Note: | The lift begins immediately following the end of the prelift required by subsection (10)(c) of this section. Thus, the weight may be determined during the prelift using a load indicating device meeting WAC 296-56-60085 (1)(a) on the crane being used to the lift the VTL. |
(d) The lift must be performed using either a shore-based container gantry crane or another type of crane that:
(i) Has the precision control necessary to restrain unintended rotation of the containers about any axis;
(ii) Is capable of handling the load volume and wind sail potential of VTLs; and
(iii) Is specifically designed to handle containers.
(e) You must ensure that the crane operator pauses the lift when the vertically coupled containers have just been lifted above the supporting surface to assure that each interbox connector is properly engaged.
(f) Containers below deck may not be handled as a VTL.
(g) VTL operations may not be conducted when the wind speed exceeds the lesser of:
(i) Fifty-five km/h (thirty-four mph or thirty knots); or
(ii) The crane manufacturer's recommendation for maximum wind speed.
(h) You must ensure that each interbox connector used in a VTL operation:
(i) Automatically locks into corner castings on containers but only unlocks manually (manual twistlocks or latchlocks are not permitted);
(ii) Is designed to indicate whether it is locked or unlocked when fitted into a corner casting;
(iii) Locks and releases in an identical direction and manner as all other interbox connectors in the VTL;
(iv) Has been tested and certificated by a competent authority of this chapter (for interbox connectors that are a part of a vessel's gear) or WAC
296-56-60093 (for other interbox connectors):
(A) As having a load-bearing surface area of eight hundred mm\two\ when connected to a corner casting with an opening that is sixty-five mm wide; and
(B) As having a safe working load of ninety-eight kN (ten thousand kg) with a safety factor of five when the load is applied by means of two corner castings with openings that are sixty-five mm wide or equivalent devices;
(v) Has a certificate that is available for inspection and that attests that the interbox connector meets the strength criteria given in(h)(iv) of this subsection; and
(vi) Is clearly and durably marked with its safe working load for lifting and an identifying number or mark that will enable it to be associated with its test certificate.
(i) Reserved.
(j) You must ensure that each container and interbox connector used in a VTL and each corner casting to which a connector will be coupled is inspected immediately before use in the VTL.
(i) Each employee performing the inspection must be capable of detecting defects or weaknesses and be able to assess their importance in relation to the safety of VTL operations.
(ii) The inspection of each interbox connector must include: A visual examination for obvious structural defects, such as cracks, a check of its physical operation to determine that the lock is fully functional with adequate spring tension on each head; and a check for excessive corrosion and deterioration.
(iii) The inspection of each container and each of its corner castings must include: A visual examination for obvious structural defects, such as cracks, a check for excessive corrosion and deterioration; and a visual examination to ensure that the opening to which an interbox connector will be connected has not been enlarged, that the welds are in good condition, and that it is free from ice, mud, or other debris.
(iv) You must establish a system to ensure that each defective or damaged interbox connector is removed from service.
(v) An interbox connector that has been found to be defective or damaged must be removed from service and may not be used in VTL operations until repaired.
(vi) A container with a corner casting that exhibits any of the problems listed in (j)(iii) of this subsection may not be lifted in a VTL.
(k) No platform container may be lifted as part of a VTL unit.
(11) You must meet the following requirements for transporting vertically coupled containers:
(a) Equipment other than cranes used to transport vertically connected containers must be either specifically designed for this application or evaluated by a qualified engineer and determined to be capable of operating safely in this mode of operation.
(b) You must develop, implement, and maintain a written plan for transporting vertically connected containers. The written plan must establish procedures to ensure safe operating and turning speeds and must address all conditions in the terminal that could affect the safety of VTL-related operations, including communication and coordination among all employees involved in these operations.
(12) You must establish a safe work zone within which employees may not be present when vertically connected containers are in motion.
(a) The safe work zone must be sufficient to protect employees in the event that a container drops or overturns.
(b) The written transport plan required by subsection (11)(b) of this section must include the safe work zone and procedures to ensure that employees are not in this zone when a VTL is in motion.
[Statutory Authority: RCW
49.17.010,
49.17.040,
49.17.050, and
49.17.060. WSR 18-03-159, § 296-56-60103, filed 1/23/18, effective 2/23/18; WSR 15-24-102, § 296-56-60103, filed 12/1/15, effective 1/5/16; WSR 09-15-144, § 296-56-60103, filed 7/21/09, effective 9/1/09. Statutory Authority: RCW
49.17.010, [49.17].040, and [49.17].050. WSR 00-21-103, § 296-56-60103, filed 10/18/00, effective 2/1/01. Statutory Authority: RCW
49.17.040. WSR 99-02-024, § 296-56-60103, filed 12/30/98, effective 3/30/99. Statutory Authority: Chapter
49.17 RCW and RCW
49.17.040, [49.17].050 and [49.17].060. WSR 92-22-067 (Order 92-06), § 296-56-60103, filed 10/30/92, effective 12/8/92. Statutory Authority: Chapter
49.17 RCW. WSR 89-11-035 (Order 89-03), § 296-56-60103, filed 5/15/89, effective 6/30/89. Statutory Authority: RCW
49.17.040 and
49.17.050. WSR 86-03-064 (Order 86-02), § 296-56-60103, filed 1/17/86; WSR 85-01-022 (Order 84-24), § 296-56-60103, filed 12/11/84.]