All electrical wiring, installations, and equipment in a hoistway, machine room or machinery space shall conform to the National Electrical Code in effect at the time of installation or major alteration.
[Statutory Authority: Chapter
70.87 RCW. WSR 18-18-070, § 296-96-05220, filed 8/31/18, effective 10/1/18. Statutory Authority: RCW
70.87.020,
70.87.030,
70.87.034,
70.87.120,
70.87.185 and chapter
70.87 RCW. WSR 01-02-026, § 296-96-05220, filed 12/22/00, effective 1/22/01.]