, detail of installation and connection, joints, penetrations, and continuity of any element, component, or system in the building.
[Statutory Authority: RCW
19.27.031,
19.27.074, and
19.27.540. WSR 23-02-073, 23-12-103, and 23-20-023, § 51-50-480702, filed 1/4/23, 6/7/23, and 9/25/23, effective 3/15/24. Statutory Authority: RCW
19.27.031 and
19.27.074. WSR 20-21-021, § 51-50-480702, filed 10/9/20, effective 11/9/20.]