PDFWAC 173-204-412

Marine finfish rearing facilities.

(1) Purpose. This section sets forth the applicability of this chapter to marine finfish rearing facilities only. This section also identifies marine finfish rearing facility siting, operation, closure and monitoring requirements to meet the intent of this chapter, as applicable.
(2) Applicability. Marine finfish rearing facilities and their associated discharges are not subject to the authority and purpose standards of WAC 173-204-100 (3) and (7), and the marine sediment quality standards of WAC 173-204-320 and the sediment impact zone maximum criteria of WAC 173-204-420, within and including the distance of one hundred feet from the outer edge of the marine finfish rearing facility structure. Marine finfish rearing facilities are not subject to the sediment impact zone standards of WAC 173-204-415.
(3) Sediment monitoring. Sediment quality compliance and monitoring requirements for marine finfish rearing facilities shall be addressed through National Pollutant Discharge Elimination System or other permits issued by the department for facility operation. Marine finfish rearing facilities shall meet the following sediment quality monitoring requirements:
(a) Any person with a new facility shall identify a baseline sediment quality prior to facility operation for benthic infaunal abundance, total organic carbon and grain size in the location of the proposed operation and downcurrent areas that may be potentially impacted by the facility discharge;
(b) Any person with an existing operating facility shall monitor sediment quality for total organic carbon levels and identify the location of any sediments in the area of the facility statistically different (t test, p ≤ 0.05) from the total organic carbon levels identified as facility baseline levels or statistically different from the applicable total organic carbon levels as identified in Table 1:
TABLE 1 - Puget Sound Reference Total Organic Carbon Values
Silt-Clay Particles
(percent Dry Weight)
Total Organic Carbon
(percent Dry Weight)
0-20
0.5
20-50
1.7
50-80
3.2
80-100
2.6
(c) The locations and frequency of monitoring for total organic carbon, benthic infaunal abundance and other parameters shall be determined by the department and identified in the applicable National Pollutant Discharge Elimination System permit;
(d) Antibacterials. Reserved: The department shall determine on a case-by-case basis the methods, procedure, locations, and frequency for monitoring antibacterials associated with the discharge from a marine finfish rearing facility;
(e) Closure. All permitted marine finfish rearing facilities shall monitor sediments impacted during facility operation to document recovery of sediment quality to background levels. The department shall determine on a case-by-case basis the methods, procedure, locations, and frequency for monitoring sediments after facility closure.
(4) Sediment impact zones. Marine finfish rearing facilities and their associated discharges that are permitted under a National Pollutant Discharge Elimination System permit are hereby provided a sediment impact zone by rule for any sediment quality impacts and biological effects within and including the distance of one hundred feet from the outer edge of the marine finfish rearing facility structure.
(a) The department may authorize an individual marine finfish rearing facility sediment impact zone for any sediments beyond a distance of one hundred feet from the facility perimeter via National Pollutant Discharge Elimination System permits or administrative actions. The authorized sediment impact zone shall meet the benthic infaunal abundance requirements of the sediment impact zone maximum criteria, WAC 173-204-420 (3)(c)(iii). Marine finfish rearing facilities that exceed the sediment quality conditions of subsection (3)(b) of this section beyond a distance of one hundred feet from the facility perimeter shall:
(i) Begin an enhanced sediment quality monitoring program to include benthic infaunal abundance consistent with the requirements of the National Pollutant Discharge Elimination System permit. The sediment quality monitoring program shall include a benthic infaunal abundance reference sediment sample as required in subsection (3)(a) of this section or a benthic infaunal abundance reference sediment sample in compliance with WAC 173-204-200(22); and
(ii) Be consistent with the sediment source control general considerations of WAC 173-204-400 and the sediment quality goal and sediment impact zone applicability requirements of WAC 173-204-410, apply for a sediment impact zone as determined necessary by the department.
(b) Administrative orders or permits establishing sediment impact zones for marine finfish rearing facilities shall describe establishment, maintenance, and closure requirements as determined necessary by the department.
[Statutory Authority: Chapters 70.105D and 90.48 RCW. WSR 13-06-014 (Order 08-07), § 173-204-412, filed 2/25/13, effective 9/1/13. Statutory Authority: RCW 90.48.220. WSR 96-02-058, § 173-204-412, filed 12/29/95, effective 1/29/96.]