(1) You must have your design plan approved by:
(a) A design approval primary inspection agency (DAPIA), if they approved the initial design plan; or
(b) A professional engineer or architect who is licensed in Washington state.
(2) You must submit two copies of your alteration design plan with the appropriate fee to us for review and approval. (See WAC
296-150M-3000.)
[Statutory Authority: RCW
43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, § 296-150M-0370, filed 10/23/96, effective 11/25/96.]