(1) Your design plan will be approved if it meets the requirements of this chapter.
(2) We will send you an approved copy of the design plan with the design-plan approval number.
(3) You must keep copies of the approved design plan available for inspection at each location where the conversion vendor unit or medical unit is built.
(4) If your design plan is not approved, you will be notified in writing of plan deficiencies. You may send a corrected design plan to us along with the resubmittal fee listed in WAC
296-150V-3000.
[Statutory Authority: Chapter
43.22 RCW. WSR 99-18-069, § 296-150V-0380, filed 8/31/99, effective 10/1/99.]