(1) Up to fifty percent of total potential credits for the bank, or for the phase of the bank that has been constructed, may be released when the department, in consultation with signatories, determines that the hydrologic performance standard(s), at a minimum, has been attained.
(2) The department may require that additional performance standards be met prior to releasing up to fifty percent of the total potential credits.
[Statutory Authority: Chapter
90.84 RCW. WSR 09-19-013 (Order 04-13), § 173-700-333, filed 9/3/09, effective 10/4/09.]