Your application for an ASR project must contain, at a minimum:
(1) A description (conceptual model) of the hydrogeologic system (see WAC
173-157-120) prepared by a hydrogeologist licensed in the state of Washington.
(2) A project operation plan (see WAC
173-157-130) with a description of the pilot and operational phases of the ASR project prepared by an engineer or geologist licensed in the state of Washington.
(3) A description of the legal framework (see WAC
173-157-140) for the proposed project.
(4) An environmental assessment and analysis (see WAC
173-157-150) of any potential adverse conditions or potential impacts to the surrounding ecosystem(s) that might result from the project, along with a plan to mitigate such conditions or impacts.
The environmental assessment will establish whether a determination of nonsignificance or an environmental impact statement is required per SEPA regulations.
(5) A project mitigation plan (see WAC
173-157-160), if required.
[Statutory Authority: RCW
90.03.370 (2)(b) and
90.44.460. WSR 03-03-081 (Order 02-06), § 173-157-110, filed 1/15/03, effective 2/15/03.]