(1) Applicability. The standards of WAC
173-304-405 through
173-304-490 are the solid waste handling facility standards and apply to all solid waste handling facilities, except for:
(a) Waste recycling facilities, whose standards are spelled out in WAC
173-304-300;
(b) On-site containerized storage, collection and transportation facilities which are spelled out in WAC
173-304-200;
(c) Single family residences and single family farms whose year round occupants engage in solid waste handling of the single family's solid waste on-site;
(e) Solid waste handling facilities that have engaged in closure and closed before the effective date of this regulation; and
(f) Domestic wastewater facilities and industrial wastewater facilities otherwise regulated by federal, state, or local water pollution permits except for any portion that utilizes or engages in landspreading disposal sludges or solid residues directly on the land.
(3) Effective dates.
(a) All existing facilities not in conformance with the following sections of the facility standards shall be placed upon compliance schedules under WAC
173-304-600 (1)(c) to assure full compliance within eighteen months of the effective date of this regulation for:
(ii) The transfer stations, baling and compaction standards, WAC
173-304-410;
(iii) Groundwater monitoring required in WAC
173-304-490;
(iv) The landfill operating and maintenance standards, WAC
173-304-460(4);
(vi) The landspreading disposal standards of WAC
173-304-450(5).
(b) All applicable solid waste facilities shall be in compliance with the general closure and post-closure standards of WAC
173-304-407 and the financial assurance standards of WAC
173-304-467 and
173-304-468 by twelve months after the effective date of WAC
173-304-407,
173-304-467, and
173-304-468, except for owners or operators of existing facilities that have a closure plan approved by the jurisdictional health department in a solid waste permit issued before the effective date of these amendments and are closing before November 27, 1989. Existing solid waste facilities shall be placed upon compliance schedules under WAC
173-304-600 (1)(c) to assure compliance by the effective date of this subsection.
(c) All existing solid waste facilities not in conformance with facility standards other than those in (a) and (b) of this subsection shall be placed upon compliance schedules under WAC
173-304-600 (1)(c) to assure full compliance within four years of the effective date of this regulation.
(d) All new and expanded facilities other than those in (b) of this subsection shall meet the facility standards of WAC
173-304-405 to
173-304-490 after the effective date of this regulation.
[Statutory Authority: RCW
70.95.215. WSR 88-20-066 (Order 88-28), § 173-304-400, filed 10/4/88. Statutory Authority: Chapter
43.21A RCW. WSR 85-22-013 (Order 85-18), § 173-304-400, filed 10/28/85.]