Failure by any registrant to comply with the provisions of the Survey Recording Act, chapter
58.09 RCW and the survey standards, chapter
332-130 WAC shall be considered misconduct or malpractice as defined by RCW
18.43.105(10).
The following standards shall also apply:
(1) The monumentation, posting, and/or the marking of a boundary line between two existing corner monuments constitutes the "practice of land surveying" as defined in chapter
18.43 RCW and chapter
196-16 WAC, and consequently requires said work to be performed under the direct supervision of a registered professional land surveyor.
(2) The field survey work performed to accomplish the monumentation, posting, and marking of a boundary line between two existing corner monuments shall meet the minimum standards imposed by chapter
332-130 WAC.
(3) The monumentation, posting, and/or marking of a boundary line between two existing corner monuments involves a determination of the accuracy and validity of the existing monuments by the use of standard survey methods and professional judgment.
(4) The monumentation, posting, and marking of a boundary line between two existing corner monuments shall require the filing of a record of survey according to chapter
58.09 RCW unless both corners satisfy one or both of the following requirements:
(a) The corner(s) are shown as being established on a properly recorded or filed survey according to chapter
58.09 RCW and are accurately and correctly shown thereon.
(b) The corner(s) are described correctly, accurately, and properly on a land corner record according to chapter
58.09 RCW if their establishment was by a method not requiring the filing of a record of survey.
[Statutory Authority: RCW
18.43.035. WSR 17-01-137, § 196-29-110, filed 12/20/16, effective 1/20/17; WSR 06-22-038, § 196-29-110, filed 10/25/06, effective 11/25/06. Formerly WAC 196-24-110.]