(1) An SEIS shall be prepared in the same way as a draft and final EIS (WAC
197-11-400 to
197-11-600), except that scoping is optional. The SEIS should not include analysis of actions, alternatives, or impacts that is in the previously prepared EIS.
(2) The fact sheet and cover letter or memo for the SEIS shall indicate the EIS that is being supplemented.
(3) Unless the SEPA lead agency wants to prepare the SEIS, an agency with jurisdiction which needs the SEIS for its action shall be responsible for SEIS preparation.
[Statutory Authority: RCW
43.21C.110. WSR 84-05-020 (Order DE 83-39), § 197-11-620, filed 2/10/84, effective 4/4/84.]