Safe Working LoadSWL | Proof Load |
Up to 20 tons | 25 % in excess |
20-50 tons | 5 tons in excess |
Over 50 tons | 10 % in excess |
(c) Hoist the test load a few inches and hold to verify that the load is supported by the derrick and held by the hoist brake(s).
(d) Swing the derrick, if applicable, the full range of its swing, at the maximum allowable working radius for the test load.
(e) Boom the derrick up and down within the allowable working radius for the test load.
(f) Lower the test load, stop and hold the load with the brake(s).
(g) After satisfactory completion of a proof load test, the derrick and all component parts thereof must be carefully examined in all applicable requirements in this section.
(h) This test must be documented on the form or in the format approved by the department. A copy of this completed form and inspection worksheets must be sent to the department within 10 working days upon completion of the examination.
[Statutory Authority: RCW
49.17.010,
49.17.040,
49.17.050,
49.17.060. WSR 16-09-085, § 296-155-53212, filed 4/19/16, effective 5/20/16. Statutory Authority: RCW
49.17.010,
49.17.040,
49.17.050,
49.17.440,
49.17.060, and 29 C.F.R. 1926, Subpart CC. WSR 12-01-086, § 296-155-53212, filed 12/20/11, effective 2/1/12. Statutory Authority: RCW
49.17.010,
49.17.040,
49.17.050,
49.17.060,
49.17.400,
49.17.410,
49.17.420,
49.17.430, and
49.17.440. WSR 08-22-080, § 296-155-53212, filed 11/4/08, effective 1/1/10.]