PDFWAC 296-155-52901

Certification and proof load testing—Requirement.

Effective January 1, 2010, all cranes and derricks covered in WAC 296-155-52900 and not exempt in subsection (3) of that section, must be certified and proof load tested annually by an accredited crane certifier recognized by the department.
Note:
For additional inspection criteria and proof load testing requirements for specific types of cranes, see:
 
• WAC 296-155-53202 for mobile cranes.
 
• WAC 296-155-53204 for articulating boom cranes.
 
• WAC 296-155-53206 for tower cranes.
 
• WAC 296-155-53208 for self-erecting tower cranes.
 
• WAC 296-155-53210 for overhead and bridge cranes.
 
• WAC 296-155-53212 for derricks.
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060, and chapter 49.17 RCW. WSR 10-14-100, § 296-155-52901, filed 7/6/10, effective 9/1/10.]