(1) General. Each permit shall contain emission limitations and standards, including those operational requirements and limitations that assure compliance with all applicable requirements at the time of permit issuance.
(2) Alternative emission limits. If the Washington state implementation plan allows a determination of an alternative emission limit at a chapter 401 source, equivalent to that contained in the plan, to be made in the permit issuance, renewal, or significant modification process, the permitting authority may elect to use such process. Any permit containing such equivalency determination shall contain provisions to ensure that any resulting emissions limit has been demonstrated to be quantifiable, accountable, enforceable, and based on replicable procedures.
(3) Reasonably available control technology (RACT). Emission standards and other requirements contained in rules or regulatory orders in effect at the time of operating permit issuance or renewal shall be considered RACT for purposes of permit issuance or renewal. RACT determinations under section 8, chapter 252, Laws of 1993, shall be incorporated into an operating permit as provided in WAC
173-401-730.
[Statutory Authority: Chapter
70.94 RCW. WSR 93-20-075 (Order 91-68), § 173-401-605, filed 10/4/93, effective 11/4/93.]