(1) All gear and equipment provided by you for rigging and materials handling must be inspected before each shift and, when necessary, at intervals during its use to ensure that is safe. Defective gear must be removed and repaired or replaced before further use.
[Statutory Authority: RCW
49.17.010,
49.17.040,
49.17.050, and
49.17.060. WSR 17-18-075, § 296-304-07001, filed 9/5/17, effective 10/6/17; Order 74-25, § 296-304-07001, filed 5/7/74.]